This federal solicitation seeks proposals for construction and renovation services at Building 620 at Wright-Patterson Air Force Base in Ohio. The work includes adding two floors of lab space and constructing balconies, as well as renovating existing areas including replacing electrical systems and installing new fire suppression and lab spaces. The estimated cost is between $5-10 million. The solicitation is full and open and utilizes the HUBZone 10% price evaluation preference. The point of contact is Jessica Moss. The deadline for proposals is July 8, 2022.

View the file

Other files

File Type Posted
W912QR22R0060_Plans-0009.pdf PDF
W912QR22R0060_Specs-0009.pdf PDF
W912QR22R0060_Specs-0007.pdf PDF
W912QR22R0060_Plans-0007.pdf PDF
W912QR22R0060-0006.pdf PDF
W912QR22R0060-0005.pdf PDF
W912QR22R0060-0004.pdf PDF
W912QR22R0060-0003.pdf PDF
W912QR22R0060-0002.pdf PDF
W912QR22R0060-0001.pdf PDF
W912QR22R0060_Plans-0000.pdf PDF
W912QR22R0060_Specs_Vol1-0000.pdf PDF
W912QR22R0060_Specs_Vol2-0000.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B620 Tow er Renovation at WPAFB, OH.

Estimated Construction Cost is betw een $5,000,000 and $10,000,000 Per FAR 36.204.

NAICS Code 236220. Size Standard $39,500,000. Please note that business size in the System for Aw ard Management (SAM) is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business w ill be considered other than a small business.

This is a Full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.

AFARS 5132.702(a)(ii)(B): Funds are not presently available for this acquisition. No contract aw ard w ill be made until appropriated funds are made available.

Central Contractor Registration and ORCA are now available through SAM, available at w w w .sam.gov. Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

PLEASE NOTE: Page numbering in this document may not be accurate.

JESSICA K MOSS 502.315.6179

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

09-Jun-2022

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 Jul 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:

W912QR22R0060 114

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

PRICE BREAKOUT SCHEDULE

SECTION 00 10 00

PRICE BREAKOUT SCHEDULE

PROJECT: Add/Alter B620 Tower Renovation

LOCATION: Wright-Patterson AFB, Dayton, Ohio

OFFEROR NAME:

Item Description Unit Amount

BASE BID

0001 Facility 20620 Construction and 9th Floor Level Addition – EEIC 529 work: Add lab space by constructing a new 9th floor (approximately 750 net square feet), to the existing 13 story research tower with the 9th floor as secure SAP lab space. Includes installing new fire suppression in added space, new rest room facilities with all necessary plumbing and fixtures, new power and lighting, new elevator access, new HVAC duct & controls by tying into existing nearby duct/piping dedicated & originally sized for heating/cooling for up to three additional floors (no increase in HVAC tonnage is required), and new balconies on 9th, 10th,, 11th, and 12thfloors (approximately 1,350 net square feet). Balcony construction locations are adjacent to the north and south sides of the new 9th floor and adjacent to the north and south sides on the existing 10th, 11th, and 12th floors. Provide interior and exterior building treatments.

Job

EEIC 524 Sustainment Repair Fac. 20620 Tower – This project scope includes alteration of existing building areas in the tower and includes Remove and replace existing electrical bus, elevator, loading dock leveler, and wall/floor/ceiling finishes.

0003 Facility 20620 EEIC 522 Renovation Repair – This project scope includes alteration of existing building areas in the tower and includes Renovate the 10th floor to provide Special Access Program (SAP) lab space due to this floor elevation has greater visibility to the flight line unachievable from lower floors. Work includes sealing unprotected penetrations in firewalls, installing new doors with automatic door closers on the 10th, 11th, and 12th floors, removing electrical panels from 10th floor stair well, providing code compliant guards in the stairwell, providing an egress door on the 1st floor that directly leads to outdoors, providing automatic sprinkler protection from the 13th floor for the electrical shafts below and providing fire rated doors between the elevator doors and labs on the 10th, 11th, and 12th floors.

0004 Facility 20620 Insulative window shades on the 1st, 11th, and 12th Floor Levels –

This scope item includes window equipment listed as Insulative shades on levels 1, 11, and 12 of existing building areas in the tower.

0005 Facility 20620 window shades on the 10th Floor Level –

This scope item includes window equipment listed as Insulative shades on levels 1, 11, and 12 of existing building areas in the tower.

0006 Facility 20620 window shades on the 9th Floor Level –

This scope item includes window equipment listed as Insulative shades on level 9 of existing building areas in the tower.

