W912QR22R0060_Plans-0000.pdf
PDF 17 MB Posted
- Attached to
- WPAFB B620 Tower Reno
- Solicitation number
- W912QR22R0060
About this file
This document provides details for a federal contract solicitation to renovate the B620 Tower at Wright-Patterson Air Force Base in Ohio. The solicitation is being conducted by the Department of the Army Corps of Engineers Engineering District Louisville. The estimated construction cost for the project is between $5 million and $10 million. The NAICS code for the work is 236220 with a size standard of $39.5 million. This is a full and open procurement that requires a 10% price evaluation preference for HUBZone small businesses. The point of contact for the solicitation is Contract Specialist Jessica Moss.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HEL
TER
#3
PARKING
PARKING
G
PARKING
PARKING
PARKING
PARKIN
PARKING
TOWER
71857184
71837182
PA
THPAR
CO
URS
78B
20B
GAT
E
70297028
7027 7026
0 701
8 7
PA
RK HA
DDE
N
39B
GAT
E
43B
GAT
E
19B
GAT
E
0 711
HIS
T.
PLA
CESNAT
ION
AL
REG
OF
ADE
NA
MO
UND
51B
SNA
CK
BA
R
8 708
4 706
9 705
73B
1 714
433125
S
18B
GAT
E
17B
GAT
E
32B
GAT
E
86H
69A
MEM
ORI
ALWRI
GHT
16B
GAT
E
L-6
L-6
L-6
618 621
22B
GAT
E
AREA
77B
79D
B
11 1
83B
37B
76B
B
79J
79A 79B 79C
79F
42977
STA
TIO
NSUB
22B
10B
27B
SOC
CER
FI
ELD
S
ARE
A
"B"
WR
IGH
T
FIEL
D
L-20
L-2041
11B
B
31B
146145
71D
STA
.SUB
.2
B 30B
193192
46B3 B
71B
194195
20A
FIEL
DSOC
CER
5B
24B
"B"SUB
ST
A.
85A
24A
25D
25C
25B
25A
24C
-A
31B
B
9B
18G
251- A
18F
18C
18D 18A
18E
18B 18
B
STA
SUB
71A2061
4B
B
251250
61A
2B
1B
GAT
E
31B
GAT
E 30B
GAT
E
29B
GAT
E
OF
HIS
TOR
IC
PLA
CESNAT
ION
AL
REG
IST
ER
PRE
HIS
TOR
IC
MOU
NDS
GRO
UP
OF
SIX
28A
28B
B
GAT
E
86J
T-2
86- B
B25B
GAT
E 1
1B
56 517
1 4
13B
GAT
E
12B
GAT
E
ARE
A "
B"
ENT
RAN
CEMAI
N
86G
57B
56B
58 15
10B
GAT
E
86D
86C
S P
C S A
H P
S P
S P
U S T
A
S P
S P
EFDZ 2
E
FD
Z 8
EFDZ 3
E
FD
Z 4
B S
E
FD
Z 9
E
FD
Z 5
E
FD
Z 1
E
FD
Z 6
LF
LF
H P
C S A
E
FD
Z 7
1 0 0 4
PLA IN
PLA IN
REC
OR
D F
LOO
D
CO
NTO
UR
(81 0'
ELE
VAT
ION
PHO
TO
TAR
GET
APP
ROX
. L
IMIT
S
OF LAN
DF I
LL
#8
APP
ROX
. L
IMIT
S
OF
LAN
DF I
LL
#8
APP
ROX
. L
IMIT
S
OF
LAN
DF I
LL
#10
APP
ROX
. L
IMIT
S
OF
LAN
DF I
LL
#10
APP
ROX
. L
IMIT
S
OF LAN
DF I
LL
#8
M-ESSENTIAL LANDING SURFACE) 34
WA
RD
PIK
E
FOURTH S
"A
S
TR
E E T
CO
NRAIL
TREET
S
TR
E E T
THIRD
S
TR
E E T
MEMORIAL ROAD
"F
ST
RE
ET
FIRST STREET
FIFTH
" C
S
TR
E E T
"B
STREET
"E
EE
T
"G"
FIF
SIXTH STREET
SEV ENTH STREET
"D
STREET
"K
EE
T
SH
EL
IN
E D
RI
VE
TH STREET
H
EE
T
R O A D
ST
RE
ET
"E
EE
T
"G
EE
T
EIGH TH
"K
EE
T
TENTH
FIFTH
STREET
"L
E
ET
" N
S
TR
E E T
STREET
S K
YL
IN
E
D R
IV
E
LO
O P
ELEVENTH STREET
STREET
"G
EE
T
TWELFTH STREET
EIGHTH
STREET
R E E T
TENTH
STREET
"O
ST
RE
E T " O
S T
RE
E T
D R I V E
THIRTEENTH STREET
S K Y
LI
N E
"P
T
STREET
TWELFTH
STREET
"Q
ST
RE
ET
N A
TI
O N A L R O A D
MEM
CONRAIL
K
AUF
THIRD STREET
SK
YL
IN
E
DR
IVE
ROA
D
AVEN
U E
ORIAL
M
AN
FIRST ST
RE
ET
STA
FI F TH
"P
ST
RE
ET
STREET
T R
EE
T
SIK
ES
H
ALLE
DU
PO
NT
PICKET
PL.
M C G
LE
LL
AN
D
OLD
STATE
ROUTE 4
TE
ROUTE
CK
WA
Y
GRANGER
COLLOPY
CRI
VE
WELCO
G S
TR
E E T
LA
N E
V A N
D O R N
TENTH
STREET
SEVENTH
STREET
"P
E E T
"R
T R
EE
T
E E
DUPONT
WAY
T.
ME
LO
N
WEITZEL
S H
IE
LD
S
MOSBY
S
BEULE
P
LA
C E
AV
E N U E
MC
D O W
EL
L
EMMES
T
CONRAIL
N A
TI
O N A L
O A D
"R"
REESE
C
IN
N
AB
AR
C T
NU
TM
EG
DRIVE
ZI
NK
OA
D
WAY
MI
DD
Y
D
RI
VE
CIMARRON
B
ROM
LEY
SUDBURY
B U R N S
IG
H L
AN
D
C T
AS
H
LE
Y C T.
EAGLE HIGHLANDS DRIVE
BUSH DRIVE
HOLLY
N E W G A
TE
C T
DRIVE
DUNCAN
CIRCLE
FIR
E S
TO
N E
PEPPERTR
EE
BLV
D.
R A I D E R
D R
P L.
D R
IV
E
FOR
EST LANE
CIRC
LE
MA
IN
U.
C.
DR
IV
E
RO
AD
S.
