W912QR22R0060_Plans-0007.pdf
PDF 1 MB Posted
- Attached to
- WPAFB B620 Tower Reno
- Solicitation number
- W912QR22R0060
About this file
This solicitation seeks proposals for the Add/Alter B620 Tower Renovation project at Wright-Patterson Air Force Base in Ohio. The project involves renovating floors and common areas, installing new finishes and equipment, and upgrading building systems. The estimated construction cost is between $5 million and $10 million. The solicitation is a full and open competition under NAICS code 236220 with a size standard of $39.5 million. Proposals are due in accordance with FAR Clause 52.236-27 Alt I. The point of contact for inquiries is the listed contracting specialist.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPUP
A-202
A-301
STAIR
CV-22
ELEVATOR
DB-20
MECHANICAL
SHAFT
CCV-19
TOILET
2DB-24
ELECTRIC
CLOSET
2CW-20
CORRIDOR
2CY-18
PASSAGE
2CY-24
2CY-18
2CY-24
2CZ-19
3' - 4"
CORRIDOR
2-6
3' - 4"
B
B
A-201
A-202
2CW-20
046046
A-401
196196
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:4
P
M
A-103
N E
W W
O R
K P
A R
T
IA
L P
L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
0 2' 4' 8' 1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 2
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN
THIS AREA.
104 NEW ELEVATOR LOBBY DOORS.
105 NEW ELEVATOR LOBBY CALL STATION.
106 NEW ELEVATOR HALL POSITION INDICATOR.
107 NEW FLOOR INDICATOR ON BOTH JAMBS.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT
42" ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
153 NEW SHOTCRETE WALL (SEE STRUCTURAL).
162 INSTALL (2) LAYERS OF 5/8" TYPE X GYPSUM BOARD ON WALL UP
TO UNDERSIDE OF DECK. TAPE AND FINISH. REFER TO FINISH
SCHEDULE FOR MORE INFORMATION.
163 INSTALL SALVAGED MARKER BOARD.
183 INSTALL SOLID SURFACE CAP ABOVE NEW WALL INSTALLATION
WITH 1" OVERHANG. FIELD MEASURE AND PREPARE AS
NECESSARY.
196 WALL FINISH ALIGNS AS INDICATED.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
UP
A-201
A-202
A-201
A-202
LAB
8DA-20
TOILET
8DA-22
ELECTRIC
CLOSET
8CW-20
MECHANICAL
SHAFT
8CV-19
CORRIDOR
8CW-21
ELEVATOR
DB-20
STAIR
CV-22
A-301
47' - 7"
"CLOSET
8CU-26
BALCONY
8CT-18
BALCONY
8DD-26
A-302
A-303
A-511
8DD-26
8CT-18
8CV-22
8CU-26
8CW-21 8DA-22
56' - 8"
4' - 6 1/2" 4' - 6 1/2"
A-611
A-611
A-611
A B C
A B C
A-502
A-501
A-501 3 8
A-501
A-304
7' - 1 1/2"
/4
8CV-19
F
G
8CW-20
B
046046
A-401
DRAWINGS INCLUDE DESCRIPTION OF AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW THE
'BASE BID' NEW 9TH FLOOR LEVEL CONSTRUCTION. THE
CONTRACTOR SHALL SEPERATELY PLAN AND BID THE 'BASE
BID' AND 'ADD ALTERNATE' WORK SCOPE.
ADD ALTERNATE INCLUDES ALL WORK AT THIS FLOOR LEVEL
INCLUDING NEW DOOR 8CW-21, EXCEPT FOR SCOPE NOTED
INSIDE EXISTING STAIR TOWER AT THIS LEVEL. ALL WORK
INSIDE STAIR TOWER CV-22 INCLUDING SCOPE AT 8CV-22,
8CW-20, AND 8CV-19 SHALL BE INCLUDED IN THE "BASE BID".
NOTE: ' ' SPECIFICALLY INDICATES RAILING, WALL, AND DOOR
SCOPE TO BE INCLUDED IN BASE BID.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:5
P
M
A-107
N E
W W
O R
K F
L O
O R
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 8
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN THIS
AREA.
104 NEW ELEVATOR LOBBY DOORS.
105 NEW ELEVATOR LOBBY CALL STATION.
106 NEW ELEVATOR HALL POSITION INDICATOR.
107 NEW FLOOR INDICATOR ON BOTH JAMBS.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36" ABOVE
STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT 42"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
116 NEW BALCONY. SEE STRUCTURAL.
117 NEW STAINLESS STEEL RAILING. REFER TO DETAIL ON A-503.
118 FIREMAN'S GATE. REFER TO DETAIL ON A-503.
131 NEW STC 50 SLIDING WINDOWS. ARROW INDICATES DIRECTION OF
TRAVEL. ALL OTHERS ARE FIXED.
142 NEW 10 LB. ABC FIRE EXTINGUISHER. MOUNT 48" AFF TOP OF CABINET.
INSTALL SIGNAGE OVER CABINET.
202 NEW WALL-MOUNTED SIGN HERE TO READ 'LIVE LIMIT LOAD ON THIS
FLOOR 120 PSF'. FONT: HELVETICA MEDIUM (TACTILE RAISED
CHARACTERS TO BE CAPITAL LETTERS). CONFIRM TEXT WITH END USER
PRIOR TO FABRICATION. CONFIRM SIGN LOCATION WITH END USER
PRIOR TO INSTALLATION. BASIS OF DESIGN SIGNAGE TO BE: TAKEFORM,
FUSION. SIGN FINISHES TO BE PER MANUFACTURER'S STANDARD COLOR
OPTIONS.
206 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES OF NEW
EXTERIOR CONCRETE BALCONY SLAB. PREP CONCRETE SURFACE PER
COATING MANUFACTURERS REQUIREMENTS. REFER TO
SPECIFICATIONS.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
F. PROVIDE AND INSTALL WINDOW SHADES AT ALL NEW WINDOWS
(SLIDING AND FIXED) ON LEVEL 8 AND LEVEL 9. SEE SPECIFICATION
SECTION 12 24 13.