Total Base Bids (CLINs 0001-0006)

OPTIONS

0007 Option 1 - 8th Floor

As an Alternate, construct a complete new 8th floor level below the Base-bid new 9th floor level excluding the CLIN item 0006 “Insulative shades” Add lab space by constructing new 8th floors (approximately 750 net square feet), to the existing 13 story research tower.

Includes installing new fire suppression in added space, new rest room facilities with all necessary plumbing and fixtures, new power and lighting, new elevator access, new HVAC duct & controls by tying into existing nearby duct/piping dedicated & originally sized for heating/cooling for up to three additional floors (no increase in HVAC tonnage is required), and new balconies on 8th floors. Balcony construction locations are adjacent to the north and south sides of the new 8th floors

Option 2 - 8th Floor

This scope item includes window equipment listed as Insulative shades on level 8.

Total All Options $

Total Base Bid with All Options $

NOTES FOR PRICE BREAKOUT SCHEDULE

1. The company name should be indicated on the face of the Price Breakout Schedule to preclude being misplaced.

2. Bidders must insert a price on all numbered items (including options) of the Price Breakout Schedule.

Failure to do so may result in the offer being unacceptable.

3. Description of Bid Items - The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the bidder for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the Price Breakout Schedule.

DESCRIPTION OF BASE BID ITEMS

a) Item No. 0001 - "Facility 20620 Renovation and 9th Floor Level Addition" includes all construction work for alteration of existing building areas at all levels in the tower and includes the addition of a new floor level of construction below the existing 10th floor level as the new 9th floor level as indicated on the Construction Documents.

DESCRIPTION OF OPTION BID ITEMSI

a) Item No. 0007 – “Option 1 - 8th Floor” includes equipment and construction work as an alternate for the construction of a complete new 8th floor level below the Base-bid new 9th floor level. See drawings and specifications for further definition. The Contracting Officer may exercise this option within 120 calendar days from issuance of Notice to Proceed.

b) Item No. 0008 – “Option 2 – 8th Floor” – The Contracting Officer may exercise this option within 120 calendar days from issuance of Notice to Proceed.

-END OF PRICE BREAKOUT SCHEDULE—

SF 1442 BLOCK 10 CONTINUATION

The solicitation will be available on the web only. Faxed, telephoned, or mailed requests for this solicitation will not be honored. To download the solicitation for this project, contractors are required to register at the Federal Contract.

Opportunities website at beta.SAM.gov. For a quick start guide use the following link:

http://falextracts.s3.amazonaws.com/Documentation/Federal%20Hierarchy/QSG%20Opportunities%20Part%204% 20of%204%20-%20Contractors.pdf

Amendments will be available from the website by download only.

Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, ProjNet Instructions for further guidance.

Please see FAR 52.236-27 ALT 1 for Site Visit information.

The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.

Please note, page numbering in this document may not be accurate.

ADDITIONAL INFORMATION:

Central Contractor Registration and ORCA are now available through the System for Award Management (SAM), available at www.sam.gov. Offerors must comply with the requirements of 52.204-7, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

Section 00 21 00 - Instructions

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self register into system.

The Solicitation Number is: W912QR22R0060 The Bidder Inquiry Key is: IRX87R-3F3TCW Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret

Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your

SecretQuestion.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within three (3) calendar days prior to the closing date stated in the solicitation.

ELECTRONIC BID SUBMISSION INST

Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.

Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:

1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal.

This will need to be completed five (5) business days prior to proposal due date.

a. Jessica Moss, Contract Specialist at Jessica.K.Moss@usace.army.mil

b. Patrick Duggins, Contracting Officer at Patrick.J.Duggins@usace.army.mil

2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two (2) business days prior to the proposal due date.

3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter

W912QR22R0060-FIRMNAME.

4. Click Upload button to send documents.

5. Guest users will need to check their email to verify their email address before the recipients will be notified.

(Government-issued Common Access Cards (CACs) are not required).

File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.

File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:

W912QR22R0060-FIRMNAME-VOLUME I

W912QR22R0060-FIRMNAME-VOLUME II

Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.

Please see examples above.

File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in each section for each factor.

Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.

Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).

Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.215-1 Instructions to Offerors--Competitive Acquisition DEC 2021 52.217-5 Evaluation Of Options JUL 1990 252.215-7008 Only One Offer JUL 2019 252.215-7013 Supplies and Services Provided by Nontraditional Defense

Contractors.

JAN 2018

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3M, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers – LRL ATTN: Patrick Duggins, Room 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for— A Site Visit/ Pre -Proposal Meeting is scheduled for 22, 23, 24 June 2022. We will be holding multiple visits over

(3) days for this project.

All attendees are required to meet at Pass and ID in Area A of WPAFB for In-Processing at 0830 and 1200 hours Eastern Time per your respective time slot on the confirmation email.