LANE
SPRINGWOOD
ZI
NK
RO
AD
H
SANZON DRIVE
SK
YLINE DR
IVE
M O N
TG
O M
ER
Y
GR
EE
NE
CO
UN
T Y
CO
UN
T Y
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
US Army Corps of Engineers ®
ISSUE DATE:
VOLUME:
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
1400 W DOROTHY LANE
DAYTON, OHIO 45409
PH: (937) 224-0861
525 VINE STREET, SUITE 1300
CINCINNATI, OHIO 45202
PH: (513) 579-9137
B&N PROJECT NO. 59520
100 E. EIGHTH STREET, STE. 300
CINCINNATI, OHIO 45202
PH: (513) 241-3222
LOCATION MAP
(NOT TO SCALE)
A/E STAMPS AREA:
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/2
/2
:3
:2
P M
G-001
C O
V E
R S
H E
E T
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
LOUISVILLE DISTRICT
06/03/2022
WRIGHT-PATTERSON AIR FORCE BASE, OH
ADD TOWER SPACE
ZHTV170030
FACILITY 20620
HOBSON WAY (LOOP ROAD)
GATE 22 B
I-675 CONNECTOR
GATE 1 B
GATE 19 B
WPAFB AREA B
BLDG 20620
PLAN NORTH
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15yrs after construction
09 June 2022
W912QR22R0060
THIS PROJECT WORK SCOPE INCLUDES ALTERATION OF
EXISTING BUILDING AREAS IN ADDITION TO NEW FLOOR LEVEL
CONSTRUCTION BELOW THE EXISTING 10TH FLOOR LEVEL OF
THE EXISTING TOWER STRUCTURE AS DEFINED IN THE
CONSTRUCTION DOCUMENTS. THE PROJECT WORK SCOPE
INCLUDES A BID ALTERNATE AS AN 'ADD ALTERNATE' TO
CONSTRUCT A COMPLETE NEW 8TH FLOOR LEVEL BELOW A
'BASE BID' NEW 9TH FLOOR LEVEL. THE 'BASE BID' EXCLUDES
CONSTRUCTION OF THE 8TH FLOOR WORK SCOPE. THE NEW
9TH FLOOR LEVEL IS CONSTRUCTED AS LOWEST LEVEL OF
NEW FLOOR CONSTRUCTION IN THE 'BASE BID'. THESE
CONSTRUCTION DRAWINGS ARE PROVIDED AS A COMPLETE
WORK SCOPE OF 'BASE BID' AND 'ADD ALTERNATE' WITH 'ADD
ALTERNATE' PORTIONS HIGHLIGHTED. THE CONTRACTOR
SHALL PLAN AND BID THE PROJECT BASED UPON THE 'BASE
BID' WORK SCOPE WITH A SEPERATE 'ADD ALTERNATE' WORK
SCOPE TO ADD THE 8TH FLOOR LEVEL.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/7
/2
:3
:5
A M
G-002
S H
E E
T L
IS
T
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
SHEET
NUMBER SHEET TITLE
FA-001 LEGEND & DESIGN NOTES
FAD101 LEVEL 10 & 11 - DEMOLITION
FAD102 LEVEL 10 & 11 - DEMOLITION
FA-101 LEVEL 2 & 3 PLAN - NEW WORK
FA-102 LEVEL 8 & 9 - NEW WORK
FA-103 LEVEL 10 & 11 - NEW WORK
FA-104 LEVEL 12 & 13 - NEW WORK
FA-105 DUCT FIRE ALARM
FA-501 DETAILS
FS-001 LEGEND & DESIGN NOTES
FSD101 LEVEL 10 & 11 - DEMOLITION
FSD102 LEVEL 12 - DEMOLITION
FS-101 LEVEL3, 8, & 9 NEW WORK
FS-102 LEVEL 10 & 11 - NEW WORK
FS-103 LEVEL 12 & 13 - NEW WORK
FS-501 DETAILS
P-001 LEGEND
P-102 PLUMBING LEVEL 2 - NEW WORK
PD101 PLUMBING LEVEL 1 - DEMOLITION
PD102 PLUMBING LEVELS 2-9 - DEMOLITION
PD103 PLUMBING LEVELS 10 & 11 - DEMOLITION
PD104 PLUMBING LEVEL 12 - DEMOLITION
P-101 PLUMBING LEVEL 1 - NEW WORK
P-103 PLUMBING LEVELS 3- 7 - NEW WORK
P-104 PLUMBING LEVELS 8 & 9 - NEW WORK
P-105 PLUMBING LEVELS 10 & 11 - NEW WORK
P-106 PLUMBING LEVEL 12 - NEW WORK
P-501 DETAILS
P-601 SCHEDULES
P-901 SOIL, WASTE, AND VENT DIAGRAM
M-001 LEGEND
MD101 DEMOLITION FLOOR PLAN - LEVELS 1 AND 2
MD102 DEMOLITION FLOOR PLAN - LEVELS 10 AND 11
MD103 DEMOLITION FLOOR PLAN - LEVEL 12
M-101 NEW WORK FLOOR PLAN - LEVELS 1, 2, & 5
M-102 NEW WORK FLOOR PLAN - LEVELS 8 AND 9
M-103 NEW WORK FLOOR PLAN - LEVELS 10 AND 11
M-104 NEW WORK FLOOR PLAN - LEVEL 12
M-501 DETAILS
M-502 DETAILS
M-601 SCHEDULES
M-701 CONTROLS LEGEND AND ABBREVIATIONS
M-702 POINT SCHEDULE INSTRUCTIONS
M-703 AHU CONTROLS SCHEMATIC - DEMOLITION
M-704 AHU CONTROLS SCHEMATIC - NEW WORK
M-705 AHU SUPPLY FAN VFD LADDER DIAGRAM
M-706 AHU SEQUENCE OF OPERATION
M-707 VAV & EXHAUST FAN CONTROL SCHEMATICS
M-708 VAV & EXHAUST FAN SEQUENCES OF OPERATION
M-709 POINTS SCHEDULES
M-710 POINTS SCHEDULES
M-711 CONTROL SCHEDULES
E-001 LEGEND
E-002 GENERAL NOTES & ABBREVIATIONS
ED101 LEVEL 1 - DEMOLITION
ED102 LEVEL 10 & 11 - DEMOLITION
ED103 LEVEL 12 - DEMOLITION
E-101 LEVEL 1 PLAN - LIGHTING
E-102 LEVEL 2 PLAN - LIGHTING
E-103 LEVEL 8 & 9 PLAN - LIGHTING
E-104 LEVEL 10 & 11 PLAN - LIGHTING
E-105 LEVEL 12 - LIGHTING
E-106 LEVEL 1 PLAN - POWER
E-107 LEVEL 8 & 9 PLAN - POWER
E-108 LEVEL 10 & 11 PLAN - POWER
E-109 LEVEL 12 - POWER
E-301 SECTION VIEWS
E-302 SECTION VIEWS
E-501 DETAILS
E-502 DETAILS
E-601 SINGLE-LINE DIAGRAM
E-602 PANELBOARD SCHEDULES
E-603 PANELBOARD SCHEDULES
E-604 LIGHTING & MOTOR SCHEDULES
ET101 LEVEL 1 PLAN - TECHNOLOGY
ET102 LEVEL 9 & 10 PLAN - TECHNOLOGY
ET501 TECHNOLOGY DETAILS
SHEET
NUMBER SHEET TITLE
G-001 COVER SHEET
G-002 SHEET LIST
G-003 GENERAL NOTES, ABBREVIATIONS
G-101 SITE PLAN
G-102 HAUL ROUTE
G-103 SOUND RATING PLANS
H-101 HAZARDOUS MATERIALS PLAN - LEVEL 1
H-102 HAZARDOUS MATERIALS PLAN - LEVELS 2 & 3
H-103 HAZARDOUS MATERIALS PLAN - LEVELS 4-9
H-104 HAZARDOUS MATERIALS PLAN - LEVELS 10 & 11
H-105 HAZARDOUS MATERIALS PLAN - LEVEL 12 AND ROOF
S-001 GENERAL STRUCTURAL NOTES
S-101 FRAMING PLANS
S-201 FRAMING ELEVATIONS
S-301 FRAMING SECTIONS
S-302 FRAMING SECTIONS
S-501 TYPICAL SHOTCRETE DETAILS
AD101 DEMOLITION FLOOR PLAN - LEVEL 1
AD102 DEMOLITION FLOOR PLAN - LEVELS 2, 3
AD103 DEMOLITION FLOOR PLAN - LEVELS 4-9
AD104 DEMOLITION FLOOR PLAN - LEVEL 10
AD105 DEMOLITION FLOOR PLAN - LEVELS 11, 12
AD106 DEMOLITION FLOOR PLAN - LEVEL 13
AD107 DEMOLITION CEILING PLAN - LEVELS 2,3
A-101 NEW WORK FLOOR PLAN - LEVEL 1
A-102 NEW WORK PARTIAL PLAN - LEVEL 1
A-103 NEW WORK PARTIAL PLAN - LEVEL 2
A-104 NEW WORK PARTIAL PLAN - LEVEL 3
A-105 NEW WORK FLOOR PLANS - LEVEL 4
A-106 NEW WORK FLOOR PLANS - LEVELS 5, 6, 7
A-107 NEW WORK FLOOR PLAN - LEVEL 8
A-108 NEW WORK FLOOR PLAN - LEVEL 9
A-109 NEW WORK FLOOR PLAN - LEVEL 10
A-110 NEW WORK FLOOR PLAN - LEVEL 11
A-111 NEW WORK FLOOR PLAN - LEVEL 12
A-112 NEW WORK FLOOR PLAN - ROOF LEVEL
A-113 EDGE OF SLAB PLANS
A-114 REFLECTED CEILING PLAN - SECOND AND THIRD
FLOORS
A-115 REFLECTED CEILING PLANS - LAB FLOORS
A-201 EAST AND WEST ELEVATIONS
A-202 NORTH AND SOUTH ELEVATIONS
A-203 ENLARGED EAST ELEVATION
A-204 ENLARGED WEST ELEVATION
A-301 BUILDING SECTIONS AND DETAILS
A-302 BUILDING SECTIONS AND DETAILS
A-303 BUILDING SECTIONS AND DETAILS
A-304 BUILDING SECTIONS AND DETAILS
A-401 ENLARGED PLANS
A-501 WALL SECTION AND DETAILS
A-502 BALCONY DETAILS
A-503 CHASE WALL DETAILS
A-511 RAILING DETAILS
A-512 STANDARD PANEL DETAILS
A-601 PARTITION TYPES
A-602 DOOR SCHEDULE AND DETAILS
A-603 DOOR DETAILS
A-604 DOOR DETAILS
A-611 WINDOW TYPES
A-621 FINISH SCHEDULE, FINISH LEGEND AND NOTES
LS-001 LIFE SAFETY LEGEND & ANALYSIS
LS-002 LIFE SAFETY ANALYSIS
LS-003 LIFE SAFETY SITE PLAN
LS-101 LEVEL 1 LIFE SAFETY PLAN
LS-102 LEVEL 2 & 3 LIFE SAFETY PLAN
LS-103 LEVEL 8 & 9 LIFE SAFETY PLAN
LS-104 LEVEL 10 & 12 LIFE SAFETY PLAN
LS-105 LEVEL 12 & 13 LIFE SAFETY PLAN
NOTICE OF BID ALTERNATE 1
PROJECT SCOPE
06/03/2022
Steven J. Birkley License # 11250 Exp 12/31/2023
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15yrs after construction
DRAWING ABBREVIATIONS
INDEX OF DRAWINGS
BUILDING SUMMARY
NUMBERING SYSTEM:
XX100
DISCIPLINE:
C - CIVIL
LS - LIFE SAFETY
A - ARCHITECTURE
M - MECHANICAL
E - ELECTRICAL
P - PLUMBING
S - STRUCTURAL
F - FIRE
DISCIPLINE MODIFIER
ANNOTATION CALLOUTS/DRAWING SYMBOLS
PRODUCT MANUFACTURER TRADE NAMES
A ---------------------
A LABEL CLASS A DOOR
A/C AIR CONDITION
A/C UNIT AIR CONDITIONING UNIT
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ACC ACCESSIBLE
ACS AUTOMATIC CONTROL SYSTEM
ACS DR ACCESS DOOR