P L A
N N
O R
T H
BID ALTERNATE PROJECT SCOPE
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
A-202
A-201
A-202
1LAB
9DA-20
TOILET
9DA-22
ELECTRIC
CLOSET
9CW-20
CORRIDOR
9CW-21
MECHANICAL
SHAFT
9CV-19
ELEVATOR
DB-20
STAIR
CV-22
BALCONY
9DD-26
CLOSET
9CU-26
BALCONY
9CT-18
A-302
A-303
A-511
9DD-26
9CT-18
9CV-22
9CW-21
9DA-22
9CU-26
56' - 8"
9DA-20
B
G H I
D E F
D
G
E
H
F
I
A-501
G
A-502
A-501
A-501
A-304
4' - 6 1/2" 47' - 7" 4' - 6 1/2"
7' - 1 1/2"
9CV-19
9CW-20
046046
A-401
VIF
2' - 3"
V
IF
104 201
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:5
P
M
A-108
N E
W W
O R
K F
L O
O R
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 9
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN THIS
AREA.
104 NEW ELEVATOR LOBBY DOORS.
105 NEW ELEVATOR LOBBY CALL STATION.
106 NEW ELEVATOR HALL POSITION INDICATOR.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36" ABOVE
STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT 42"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
116 NEW BALCONY. SEE STRUCTURAL.
131 NEW STC 50 SLIDING WINDOWS. ARROW INDICATES DIRECTION OF
TRAVEL. ALL OTHERS ARE FIXED.
138 HID PROXIMITY CARD READER AND ELECTRIC STRIKE WITH 12V BACKUP
BATTERY STAND ALONE SYSTEM.
142 NEW 10 LB. ABC FIRE EXTINGUISHER. MOUNT 48" AFF TOP OF CABINET.
INSTALL SIGNAGE OVER CABINET.
149 STUD & GYP BOARD DUCT ENCLOSURE. HOLD TIGHT TO DUCT.
201 NEW FLOOR INDICATOR ON INTERIOR SIDE OF SECURITY DOORS.
202 NEW WALL-MOUNTED SIGN HERE TO READ 'LIVE LIMIT LOAD ON THIS
FLOOR 120 PSF'. FONT: HELVETICA MEDIUM (TACTILE RAISED
CHARACTERS TO BE CAPITAL LETTERS). CONFIRM TEXT WITH END USER
PRIOR TO FABRICATION. CONFIRM SIGN LOCATION WITH END USER PRIOR
TO INSTALLATION. BASIS OF DESIGN SIGNAGE TO BE: TAKEFORM, FUSION.
SIGN FINISHES TO BE PER MANUFACTURER'S STANDARD COLOR
OPTIONS.
206 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES OF NEW
EXTERIOR CONCRETE BALCONY SLAB. PREP CONCRETE SURFACE PER
COATING MANUFACTURERS REQUIREMENTS. REFER TO SPECIFICATIONS.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
F. PROVIDE AND INSTALL WINDOW SHADES AT ALL NEW WINDOWS
(SLIDING AND FIXED) ON LEVEL 8 AND LEVEL 9. SEE SPECIFICATION
SECTION 12 24 13.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
A-202
A-201
A-202
LAB
10DA-20
TOILET
10DA-22
ELECTRIC
CLOSET
10CW-20
CORRIDOR
10CW-21
MECHANICAL
SHAFT
10CV-19
ELEVATOR
DB-20
STAIR
CV-22
4' - 6" 47' - 8" 4' - 6"
BALCONY
10CT-18
BALCONY
10DD-26
A-302
A-303
108108
10CV-22
10CW-21
106 10DA-20
B
G
A-502
A-304
56' - 8"
10CY-24
10CY-19
10CV-19
10CW-20
046046
A-401
201206
207207
207207
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:5
P
M
A-109
N E
W W
O R
K F
L O
O R
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 10
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN THIS
AREA.
104 NEW ELEVATOR LOBBY DOORS.
106 NEW ELEVATOR HALL POSITION INDICATOR.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36" ABOVE
STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT 42"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
116 NEW BALCONY. SEE STRUCTURAL.
117 NEW STAINLESS STEEL RAILING. REFER TO DETAIL ON A-503.
136 EXISTING WINDOWS AND DOOR TO REMAIN
142 NEW 10 LB. ABC FIRE EXTINGUISHER. MOUNT 48" AFF TOP OF CABINET.
INSTALL SIGNAGE OVER CABINET.
146 ALL HOLES AND ABANDONED DUCT SPACES SHALL BE FIRESTOPPED TO
QUALIFY AS A 2-HOUR PARTITION. NEW ELECTRONIC DEVICES SHALL BE
SURFACE MOUNTED.
147 PATCH CONCRETE WHERE CURB WAS REMOVED AND MAKE SMOOTH
TRANSITION TO NEW BALCONY.
149 STUD & GYP BOARD DUCT ENCLOSURE. HOLD TIGHT TO DUCT.
201 NEW FLOOR INDICATOR ON INTERIOR SIDE OF SECURITY DOORS.
206 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES OF NEW
EXTERIOR CONCRETE BALCONY SLAB. PREP CONCRETE SURFACE PER
COATING MANUFACTURERS REQUIREMENTS. REFER TO SPECIFICATIONS.
207 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES OF
EXISTING EXTERIOR CONCRETE BALCONY SLAB. EXTEND COATING 12" UP
THE VERTICAL FACE OF EXTERIOR CONCRETE GUARD WALL. PREP
CONCRETE SURFACE PER COATING MANUFACTURERS REQUIREMENTS.