Schedule:

Morning Session:

0830-0900: Registration for site visit (USACE will sponsor visitors for a (1) day base pass) 0900-1100: Site Visit at site location

Afternoon Session:

1200-1230: Registration for site visit (USACE will sponsor visitors for a (1) day base pass) 1230-1430: Site Visit at site location

No inquiries will be allowed during the site visit. All inquiries must be submitted via the Projnet Bidder Inquiry site.

A Bidder Key is provided with the solicitation information. Please RSVP the following information:

1. Name of Attendee

2. Company

3. Phone Number and Email Address

4. Time Slot and Day of Site Visit will be assigned to each participant.

Please remember to bring a Current State Issued ID in order to attend the site visit.

Send RSVP to John.P.Hearn@usace.army.mil, USACE must receive the email by 1500 hours Eastern Time on 15 June 2022. No additional attendees will be registered after this date or time. A Confirmation email will be sent out by 17 June 2022, to confirm each registration. It will include driving instructions to WPAFB visitors center. We will also provide a base map and any other pertinent information.

In Addition to the above requirements – each Participant or Company Must Provide a list of participants on Company Letterhead and signed by an Authorized agent of the Company, it cannot be a person attending the site visit.

The following information is required to be provided for each participant:

• Full Name

• Date of Birth

• Driver License # and state OR US Passport #

• A valid email address

• Statement avowing that all persons are US citizens

Letters need to be sent to: beth.rinderle@us.af.mil – This Letter must be sent to AFRL No later than 15 June 2022.

NO ELECTRONIC DEVICES WILL BE PERMITTED ON THE SITE VISIT; To include, but not limited too: Cell Phones, Cameras or Tablets etc.

(c) Participants will meet at-- Pass and ID in Area A of WPAFB

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov

The full text of a DFARS provision may be accessed electronically at this/these address(es):

https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 22 00 - Supplementary Instructions

EVALUATION CRITERIA

PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION CRITERIA

1. Overview

1.1 The intent of this solicitation is to select one contractor for the Add/Alter AFRL Tower, Bldg 620 Area B located at Wright Patterson Air Force Base (WPAFB). The basis of award is the Best Value Trade-Off process. The Government will evaluate the proposals in accordance with the criteria described herein. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority (SSA) determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.2 This project involves both renovation and construction. The renovation includes the removal and replacement of existing electrical bus, elevator, loading dock leveler, and wall/floor/ceiling finishes, and Special Access Program (SAP) on the 10th floor. Renovation also includes sealing unprotected penetrations in firewalls, installing new doors with automatic door closers on the 10th, 11th, and 12th floors, removing electrical panels from 10th floor stair well, providing code compliant guards and hand railing in the stairwell, providing an egress door on the 1st floor, providing automatic sprinkler protection from the 13th floor for the electrical shafts below, and providing fire rated doors between the elevator doors and labs on the 10th, 11th, and 12th floors.

The construction includes adding lab space by constructing 8th and 9th floors (approximately 1,500 net square feet) to the existing 13-story research tower with the 9th floor constructed as secure SAP lab space.

The newly added space construction involves installing new fire suppression in the added space, new rest room facilities, new power and lighting, new elevator access, new HVAC duct & controls, and new balconies on 8th, 9th, 10th, 11th, and 12th floors (approximately 1,350 net square feet).

1.3 The target ceiling for contract award for construction is $5,800,000.00 based on the funds made available for this project. The Government may not be able to award a contract in excess of this ceiling. Offerors are under no obligation to approach this ceiling.

2. Submittal of Offers

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's past performance, and technical approach necessary for successful completion of the project. Requirements stated in the Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.

2.2 Due to COVID-19 impacts, all submissions to this proposal announcement shall be submitted electronically through DoD SAFE no later than the time and date specified in Block 13 of Standard Form 1442. Please refer to and follow the instructions specified in the Electronic Proposal Submission Instructions, attached herein.

2.3 Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted electronically with a table of contents and section dividers. The sections should parallel the submission requirements identified herein.

2.4 Volume I shall be submitted electronically in accordance with the Proposal Submission Instructions in Section 00 21 00 and include the following information:

Volume I – Factor I: Past Performance Volume I – Factor II: Management Plan Volume I – Factor III: Small Business Participation Plan

NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit will not be evaluated.

2.5 Volume II shall be submitted electronically in accordance with the Electronic Bid Submission Instructions in Section 00 21 00 and include the following information:

Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule Volume II – Tab B: Joint Venture Agreements Volume II – Tab C: Evidence of Ability to Obtain Bonding & Proof of Financial Ability Volume II – Tab D: Pre-Award Information Volume II – Tab E: Subcontracting Plan

NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.