ACS PNL ACCESS PANEL
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHU AIR HANDLING UNIT
AIB AIR INFILTRATION BARRIER
ALT ALTERNATE
ALUM ALUMINUM
ANOD ANODIZE
APC ACOUSTICAL PANEL CEILING
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
ASSY ASSEMBLY
ATC ACOUSTICAL TILE CEILING
AVG AVERAGE
AW ARCHITECTURAL WOODWORK
AWT ACOUSTICAL WALL TREATMENT
B ---------------------
B LABEL CLASS B DOOR
BALC BALCONY
BB BASEBOARD
BC BOOKCASE
BD BOARD
BDRY BOUNDARY
BFF BELOW FINISH FLOOR
BHMA BUILDER'S HARDWARE
MANUFACTURER'S ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BN BULLNOSE
BOS BOTTOM OF STEEL
BOT BOTTOM
BP BUILDING PAPER
BRKT BRACKET
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C ---------------------
C CONC CAST CONCRETE
C LABEL CLASS C DOOR
CAB CABINET
CATW CATWALK
CAV CAVITY
CBB CEMENTITIOUS (BACKER) BOARD
CD CONSTRUCTION DOCUMENTS
CDW CHILLED DRINKING WATER
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR
FURNISHED/CONTRACTOR INSTALLED
CFE CONTRACTOR FURNISHED EQUIPMENT
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLG DIFF CEILING DIFFUSER
CLG HTCEILING HEIGHT
CLL COLUMN LINE
CLO CLOSET
CLR COLOR
CLRM CLASSROOM
CMU CONCRETE MASONRY UNIT
CNDS CONDENSATE
CDR CARD READER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONC FLR CONCRETE FLOOR
CONF CONFERENCE
CONT CONTINUE
COORDCOORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CR CONTROL ROOM
CS CAST STONE
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTR CENTER
CU FT CUBIC FEET
CW CASEMENT WINDOW
D ---------------------
D DEPTH
D LABEL CLASS D DOOR
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
E ---------------------
E LABEL CLASS E DOOR
EA EACH
EF EACH FACE
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
ES EACH SIDE
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPS EXPANDED POLYSTYRENE BOARD
(INSULATION)
EQ EQUAL
ETR EXISTING TO REMAIN
EWC ELECTRIC WATER COOLER
EXP EXPOSED
EXT EXTERIOR
EXT EXTINGUISHER
EXT GREXTERIOR GRADE
F ---------------------
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FAS BD FASCIA BOARD
FC BRKFACE BRICK
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF INSUL FOIL BACKED INSULATION
FGL FIBERGLASS
FH FIRE HOSE
FHP FULL HEIGHT PARTITION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLRFINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FM FACTORY MUTUAL
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FR FIRE RESISTANT
FRG FIBER REINFORCED GYPSUM
FRMG FRAMING
FRP FIBERGLASS REINFORCED PLASTIC
FRTW FIRE RETARDANT TREATED WOOD
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET
FTG FOOTING
FWC FABRIC WALLCOVERING
G ---------------------
G NATURAL GAS
GALV GALVANIZED
GB GRAB BAR
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALLED
GFGI GOVERNMENT INSTALLED
GOVERNMENT INSTALLED
GFRG GLASS-FIBER-REINFORCED GYPSUM
GLZ GLAZING
GR FL GROUND FLOOR
GUT GUTTER
GYP BD GYPSUM BOARD
GYP PLAS GYPSUM PLASTER
H ---------------------
HB HOSE BIBB
HDPE HIGH DENSITY POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR
(FILTER)
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HORIZ HORIZONTAL
HT HEIGHT
HYDR HYDRAULIC
I ---------------------
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J ---------------------
JAN JANITOR
K ---------------------
KPD KEYPAD
KIT KITCHEN
KPL KICKPLATE
L ---------------------
LAM LAMINATE
LAV LAVATORY
LBR LUMBER
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIB LIBRARY
LIN LINEAR
LKR LOCKER
LOC LOCATION
LT LIGHT
LVDR LOUVER DOOR
LVR LOUVER
M ---------------------
MACH RM MACHINE ROOM
MATL MATERIAL
MAX MAXIMUM
MC MOISTURE CONTENT
MD METAL DECK
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MEMB MEMBRANE
MF MILL FINISH
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM, MINUTE
MIRR MIRROR
MISC MISCELLANEOUS
MLDG MOLDING (MOULDING)
MO MASONRY OPENING
MOD MODIFY
MB MOISTURE BARRIER
MTG MOUNTING
MTL METAL
MVBL MOVABLE
MWP MEMBRANE WATERPROOFING
N ---------------------
N NORTH
NA NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NP NO PAINT
NRC NOISE REDUCTI
O -------------------
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OFF OFFICE
OGL OBSCURE GLASS
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPQ OPAQUE
OWSJ OPEN WEB STEEL JOIST
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P --------------------
PA PUBLIC ADDRESS
PAR PARAPET
PAT PATTERN
PB PULL BOX
PBD PARTICLEBOARD
PCC PRECAST CONCRETE
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PH PHASE
PIL PILASTER
PL PROPERTY LINE
PL GL PLATE GLASS
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLG PILING
PLYWD PLYWOOD
PNL PANEL
PP PL PUSH/PULL PLATE
PR PAIR
PRCST PRECAST
PRKG PARKING
PS CONC PRESTRESSED CONCRETE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTDR PAPER TOWEL DISPENSER AND
RECEPTACLE
PTN PARTITION
PWR POWER
Q --------------------
QT QUARRY TILE
QTY QUANTITY
R --------------------
RB RESILIENT BASE
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RC REINFORCED CONCRETE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RDG INS RIGID INSULATION, SOLID
REC RECESSED
REC ROOM RECREATION ROOM
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
REST RESTROOM
RF RESILIENT FLOORING
RFG ROOFING
RH ROOF HATCH
RHR RIGHT HAND REVERSE
RL ROOF LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RSD ROLLING STEEL DOOR
RV ROOF VENT
RVL REVEAL
REFER TO A/E/C CAD STANDARD FOR
SHEET NUMBERINGSTANDARDS
REVISION
TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM TAG
ELEVATION NUMBER
SECTION
EXTERIOR ELEVATION
ENLARGEMENT
DETAIL
SPOT ELEVATION
LEVEL NAME
SHEET NUMBER
SHEET NUMBER
SHEET NUMBER
SHEET KEYNOTE
INTERIOR ELEVATION
SHEET NUMBER
S --------------------
SB SPLASH BLOCK
SCHED SCHEDULE
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SFRM SPRAYED FIRE-RESISTIVE MATERIAL
SFTWD SOFTWOOD
SGL SINGLE
SHT MTL FLASH SHEET METAL
(FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SKLT SKYLIGHT
SLNT SEALANT
SMK SMOKE
SMLS SEAMLESS
SP EL SPOT ELEVATION
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SST STAINLESS STEEL
ST STAIRS
STD STANDARD
STL JST STEEL JOIST
STL RF DK STEEL ROOF DECK
STOR STORAGE
STR STRINGERS
STRB/HRN STROBE/HORN
SUB FL SUBFLOOR
SV SHEET VINYL
SW SIDEWALK
T --------------------
T TREAD
T/S TUB/SHOWER
TC TERRA COTTA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TFF TOP OF FINISH FLOOR
THK THICKNESS
TK BD TACKBOARD
TMPD GL TEMPERED GLASS
TN TRUE NORTH
TOF TOP OF FOOTING
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF SLAB
TRANS TRANSOM
TRTD TREATED
TV TELEVISION
SHEET NUMBER WITHIN SERIES
A201
A204
A301
A401
ROOM
100'
LEVEL 01
100'
A
PLAN NORTH
GENERAL DEMOLITION NOTES
A. THIS WORK SHALL INCLUDE THE FURNISHING OF ALL MATERIALS, LABOR,
EQUIPMENT, AND ALL OTHER SERVICES TO CONSTRUCT THE PROJECT AS SHOWN
ON THE DRAWINGS AND AS OUTLINED IN THE SPECIFICATIONS.
B. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH THE LATEST
ADOPTED CODES, REGULATIONS, AND STANDARDS.
C. THE DRAWINGS FOR THIS PROJECT INDICATE THE GENERAL INTENT OF THE WORK
REQUIRED. SIMILAR CONDITIONS NOT SPECIFICALLY SHOWN, WHICH ARE
REQUIRED FOR A COMPLETE PROJECT, SHALL BE INCLUDED IN THE WORK.
D. IF EXISTING FIELD CONDITIONS ARE DIFFERENT THAN THAT SHOWN ON THE
DRAWINGS, THE CONTRACTOR SHALL NOTIFY THE GOVERNMENT BEFORE
PROCEEDING WITH THE WORK.