REFER TO SPECIFICATIONS.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
A-202
A-201
A-202
LAB
11DA-20
TOILET
11DA-22
ELECTRIC
CLOSET
11CW-20
CORRIDOR
11CW-21
MECHANICAL
SHAFT
11CV-19
ELEVATOR
DB-20
STAIR
CV-22
BALCONY
11CT-18
BALCONY
11DD-26
A-302
A-303
11CV-22
56' - 8"
4' - 6"4' - 6" 47' - 8"
18' - 0"
B
A-502
A-502
A-304
206 206
11CV-19
11CW-20
046046
A-401
207207
207207
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:0
P
M
A-110
N E
W W
O R
K F
L O
O R
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 11
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK
WITHIN THIS AREA.
104 NEW ELEVATOR LOBBY DOORS.
105 NEW ELEVATOR LOBBY CALL STATION.
106 NEW ELEVATOR HALL POSITION INDICATOR.
107 NEW FLOOR INDICATOR ON BOTH JAMBS.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC
AT 42" ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
116 NEW BALCONY. SEE STRUCTURAL.
117 NEW STAINLESS STEEL RAILING. REFER TO DETAIL ON A-503.
136 EXISTING WINDOWS AND DOOR TO REMAIN
142 NEW 10 LB. ABC FIRE EXTINGUISHER. MOUNT 48" AFF TOP OF
CABINET. INSTALL SIGNAGE OVER CABINET.
147 PATCH CONCRETE WHERE CURB WAS REMOVED AND MAKE
SMOOTH TRANSITION TO NEW BALCONY.
206 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES
OF NEW EXTERIOR CONCRETE BALCONY SLAB. PREP
CONCRETE SURFACE PER COATING MANUFACTURERS
REQUIREMENTS. REFER TO SPECIFICATIONS.
207 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES
OF EXISTING EXTERIOR CONCRETE BALCONY SLAB. EXTEND
COATING 12" UP THE VERTICAL FACE OF EXTERIOR CONCRETE
GUARD WALL. PREP CONCRETE SURFACE PER COATING
MANUFACTURERS REQUIREMENTS. REFER TO
SPECIFICATIONS.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
UPUP
A-202
LAB
12DA-20
TOILET
12DA-22
ELECTRIC
CLOSET
12CW-20
CORRIDOR
12CW-21
MECHANICAL
SHAFT
12CV-19 ELEVATOR
DB-20
STAIR
CV-22
A-301
BALCONY
12CT-18
BALCONY
12DD-26
A-302
A-303
115 115
115 116
108 108
109 107
12CV-22
18' - 0"
B
A-502
56' - 8"
4' - 6" 47' - 8" 4' - 6"
/3
/3
12CV-19
A-201
A-202
12CW-20
046046
A-401
207207
207207
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:0
P
M
A-111
N E
W W
O R
K F
L O
O R
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - LEVEL 12
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN
THIS AREA.
104 NEW ELEVATOR LOBBY DOORS.
105 NEW ELEVATOR LOBBY CALL STATION.
106 NEW ELEVATOR HALL POSITION INDICATOR.
107 NEW FLOOR INDICATOR ON BOTH JAMBS.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT
42" ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
116 NEW BALCONY. SEE STRUCTURAL.
117 NEW STAINLESS STEEL RAILING. REFER TO DETAIL ON A-503.
136 EXISTING WINDOWS AND DOOR TO REMAIN
142 NEW 10 LB. ABC FIRE EXTINGUISHER. MOUNT 48" AFF TOP OF
CABINET. INSTALL SIGNAGE OVER CABINET.
147 PATCH CONCRETE WHERE CURB WAS REMOVED AND MAKE
SMOOTH TRANSITION TO NEW BALCONY.
206 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES
OF NEW EXTERIOR CONCRETE BALCONY SLAB. PREP
CONCRETE SURFACE PER COATING MANUFACTURERS
REQUIREMENTS. REFER TO SPECIFICATIONS.
207 TRAFFIC COATING TO BE APPLIED TO ALL EXPOSED SURFACES
OF EXISTING EXTERIOR CONCRETE BALCONY SLAB. EXTEND
COATING 12" UP THE VERTICAL FACE OF EXTERIOR CONCRETE
GUARD WALL. PREP CONCRETE SURFACE PER COATING
MANUFACTURERS REQUIREMENTS. REFER TO SPECIFICATIONS.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
A-201
ROOF AREA
13DA-20
ELEVATOR ROOM
13DA-22
CORRIDOR
13CW-21
ELECTRIC
CLOSET
13CW-20
MECHANICAL
SHAFT
13CV-19
ELEVATOR
DB-20
STAIR
CV-22
A-301
A-302
A-303
DN
115115
13CV-22
B
13CV-19
A-202
A-202
13CW-20
046046
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:0
P
M
A-112
N E
W W
O R
K F
L O
O R
P L A
N
R O
O F
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
NEW WORK FLOOR PLAN - ROOF LEVEL 13
0 2' 4' 8'
GENERAL NOTES
ARCHITECTURAL KEYNOTES
046 REFER TO MEP DRAWINGS FOR DESCRIPTION OF WORK WITHIN
THIS AREA.
108 NEW STAINLESS STEEL HANDRAIL WITH WALL RETURNS AT 36"
ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
109 NEW STAINLESS STEEL GUARDRAIL WITH SPINDELS AT 4" OC AT
42" ABOVE STAIR NOSING. REFER TO STAIR DETAILS.
115 EXISTING DOOR TO REMAIN.
145 PATCH DAMAGED/DETERIORATED ROOF SURFACE AS MAY BE
REQUIRED. CONTRACTOR TO PROVIDE $5,000 ALLOWANCE FOR
REPAIRS TO EXISTING BASED ON CONDITION PRIOR TO
CONSTRUCTION ACTIVITIES. CONFIRM ACTUAL REPAIR
REQUIREMENTS PRIOR TO CONSTRUCTION.
A. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED
DURING CONSTRUCTION.
B. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705
STANDARDS.