3. Proposal Evaluation Process

3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals (i.e., the non-price evaluation factors) will be reviewed and rated without knowledge of the price offered.

The number and identities of offerors will not be revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is Best Value Trade-Off, as stated above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical evaluation, price evaluation, and price/technical trade-off analysis.

3.2.1 Proposal Compliance/Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements. Factor

I – Past Performance will be rated using Tables 1 & 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience, and the quality of the offeror’s performance. Factor II –Management Plan will be rated using Table 3 below.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical/quality evaluation. The SSEB will not have access to price information until completion of the technical/quality evaluation.

3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The SSA will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors

4.1 Proposals will be evaluated in accordance with the factors and sub factors below, listed in relative order of importance. All evaluation factors, other than cost or price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

4.2 Volume I – Factor I: Past Performance 1st

4.3 Volume I – Factor II: Management Plan 2nd

4.4 Volume I – Factor III: Small Business Participation Plan 3rd

4.5 Volume II – Pro Forma Information

Tab A Standard Form 1442 and Price Breakout Schedule Not Rated

Tab B Joint Venture Agreements Not Rated

Tab C Evidence of Ability to Obtain Bonding Not Rated and Proof of Financial Ability

Tab D Pre-Award Information Not Rated

Tab E Subcontracting Plan Acceptable / Unacceptable

4.6 Ratings:

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

Table 1 Past Performance Relevancy Ratings

Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Table 2 Performance Confidence Assessments

Rating Description Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.

Table 3 Technical Assessment Ratings

Adjectival Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.

Proposal is unawardable.

TABLE 4

Small Business Ratings

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

4.7 Definitions:

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offerors’ proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).

7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “PPIRS” or “FAPIIS.”

5. Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last five (5) years (from the solicitation issue date) which are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to complete all phases of the project. An IDIQ contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size consist of a minimum of five (5) floors of new vertical construction utilizing elevated concrete slabs with a total of at least 2,850 square feet.

5.1.3 Projects considered similar in scope to this project include a minimum of 5 floors of new vertical construction utilizing elevated concrete slabs.

5.1.4 The prime contractor must have self-performed at least 20% of the cost of the contract, not including the cost of materials, with its own employees to be considered similar.

5.1.5 Additional consideration may be given for projects which contain the following features:

a) Projects completed for USACE

b) Projects that have had ICD 705 requirements

c) Projects consisting of new balcony additions to elevated concrete structures.

5.1.6 The following information shall be provided for each project:

a) Project Title, Contract Number, and Location.

b) Current percentage of construction complete and when it was or will be completed.

1. If project is not yet complete, provide a description of work remaining to be completed.

c) Scope of the project, to include purpose/use of facility.

d) Size of the project; differentiate square footage of new construction versus renovation (if the project includes both).

e) Role of firm: Provide a description of the type of work performed and the percentage of work that was self-performed.

f) Dollar value of the project.

g) Customer primary point of contact (POC) and alternate POC (name, relationship to project, agency/firm affiliation, city, state, current and correct phone number, and current and correct email address).

5.1.7 Provide two references for all of the projects identified in Paragraph 5.1.1, 5.1.2, and 5.1.3. Reference information must include project name, location, owner’s name, point of contract, telephone number, and email address.

For this factor, also include any ratings, letters, awards, etc. which support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s corrective action.

NOTE: For purposes of evaluating Past Performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed joint venture agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each party of the Joint Venture must submit their own Unique Entity Identifier number with the JV proposal. If the offeror represents the combining of two or more companies as a joint venture for the purpose of this RFP, each company in the joint venture may submit project examples, but the total submitted by the joint venture will not exceed five (5).

5.2. Evaluation Criteria:

5.2.1 The SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size and magnitude of effort, and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings (Table 1), above.

5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.

In addition to the information submitted by the offeror, the Government may review any other sources of relevant information for evaluating past performance, including similar projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers identified in the offeror’s proposal. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.2.3 The SSEB will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.

6.0 Volume I – Factor II: Management Plan

6.1 Submission Requirements:

Provide a management plan narrative for the project that describes how your labor, resources, designers, subcontractors, and material suppliers will be managed, supervised, coordinated, and used to ensure successful completion of the project. Additionally, the Management Plan shall include the following information:

Identify significant areas of risk related to this project and provide your plan for mitigating the identified risks during contract performance.

Discuss your means and methods of constructing the elevated platforms and the safety procedures related to those features.

Describe your process for coordinating with existing building functions and personnel.

Narrative should reference how construction activities (utility service interruptions, construction parking/beddown areas, escorting requirements) will be integrated into the project to ensure minimal impact to ongoing building operations.

NOTE: There…