E. PROVIDE OPENINGS IN THE BUILDING CONSTRUCTION FOR THE PASSAGE OF ALL
SERVICES. DO NOT PENETRATE STRUCTURAL MEMBERS WITHOUT THE REVIEW
AND APPROVAL OF THE GOVERNMENT.
F. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE THE WORK OF
ALL DISCIPLINES AND TRADES.
G. ALL WORK SHALL BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER IN
ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDATIONS.
H. ALL WORK AND MATERIALS ARE NEW AND PROVIDED BY THE CONTRACTOR
UNLESS NOTED OTHERWISE.
I. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SAFETY ON THE JOB SITE.
J. ANY EXISTING SURFACE DAMAGED BY THE CONTRACTOR’S OPERATIONS SHALL
BE REPAIRED TO ITS ORIGINAL CONDITION.
K. THE CONTRACTOR IS RESPONSIBLE FOR THE THOROUGH COORDINATION OF ALL
TRADES.
L. ALL MOUNTING OF EQUIPMENT, FIXTURES, OR ACCESSORIES; INCLUDING WALL,
FLOOR AND CEILING INSTALLATION SHALL BE AS PER MANUFACTURER'S WRITTEN
INSTALLATION INSTRUCTIONS.
M. THE DRAWINGS COMMUNICATE INFORMATION CONCERNING SIZES, LOCATIONS,
RELATIONSHIPS, CONFIGURATIONS, AND OTHER SIMILAR ITEMS WHICH REQUIRE
CAREFUL COORDINATION OF VARIOUS SUBCONTRACTORS. THE DRAWINGS DO
NOT CONTAIN EXPLICIT INFORMATION ON EVERY DETAIL OF THE CONSTRUCTION.
CONTRACTOR SHALL BE RESPONSIBLE FOR FINAL COORDINATION BETWEEN ALL
SYSTEMS AND COMPONENTS.
N. ALL DIMENSIONS SHOWN AND INDICATED ARE TO FACE OF FINISH, UNLESS
OTHERWISE NOTED.
A. DEMOLITION INDICATED IS BASED ON EXISTING DRAWINGS AND FIELD
OBSERVATIONS. THIS DRAWING IS NOT INTENDED TO BE CONSIDERED A RECORD
DRAWING OF EXISTING CONDITIONS. THE CONTRACTOR SHALL FIELD VERIFY ALL
CONDITIONS FOR COORDINATION OF ALL APPROPRATE TRADES. REPORT ANY
CONFLICTS, DISCREPANCIES, OR DEVIATIONS TO THE ARCHITECT BEFORE
PROCEEDING WITH DEMOLITION. VERIFY EXISTING UTILITIES & SCHEDULE ALL
UTILITY OUTAGES REQUIRED FOR COMPLETION OF THE WORK FOR OWNER'S
APPROVAL.
B. THIS BUILDING CONTAINS HAZARDOUS MATERIAL THAT WILL NEED TO BE
REMOVED PER WRIGHT-PATTERSON AIR FORCE BASE, SPECIFICATION SECTION 01
35 43 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB). SEE
HAZARDOUS BUILDING MATERIAL REPORT.
C. DISPOSAL OF DEMOLISHED MATERIALS IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
D. COORDINATE DEMOLITION WITH ALL TRADES TO ENSURE THAT ALL EFFECTED
APPURTENANCES ARE REMOVED SAFELY, AND TO ENSURE THAT ACCESS AND
SERVICES TO UNAFFECTED AREAS OF THE BUILDING ARE NOT INTERRUPTED BY
THE DEMOLITION.
E. GENERAL CONTRACTOR SHALL COORDINATE WITH ALL HVAC, PLUMBING AND
ELECTRICAL SUBCONTRACTOR(S) TO FACILITATE DEMOLITION OF ITEMS
INDICATED IN ARCHITECTURAL AND STRUCTURAL DRAWINGS.
F. THE CONTRACTOR SHALL EXERCISE EXTREME CARE DURING DEMOLITION TO
PROTECT EXISTING AREAS NOT IN CONTRACT BUT ADJACENT TO WORK,
INCLUDING EXTERIOR WORK.
G. PROVIDE TEMPORARY SHORING, BRACING, AND SUPPORT OF ALL EXISTING
STRUCTURAL ELEMENTS, BEARING PARTITIONS TO REMAIN, ETC. TO MAINTAIN
SAFETY AND INTEGRITY OF THE STRUCTURE. IF ANY STRUCTURAL WALLS OR
COLUMNS NOT SHOWN IN THESE DRAWINGS ARE DISCOVERED, THEN
IMMEDIATELY NOTIFY THE OWNER AND STRUCTURAL ENGINEER.
H. REMOVE EXISTING HARD STRUCTURES; WALLS, DOORS/FRAMES, WHERE
INDICATED AS DASHED ON PLANS. SEE KEYED DEMOLITION INFORMATION ON
DEMOLITION SHEETS.
I. GENERAL CONTRACTOR SHALL COORDINATE WALL AND PARTITION DEMOLITION
WITH ALL NEW HVAC DUCTWORK.
J. PARTITION REMOVAL INCLUDES WALL-MOUNTED ITEMS, BRACING, AND ALL
EMBEDDED RECEPTACLES, THERMOSTATS, SENSORS, SWITCHES, DEVICES,
CONDUIT, AND WIRING AFTER DISCONNECTION BY APPROPRIATE CONTRACTOR.
REMOVE ALL FIRE EXTINGUISHERS AND ASSOCIATED CABINETS.
K. FLOORING REMOVAL INCLUDES CARPET, CARPET TILE, RESILIENT TILE. REMOVAL
INCLUDES BOTH VISIBLE AND HIDDEN MULTIPLE LAYERS OF FLOORING
MATERIALS, AND ALL ADHESIVES, MASTICS, OR SETTING BEDS TO PREPARE
SURFACE FOR NEW MATERIAL PER MANUFACTURER'S WRITTEN
RECOMMENDATIONS.
L. THE CONTRACTOR IS RESPONSIBLE TO PROVIDE, AS REQUIRED BY APPLICABLE
CODES, THE MEANS AND METHODS REQUIRED TO MAINTAIN APPROPRIATE
VENTILATION, LIGHTING, LIFE SAFETY, ETC. THROUGHOUT THE DEMOLITION
PROCESS. THIS SHALL INCLUDE MAINTAINING ADEQUATE EGRESS FROM ANY
OCCUPIED AREAS DURING CONSTRUCTION.
M. PATCH PENETRATIONS IN FLOOR AND WALLS RESULTING FROM DEMOLITION.
REPAIR DAMAGE TO FIRE RATED SYSTEMS INCLUDING FIRE-PROOFING.
N. PROVIDE ALL DEMOLITION REQUIRED FOR REMOVAL OF SYSTEMS, MATERIALS
AND COMPONENTS MADE OBSOLETE BY THIS PROJECT. NO SYSTEMS OR
COMPONENTS SHALL BE ABANDONED IN PLACE, U.O.N.PROTECT ADJACENT
CONSTRUCTION TO REMAIN FROM DEMOLITION AND CONSTRUCTION
O. EXISTING CEILING GRID, CEILING TILE AND LIGHTING TO REMAIN WHERE
INDICATED. REPLACE CEILING TILES DAMAGED DURING DEMOLITION ACTIVITIES.
P. REMOVE EXISTING PLUMBING FIXTURES AND CAP OFF SUPPY, WASTE AND VENT.
REFER TO MEP DRAWINGS FOR REUSE AND RELOCATION.
Q. END USER TO COORDINATE THE REMOVAL OF ALL ELECTRONIC AND
COMMUNICATIONS EQUIPMENT PRIOR TO DEMOLITION.
R. WHERE EXISTING FINISHES HAVE BEEN DEMOLISHED. PREPARE FOR NEW
SUBSTRATE AS REQUIRED.
S. PATCH AND REPAIR SURFACES AFFECTED BY DEMOLITION ACTIVITES TO MATCH
ADJACENT SURFACES.
GENERAL NOTES
A. THESE PLANS ARE NOT RECORD DRAWINGS OR AS-BUILTS. THEY INDICATE A GENERAL SCOPE
OF SELECTIVE DEMOLITION WORK REQUIRED FOR THE NEW WORK TO BE PERFORMED
PROPERLY.
B. VERIFY ALL EXISTING CONDITIONS BOTH INTERIOR AND EXTERIOR, PRIOR TO STARTING ANY
RENOVATION WORK.
C. IF ANY ITEMS IS DISCOVERED WHICH CREATE A DISCREPANCY RELATIVE TO THE REQUIRED NEW
WORK THE GOVERNMENT AND/OR OWNER SHALL BE NOTIFIED BEFORE PROCEEDING WITH THE
WORK..
D. COORDINATE THE INSTALLATION OF NEW MATERIALS WITH ALL TRADES TO ENSURE THAT ALL
EFFECTED APPURTENANCES AND ACCESS TO OTHER TRADES WILL REMAIN UNINTERRUPTED.
E. EXISTING SURFACES TO RECEIVE NEW FINISHES AS NOTED. PATCH AND REPAIR SURFACE TO
MATCH EXISTING ADJACENT SURFACE FLUSH AND SMOOTH.
F. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO PHYSICAL CONSTRUCTION FOR
CLEARANCES AND DIMENSIONS. NOTIFY ARCHITECT OF DISCREPANCIES.
G. PROVIDE WOOD BLOCKING, FLEXIBLE WOOD BACKING, STEEL STRAP BACKING PLATES, OR
SUPPORT BRACKETS REQUIRED FOR PROPER SUPPORT OF WALL-MOUNTED EQUIPMENT,
COUNTERTOPS, VIDEO DISPLAYS, ETC. ALL WOOD BLOCKING SHALL BE FIRE-RETARDANT.
H. THE FIRST THREE FLOORS OF THIS BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.
I. LEVELS 9 AND 10 SHALL BE CONSTRUCTED TO MEET ICD/ICS 705 STANDARDS.
GENERAL ENVIRONMENTAL NOTES
A. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION
01 35 43.
B. NO ASBESTOS-CONTAINING MATERIAL SHALL BE INSTALLED DURING THIS PROJECT.
C. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE
OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR
PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED
BY THE OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88
CEG/CEIEA WATER PM MIKE VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) FOR
ADDITIONAL INFORMATION.
D. THE GENERATION OF FUGITIVE EMISSIONS MUST BE KEPT TO A MINIMUM USING APPROVED DUST
SUPPRESSING METHODS SUCH AS WATER SPRAYS ON AREA OF HIGH DUST GENERATION. FOR
ADDITIONAL INFORMATION PLEASE CONTACT THE 88 CEG/CEIEA AIR PM CHRIS TUMBUSCH. CHRIS
CAN BE REACHED AT 937-257-2455 OR BY EMAIL AT CHRISTOPHER.TUMBUSCH@US.AF.MIL
E. RECOVER AND RECLAIM ANY REFRIGERANT IN ACCORDANCE WITH WPAFB SPECIFICATION
SECTION 01 35 43.
F. ALL HAZARDOUS MATERIALS MUST BE PROPERLY MANAGED, LABELED AND STORED. ANY
HAZARDOUS WASTE GENERATED FROM THIS CONSTRUCTION ACTIVITY MUST BE PROPERLY
CHARACTERIZED, LABELED AND MANAGED BY TRAINED EMPLOYEE OF THE CONTRACTOR WITH
KNOWLEDGE OF THE ACTIVITY / PROCESS WHERE THE WASTE WAS GENERATED. ALL
HAZARDOUS WASTE WILL BE TURNED OVER TO THE GOV'T FOR DISPOSAL. IN ADDITION PROPER
COORDINATION IS NEEDED WITH 88 CEG/CEIEC. QUESTIONS CONCERNING THE REQUIREMENTS
FORSTORAGE AND DISPOSAL OF ANY HAZARDOUS MATERIALS CAN BE ADDRESSED BY THE 88
CEG/CEIEC HAZARDOUS MATERIALS PM AT KAREN.BEASON@US.AF.MIL OR 937-257-5899 OR 88
CEG/CEIEC HAZARDOUS WASTE PM, MARIA.CRUSET@US.AF.MIL OR 937-257-0023.
G. ANY LEAD CONTAINING PAINT CONTROL MEASURES SHALL BE PERFORMED IN ACCORDANCE
WITH WPAFB SPECIFICATION SECTION 01 35 43.
H. ALL METAL AND WIRING SHALL BE RECYCLED AT THE WPAFB BASE RECYCLING CENTER. THE
WPAFB RECYCLING CENTER IS AVAILABLE FOR CONTRACTOR USE TO REDUCE WASTE DISPOSAL.
ALL RECYCLABLE METAL IS TO BE RECYCLED THROUGH THE BASE RECYCLING CENTER. ALL
RECYCLING MUST BE ACCOMPLISHED IN ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01
35 43. CONTACT WPAFB RECYCLING PROGRAM MANAGER AT 937-257-5060 TO CONFIRM WHAT
MATERIALS ARE RECYCLABLE AND TO COORDINATE TURN-IN. THE CONTRACTOR SHALL SUBMIT A
QUARTERLY SUMMARY REPORT TO THE GOVERNMENT CONTRACT REPRESENTATIVE IAW WPAFB
SPECIFICATION SECTION 01 35 43 STATING (1) THE COST TO RECYCLE AND THE TONNAGE OF
CONSTRUCTION AND DEMOLITION MATERIALS RECYCLED, (2) THE COST TO DIVERT/REUSE THE
TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS DIVERTED/REUSE, (3) THE COST TO
MULCH AND THE TONNAGE AND COST OF CONSTRUCTION AND DEMOLITION MATERIALS
MULCHED, (4) THE COST FOR WASTE-TO-ENERGY AND THE TONNAGE OF CONSTRUCTION AND
DEMOLITION MATERIALS CONVERTED FROM WASTE-TO-ENERGY, (5) THE COST TO LANDFILL AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS LAND-FILLED, (6) THE COST TO
INCINERATE AND THE TONNAGE OF CONSTRUCTION AND DEMOLITION MATERIALS INCINERATED,
AND (7) EXPLANATION OF THE DIVERSION RATE IF LESS THAN 60%. THE QUARTERLY SUMMARY REPORTS SHALL BE RECEIVED ON APRIL 7, JULY 7, OCTOBER 7, AND JANUARY 7 COVERING THE
THREE MONTHS PRIOR. THE QUARTERLY SUMMARY REPORTS SHALL BE ON THE WPAFB
DIVERSION FORM. FOR ADDITIONAL INFORMATION CONTACT THE RECYCLING PM, BRIAN
ROBINSON, AT 937-257-5060 OR BRIAN.ROBINSON.5@US.AF.MIL
I. TURN-IN ALL MERCURY CONTAINING DEVICES, SWITCHES AND THERMOSTATS TO 88 CEG/CEIE IN
ACCORDANCE WITH WPAFB SPECIFICATION SECTION 01 35 43 FOR RECYCLING.
J. TURN-IN ALL MERCURY CONTAINING LAMPS TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 35 43.
K. TURN-IN ALL PCB CONTAINING LIGHT BALLAST TO 88 CEG/CEIE IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 35 43.
L. REMOVE AND DISPOSE OF ANY ASBESTOS CONTAINING MATERIAL IN ACCORDANCE WITH WPAFB
SPECIFICATION SECTION 01 35 43.
M. 30 DAYS PRIOR TO START OF WORK, THE CONTRACTOR SHALL TAKE A REPRESENTATIVE
SAMPLE OF THE HVAC SYSTEM WATER TO DETERMINE WHETHER IT CAN BE DRAINED DIRECTLY
INTO THE SANITARY SEWER. ANALYZE THE WATER TO DETERMINE THE TOTAL LEVEL OF EACH OF
THE FOLLOWING: ARSENIC, CADMIUM, CHROMIUM, COPPER, CYANIDE, LEAD, MERCURY,
MOLYBDENUM, NICKEL, SELENIUM, SILVER, ZINC, SULFIDE, OIL AND GREASE, PHOSPHORUS, COD AND BOD. THE LAB PERFORMING THE ANALYSES MUST BE CERTIFIED BY OHIO EPA TO ANALYZE
FOR THESE PARAMETERS. PROVIDE A COPY OF THE LAB'S REPORT TO THE CONTRACTING
OFFICER, WHO WILL IN TURN FORWARD IT TO 88 CEG/CEIEA FOR A DETERMINATION ON THE
WASTEWATER DISPOSAL METHOD.
N. ALL WINDOW AND DOOR FRAME CAULKING AND GLAZING WILL BE TREATED AS CONTAINING
ASBESTOS UNLESS TESTING PROVES IT TO BE ASBESTOS FREE.
O. SOIL DISTURBANCE DURING THIS PROJECT, INCLUDING EQUIPMENT STAGING AREAS, WILL
REQUIRE EROSION CONTROL MEASURES. FOR PROJECTS THAT DISTURB LESS THAN AN ACRE
OF SOIL, AN EROSION CONTROL PLAN IS REQUIRED PRIOR TO SOIL DISTURBANCE. FOR
PROJECTS THAT DISTURB MORE THAN AN ACRE, A NOTICE OF INTENT (NOI) MUST BE APPROVED
BY THE OHIO EPA PRIOR TO ANY SOIL BEING DISTURBED AS WELL AS A STORM WATER
POLLUTION PREVENTION PLAN (SWPPP) APPROVED BY 88 CEG/CEIEA. PLEASE CONTACT THE 88
CEG/CEIEA WATER PM MIKE VAUGHN, (937-257-8028 OR MICHAEL.VAUGHN.3@US.AF.MIL) FOR
ADDITIONAL INFORMATION.
A PARTITION TAG
A. SAW CUT PERIMETER OF AREA TO BE REMOVED IN SOUND CONCRETE TO A 1/2"
DEPTH. VERIFY 1/2" DEPTH OF SAWCUT WILL NOT HIT TOP SLAB REINFORCEMENT
BEFORE SAW CUTTING. NOTIFY OWNER IF TOP SLAB REINFORCEMENT IS WITHIN
THE 1/2" SAW CUT ZONE.