C. REFER TO A-605 FOR INFORMATION RELATED TO FINISHES.
D. REFER TO A-601 FOR PARTITION TYPES.
E. PATCH AND REPAIR GYPSUM BOARD AROUND NEW ELEVATOR
DEVICES. PAINT PATCHED AREAS.
P L A
N N
O R
T H
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
LEVEL 8
1075'-0"
LEVEL 9
1086'-6"
LEVEL 10
1098'-0"
LEVEL 11
1109'-6"
LEVEL 12
1121'-0"
LEVEL 13/ROOF
1132'-6"
LEVEL 13 STAIR
1133'-8 1/2"
STAIR ROOF
1142'-8 1/2"
ELEVATOR PENTHOUSE
1149'-5"
ELEVATOR ROOF
1155'-0"
NEW BALCONY SLAB
1120'-4"
NEW BALCONY SLAB
1108'-10"
NEW BALCONY SLAB
1097'-4"
NEW BALCONY SLAB
1086'-5"
NEW BALCONY SLAB
1074'-11"
A-512
A-512
160 160
A-501
0 2' 4' 8' 12'
B
ID
A L T
E R
N A
T E
DRAWINGS INCLUDE DESCRIPTION OF AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW THE
'BASE BID' NEW 9TH FLOOR LEVEL CONSTRUCTION. THE
CONTRACTOR SHALL SEPARATELY PLAN AND BID THE 'BASE
BID' AND 'ADD ALTERNATE' WORK SCOPE.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:1
P
M
A-203
E N
L A
R G
E D
E A
S T
E L E
V A
T
IO
N
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
3/16" = 1'-0"1
ENALRGED EAST ELEVATION
EXTERIOR MATERIALS
SCHEDULE
INSULATED METAL WALL PANEL
BASIS OF DESIGN
CENTRIA FORMAWALL
COLOR: 133 SANDSTONE
ALUMINUM WINDOW FRAME
COLOR: DARK BRONZE
WINDOW GLAZING
ALUMINUM SOFFIT PANEL
BASIS OF DESIGN
CENTRIA 1W-10 PERFORATED PANEL
COLOR: 133 SANDSTONE
EXTERIOR HOLLOW METAL DOORS
PAINT: P-2
EXPOSED CONCRETE
ELASTOMETRIC COATING ON VERTICAL SURFACES TO MATCH
EXISTING CONCRETE AS REQUIRED
TRAFFIC COATING OVER NEW HORIZONTAL CONCRETE WALKWAY
ARCHITECTURAL KEYNOTES
155 NEW STAINLESS STEEL RAILING.
156 NEW METAL PANEL BEAM COVER.
157 EXISTING CONCRETE.
158 NEW INSULATED METAL PANEL.
160 METAL PANEL JOINT.
167 PRE-FINISHED SOFFIT PANEL BOTTOM OF ASSEMBLY.
168 ALUMINUM FRAMED WINDOWS.
169 ALUMINUM SOFFIT PANEL BOTTOM OF ASSEMBLY.
BID ALTERNATE PROJECT SCOPE
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
LEVEL 8
1075'-0"
1" 6 3/4"
1"
4' - 11"
TO FACE OF SHAFT
5' - 0"
TO FACE OF SHAFT
FACE OF
CONCRETE
BALCONY
ABOVE
3' - 10"
TO FACE
OF SHAFT
8 13/16"
1" 4' - 6"
TO FACE OF SHAFT
LEVEL 9
1086'-6"
6 3/4"
1 1/4"
10 5/8"
5" 4' - 6"
TO FACE OF SHAFT
612 2 LAYERS
612 2 LAYERS
619619
EXISTING CONCRETE
BALCONY
1"
3" 3 3/4"
619 619
2 LAYERS
633 1' - 0"
LEVEL 10
1098'-0"
1"
1" 4"
6 3/4"
4' - 6"
TO FACE OF SHAFT
619 621
/4
/2
/4
/4
2 LAYERS
612 2 LAYERS
619619619
2 LAYERS
4' - 6"
TO FACE OF SHAFT
612 2 LAYERS
F
DRAWINGS INCLUDE DESCRIPTION OF AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW THE
'BASE BID' NEW 9TH FLOOR LEVEL CONSTRUCTION. THE
CONTRACTOR SHALL SEPARATELY PLAN AND BID THE 'BASE
BID' AND 'ADD ALTERNATE' WORK SCOPE.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:1
P
M
A-501
W A
L L S
E C
T
IO
N A
N D
D E
T A
IL
S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1 1/2" = 1'-0"7
LEVEL 8 UNDERSIDE DETAIL
1 1/2" = 1'-0"1
LEVEL 8 CEILING DETAIL
1 1/2" = 1'-0"2
TOP OF PARTITION DETAIL
1 1/2" = 1'-0"5
LEVEL 9 CEILING DETAIL
1 1/2" = 1'-0"4
LEVEL 8 WINDOW DETAIL
0 0.25' 0.5' 1' 1.5' 1 1/2" = 1'-0"3
LEVEL 8, 9 WALL DETAIL
1 1/2" = 1'-0"8
LEVEL 9-WINDOW DETAIL
ARCHITECTURAL KEYNOTES
601 3" INSULATED METAL PANEL
602 EXTRUDED ALUMINUM PANEL EDGE TRIM BY PANEL
MANUFACTURER.
604 MITER BOTTOM OF PANEL AT EAST AND WEST CORNER.
605 2HR SPRAYED FIRE RESISTIVE MATERIAL ON ALL PRIMARY
STRUCTURAL STEEL.
606 R20 SPRAY FOAM INSULATION APPLIED TO BOTTOM OF METAL
DECK, DO NOT APPLY OVER STRUCTURAL STEEL SURFACES
RECEIVING SPAY-ON FIRE RESISTANT MATERIAL.