B. CHIP OUT CONCRETE TO BE REMOVED DOWN TO SOUND CONCRETE A MINIMUM
OF 1/2" UTILIZING A 30 POUND MAXIMUM CHIPPING HAMMER. MECHANICALLY
PREPARE EXISTING CONCRETE SURFACE TO A PROFILED, CLEAN, CONTAMINANT
FREE, SOUND, DRY CONDITION SURFACE. CONCRETE SURFACE SHALL HAVE A
MINIMUM SURFACE PROFILE OF 4 (CSP-4 - TYPICAL +/- 1/16" AMPLITUDE OF
ROUGHNESS).
C. IF CONCRETE IS DETERIORATED INTO THE REINFORCING STEEL, CHIP 3/4" DEPTH
AROUND REINFORCING SO THAT REINFORCING IS EMBEDDED IN THE REPAIR
MORTAR.
D. CLEAN EXPOSED REINFORCING AND PRIME REINFORCING WITH SIKA ARMATEC 110
EPOCEM AS NOTED IN THE SPECIFICATIONS.
E. FOLLOWING SOUNDNESS AND PREPARATION INSPECTION, WET SURFACE TO A
SATURATED SURFACE DRY CONDITION WITH NO STANDING WATER. APPLY A
SCRUB COAT OF REPAIR MORTAR TO CONCRETE SURFACE PRIOR TO PLACEMENT
OF REPAIR MORTAR. APPLY REPAIR MORTAR INTO THE WET SCRUB BEFORE IT
DRIES. FOLLOW ALL MANUFACTURER'S APPLICATION INSTRUCTIONS AND
REQUIREMENTS.
F. REPAIR MORTAR SHALL BE SIKAQUICK 1000 FOR HORIZONTAL SURFACES OR
SIKAQUICK VOH FOR VERTICAL AND OVERHEAD SURFACES OR APPROVED EQUAL.
CONCRETE REPAIR NOTES
CONTRACTORS ARE FREE TO USE ANY PRODUCT WHICH MEETS THE GOVERNMENT'S MINIMUM
REQUIREMENTS AND NOT IN CONFLICT WITH OTHER CONTRACT PROVISIONS. UNLESS INDICATED OTHERWISE ON THE PLANS OR SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED MANUFACTURERS ARE THE BASIS OF DESIGN. FOR THESE BASIS OF DESIGN PRODUCTS, OTHER MANUFACTURERS MAY BE SUBSTITUTED AS LONG AS THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE SUBSTITUTED MANUFACTURER MEET OR EXCEED THE STANDARD OF QUALITY AND CHARACTERISTICS OF THE BASIS
OF DESIGN.
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/2
/2
:1
:0
P M
G-003
G E
N E
R A
L N
O T
E S
A
B B
R E
V
IA
T
IO
N S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
06/03/2022
Steven J. Birkley License # 11250 Exp 12/31/2023
W
2Q R
R
_P la ns -0
+/- 60' - 0"
170170
171171
172172
172172
PROJECT LOCATION
BUILDING 20620 TOWER BUILDING
TO HOBSON WAY
AVIONICS CIRCLE
200200
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/2
/2
:1
:0
P M
G-101
S
IT
E P
L A
N
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/64" = 1'-0"1
SITE PLAN
P L A
N N
O R
T H
A. IT SHALL BE THE CONTRACTOR'S FULL RESPONSIBILITY TO INVESTIGATE
SITE IMPROVEMENTS FOR ANY UNDERGROUND UTILITIES THAT MAY BE
PRESENT PRIOR TO PLACING ANY EQUIPMENT OR EXCAVATION WORK
START UP. NO ADDITIONAL COMPENSATION SHALL BE PAID TO THE
CONTRACTOR FOR DAMAGE AND REPAIR TO EXISTING CONDITIONS
CAUSED BY HIS WORK FORCE.
B. CONTRACTOR IS RESPONSINLE FOR INSTALLING A FENCED PERIMETER
OF THE CONTRACTOR LAYDOWN AREA. FENCE TO BE CHAINLINK, MIN 6'
HIGH WITH PRIVACY FABRIC.
C. CONTRACTOR IS RESPONSIBLE FOR PROVIDING/ EXTENDING ANY
TEMPORARY UTILITES TO FENCED AREA.
D. CONTRACTOR SHALL RESTORE ALL LAWN AND PAVEMENT AREAS
DISTURBED BY CONSTRUCTION ACTIVITIES. RESTORED GRASS AREAS
SHALL HAVE ESTABLISHED GROWTH PRIOR TO GOVT INSPECTION AND
TURNOVER.
E. PRIOR TO STARTING WORK CONTRACTOR SHALL REVIEW AND CONFIRM
w/ GOVT PROJECT REPRESENTATIVE, PROTOCAL AND PROCEDURES FOR
MAINTAINING SECURITY OF ON SITE MATERIALS AND EQUIPMENT
STORAGE AREAS AND SECURITY ACCESS TO PROJECT WORK AREAS.
F. PRIOR TO STARTING WORK CONTRACTOR SHALL REVIEW AND CONFIRM
WITH GOVT PROJECT REPRESENTATIVE SPECIFIC SITE LOGISTICS
DETAILS (FENCED AREAS, PARKING, SCAFFOLDING AREAS, CRANE AND
SCAFFOLDING AREAS, CONSTRUCTION BARRIERS, BARRIER PROTECTION
OF IMPACTED SITE CIRCULATION PATHS AND ASSOCIATED LOGISTICS)
BASED ON PROPOSED CONDITIONS DESCRIBED IN THE DOCUMENTS AND
CONTRACTORS MEANS AND METHODS PLAN FOR THE CONSTRUCTION
PERIOD. BEFORE STARTING ANY WORK, CONTRACTOR SHALL IDENTIFY
AND MARK ALL UTILITY ROUTES WITHIN ANY AREAS OF CONSTRUCTION
ACTIVITY AND AS DIRECTED BY GOVT PROJECT REPRESENTATIVE.
EXCLUDE OR PROTECT THEM FROM THE CONSTRUCTION AREA.
GENERAL NOTES
0 32' 64' 128'
ARCHITECTURAL KEYNOTES
170 BOUNDARY OF PROPOSED CONTRACTOR FENCED AREA FOR
LAYDOWN, STORAGE,TRAILERS, RESTROOMS AND
MISCELLANEOUS CONTRACTOR OPERATIONS. PLAN SHALL BE
SUBMITTED TO THE GDA FOR APPROVAL.
171 BOUNDARY OF PROPOSED CONTRACTOR PARKING AREA. PLAN
SHALL BE SUBMITTED TO THE GDA FOR APPROVAL.
172 EXISTING DRIVE AND PARKING AREAS TO REMAIN OPEN
ACCESSIBLE DURING THE CONSTRUCTION PERIOD
173 BOUNDARY OF PROPOSED GROUND LEVEL CONSTRUCTION
OPERATIONS AREA FOR CRANE OPERATION, SCAFFOLDING
CONSTRUCTION AND GENERAL GROUND LEVEL CONSTRUCTION
OPERATIONS. INSTALL CONSTRUCTION BARRIERS AND OVERHEAD
PROTECTION TO MAINTAIN AND PROTECT SEPARATION.
CONSTRUCTION OPERATIONS AREA MUST MAINTAIN STAFF AND
BUILDING SERVICES ACCESS OPERATIONS.
175 EXISTING 2ND FLOOR ENCLOSED CONNECTOR AND GROUND
LEVEL OPEN AIR WALKWAY PATH BELOW TO BE MAINTAINED
DURING CONSTRUCTION. INSTALL CONSTRUCTION SAFETY
BARRIERS AND OVERHEAD PROTECTION TO MAINTAIN AND
PROTECT SEPARATION.
200 APPROXIMATE AREA OF SITE UTILITIES. FIELD VERIFY ALL UTILITY
LOCATIONS PRIOR TO WORK.
06/03/2022
Steven J. Birkley License # 11250 Exp 12/31/2023
W
2Q R
R
_P la ns -0
PROPOSED HAUL ROUTE. ROUTE TO
BE REVIEWED AND CONFIRMED WITH
GOVT PROJECT REPRESENTATIVE
PRIOR TO STARTING WORK.
PROJECT SITE BLDG 20620
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/2
/2
:1
:0
P M
G-102
H A
U L R
O U
T E
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
NTS1
BASE PLAN - HAUL ROUTE
06/03/2022
Steven J. Birkley License # 11250 Exp 12/31/2023
W
2Q R
R
_P la ns -0
UPDN
UPDN
LAB
9DA-20
TOILET
9DA-22
ELECTRIC
CLOSET
9CW-20
CORRIDOR
9CW-21
MECHANICAL
SHAFT
9CV-19
ELEVATOR
DB-20
STAIR
CV-22
BALCONY
9DD-26
CLOSET
9CU-26
BALCONY
9CT-18
LAB
10DA-20
TOILET
10DA-22
ELECTRIC
CLOSET
10CW-20
CORRIDOR
10CW-21
MECHANICAL
SHAFT
10CV-19
ELEVATOR
DB-20
STAIR
CV-22
BALCONY
10CT-18
BALCONY
10DD-26
SECURE SPACE
SECURE SPACE
BOUNDRY LEGEND
STC 45 PERIMETER
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P
P R
\c a d d \R e v it \9
-S c ra p \T
O W
E R
S P
A C
E C
N T
R L -R a m a n d a .v ie u .r v t
/2
/2
:1
:1
P M
G-103
S O
U N
D R
A T
IN
G
P L A
N S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
S B
IR
K
L E
Y
E L E
W
IS
B
N /H
E A
P Y
J V
L W
O O
D A
R D
/0
/2
P N
O
CERTIFIED FINAL
A D
D T
O W
E R
S P
A C
E
Z H
T V
1/4" = 1'-0"1
SOUND WALL PLAN - LEVEL 9
1/4" = 1'-0"2
SOUND WALL PLAN - LEVEL 10
A. CONTRACTOR SHALL HIRE A CERTIFIED ACOUSTICAL CONSULTANT TO
CONDUCT FIELD ELECTRONIC TESTING, EXCEPT WHERE SPECIFIC
EXCEPTION IS NOTED. EXISTING ALUMINUM WINDOW AND DOOR
ASSEMBLY ON NORTH AND SOUTH BOUNDRY OF LEVEL 10 ARE
EXCLUDED FROM SOUND TESTING AND SOUND GROUP COMPLIANCE.
MINIMUM NIC OF 40 SHALL BE ACHIEVED FOR SOUND GROUP 3 ROOMS.
SOUND GROUP 3 ROOMS:
LEVEL 9 LAB
LEVEL 10 LAB
SEE FLOOR PLAN FOR STC PERIMETER. PROVIDE COPY OF SOUND
TEST RESULTS TO GOVERNMENT FOR APPROVAL.
B. SEE FLOOR PLAN FOR SECURE SPACE AREA. FILL ALL OLD
ABANDONED UTILTIY OPENINGS IN EXISTING CONCRETE WALLS AND
FLOORS (ABOVE AND BELOW SPACE) WITH FULL DEPTH CONCRETE TO
MAINTAIN SOUND RATINGS.
C. SEAL ALL NEW FLOOR AND WALL PENETRATIONS (ABOVE AND BELOW
SPACE) TO MAINTAIN SOUND RATINGS.
GENERAL NOTES
0 4' 8' 16'
P L A
N N
O R
T H
P L A
N N
O R
T H
0 4' 8' 16'
06/03/2022
Steven J. Birkley License # 11250 Exp 12/31/2023
W
2Q R
R
_P la ns -0
35-GALLON GALVONIZED STEEL
CONTAINER FOR THE HYDROLIC
OIL FOR THE ELEVATOR
22 FLB
12 LB
1 HILB w/BB
3 NMT
4 FLB
2 LB
6 FLB
6 LB
1 HILB w/BB
ELECTRICAL
SWITCHGEAR
FIRE DOOR AND
ELEVATOR DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
YELLOW JOINT COMPOUND
ASSOCIATED WITH THE
BLUE/GREY BASE COVE
KEY:
FLB
LB
BLP
HILB w/BB
BB
NMT
ACM
FLUORESCENT LIGHT BULB
LIGHT BALLAST
LIGHT BALLAST PCB
HIGHT INTENSITY LIGHT BULB
w/BATTERY BACKUP
BATTERY BACKUP
NON-MERCURY THERMOSTAT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P N
O
B
N /H
E A
P Y
J V d a y d a ta
\u s e rd a ta
\u s r\
C S
R o h re n \M y D o c s \2
-0
.0
-M
E P
-C e n tr a l_ c s ro h re n .r v t
/2
/2
:1
:2
A M
H-101
H A
Z A
R D
O U
S M
A T
E R
IA
L S
P L A
N
L E
V E
L
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
N L A
S H
L E
Y
J E
L L E
R
T S
E C
A R
Y
/0
/2
A D
D T
O W
E R
S P
A C
E
Z H
T V
CERTIFIED FINAL
SCALE: 1/8" = 1'-0"
LEVEL 1
N
GENERAL NOTES
A. THE FOLLOWING CATEGORY I/II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 1 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• GASKETS (~12 SQUARE FEET)
• TRANSITE PANELS (~60 SQUARE FEET)
• YELLOW MASTIC ASSOCIATED WITH BLUE/GRAY COVE BASE (~25 SQUARE FEET)
• FIRE DOORS (2 EACH)
• WIRING INSULATION (~25 SQUARE FEET)
B. REMOVAL OF ACM MATERIAL WILL NEED TO COMPLY WITH OSHA AND WPAFB
STANDARD SPECIFICATION SECTIONS 01 35 43 (GENERAL ENVIRONMENTAL
PROTECTION REQUIREMENTS).
C. THE FOLLOWING HAZARDOUS MATERIALS WERE REPORTED TO BE PRESENT
WITHIN THE RENOVATION AREA LEVEL1:
• FLUORESCENT LAMPS (32 EACH)
• MOLD (250 SF DRYWALL DAMAGE; 100 LF DAMAGE TO PIPE INSULATION)
• NON-PCB BALLAST (14 EACH)
• PCB BALLAST (6 EACH)
• BATTERY BACK-UP (2 EACH)
• NON-MERCURY THERMOSTAT
• 35 GALLONS OF HYDRAULIC OIL
D. MOLD REMEDIATION SHOULD BE CONDUCTED IN ACCORDANCE WITH EPA 402-
K-01-001 “MOLD REDEDICATION IN SCHOOLS AND COMMERCIAL BUILDINGS”
DOCUMENT ISSUED SEPTEMBER 2008 AND OSHA IN 29 CFR 1910.134 INDIVIDUALS
WHO USE RESPIRATORS. IN THIS REPORT IT OUTLINES HOW TO REMEDIATE MOLD
IN A SCHOOL AND/OR COMMERCIAL BUILDING IF IT OCCURS IN AN OCCUPIED
STRUCTURE.
W
2Q R
R
_P la ns -0
FIRE DOOR AND
ELEVATOR DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
FIRE DOOR AND
ELEVATOR DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
KEY:
FLB
LB
BLP
HILB w/BB
BB
NMT
ACM
FLUORESCENT LIGHT BULB
LIGHT BALLAST
LIGHT BALLAST PCB
HIGHT INTENSITY LIGHT BULB
w/BATTERY BACKUP
BATTERY BACKUP
NON-MERCURY THERMOSTAT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P N
O
B
N /H
E A
P Y
J V d a y d a ta
\u s e rd a ta
\u s r\
C S
R o h re n \M y D o c s \2
-0
.0
-M
E P
-C e n tr a l_ c s ro h re n .r v t
/2
/2
:1
:2
A M
H-102
H A
Z A
R D
O U
S M
A T
E R
IA
L S
P L A
N
L E
V E
L S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
N L A
S H
L E
Y
J E
L L E
R
T S
E C
A R
Y
/0
/2
A D
D T
O W
E R
S P
A C
E
Z H
T V
CERTIFIED FINAL
SCALE: 3/16" = 1'-0"
LEVEL 2
SCALE: 3/16" = 1'-0"
LEVEL 3
N
N
GENERAL NOTES
A. REMOVAL OF ACM MATERIAL WILL NEED TO COMPLY WITH OSHA AND WPAFB
STANDARD SPECIFICATION SECTIONS 01 35 43 (GENERAL ENVIRONMENTAL
PROTECTION REQUIREMENTS).
B. THE FOLLOWING CATEGORY II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 2 AND ARE ANTICIPATE TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
C. THE FOLLOWING CATEGORY NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 3 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
W
2Q R
R
_P la ns -0
FIRE DOOR AND
ELEVATOR DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
FIRE DOOR AND
ELEVATOR DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
KEY:
FLB
LB
BLP
HILB w/BB
BB
NMT
ACM
FLUORESCENT LIGHT BULB
LIGHT BALLAST
LIGHT BALLAST PCB
HIGHT INTENSITY LIGHT BULB
w/BATTERY BACKUP
BATTERY BACKUP
NON-MERCURY THERMOSTAT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P N
O
B
N /H
E A
P Y
J V d a y d a ta
\u s e rd a ta
\u s r\
C S
R o h re n \M y D o c s \2
-0
.0
-M
E P
-C e n tr a l_ c s ro h re n .r v t
/2
/2
:1
:2
A M
H-103
H A
Z A
R D
O U
S M
A T
E R
IA
L S
P L A
N
L E
V E
L S
-9
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
N L A
S H
L E
Y
J E
L L E
R
T S
E C
A R
Y
/0
/2
A D
D T
O W
E R
S P
A C
E
Z H
T V
CERTIFIED FINAL
SCALE: 1/4" = 1'-0"
LEVEL 5 THROUGH 9
SCALE: 1/4" = 1'-0"
LEVEL 4
N
N
GENERAL NOTES
A. REMOVAL OF ACM MATERIAL WILL NEED TO COMPLY WITH OSHA AND WPAFB
STANDARD SPECIFICATION SECTIONS 01 35 43 (GENERAL ENVIORNMENTAL
PROTECTION REQUIREMENTS).