607 VENTILATED METAL PANEL, CEILING / SOFFIT SYSTEM WITH
CONCEALED FASTENERS AND EDGE TRIM. SOFFIT PANEL
ATTACHMENT TO RESIST MIN ARCHITECTURAL COMPONENT
WINDLOAD PERFORMANCE DEFINED IN DESIGN LOADS OF SHT
S-001.
608 SOFFIT PANEL ATTACHMENT STRUCTURE, 2 1/2" C-STUD FRAMING
(MIN 20 GA, G90 COATING). HORIZONTAL MEMBERS
PERPENDICULAR TO SOFFIT PANELS SPACED MAX 24" OC.
VERTICAL MEMBERS, ATTACHED TO BOTTOM OF PRIMARY FLOOR
STRUCTURE ABOVE, TO LIMIT MAX HORIZONTAL MEMBER SPAN TO
36".
609 3 5/8" (MIN 18GA 1 3/8" FLANGE) AT 16" OC
610 DIAGONAL BRACES @ 48" OC
612 5/8" GYPSUM WALL BOARD
614 3/4" VERTICAL FURRING & AIR CAVITY.
619 BACKER ROD AND SEALANT.
620 10" CONTINUOUS SHEET METAL. FASTEN TO METAL FRAMING T&B.
CENTER ON FLOOR SLAB.
621 WINDOW CONNECTION TO BLAST FRAME BY WINDOW
MANUFACTURER. REFER TO STRUCTURAL DRAWINGS.
622 HORIZONTAL STUD BETWEEN VERTICAL FRAMING. ALIGN TO
BOTTOM OF SLAB.
623 GYPSUM WALL BOARD CEILING SOFFIT. 5/8" GYP BOARD AND 2 1/2"
LIGHT GAUGE FRAMING @ 24" O.O. REFER TO REFLECTED CEILING
PLAN.
624 2 HR RATED JOINT SYSTEM. UL FW.D.1003. MINERAL WOOL
FORMING MATERIAL W/ FILL MATERIAL FLUSH W/ FLOOR SURFACE.
625 2 HR RATED JOINT SYSTEM. UL FW.D.0057. MINERAL WOOL
FORMING MATERIAL W/ FILL MATERIAL SEALANT FLUSH W/ FLOOR
SURFACE.
626 3/4" THICK SOLID SURFACE.
627 BLAST FRAME. REFER TO STRUCTURAL DRAWINGS.
629 WALL ASSEMBLY AS SCHEDULED.
630 WINDOW MULLION AS SPECIFIED
631 SEAL WALL ASSEMBLY AS REQUIRED FOR SPECIFIED WALL
RATINGS.
632 3" Z FURRING AT 24" OC, INSTALLED AROUND OTHER FRAMING.
FASTEN TO BOTTOM OF CONCRETE SLAB. INSTALL 3" DEPTH OF
SPRAY FOAM INSULATION, TRIMMED TO FACE OF 3" FURRING.
INSTALL 5/8 GYPSUM BOARD CEILING OVER INSULATION AS
'THERMAL BARRIER' WITH LEVEL 1 BOARD FINISH. COVERAGE
LIMTED TO CONCRETE SLAB BELOW EXTERIOR BALCONY.
633 DRIP ALONG TOP OF WINDOW ASSEMBLY.
634 PREFINISHED METAL TRIM
0 0.25' 0.5' 1' 1.5'
0 0.25' 0.5' 1' 1.5' 0 0.25' 0.5' 1' 1.5'
0 0.25' 0.5' 1' 1.5'
0 0.25' 0.5' 1' 1.5' 0 0.25' 0.5' 1' 1.5'
3" = 1'-0"6
WALL AT MULLION DETAIL
0 0.125' 0.25' 0.5' 0.75'
BID ALTERNATE PROJECT SCOPE
A. AT LOCATIONS WHERE ACOUSTICAL CEILING GRID OR METAL SOFFIT ABUTS
RIBBED CONCRETE WALL SURFACES, CLEANLY SAWCUT RIBS OFF TO A
HEIGHT OF 2" BELOW THE FINISH CEILING HEIGHT PATCH SURFACE AND
PAINT TO MATCH EXISTING AS REQUIRED TO CREATE SMOOTH FINISHED
CONCRETE.
B. REFER TO FLOOR PLANS FOR DEFINITION OF TRAFFIC COATING APPLIED TO
EXTERIOR BALCONY SURFACES.
GENERAL NOTES
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
LEVEL 11
1109'-6"
8" RETURN
1"
4 1/2"
1"
LEVEL 12
1121'-0"
LEVEL 11 /
1109'-6"
617617
4' - 6"
LEVEL 8
1075'-0"
3' - 9"8" RETURN
4' - 6"
4 1/2"
615 619
608608
1"
A-113
3' - 9"8" RETURN
4' - 6"
LEVEL 9
1086'-6"
4 1/2"
608608
2 LAYER
TOP OF METAL PANEL
9'-4" AFF
1"
8" RETURN
LEVEL 10
1098'-0"
1"
4 1/2"
/8
M C
612 2 LAYERS
615 635
607602
TOP OF METAL PANEL
9'-4" AFF
4' - 6"
639639
DRAWINGS INCLUDE DESCRIPTION OF AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW THE
'BASE BID' NEW 9TH FLOOR LEVEL CONSTRUCTION. THE
CONTRACTOR SHALL SEPARATELY PLAN AND BID THE 'BASE
BID' AND 'ADD ALTERNATE' WORK SCOPE.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:2
P
M
A-502
B A
L C
O N
Y D
E T
A
IL
S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1 1/2" = 1'-0"1
BALCONY DETAIL - LEVELS 11, 12
1 1/2" = 1'-0"4
BALCONY DETAIL - LEVEL 8
GENERAL NOTES
A. AT LOCATIONS WHERE ACOUSTICAL CEILING GRID OR METAL SOFFIT ABUTS
RIBBED CONCRETE WALL SURFACES, CLEANLY SAWCUT RIBS OFF TO A
HEIGHT OF 2" BELOW THE FINISH CEILING HEIGHT PATCH SURFACE AND
PAINT TO MATCH EXISTING AS REQUIRED TO CREATE SMOOTH FINISHED
CONCRETE.
B. REFER TO FLOOR PLANS FOR DEFINITION OF TRAFFIC COATING APPLIED TO
EXTERIOR BALCONY SURFACES.
1 1/2" = 1'-0"3
BALCONY DETAIL - LEVEL 9
1 1/2" = 1'-0"2
BALCONY DETAIL - LEVEL 10
0 0.25' 0.5' 1' 1.5'
ARCHITECTURAL KEYNOTES
601 3" INSULATED METAL PANEL
602 EXTRUDED ALUMINUM PANEL EDGE TRIM BY PANEL
MANUFACTURER.
604 MITER BOTTOM OF PANEL AT EAST AND WEST CORNER.
605 2HR SPRAYED FIRE RESISTIVE MATERIAL ON ALL PRIMARY
STRUCTURAL STEEL.
607 VENTILATED METAL PANEL, CEILING / SOFFIT SYSTEM WITH
CONCEALED FASTENERS AND EDGE TRIM. SOFFIT PANEL
ATTACHMENT TO RESIST MIN ARCHITECTURAL COMPONENT
WINDLOAD PERFORMANCE DEFINED IN DESIGN LOADS OF SHT
S-001.
608 SOFFIT PANEL ATTACHMENT STRUCTURE, 2 1/2" C-STUD FRAMING
(MIN 20 GA, G90 COATING). HORIZONTAL MEMBERS
PERPENDICULAR TO SOFFIT PANELS SPACED MAX 24" OC.
VERTICAL MEMBERS, ATTACHED TO BOTTOM OF PRIMARY FLOOR
STRUCTURE ABOVE, TO LIMIT MAX HORIZONTAL MEMBER SPAN TO
36".
609 3 5/8" (MIN 18GA 1 3/8" FLANGE) AT 16" OC
610 DIAGONAL BRACES @ 48" OC
611 5/8" EXTRUDED GLASS MAT GYPSUM SHEATHING.
612 5/8" GYPSUM WALL BOARD
615 CONCRETE BALCONY SLAB WITH ELASTOMERIC COATING
(TRAFFIC COATING) APPLIED TO ALL EXPOSED SURFACES.
616 UNFACED BATT INSULATION FROM TOP STUD CAVITY TO MINIMUM
8" BELOW TOP OF INSULATED METAL WALL PANEL.
617 PRE-FINISHED METAL BEAM COVER TO MATCH INSULATED METAL
PANEL. PROVIDE MISC CONCEALED WALL MOUNTED BRACKETS
FOR ATTACHMENT.
619 BACKER ROD AND SEALANT.
635 SELF LEVELING SEALANT AT BALCONY JOINT.
636 REFER TO PLANS AND CONCRETE REPAIR NOTES ON G-003 FOR
EXISTING CURB REMOVAL AND SLAB REPAIR. ELASTOMERIC
COATING (TRAFFIC COATING) TO BE APPLIED TO ALL EXPOSED
SURFACES.
637 EXISTING CONCRETE STRUCTURE. PROTECT DURING
CONSTRUCTION.
638 PREFINISHED METAL FLASHING
639 INTERIOR PRE-FINISHED METAL BEAM COVER TO MATCH
INSOLATED METAL WALL PANEL. PROVIDE MISC CONCEALED
WALL MOUNTED BRACKETS FOR ATTACHMENT.
0 0.25' 0.5' 1' 1.5'
0 0.25' 0.5' 1' 1.5'0 0.25' 0.5' 1' 1.5' BID ALTERNATE PROJECT SCOPE
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
1. PROVIDE NEW 4" HIGH RUBBER BASE AND PAINT WALL SURFACE AT NEW PARTITION AT NORTH WALL TO MATCH EXISTING ADJACENT FINISH COLORS.
2. PAINT ALL WALLS IN STAIRWELL. AT LEVEL 1, RESINSTALL SALVAGED CARPET AND WALL BASE AT LEVEL 1. REMOVE ALL CARPET AND ADHESIVE AND
SMOOTH EXISTING SLAB TO PROPERLY PREP CONCRETE FOR SEALING ON LEVELS 2 AND 3. PROVIDE SC-1 CONCRETE SEALER AT CONCRETE SUBSTRATE. FLOORING AT ALL OTHER LANDINGS/LEVELS WITHIN STAIRWELL IS EXISTING TO REMAIN (ETR). PAINT EXISTING STAIR RAILINGS P-2 THROUGHOUT STAIRWELL (REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION RELATED TO PAINT TYPE AND COATINGS).
3. PROVIDE 5'-0" CT-1 CERAMIC TILE WAINSCOT WITH CTB-1 AT BASE, AT ALL WALLS. GYPSUM WALL ABOVE WAINSCOT TO BE PAINTED P-1.
4. ESD-1 ELECTROSTATIC DISSIPATIVE FLOORING TO BE INSTALLED OVER EXISTING POLYMERIC POURED FLOOR IN LABS ON LEVEL 10 (ROOM NUMBER 10-1).
INSPECT EXISTING FLOOR PER MANUFACTURERS GUIDELINES PRIOR TO INSTALLATION. ADHERE TO MANUFACTURERS GUIDELINES FOR INSTALLATION.
5. PROVIDE A 5'-0" CT-1 CERAMIC TILE WAINSCOT WITH CTB-1 AT BASE AT SOUTH WALL. PAINT GYPSUM BOARD P-1 ABOVE WAINSCOT. PAINT EXPOSED
GYPSUM BOARD P-1. PAINT EXPOSED GYPSUM BOARD P-1 AT NORTH, EAST, WEST WALLS.
6. SALVAGE AND REUSE EXISTING CEILING TILES.
7. PAINT SOFFITS P-1.
8. REFER TO ELEVATOR SPECIIFICATIONS FOR CAB INTERIOR FINISHES.
9. PROVIDE SOLID SURFACE SS-1 ON WINDOW SILLS PER DETAILS.
ROOM FINISH SCHEDULE NOTES
A. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION RELATED TO FINISHES.
B. FIELD VERIFY EXISTING CONDITIONS PRIOR TO COMMENCEMENT OF WORK.
C. NEW HOLLOW METAL DOORS & FRAMES TO BE PAINTED P-2 U.N.O.
D. ETR= EXISTING TO REMAIN.
E. EXISTING INTERIOR STAIR HANDRAIL TO BE PAINTED P-2 (REFER TO
SPECIFICATIONS FOR ADDITIONAL INFORMATION RELATED TO PAINT TYPE AND
COATINGS). NEW RAILS TO BE STAINLESS STEEL.
F. MANUFATURERS LISTED IN FINISH SCHEDULE ARE USED TO INDICATE A BASIS OF
DESIGN. PRODUCTS WITH EQUAL PHYSICAL PROPERTIES AND COLORS MAY BE
USED. REFER TO SPECIFICATIONS.
G. PROVIDE AND INSTALL WINDOW SHADES AT ALL NEW WINDOWS (SLIDING AND
FIXED) ON LEVEL 8 AND LEVEL 9. SEE SPECIFICATION SECTION 12 24 13.
DRAWINGS INCLUDE DESCRIPTION OF AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW THE
'BASE BID' NEW 9TH FLOOR LEVEL CONSTRUCTION. THE
CONTRACTOR SHALL SEPARATELY PLAN AND BID THE 'BASE
BID' AND 'ADD ALTERNATE' WORK SCOPE.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e vi t\ -S cr a p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r vt
/2
/2
:2
:2
P
M
A-621
F
IN
IS
H
S C
H E
D U
L E
F
IN
IS
H L
E G
E N
D A
N D
N O
T E
S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/2
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
ROOM FINISH SCHEDULE LEVEL 1
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
1CW-21 CORRIDOR ETR ETR/ RB ETR/ PAINT ETR ETR NOTE 1
1DB-24 TOILET ETR ETR/CTB-1 ETR/CT-1/P-1 P-1 MATCH
EXISTING
NOTE 5
ROOM FINISH SCHEDULE LEVEL 2
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
2-6 CORRIDOR ETR ETR/RB ETR/P-1 ETR ETR NOTE 6
2CY-18 CORRIDOR ETR ETR/RB ETR/ PAINT ETR ETR NOTE 1
2CY-24 PASSAGE ETR ETR/RB ETR/P-1 ETR ETR NOTE 6
2DB-24 TOILET ETR ETR/CTB-1 ETR/ PAINT/CT-1 P-1 MATCH
EXISTING
NOTE 5
ROOM FINISH SCHEDULE LEVEL 3
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
3CW-21 CORRIDOR ETR ETR/ RB ETR/ PAINT ETR ETR NOTE 1
3CX-31 PASSAGE ETR ETR/RB ETR/ PAINT P-1 MATCH
EXISTING
3CX-32 PASSAGE ETR ETR/ RB ETR/ PAINT ACT-1 8'-0"
3DA-20 PASSAGE ETR ETR/ RB ETR/ PAINT ETR ETR
3DB-24 CHASE ETR ETR/CTB-1 ETR/ PAINT/CT-1 P-1 ETR NOTE 5
ROOM FINISH SCHEDULE LEVEL 4
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
4CW-21 CORRIDOR ETR ETR/ RB ETR/ PAINT ETR ETR NOTE 1
ROOM FINISH SCHEDULE LEVEL 5, 6 & 7
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
5CW-21 CORRIDOR ETR ETR/ RB ETR/ PAINT ETR ETR NOTE 1
ROOM FINISH SCHEDULE LEVEL 8
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
8CT-18 BALCONY TFAW N/A N/A N/A N/A
8CU-26 CLOSET ESD-1 RB-1 P-1 ACT-1 8'-4"
8CV-19 MECHANICAL
SHAFT
ETR ETR ETR ETR ETR
8CW-20 ELECTRIC
CLOSET
ETR ETR ETR P-1 8'-0"
8CW-21 CORRIDOR ESD-1 RB-1 P-1 ETR ETR
8DA-20 LAB ESD-1 RB-1 P-1 ACT-1 8'-4" NOTES 7, 9
8DA-22 TOILET PT-1 CTB-1 P-1/CT-1 ACT-1 8'-0" NOTE 3
8DD-26 BALCONY TFAW N/A N/A N/A N/A
ROOM FINISH SCHEDULE LEVEL 9
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
9CT-18 BALCONY TFAW N/A N/A N/A N/A
9CU-26 CLOSET ESD-1 RB-1 P-1 ACT-1 8'-4"
9CV-19 MECHANICAL
SHAFT
ETR ETR ETR ETR ETR
9CW-20 ELECTRIC
CLOSET
ETR ETR ETR P-1 8'-0"
9CW-21 CORRIDOR ESD-1 RB-1 P-1 ETR ETR
9DA-20 LAB ESD-1 RB-1 P-1 ACT-1 8'-4" NOTES 7, 9
9DA-22 TOILET PT-1 CTB-1 P-1/CT-1 ACT-1 8'-0" NOTE 3
9DD-26 BALCONY TFAW N/A N/A N/A N/A
ROOM FINISH SCHEDULE LEVEL 10
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
10CT-18 BALCONY TFAW N/A N/A N/A N/A
10CV-19 MECHANICAL
SHAFT
ETR ETR ETR ETR ETR
10CW-20 ELECTRIC
CLOSET
ETR ETR ETR P-1 8'-0"
10CW-21 CORRIDOR ESD-1 RB-1 P-1 ETR ETR
10DA-20 LAB ESD-1 RB-1 ETR ACT-1 8'-11" NOTE 4
10DA-22 TOILET PT-1 CTB-1 P-1/CT-1 ACT-1 8'-0" NOTE 3
10DD-26 BALCONY TFAW N/A N/A N/A N/A
ROOM FINISH SCHEDULE LEVEL 11
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
11CT-18 BALCONY TFAW N/A N/A N/A N/A
11CV-19 MECHANICAL
SHAFT
ETR ETR ETR ETR ETR
11CW-20 ELECTRIC
CLOSET
ETR ETR ETR P-1 8'-0"
11CW-21 CORRIDOR ETR ETR P-1 ETR ETR
11DA-20 LAB ETR ETR ETR ACT-1 8'-11"
11DA-22 TOILET ETR CTB-1 P-1/CT-1 ACT-1 8'-0" NOTE 5
11DD-26 BALCONY TFAW N/A N/A N/A N/A
ROOM FINISH SCHEDULE LEVEL 12
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
12CT-18 BALCONY TFAW N/A N/A N/A N/A
12CV-19 MECHANICAL
SHAFT
ETR ETR ETR ETR ETR
12CW-20 ELECTRIC
CLOSET
ETR ETR ETR P-1 8'-0"
12CW-21 CORRIDOR ETR ETR P-1 ETR ETR
12DA-20 LAB ETR ETR ETR ACT-1 8'-11"
12DA-22 TOILET ETR CTB-1 P-1/CT-1 ACT-1 8'-0" NOTE 5
12DD-26 BALCONY TFAW N/A N/A N/A N/A
ROOM FINISH SCHEDULE LEVEL 13
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
13CW-21 CORRIDOR ETR ETR/ RB ETR/ PAINT ETR ETR NOTE 1
ROOM FINISH SCHEDULE STAIRS
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
CCV-19 MECHANICAL
SHAFT
CV-22 STAIR ETR/SC-1 RB-2 P-1 ETR ETR NOTE 2
GENERAL FINISH NOTES
ROOM FINISH SCHEDULE ELEVATORS
ROOM NO
ROOM
NAME FLOOR FINISH
BASE
FINISH WALL FINISH
CEILING
FINISH
CEILING
HEIGHT NOTES & REMARKS (SEE NOTES)
DB-20 ELEVATOR CPT-1 RB-1 MFG STD. MFG STD. MFG STD. NOTE 8
SS-1 SOLID SURFACE WILSONART SOLID SURFACE D354SL DESIGNER WHITE
GR-1 FLOOR & WALL GROUT CUSTOM BUILDING PRODUCTS CEG-LITE 165 DELOREAN GRAY 100% SOLIDS COMMERCIAL EPOXY GROUT
TFAW
TRAFFIC FLUID APPLIED
WATERPROOFING
SIKA
MISCELLANEOUS
ACT-1 ACOUSTICAL CEILNG TILE ACOUSTICAL SURFACES, INC. SOUND SILENCER - WHITE 24" X 24" USE WITH 15/16" GRID
CEILING
P-2 TRIM PAINT SHERWIN WILLIAMS PROMAR 200 SW7074 SOFTWARE
P-1 WALL PAINT SHERWIN WILLIAMS PROMAR 200 SW6245 QUICK SILVER
CT-1 CERAMIC TILE DALTILE SEMI-GLOSS SERIES 0190 ARCTIC WHITE 4-1/4" X 4-1/4"
WALLS
RB-2 RUBBER BASE JOHNSONITE TIGHTLOCK WALL BASE 71 STORM CLOUD 6-1/2" H
RB-1 RUBBER BASE JOHNSONITE TIGHTLOCK WALL BASE 71 STORM CLOUD 4-1/2" H
CTB-1 CERAMIC TILE BASE DALTILE SEMI-GLOSS SERIES A3401/O190 ARCTIC WHITE 4-1/4" X 4-1/4"
BASE
SC-1 SEALED CONCRETE
CPT-1 CARPET SHAW CONTRACT DIFFUSE 59575-75567 TRAIN STATION 24" X 24"
PT-1 PORCELAIN FLOOR TILE DALTILE VOLUME 1.0 VL73 STEREO GREY 12" X 12"
ESD-1
ELECTROSTATIC
DISSIPATIVE FLOORING...
ARMSTRONG EXCELON STATIC DISSIPATIVE FLOORING 51958 FOSSIL GRAY 12" X 12"
FOUR-PART SYSTEM TO INCLUDE STATIC DISSIPATIVE ADHESIVE, STATIC
DISSIPATIVE FLOOR TILE, STATIC DISSIPATIVE FLOOR POLISH, AND COPPER...
FLOORING
SYMBOL MATERIAL MANUFACTURER PRODUCT NAME NUMBER COLOR SIZE REMARKS
FINISH MATERIALS LEGEND
BID ALTERNATE PROJECT SCOPE
01/25/2023
Steven J. Birkley License # 11250 Exp 12/31/2023
A m e n d m e n t
/2
/2
ARIMS: 200A Disposition: Maintain for 15 yrs after construction
W
2Q R
R
_P la ns -0
| Sheets |
| A-103 - NEW WORK PARTIAL PLAN - LEVEL 2 |
| A-107 - NEW WORK FLOOR PLAN - LEVEL 8 |
| A-108 - NEW WORK FLOOR PLAN - LEVEL 9 |
| A-109 - NEW WORK FLOOR PLAN - LEVEL 10 |
| A-110 - NEW WORK FLOOR PLAN - LEVEL 11 |
| A-111 - NEW WORK FLOOR PLAN - LEVEL 12 |
| A-112 - NEW WORK FLOOR PLAN - ROOF LEVEL |
| A-203 - ENLARGED EAST ELEVATION |
| A-501 - WALL SECTION AND DETAILS |
| A-502 - BALCONY DETAILS |
| A-621 - FINISH SCHEDULE, FINISH LEGEND AND NOTES |
File details come from the government source that posted it. Updated .