B. THE FOLLWING CATEGORY II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 4 AND ARE ANTICIPATE TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
C. THE FOLLOWING CATEGORY NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 5 THROUGH LEVEL 9 AND ARE ANTICIPATED TO BE IMPACTED
OR DISTURBED AS A RESULT OF TIS PROJECT:
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
W
2Q R
R
_P la ns -0
FIRE DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
ELEVATOR DOOR
GASKETS ASSOCIATD WITH FLANGES AND VALVES
STARTS IN THE MECHANICAL ROOM AND RUNS
THROUGH THE MECHANICAL CHASE
MECH
10-5
ACM TAN MASTIC ASSOICATED WITH HVAC
SYSTEMS LOCATED ABOVE CEILING
5 FLB
3 LB
8 FLB
4 LB
1 BB
1 NMT
FIRE DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
ELEVATOR DOOR
GASKETS ASSOCIATD WITH FLANGES AND VALVES
STARTS IN THE MECHANICAL ROOM AND RUNS
THROUGH THE MECHANICAL CHASE
MECH
11-5
ACM TAN MASTIC ASSOICATED WITH HVAC SYSTEMS
AND TAN WRAP ASSOCIATED WITH REPAIRS ON THE
PIPING INSULATION LOCATED ABOVE CEILING
4 FLB
1 LB
16 FLB
4 LB
2 NMT
100 SQUARE FEET OF MOLD
DAMAGE TO THE DRYWALL
50 LINEAR FEET MOLD DAMAGE
TO PIPE INSULATION IN THE
BATHROOM
TLT
11-2
KEY:
FLB
LB
BLP
HILB w/BB
BB
NMT
ACM
FLUORESCENT LIGHT BULB
LIGHT BALLAST
LIGHT BALLAST PCB
HIGHT INTENSITY LIGHT BULB
w/BATTERY BACKUP
BATTERY BACKUP
NON~MERCURY THERMOSTAT
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P N
O
B
N /H
E A
P Y
J V d a y d a ta
\u s e rd a ta
\u s r\
C S
R o h re n \M y D o c s \2
-0
.0
-M
E P
-C e n tr a l_ c s ro h re n .r v t
/2
/2
:1
:2
A M
H-104
H A
Z A
R D
O U
S M
A T
E R
IA
L S
P L A
N
L E
V E
L S
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
N L A
S H
L E
Y
J E
L L E
R
T S
E C
A R
Y
/0
/2
A D
D T
O W
E R
S P
A C
E
Z H
T V
CERTIFIED FINAL
SCALE: 1/4" = 1'-0"
LEVEL 10
SCALE: 1/4" = 1'-0"
LEVEL 11
N
N
A. THE FOLLOWING CATEGORY I/II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 10 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• HVAC TAN MASTIC (~25 SQUARE FEET)
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
B. REMOVAL OF ACM MATERIAL WILL NEED TO COMPLY WITH OSHA AND WPAFB
STANDARD SPECIFICATION SECTIONS 01 35 43 (GENERAL ENVIRONMENTAL
PROTECTION REQUIREMENTS).
C. THE FOLLOWING HAZARDOUS MATERIALS WERE REPORTED TO BE PRESENT
WITHIN THE RENOVATION AREA LEVEL10:
• FLUORESCENT LAMPS (13 EACH)
• NON-PCB BALLAST (7 EACH)
• BATTERY BACKUP (1 EACH)
• NON-MERCURY THERMOSTAT (1 EACH)
D. THE FOLLOWING CATEGORY I/II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 11 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• HVAC TAN MASTIC (~25 SQUARE FEET)
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
• TAN WRAP ASSOCIATED WITH PIPING INSULATION (~25 SQUARE FEET)
E. THE FOLLOWING HAZARDOUS MATERIALS WERE REPORTED TO BE PRESENT
WITHIN THE RENOVATION AREA LEVEL11:
• FLUORESCENT LAMPS (20 EACH)
• NON-PCB BALLAST (5 EACH)
• NON-MERCURY THEROSTAT (1 EACH)
• MOLD (100 SF DRYWALL DAMAGE; 50 LF DAMAGE TO PIPE INSULATION)
F. MOLD REMEDIATION SHOULD BE CONDUCTED IN ACCORDANCE WITH EPA 402-
K-01-001 “MOLD REDEDICATION IN SCHOOLS AND COMMERCIAL BUILDINGS”
DOCUMENT ISSUED SEPTEMBER 2008 AND OSHA IN 29 CFR 1910.134 INDIVIDUALS
WHO USE RESPIRATORS. IN THIS REPORT IT OUTLINES HOW TO REMEDIATE MOLD
IN A SCHOOL AND/OR COMMERCIAL BUILDING IF IT OCCURS IN AN OCCUPIED
STRUCTURE.
GENERAL NOTES
W
2Q R
R
_P la ns -0
FIRE DOOR
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
ELEVATOR DOOR
GASKETS ASSOCIATD WITH FLANGES AND VALVES
STARTS IN THE MECHANICAL ROOM AND RUNS
THROUGH THE MECHANICAL CHASE
MECH
12-5
ACM TAN MASTIC ASSOICATED WITH HVAC SYSTEMS
AND TAN WRAP ASSOCIATED WITH REPAIRS ON THE
PIPING INSULATION LOCATED ABOVE CEILING
2 FLB
1 LB
8 FLB
4 LB
4 NMT
150 SQUARE FEET OF MOLD
DAMAGE TO THE DRYWALL
50 LINEAR FEET MOLD DAMAGE
TO PIPE INSULATION IN THE
BATHROOM
TLT
12-2
KEY:
FLB
LB
BLP
HILB w/BB
BB
NMT
ACM
FLUORESCENT LIGHT BULB
LIGHT BALLAST
LIGHT BALLAST PCB
HIGHT INTENSITY LIGHT BULB
w/BATTERY BACKUP
BATTERY BACKUP
NON-MERCURY THERMOSTAT
BUS BOX RUNS
LENGTH OF
BUILDING TO THE
12TH FLOOR
GASKETS ASSOCIATD WITH FLANGES AND VALVES
STARTS IN THE MECHANICAL ROOM AND RUNS
THROUGH THE MECHANICAL CHASE
MECH
13-5
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
F ile
P a th
P lo t D a te
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
P N
O
B
N /H
E A
P Y
J V d a y d a ta
\u s e rd a ta
\u s r\
C S
R o h re n \M y D o c s \2
-0
.0
-M
E P
-C e n tr a l_ c s ro h re n .r v t
/2
/2
:1
:2
A M
H-105
H A
Z A
R D
O U
S M
A T
E R
IA
L S
P L A
N
L E
V E
L
A
N D
R O
O F
W R
IG
H
T -P
A T
T E
R S
O N
A
IR
F O
R C
E B
A S
E O
H L O
U
IS
V
IL
L E
D
IS
T R
IC
T
D
R M
A R
T
IN
L U
T H
E R
K
IN
G J
R P
L
L O
U
IS
V
IL
L E
K
Y
B U
R G
E S
S
N
IP
L E
V
IN
E
S T
S
U
IT
E
C
IN
C
IN
N
A T
I, O
H
N L A
S H
L E
Y
J E
L L E
R
T S
E C
A R
Y
/0
/2
A D
D T
O W
E R
S P
A C
E
Z H
T V
CERTIFIED FINAL
SCALE: 1/4" = 1'-0"
LEVEL 12
N
A. THE FOLLOWING CATEGORY I/II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 12 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• HVAC TAN MASTIC (~25 SQUARE FEET)
• WIRING INSULATION (~20 SQUARE FEET)
• FIRE DOOR (STAIRS AND ELEVATOR)
• TAN WRAP ASSOCIATED WITH PIPING INSULATION (-25 SQUARE FEET)
• GSKETS (~6 SQUARE FEET)
B. REMOVAL OF ACM MATERIAL WILL NEED TO COMPLY WITH OSHA AND WPAFB
STANDARD SPECIFICATION SECTIONS 01 35 43 (GENERAL ENVIRONMENTAL
PROTECTION REQUIREMENTS).
C. THE FOLLOWING HAZARDOUS MATERIALS WERE REPORTED TO BE PRESENT
WITHIN THE RENOVATION AREA LEVEL 12:
• FLUORESCENT LAMPS (10 EACH)
• NON-PCB BALLAST (5 EACH)
• NON-MERCURY THERMOSTAT (4 EACH)
• MOLD (150 SF DRYWALL DAMAGE; 50 LF DAMAGE TO PIPE INSULATION)
D. THE FOLLOWING CATEGORY I/II NON-FRIABLE ACM WERE DETERMINED WITHIN THE
CONFINES OF LEVEL 12 AND ARE ANTICIPATED TO BE IMPACTED OR DISTURBED AS
A RESULT OF THIS PROJECT:
• WIREING INSULATION (~20 SQUARE FEET)
• GASKETS (~6 SQUARE FEET)
E. MOLD REMEDIATION SHOULD BE CONDUCTED IN ACCORDANCE WITH EPA 402-
K-01-001 “MOLD REDEDICATION IN SCHOOLS AND COMMERCIAL BUILDINGS”
DOCUMENT ISSUED SEPTEMBER 2008 AND OSHA IN 29 CFR 1910.134 INDIVIDUALS
WHO USE RESPIRATORS. IN THIS REPORT IT OUTLINES HOW TO REMEDIATE MOLD
IN A SCHOOL AND/OR COMMERCIAL BUILDING IF IT OCCURS IN AN OCCUPIED
STRUCTURE.
GENERAL NOTES
SCALE: 1/4" = 1'-0"
ROOF LEVEL
N
W
2Q R
R
_P la ns -0
A. CODES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .