W912QR22R0020_Plans-0002.pdf
PDF 9 MB Posted
- Solicitation number
- W912QR22R0020
About this file
This solicitation is for a runway renovation project at Grissom Air Reserve Base. The project scope includes repairing taxiway throats at Taxiway C by removing all pavement layers to subgrade and replacing with Portland cement concrete. Additional work includes repairing sections of Taxiway G by removing asphalt over Portland cement concrete at full depth and replacing with PCC. A variable mill and overlay will be conducted for the full length of Runway 12,501 feet, with 1,200 linear feet repaired to full depth with PCC. Runway shoulders along the entire length will also be repaired by variable milling and overlaying with asphalt concrete. Overruns at each end of the runway will be repaired by milling the surface and overlaying with asphalt concrete. Airfield lighting circuits will also be repaired or replaced. The solicitation was issued by the Department of the Army Corps of Engineers Engineering District Louisville.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RUNWAY 05-23
TAXIWAY F
T A
X I W
A Y
D
T A
X I W
E
A
X
I
W
C
A
X
I
W
B
A
X I W
TAXIWAY G
T
A
X
I
W
G
R
I
S
S
O
M
V
E
W
A
R
T
H
S
B
O
X
C
R
N
H
O
S
I
L
V
D
B
A
K
A
L
CIVILIAN
AIRCRAFT
APRON
MASS
PARKING
APRON
(MPA)
BASE BID
25 'RUNWAY SHOULDERS, ASSOCIATED
TAXIWAY SHOULDERS, AND
TAXIWAY A & D THROATS
SEE SHEETS GC101-GC102 FOR
PHASING INFORMATION
BASE BID
200' WIDE RUNWAY
(EXCL. PCC SECTIONS)
SEE SHEETS GC101-GC102
FOR PHASING INFORMATION
BASE BID
RUNWAY OVERRUNS
SEE SHEETS GC101-GC102
FOR PHASING INFORMATION
BASE BID
RUNWAY OVERRUNS
SEE SHEETS GC101-GC102
FOR PHASING INFORMATION
BID OPTION #1
TAXIWAY G/MPA
SEE SHEET GC103 FOR
PHASING INFORMATION
PCC PAVEMENT
SECTIONS TO REMAIN
CONTRACTOR'S HAUL ROUTE (TYP.)
SEE NOTE 12 AND SHEETS
GC101-GC105 FOR WORK/BID
OPTION-SPECIFIC AIRFIELD ACCESS,
HAUL ROUTES, AND SIGNAGE
TRANSIENT
APRON
~2 AC SITE CONTRACTOR
STAGING AREA
BID OPTION #1
TAXIWAY G/MPA
SEE SHEET GC104 FOR
PHASING INFORMATION
BID OPTION #1
TAXIWAY C THROAT (NORTH)
SEE SHEET GC105 FOR
PHASING INFORMATION
PCC PAVEMENT
SECTION TO REMAIN
BASE BID
25 'RUNWAY SHOULDERS, ASSOCIATED
TAXIWAY SHOULDERS, AND
TAXIWAY A & D THROATS
SEE SHEETS GC101-GC102 FOR
PHASING INFORMATION
BASE BID
TAXIWAY C THROAT (SOUTH)
SEE SHEETS GC101-GC102
FOR PHASING INFORMATION
AIRFIELD
ACCESS GATE
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #2
~5 AC SITE. LIMITS OF ON-BASE
LOCATION TO BE CONFIRMED BY
BASE REPRESENTATIVE.
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #1
~2.5 AC SITE. LIMITS OF ON-BASE
LOCATION TO BE CONFIRMED BY
BASE REPRESENTATIVE.
BASE ENTRANCE
SECURITY CHECKPOINT
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T I
U T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
P
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
F
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D A
R G
I E
C
S A
W Y
E R
C
S A
W Y
E R
R
D O
W N
S
G E
N E
R A
L
S
I T
E
P
L A
N
GI111
GENERAL PLAN NOTES:
1. SEE WORK SUMMARY, THIS SHEET, FOR BASE BID AND CIVIL WORKS BID OPTION OVERVIEW.
2. SCHEDULE MANPOWER AND EQUIPMENT AS REQUIRED TO COMPLETE ALL SCHEDULED WORK WITHIN THE SPECIFIED TIME
FRAMES. SEE TIME FRAMES ON PHASING PLANS.
3. MAINTAIN COMMUNICATION AND PROJECT COORDINATION WITH THE CONTRACTING OFFICER'S REPRESENTATIVE AND BASE
OPERATIONS AT ALL TIMES.
4. AIRCRAFT OPERATING AREAS (AOA) SHALL REMAIN ACTIVE THROUGHOUT THE PROJECT EXCEPT DURING THE CLOSURE
PERIOD. PLACE LIGHTED LOW PROFILE BARRICADES AND/OR CHANNELIZER CONES AT THE LOCATIONS SHOWN ON THE
PHASING PLANS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER'S REPRESENTATIVE AND BASE OPERATIONS. LOW
PROFILE BARRICADES SHALL BE UTILIZED ADJACENT TO ALL AREAS WHERE AIRCRAFT ARE OPERATING.
5. NOTAMS SHALL BE ISSUED BY THE GOVERNMENT AFTER COORDINATING WITH THE CONTRACTING OFFICER'S
REPRESENTATIVE AND BASE OPERATIONS. NOTICE TO AIRMEN (NOTAMS) SHALL BE ISSUED FOR RUNWAY CLOSURES AND
REOPENING. COORDINATE, IN WRITING, SCHEDULED RUNWAY CLOSURES AND REOPENINGS A MINIMUM OF 72 HOURS IN
ADVANCE UNLESS OTHERWISE SPECIFIED.
6. REFER TO "ARTICLE II - GENERAL AND SPECIAL PROVISIONS" OF THE CONTRACT DOCUMENTS FOR ADDITIONAL SAFETY
CONSIDERATIONS.
7. THE LOCATION OF THE CONTRACTOR'S FIELD OFFICE AND STAGING AREA FOR STORING MATERIALS AND PARKING
CONSTRUCTION EQUIPMENT WILL BE PROVIDED BY THE BASE. THE BASE WILL INDICATE LOCATION OF WATER AND
ELECTRICITY SOURCES. THE CONTRACTOR SHALL COORDINATE THE UTILITY CONNECTIONS WITH THE PUBLIC UTILITY
COMPANIES. ALL COSTS ASSOCIATED WITH THE UTILITY CONNECTIONS AND MODIFICATIONS WILL BE BORNE BY THE
CONTRACTOR (SEE SPEC 00 80 00.00 06, PARA 1.10.A). THE ACTUAL SIZE OF THE STAGING AREA SHALL BE APPROVED BY BASE
OPERATIONS AND THE CONTRACTING OFFICER'S REPRESENTATIVE PRIOR TO COMMENCING WITH CONSTRUCTION. CLEARLY
MARK THE ACCESS ROUTES TO PREVENT CONSTRUCTION EQUIPMENT AND VEHICLES FROM ENTERING ACTIVE AIRFIELD
OPERATIONS AREAS. RESTORE THE STORAGE AREAS AND ACCESS ROUTES TO THEIR ORIGINAL OR IMPROVED CONDITION AS
WELL AS ROADS AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. PROVIDE SUFFICIENT EROSION AND SILTATION CONTROL DEVICES TO ENSURE THAT NO SILT OR OTHER CONSTRUCTION
MATERIALS ARE DEPOSITED BEYOND THE PROJECT LIMITS. ALL EROSION AND SILTATION CONTROL DEVICES SHALL BE IN
PLACE AND APPROVED BY THE CONTRACTING OFFICER PRIOR TO THE COMMENCEMENT OF EARTHWORK. .
9. LEGALLY DISPOSE OF ALL DEBRIS AND UNSATISFACTORY MATERIALS OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH
FEDERAL, STATE, AND LOCAL LAWS AND REGULATIONS.
10. VEHICLES AND EQUIPMENT SHALL AT ALL TIMES GIVE WAY TO AIRCRAFT OPERATIONS, SUPPORT VEHICLES, AND EMERGENCY
VEHICLES. CONTRACTOR VEHICLES/EQUIPMENT SHALL NOT ENTER ANY RUNWAY, TAXIWAY OR APRON IN THE AIR
OPERATIONS AREA (AOA) AT ANY TIME, WITHOUT PRIOR AUTHORIZATION FROM BASE OPERATIONS AND/OR THE
CONTRACTING OFFICER'S REPRESENTATIVE.
11. AT A MINIMUM, AT THE COMPLETION OF WORK EACH DAY, INSPECT THE WORK AREA AND VERIFY THAT ALL CONES, BARRICADES, AND LIGHTS ARE IN PLACE AND IN WORKING ORDER. CONTRACTOR SHALL CHECK IN BEFORE AND AFTER DAILY
WORK WITH AIRFIELD MANAGEMENT AND SECURITY FORCES.
12. HAUL ROUTES SHALL BE SUBMITTED AND APPROVED BY THE BASE PRIOR TO CONSTRUCTION. HAUL ROUTES SHOWN MAY BE
CHANGED AT BASE DIRECTION DUE TO MISSION REQUIREMENTS.
13. THOROUGHLY CLEAN VEHICLE TIRES PRIOR TO THE VEHICLES ENTERING THE AIRFIELD AND PRIOR TO LEAVING THE WORK
AREA. AT THE END OF EACH SHIFT, WITH THE CONTRACTING OFFICER'S REPRESENTATIVE, INSPECT THE ADJACENT
ROADWAYS, AS WELL AS PAVED HAUL ROUTES USED BY THE CONTRACTOR WITHIN AIRPORT PROPERTY, AND CLEAN DAILY.
14. DOCUMENT THE CONDITIONS OF ANY PROPOSED HAUL ROUTES AND STORAGE AREAS ON AIRPORT PROPERTY PRIOR TO THE
START OF CONSTRUCTION WITH CONCURRENCE FROM BASE OPERATIONS AND THE CONTRACTING OFFICER. PHOTOS/VIDEOS
ARE NOT PERMITTED ON THE AIRFIELD. HAUL ROADS AND STORAGE AREAS DAMAGED BY THE CONTRACTOR'S EQUIPMENT
SHALL BE REPAIRED TO THEIR ORIGINAL CONDITION BEFORE THE CONTRACT WILL BE CONSIDERED COMPLETE. ALL COSTS
FOR RESTORATION OF HAUL ROADS AND STORAGE AREAS SHALL BE AT NO ADDITIONAL COST TO THE GOVERNMENT .
15. HAUL ROUTES SHALL BE CLEANED DAILY WITH THE USE OF A SWEEPER TRUCK. CURBS, SIDEWALKS, AND GRASS SURFACES
THAT HAVE BEEN DAMAGED DUE TO HAULING TRAFFIC SHALL BE REPLACED BY THE CONTRACTOR AT NO ADDITIONAL COST
TO THE GOVERNMENT.
16. AT THE COMPLETION OF THE CONTRACT, ALL CONTRACTOR'S AND SUBCONTRACTOR'S FACILITIES SHALL BE REMOVED
PROMPTLY AND THE AREA LEFT CLEAN AND FREE OF ALL DEBRIS OR SURPLUS MATERIAL. ANY DISTURBED AREAS WITHIN THE
SITE (INCLUDING ALL AREAS ADJACENT TO AND WITHIN WORK AREAS, HAUL ROUTES, STAGING AREAS, AFFECTED DRAINAGE
SWALES & UTILITIES, AND DISTURBED AREAS CAUSED BY THE REMOVAL OF EROSION CONTROL MEASURES) SHALL BE
RESTORED TO THEIR ORIGINAL CONDITION AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT. FAILURE TO DO SO MAY
RESULT IN A DELAY OF PARTIAL/FINAL PAYMENT APPROVAL UNTIL AREA IS RESTORED. ALL COSTS ASSOCIATED WITH SITE
RESTORATION SHALL BE CONSIDERED INCIDENTAL TO THE VARIOUS PROJECT ITEMS. EROSION CONTROLS SHALL REMAIN IN
PLACE UNTIL GRASS IS ESTABLISHED.
17. THE CONTRACTOR MAY UTILIZE ONLY (1) OF THE (2) AVAILABLE LOCATIONS FOR AN ON-SITE PROJECT-SPECIFIC BATCH PLANT, AS INDICATED ABOVE. THE CONTRACTOR MAY ALSO ELECT TO UTILIZE SOME OFF-BASE ALTERNATE SITE THAT IS NO MORE
THAN 15 MINUTES OF HAUL TIME FROM THE PLACING SITE. ONCE SELECTED, THE BATCH PLANT LOCATION SHALL NOT BE
MOVED DURING THE LIFE OF THE PROJECT.
18. CONTRACTOR SHALL DOCUMENT EXISTING SITE CONDITIONS PRIOR TO MOBILIZATION OF BATCH PLANT(S). SITE SHALL BE
RESTORED TO PRE-USE CONDITION AFTER DEMOBILIZATION OF BATCH PLANT(S).
19. TEMPORARY HAUL ROADS AND STAGING AREAS SHALL BE CONSTRUCTED BY THE CONTRACTOR TO SUPPORT ACCESS TO
AND FROM THE WORKSITE AN OFF-SITE BATCH PLANT, IF USED, AND ASSOCIATED STOCKPILE AREAS AT NO ADDITIONAL COST
TO THE GOVERNMENT. A TEMPORARY SECURITY ACCESS GATE SHALL BE INSTALLED BY THE CONTRACTOR TO GAIN ACCESS
TO THE ACTIVE AIRFIELD AT NO ADDITIONAL COST TO THE GOVERNMENT. THE REQUIREMENTS OF THE ACCESS GATE SHALL
BE COORDINATED WITH THE CONTRACTING OFFICER AND BASE SECURITY FORCES FOR APPROVAL. THE ACCESS GATE SHALL
REMAIN CLOSED AND LOCKED DURING ALL NON-WORK HOURS.
20. CONTRACTOR SHALL PROVIDE A SOILS TEST REPORTS FROM AN ACCREDITED ENVIRONMENTAL ENGINEERING FIRM BEFORE
MOBILIZATION AND AFTER DEMOBILZATION THAT CERTIFIES NO CONTAMINATION HAS BEEN DEPOSITED ON THE SITE. ANY
CONTAMINATION FOUND SHALL BE REMEDIATED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
SCALE IN FEET
650 0
PLAN
NORTH
BASE BID (CTGB222011, FAC 955):
200' WIDE RUNWAY REHABILITATION
·· VARIABLE MILL AND OVERLAY
·· ASPHALT CONCRETE (AC) AND PORTLAND CEMENT
CONCRETE (PCC) DEMOLITION & REMOVAL
·· FULL-DEPTH PCC CONSTRUCTION
BASE BID (CTGB222011, FAC 955):
25' WIDE RUNWAY SHOULDERS AND ASSOCIATED TAXIWAY
SHOULDERS, TAXIWAYS A & D THROATS
·· CONSTANT MILL AND OVERLAY
·· EXTERIOR 25' FOD MITIGATION
BASE BID (CTGB222012, FAC 999):
RUNWAY OVERRUNS
·· CONSTANT MILL AND OVERLAY
BID OPTION 1 (CTGB222010, FAC 998):
PORTION OF TAXIWAY G (EAST) & ADJACENT SECTION
OF MASS PARKING APRON
·· MILL AND OVERLAY
·· AC AND PCC DEMOLITION & REMOVAL
·· FULL-DEPTH PCC CONSTRUCTION
BID OPTION 1 (CTGB222010, FAC 998):
PORTION OF TAXIWAY G (WEST) & ADJACENT SECTION
OF MASS PARKING APRON
·· MILL AND OVERLAY
·· AC AND PCC DEMOLITION & REMOVAL
·· FULL-DEPTH PCC CONSTRUCTION
BID OPTION 1 (CTGB2220009, FAC 998):
TAXIWAY C THROATS (NORTH)
·· AC AND PCC DEMOLITION & REMOVAL
·· FULL-DEPTH PCC CONSTRUCTION
·· MILL AND OVERLAY
BASE BID AND BID OPTIONS WORK SUMMARY
SEE SHEET GI113 & GI114 FOR ELECTRICAL BID OPTION WORK SUMMARIES
BASE BID (CTGB2220009, FAC 998):
TAXIWAY C THROATS (SOUTH)
·· AC AND PCC DEMOLITION & REMOVAL
·· FULL-DEPTH PCC CONSTRUCTION
ALL WORK ASSOCIATED WITH THE FOLLOWING WORK PACKAGES (AS AWARDED TO
THE CONTRACT) SHALL BE COMPLETED DURING THE DEFINED AIRFIELD CLOSURE
PERIOD.
· BASE BID
· OPTION #2
· OPTION #3
· OPTION #17
· OPTION #18
BID OPTION #1 MAY ALSO BE CONSTRUCTED DURING THE DEFINED AIRFIELD CLOSURE
PERIOD WITHOUT PHASING PROVISIONS AS PER SHEETS GC103, GC104, AND GC105.
HOWEVER, IF BID OPTION #1 IS AWARDED OUTSIDE OF THE DEFINED AIRFIELD
CLOSURE PERIOD, PHASING SHALL BE COMPLETED IN ACCORDANCE WITH GC103,
GC104, AND GC105. WORK PORTIONS (TAXIWAY G - EAST, TAXIWAY G - WEST, AND
TAXIWAY C THROAT - NORTH) SHALL NOT BE NOT BE CONSTRUCTED CONCURRENTLY.
EACH PORTION OF BID OPTION #1 MUST BE COMPLETED, ACCEPTED, AND OPEN TO
AIRCRAFT OPERATIONS PRIOR TO THE COMMENCEMENT OF THE ADJACENT PORTION.
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
G E
N E
R A
L
S
I T
E
P
L A
N
GI112
GENERAL PLAN NOTES (CONTINUED FROM GI111):
21. CONTRACTOR SHALL OBTAIN STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FROM THE DISTRICT. IF CONTRACTOR ELECTS TO UTILIZE (1) OF THE AVAILABLE
PROJECT-SPECIFIC ON-BASE BATCH PLANT SITES, THEY MUST ALSO GENERATE AN ENVIRONMENTAL PLAN FOR THE BATCH PLANT SITE TO ACCOMPANY THE NOTICE
OF INTENT (NOI). CONTRACTOR SHALL GENERATE AN ENVIRONMENTAL PLAN FOR THE BATCH PLANT SITE TO ACCOMPANY THE NOTICE OF INTENT (NOI). ALL NOI
DOCUMENTS SHALL BE SUBMITTED TO, REVIEWED BY, AND APPROVED BY BASE ENVIRONMENTAL PRIOR TO SUBMISSION TO INDIANA DEPARTMENT OF
ENVIRONMENTAL MANAGEMENT (IDEM). NOI AND ENVIRONMENTAL PLAN APPROVAL FOR THE BATCH PLANT SITE SHALL BE OBTAINED FROM IDEM PRIOR TO ANY LAND
DISTURBANCE. SWPPP REQUIREMENTS SHALL APPLY FOR ALL WORK WITHIN, AND OUTSIDE OF, THE AIRFIELD CLOSURE PERIOD.
22. WATER METER SHALL AND ACCESSED SHALL BE COORDINATED THROUGH PERU UTILITIES PRIOR TO ESTABLISHING CONNECTION TO ANY WATER UTILITIES.
CONTRACTOR SHALL SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED CONNECTION, INSTALLATION, AND REMOVAL OF THE WATER SERVICE. THE LINE SHALL BE
METERED BY THE CONTRACTOR AND PAID TO PERU UTILITIES. SEE NOTE 25 FOR ASSOCIATED CONTACT INFORMATION.
23. ELECTRIC SERVICE SHALL BE COORDINATED WITH THE BASE AND THE RURAL ELECTRIC MEMBERSHIP CORPORATION (REMC). CONTRACTOR TO PROVIDE METER AND
SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED INSTALLATION AND REMOVAL OF ELECTRICAL SERVICE. A UTILITY CONNECTION PLAN SHALL BE PROVIDED
WITHIN THE SITE PLAN SUBMITTAL AND APPROVED BY THE BASE PRIOR TO MOBILIZATION. SEE NOTE 25 FOR ASSOCIATED CONTACT INFORMATION.
24. TEMPORARY HAUL ROADS THAT ARE INSTALLED TO SUPPORT ACCESS TO AND FROM AN OFF-SITE BATCH PLANT, IF USED, SHALL BE REMOVED IN THEIR ENTIRETY AND
RESTORED TO PRE-CONSTRUCTION CONDITION. GRASS WITHIN THE AIRFIELD FENCE BOUNDARY FENCE SHALL BE WITH RE-ESTABLISHED WITH HYDRO SEED.
OUTSIDE THE FENCE LINE (WITHIN MCEDA PROPERTY), SEED AND MULCH SHALL BE USED.
25. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LEASE AGREEMENTS AND PERMITS ASSOCIATED WITH CONSTRUCTING AND OPERATING BATCH
PLANTS FOR THIS PROJECT. THIS INCLUDES BUT IS NOT LIMITED TO COORDINATION WITH ALL REGULATORY AGENCIES AND PAYMENT OF ANY ASSOCIATED FEES.
SPECIFIC ADDITIONAL REQUIREMENTS SHALL INCLUDE:
25.1. NOT USED.
25.2. CONTRACTOR SHALL PROVIDE DOCUMENTS DETAILING THE ASSESSMENT OF AIR EMISSIONS IMPACTS ASSOCIATED WITH THE CONSTRUCTION AND OPERATION OF
THE CONTRACTOR’S BATCH PLANTS.
25.3. CONTRACTOR SHALL PROVIDE A DETAILED ASSESSMENT OF HOW CONSTRUCTION AND OPERATION OF BATCH PLANTS MAY AFFECT ANY ACTIVE PERMIT(S) ON FILE
FOR GRISSOM ARB.
26. NOT USED.
26. CONSTRUCTION VEHICLES AND EMPLOYEE VEHICLES SHALL BE PARKED OUTSIDE OF THE SECURE AIRFIELD AND WITHIN LIMITS SPECIFIED AND AS APPROVED BY THE
BASE.
27. CONSTRUCTION MATERIALS STAGING AND STOCKPILE AREA SHALL ONLY BE WITHIN DESIGNATED STAGING AND STOCKPILE AREA. A SITE LAYDOWN PLAN MUST BE
SUBMITTED TO THE BASE FOR APPROVAL AS PART OF THE PRE-CONSTRUCTION WORK.
28. LEAVING ANY TRENCHES OR OTHER EXCAVATIONS OPEN AT NIGHT, ON WEEKENDS OR AT OTHER TIMES WHEN NOT ON THE SITE IS PROHIBITED WITHOUT PRIOR
APPROVAL OF THE CONTRACTING OFFICER'S REPRESENTATIVE. ANY TRENCHES/EXCAVATIONS APPROVED TO BE LEFT UNATTENDED SHALL BE ADEQUATELY
PROTECTED, MARKED, AND LIGHTED.
29. PRIOR TO THE COMMENCEMENT OF THE PROJECT, ALL THE CONTRACTOR AND SUBCONTRACTOR'S PERSONNEL SHALL ATTEND A FOREIGN OBJECT DEBRIS (FOD) AND
SAFETY PRESENTATION AT THE BASE OPERATIONS. ALL ATTENDEES WILL BE REQUIRED TO UNDERSTAND AND COMPLY WITH SAFETY AND SECURITY REQUIREMENTS.
30. THE CONTRACTOR SHALL SUPPLY A DUMPSTER WITH COVER TO KEEP THE CONSTRUCTION SITE FREE OF PAPER, BOXES, AND OTHER DEBRIS WHICH COULD BE BLOWN
ONTO THE AOA AND/OR ATTRACT WILDLIFE. NO DUMPSTER WILL BE ALLOWED ON THE MPA. SUBMIT PROPOSED DUMPSTER LOCATION ON SITE/WORK PLAN FOR
APPROVAL PRIOR TO CONSTRUCTION.
31. PAY PARTICULAR ATTENTION TO THE DUST CONTROL REQUIREMENTS OF THIS CONTRACT. FURNISH AND OPERATE A MINIMUM OF ONE (1) SELF-PROPELLED VACUUM
SWEEPER TO MAINTAIN OPERATIONS OF THE RUNWAYS, TAXIWAYS, APRONS, AND OTHER AIRCRAFT OPERATING AREAS SENSITIVE TO DUST. THE CONTRACTOR SHALL
BE RESPONSIBLE FOR DUST CONTROL WITHIN THE CONSTRUCTION LIMITS AS WELL AS ALONG ANY PUBLIC ROADWAYS USED BY HIS EQUIPMENT AND VEHICLES. THE
CONTRACTING OFFICER'S REPRESENTATIVE RESERVES THE RIGHT TO STOP WORK IF NECESSARY IN ORDER TO BRING DUST UNDER CONTROL. FAILURE TO CONTROL
THESE ITEMS SHALL RESULT IN SUSPENSION OF PROJECT WORK. NO ADDITIONAL COMPENSATION OR TIME SHALL BE MADE TO THE CONTRACTOR SHOULD LOSS OF
PRODUCTIVITY OR DOWN-TIME OCCUR AS A RESULT OF THE CONTRACTING OFFICER LIMITING OR SUSPENDING WORK BECAUSE OF THE CONTRACTOR'S FAILURE TO
CONTROL DUST. AT A MINIMUM THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AND APPLY WATER FOR DUST CONTROL AS NECESSARY. ADDITIONAL MEASURES
MAY BE REQUIRED AS DIRECTED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
32. THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT LOCATIONS AND/OR ELEVATIONS OF EXISTING UNDERGROUND UTILITIES AS SHOWN ON THESE PLANS ARE
BASED ON RECORD DRAWINGS AND WERE FIELD SURVEYED FOR CONFIRMATION ONLY WHERE POSSIBLE. THIS INFORMATION IS NOT TO BE RELIED ON AS BEING
COMPLETE OR EXACT AND THE CONTRACTOR SHALL FIELD VERIFY ALL INFORMATION PRIOR TO COMMENCEMENT OF THE WORK. IT IS THE CONTRACTOR'S
RESPONSIBILITY TO ENSURE ALL EXISTING UTILITIES ARE IDENTIFIED AND PROTECTED PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE
CONTRACTING OFFICER IN WRITING OF ANY DISCREPANCY DISCOVERED DURING FIELD VERIFICATION.
33. COORDINATE UTILITY LOCATING SERVICES WITH THE BASE. THE BASE REQUIRES 15 DAY NOTIFICATION FOR UTILITY LOCATING WORK. ALL EXISTING UTILITIES IN THE
VICINITY OF ANY EXCAVATION SHALL BE CLEARLY MARKED ON THE GROUND BY THE CONTRACTOR PRIOR TO BEGINNING EXCAVATION. A MINIMUM OF 72 HOURS
NOTICE TO THE CONTRACTING OFFICER, BASE OPERATIONS, AND THE UTILITY COMPANY IS REQUIRED WHEN DISRUPTION OF UTILITIES ARE REQUESTED BY THE
CONTRACTOR. ALL COSTS ASSOCIATED WITH LOCATING UTILITIES SHALL BE CONSIDERED INCIDENTAL TO THE VARIOUS PROJECT ITEMS.
34. DOCUMENT THE CONDITION OF ANY HAUL ROUTES USED TO SUPPORT ACCESS TO AND FROM BATCH PLANT SITES AND/OR ANY OTHER LEASED SPACE. THE USE OF
PUBLIC OR PRIVATE ROADS BY THE CONTRACTOR SHALL NOT RESULT IN ANY ADDITIONAL COSTS TO THE GOVERNMENT. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR ANY AND ALL PERMITS ASSOCIATED WITH USE OF ROADS AND CROSSINGS. THE CONTRACTOR SHALL REPAIR OR REPLACE, AT THEIR OWN EXPENSE, ANY ROADS
OR CROSSINGS DAMAGED BY THEIR OPERATIONS. THE REPAIRS MUST BE INSPECTED AND APPROVED BY THE ROAD OR CROSSING OWNER OR AUTHORITY.
35. HAND DIG WHEN WITHIN THREE (3) FEET OF ANY KNOWN OR SUSPECTED UNDERGROUND UTILITIES.
36. THE CONTRACTOR SHALL IMMEDIATELY REPAIR OR REPLACE, AT HIS/HER OWN EXPENSE, ANY UTILITIES DAMAGED BY HIS/HER OPERATIONS, AT NO ADDITIONAL COST
TO THE GOVERNMENT. THE REPAIRS MUST BE INSPECTED AND APPROVED BY THE UTILITY GOVERNMENT.
37. SMOKING IS STRICTLY PROHIBITED ON THE BASE.
38. ALL SITE LAYOUT INCLUDING PAVEMENT MARKINGS, WILL BE PERFORMED BY OR UNDER THE SUPERVISION OF AN INDIANA PROFESSIONAL LAND SURVEYOR (INPLS).
39. REFER TO SHEET VS101 FOR SURVEY CONTROL DATA.
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
RUN
WAY
05-
TAX
IWA
Y F
TAX
IWA
Y D
TAX
IWA
Y E
TAX
IWA
Y C
TAX
IWA
Y B
TAX
IWA
Y A
TAX
IWA
Y G
TAX
IWA
Y G
BASE BID
25' RUNWAY SHOULDERS,
ASSOCIATED TAXIWAY
SHOULDERS, AND
TAXIWAYS A & D THROATS
EXISTING
PAVEMENT EDGE
RUNWAY 05-23
TAXIWAY F
T A
X I W
A
X I W
A
X
I
W
A
X
I
W
A
X I W
T
A
X
I
W
O
S
I
V
D
T
A
N
K
CIVILIAN AIRCRAFT
PARKING APRON
MASS PARKING
APRON (MPA)
BASE ENTRANCE
SECURITY
CHECKPOINT
BASE BID
200' WIDE RUNWAY
(EXCL. PCC SECTIONS)
CONTRACTOR'S
HAUL ROUTE
(TYP.)
UNLIT RUNWAY
CLOSURE MARKER
PLACE AND SECURE UNLIT RUNWAY
CLOSURE MARKER AT EACH RUNWAY END
(TYP.)
CLOSURE MARKERS SHALL BE PLACED ON
TOP OF RUNWAY DESIGNATION NUMERALS.
SEE DETAIL BELOW
~2 AC SITE CONTRACTOR
STAGING AREA
PCC PAVEMENT
SECTIONS TO REMAIN
PCC PAVEMENT
SECTIONS TO REMAIN
PLACE AND SECURE LIGHTED RUNWAY
CLOSURE MARKER AT EACH RUNWAY END
(TYP.) SEE DETAIL BELOW
LIGHTED RUNWAY
CLOSURE MARKER
AIRSIDE ACCESS
GATE
STABILIZED CONSTRUCTION
ENTRANCE
SEE DETAIL M17 ON C-507
BASE BID
RUNWAY OVERRUNS
BASE BID
RUNWAY OVERRUNS
GROUND CONTROL
CHECK POINTS
BASE BID
TAXIWAY C SOUTH
THROAT
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #2
~5 AC SITE. SEE GI111.
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #1
~2.5 AC SITE. SEE GI111.
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
GC101
BASE BID
SCALE IN FEET
650 0
PLAN
NORTH
BASE BID PHASING/CLOSURE NOTES:
DURATION:
· 150 DAYS
· 7 DAYS/WEEK, UNLESS OTHERWISE APPROVED AND DIRECTED BY THE GOVERNMENT
WORK HOURS:
· 0600-1800
· WORK OUTSIDE OF THESE HOURS SHALL REQUIRE PRIOR APPROVAL FROM BASE
OPERATIONS AND THE CONTRACTING OFFICER
CLOSURES:
· WING-ASSIGNED AIRCRAFT WILL VACATE GRISSOM FOR THE DURATION OF THE RUNWAY
CLOSURE
200' WIDE RUNWAY
MAJOR WORK ITEMS:
· ASPHALT CONCRETE (AC)/PORTLAND CEMENT CONCRETE (PCC) DESIGN APPROVAL
· AC REMOVAL
· DEMOLISH PCC PAVEMENT
· EXCAVATE BASE MATERIALS (DEPTH PER TYPICAL SECTIONS)
· VARIABLE AC MILL AND OVERLAY
· CONSTRUCT FULL-DEPTH PCC PAVEMENT SECTION (PER TYPICAL SECTIONS)
ADDITIONAL COMMENTS:
· ALL CONSTRUCTION DEBRIS AND MATERIALS SHALL BECOME PROPERTY OF THE
CONTRACTOR AND SHOULD BE DISPOSED OF OFF GOVERNMENT PROPERTY, UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER, IN ACCORDANCE WITH THE
CONTRACT DOCUMENTS
25' RUNWAY SHOULDERS, ASSOCIATED TAXIWAY SHOULDERS, AND
TAXIWAYS A & D THROATS
MAJOR WORK ITEMS:
· ASPHALT CONCRETE (AC) MILL AND OVERLAY
· FOD MITIGATION IN EXTERIOR 25' OF SHOULDER
ADDITIONAL COMMENTS:
· RUNWAY CLOSURE MARKERS SHALL BE SECURED SUCH THAT THEY REMAIN IN PLACE
FOR THE PROJECT DURATION
SPECIAL PROVISIONS:
· SEE BID OPTION #2 DRAWINGS TO COORDINATE AND INTEGRATE RUNWAY EDGE LIGHT
WORK WITH THE MILL AND INLAY SCOPE OF RUNWAY SHOULDERS INDICATED IN BASE BID
GENERAL SAFETY AND PHASING NOTES:
1. SAFETY/SECURITY PLAN: REVIEW THE OUTLINED REQUIREMENTS AND PROCEDURES
CONTAINED IN THE FAA ADVISORY CIRCULAR NO. 150/5370-2F OPERATIONAL SAFETY ON
AIRPORTS DURING CONSTRUCTION AND THE USACE EM 385-1-1 SAFETY AND HEALTH
REQUIREMENTS MANUAL. PREPARE AND SUBMIT FOR APPROVAL A SAFETY PLAN
COMPLIANCE DOCUMENT (SPCD) IN ACCORDANCE WITH THE REQUIREMENTS OF AC
150/53702-F SECTION 103.B., 104.C.(1), AND 203.C AS WELL AS REQUIREMENTS OUTLINED IN
USACE EM 385-1-1. BASE OPERATIONS AND THE CONTRACTING OFFICER'S REPRESENTATIVE
SHALL REVIEW THE CONTRACTOR'S SPCD, AND THE APPROVAL OF THE PLAN WILL BE
REQUIRED PRIOR TO THE CONTRACTOR'S MOBILIZATION FOR THE PROJECT. THE SPCD
SHALL ADDRESS THE FOLLOWING MAJOR ITEMS AT A MINIMUM AS THEY PERTAIN TO THE
SCHEDULED WORK EFFORTS:
· PROCEDURES AND REQUIREMENTS FOR RUNWAY & PARTIAL TAXIWAY CLOSURES.
· NOTIFICATION OF SCHEDULED CONSTRUCTION ACTIVITIES.
· CONSTRUCTION ACTIVITIES WITHIN RUNWAY SAFETY AREAS AND OTHER AIRPORT
OPERATIONAL AREAS.
· DAILY AIRFIELD AND RADIO COMMUNICATIONS.
· PLACEMENT OF ALL BARRICADES/CONES.
· CONSTRUCTION AND PUBLIC ROADWAY SIGNAGE.
· GATE ACCESS PROCEDURES/USE OF GATE GUARDS.
· REMOVAL & DISPOSAL OF SURPLUS MATERIALS & DEBRIS.
· DUST AND FOD CONTROL.
· LIGHT FIXTURE REMOVAL, STORAGE, RECONDITIONING, AND REINSTALLATION (AS
NEEDED, PENDING AWARD OF BID OPTION #2).
2. SAFETY OFFICER: PROVIDE A SAFETY OFFICER/POINT OF CONTACT PERSON WHO CAN BE
CONTACTED 24 HOURS A DAY-SEVEN DAYS A WEEK FOR THE DURATION OF THE PROJECT.
THIS PERSON WILL BE RESPONSIBLE FOR TAKING IMMEDIATE ACTION TO CORRECT ANY
CONSTRUCTION ACTIVITIES IDENTIFIED AS NOT IN THE BEST INTEREST OF AIR FIELD'S SAFE
OPERATION AND/OR SECURITY.
3. CROSSING/ACCESSING ACTIVE RUNWAYS/TAXIWAYS OR STAGING EQUIPMENT IN RUNWAY
APPROACHES WITHOUT PRIOR COORDINATION WITH BASE OPERATIONS AND THE
CONTRACTING OFFICER'S REPRESENTATIVE IS PROHIBITED. THE CONTRACTOR'S RADIO
COMMUNICATIONS PERSONNEL SHALL VERIFY THE PROPER RADIO FREQUENCY TO
MONITOR.
4. ALL AUTHORIZED CONSTRUCTION VEHICLES SHALL DISPLAY AN ORANGE/WHITE
CHECKERED FLAG, SHALL HAVE AN AMBER/YELLOW STROBE BEACON LIGHT ATTACHED TO
THE ROOF AND BE CLEARLY IDENTIFIED BY EITHER ASSIGNED INITIALS OR NUMBERS
PROMINENTLY DISPLAYED ON EACH SIDE OF VEHICLE. THERE SHALL BE NO SEPARATE
PAYMENT FOR PROVIDING FLASHING YELLOW BEACONS AND ORANGE/WHITE CHECKERED
FLAGS IN ACCORDANCE WITH FAA AC 150/5210-5D.
5. CONSTRUCTION PERSONNEL: WEAR APPROPRIATE REFLECTIVE SAFETY VESTS AND
CUSTOMARY PERSONAL PROTECTIVE EQUIPMENT (PPE) AT ALL TIMES WHEN WORKING ON
THE AIRFIELD AND ADJACENT WORK AREAS. ALL PERSONNEL SHALL BE AWARE OF SAFETY
REQUIREMENTS AND THE DANGERS OF WORKING ADJACENT TO ACTIVE AIRCRAFT
OPERATIONAL AREAS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION ACTIVITIES.
ENSURE THAT ALL PERSONNEL UNDERSTAND AND COMPLY WITH THE AIRFIELD'S
SAFETY/SECURITY REQUIREMENTS AND THE FOREIGN OBJECT DEBRIS (FOD) PROCEDURES.
6. IN THE EVENT OF A CONSTRUCTION ACCIDENT, CALL 765-688-3353 (GRISSOM FIRE DEPT)
AND IMMEDIATELY NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE AND BASE
OPERATIONS.
7. CLOSURE BARRICADES/CONES: ALL REQUIRED LIGHTED SAFETY BARRICADES, LIGHTED
CHANNELIZER CONES, FLAGGED STAKES, TRAFFIC CONES, TEMPORARY TRAFFIC SIGNS,
ETC., SHALL BE IN PLACE PRIOR TO THE COMMENCEMENT OF WORK. THERE SHALL BE NO
SEPARATE PAYMENT FOR FURNISHING, PLACING, RELOCATING, MAINTAINING, AND
REMOVAL OF THESE AS MAY BE REQUIRED BY BASE OPERATIONS OR THE CONTRACTING
OFFICER TO ENSURE SAFETY OVER THE LIFE OF THE PROJECT. AT THE COMPLETION OF
THE PROJECT, ALL LIGHTED SAFETY BARRICADES, CHANNELIZER CONES AND SIGNS SHALL
BE REMOVED, AND SHALL REMAIN THE PROPERTY OF THE CONTRACTOR.
8. SUBMIT PROPOSED WORK HOURS TO THE CONTRACTING OFFICER FOR APPROVAL PRIOR
TO CONSTRUCTION. IN THE EVENT NIGHT WORK IS EXPECTED, A LIGHTING PLAN MUST BE
SUBMITTED TO THE CONTRACTING OFFICER AND BASE OPERATIONS FOR APPROVAL.
TEMPORARY LIGHT TOWERS MUST BE LOCATED AND AIMED SO AS TO NOT AFFECT AIR
TRAFFIC CONTROL PERSONNEL IN THE TOWER, AND AIRCRAFT OPERATIONS ON RUNWAYS,
TAXIWAYS, AND APRONS.
9. CONTRACTOR ACCESS TO THE CONSTRUCTION SITE SHALL BE LIMITED TO THE SECURITY
CHECKPOINT SHOWN ON THE PLAN, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING
OFFICER. THE SECURITY CHECK POINTS SHALL BE MANNED WITH FULL-TIME
RADIO-EQUIPPED ACCESS/GATE GUARDS. ALL GATES SHALL BE CLOSED AND LOCKED WHEN
NOT MANNED AND DURING HOURS OF CONSTRUCTION INACTIVITY.
10. CONTRACTOR VEHICLES AND PERSONNEL SHALL BE INSPECTED BY BASE SECURITY
FORCES PRIOR TO ACCESSING THE SECURE SIDE OF THE AIRFIELD.
RUNWAY OVERRUNS
MAJOR WORK ITEMS:
· REMOVE AND REPLACE GROUND CONTROL CHECK POINTS
SPECIAL PROVISIONS:
· SEE BID OPTION #2 DRAWINGS TO COORDINATE AND INTEGRATE RUNWAY
APPROACH LIGHT WORK WITH THE MILL AND INLAY SCOPE OF RUNWAY
OVERRUNS INDICATED IN BASE BID.
TAXIWAY C SOUTH THROAT
MAJOR WORK ITEMS:
· ASPHALT CONCRETE (AC) REMOVAL
· PORTLAND CEMENT CONCRETE (PCC) REMOVAL
· EXCAVATE BASE MATERIAL (PER SECTIONS)
· SOIL STABILIZATION, AS DIRECTED BY THE CONTRACTING OFFICER
· PLACE & COMPACT BASE/SUBBASE
· PLACE PCC
· PLACE PAVEMENT MARKINGS
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
GC102
BASE BID
LIGHTED CHANNELIZER CONE NOTES:
1. THERE SHALL BE NO SEPARATE PAYMENT FOR SUPPLYING, PLACING, MAINTAINING AND REMOVAL OF LIGHTED
CHANNELIZER CONES. THE CONTRACTOR SHALL RETAIN POSSESSION OF THE CONES UPON COMPLETION OF THE
PROJECT.
2. LIGHTED CHANNELIZER CONES SHALL BE USED FOR THE FOLLOWING CONDITIONS:
· AT LOCATIONS IN ACCORDANCE WITH AIRFIELD CLOSURE REQUIREMENTS.
· TO IDENTIFY A RUNWAY AND/OR TAXIWAY SAFETY AREA TO KEEP PERSONNEL AND EQUIPMENT FROM
ENTERING AN ACTIVE RUNWAY OR TAXIWAY.
3. THE CONTRACTOR SHALL ENSURE THE CONTINUOUS OPERATION OF ALL LIGHTS FOR THE DURATION OF THE
PROJECT. LIGHTS AND/OR BATTERIES SHALL BE REPLACED AS NEEDED.
4. PLACE CONES CONTINUOUSLY AT 4' ON CENTER ON ALL PAVED SURFACES AND 10' ON ALL TURF AREAS.
LIGHTED LOW PROFILE BARRICADE NOTES:
1. THERE SHALL BE NO SEPARATE PAYMENT FOR SUPPLYING, PLACING, MAINTAINING AND REMOVAL OF
LIGHTED LOW PROFILE BARRICADES.
2. THE LIGHTED SAFETY BARRICADES SHALL BE PLACED AT LOCATIONS IN ACCORDANCE WITH AIRFIELD
CLOSURE REQUIREMENTS AND BE USED WHEN A WORK AREA IS DIRECTLY ADJACENT TO AN ACTIVE
TAXIWAY TO KEEP AIRCRAFTS AND VEHICLES FROM TRAVELING INTO A WORK AREA.
3. BARRICADES SHALL BE INTERCONNECTED ON AIRFIELD PAVEMENTS AND WITHIN AIR OPERATIONS AREAS
(AOA). BARRICADE SPACING MAY BE INCREASED TO 10' ON CENTER IN ALL OTHER AREAS UNLESS
OTHERWISE DIRECTED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RELOCATING AND/OR PROVIDING ADDITIONAL
BARRICADES AROUND THE SITE AS NECESSARY TO ACCOMMODATE THE PROPOSED WORK.
5. THE CONTRACTOR SHALL ENSURE THE CONTINUOUS OPERATION OF ALL LIGHTS FOR THE DURATION OF
THE PROJECT. LIGHTS AND BATTERIES SHALL BE REPLACED AS NEEDED.
6. THE BARRICADES SHALL BE FILLED WITH WATER.
RUNWAY CLOSURE MARKER NOTES:
1. CLOSURE MARKER SHALL CONFORM TO UFC 3-260-04, AIRFIELD AND HELIPORT MARKING, SECTION 8-5.
2. UNLIT CLOSURE MARKERS SHALL BE PLACED ON RUNWAY DESIGNATION MARKINGS PRIOR TO ACCESSING THE RUNWAY ENVIRONMENT / COMMENCING
CONSTRUCTION ACTIVITIES. LIGHTED CLOSURE MARKERS SHALL BE PLACED DIRECTLY ADJACENT TO THE UNLIT MARKER, ON CENTERLINE, AND REMAIN LIT
BETWEEN DUSK AND DAWN.
3. MARKER PLACEMENT, AS DIRECTED BY THE CONTRACTING OFFICER, FOR CONSTRUCTION OUTSIDE OF THE EXTENDED RUNWAY CLOSURE WITHIN THE RUNWAY
ENVIRONMENT SHALL BE PLACED AT THE BEGINNING OF, AND REMOVED AT THE END OF, EACH PHASE/WORK SHIFT.
4. UPON PROJECT COMPLETION, THE RUNWAY CLOSURE MARKERS ARE TO REMAIN THE PROPERTY OF THE CONTRACTOR.
5. UNLIT MARKER: MARKER SHALL BE ANCHORED BY AN APPROVED METHOD SUCH THAT IT REMAINS IN PLACE FOR THE PROJECT DURATION.
6. LIGHTED MARKER: MARKER SHALL BE FUELED AND MAINTAINED BY THE CONTRACTOR TO REMAIN LIT WHILE IN USE ON THE RUNWAY.
7. LOCATIONS OF ALL MARKINGS, AND MEANS OF INSTALLATION AND FASTENING, SHALL BE APPROVED BY THE CONTRACTING OFFICERS REPRESENTATIVE.
30lb. SOLID OCTAGONAL
RUBBER BASE
RED BATTERY POWERED
OMNI-DIRECTIONAL FLASHING LIGHT
WITH PHOTOCELL SECURELY
FASTENED TO TOP OF CONE
MINIMUM OF TWO 6"
WHITE REFLECTIVE BANDS
28"
HIGH DENSITY FLUORESCENT
ORANGE
POLYETHYLENE CONE
8-1/2"
16-1/2"
1-3/4"
SOLAR POWERED FLASHING RED
LIGHT WITH PHOTOCELL SECURELY
FASTENED TO TOP OF BARRICADE
(2 PER BARRICADE)
FLUORESCENT ORANGE
POLYETHYLENE BARRICADE
WITH WHITE REFLECTIVE
SHEETING BOTH SIDES
LIGHTED LOW-PROFILE BARRICADE
LIGHTED CHANNELIZER CONE
UNLIT RUNWAY CLOSURE MARKER
YELLOW VINYL 'X' PLACED
OVER RUNWAY
IDENTIFICATION MARKINGS
DIESEL
ENGINE
BACKUP
GENERATOR
YELLOW
FLASHING
LIGHTS
LIGHTED RUNWAY CLOSURE MARKER
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
CIVILIAN AIRCRAFT
PARKING APRON
SEE HAUL ROUTE ON
GI111 AND NOTE 1 ON
THIS SHEET
SECTION OF
APRON/TAXILANE LIMITED
TO 150' MAX WINGSPAN
TRANSIENT
APRON
MPA
LOW PROFILE
BARRICADES (TYP.)
SEE DETAIL ON GC101
TEMPORARY TAXIWAY
CENTERLINES
SEE INSET FOR LAYOUT
BID OPTION #1
TAXIWAY G/MPA
~2 AC SITE CONTRACTOR
STAGING AREA
LIGHTED
CHANNELIZER CONES
(TYP.)
SEE DETAIL ON GC101
LIGHTED CHANNELIZER
CONES (TYP.)
SEE DETAIL ON GC102
TEMPORARY RESTRICTION
AREA BOUNDARY
COORDINATE FINAL LOCATION
WITH BASE OPS AND
CONTRACTING OFFICER'S
REPRESENTATIVE
AIRSIDE
ACCESS GATE
LOW PROFILE
BARRICADES (TYP.)
SEE DETAIL ON GC102
AVAILABLE OPTIONAL ON-SITE BATCH
PLANT SITE #2
~5 AC SITE. SEE GI111.
AVAILABLE OPTIONAL ON-SITE BATCH
PLANT SITE #1
~2.5 AC SITE. SEE GI111.
T A
X I W
C
L
A
X
Y
C
L
A
X
Y
C
L
A
X
Y
C
L
A
X
Y
MPA
ROW C
MPA
ROW D
MPA
ROW E
MPA
ROW F
C
W I N
G T
I P
C L E
A R
A N
C E
G R
I S
S O
M
A
V E
N: 1971398.8176
E: 193658.1400
N: 1971399.6888
E: 193980.0472
N: 1971400.5602
E: 194302.0353
N: 1971311.0061
E: 194392.2776
N: 1971399.2631
E: 193748.1387
N: 1971400.1343
E: 194070.0459
N: 1971401.0056
E: 194392.0340
N: 1971310.1348
E: 194070.2895
N: 1971309.2636
E: 193748.3823
N: 1971307.9631
E: 193267.7929
N: 1971311.4160
E: 194543.7416
N: 1971222.0178
E: 194633.9829
N: 1971221.4165
E: 194543.9851
R
R
R
R
RESTRICTED AREA BOUNDARY
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
GC103
OPTION #1
OPTION #1 PHASING/CLOSURE NOTES:
THIS SHEET SHALL BE ACTIVATED IF OPTION #1 IS AWARDED
DURATION:
· 180 DAYS
· 6 DAYS/WEEK, UNLESS OTHERWISE APPROVED BY THE GOVERNMENT
WORK HOURS:
· 0600-1800
· WORK OUTSIDE OF THESE HOURS SHALL REQUIRE PRIOR APPROVAL FROM BASE OPERATIONS
AND THE CONTRACTING OFFICER
CLOSURES:
· TAXIWAY G BETWEEN TRANSIENT APRON AND MPA ROW F
·· BYPASS CONSTRUCTION VIA TEMPORARY CENTERLINE
· 8 MPA PARKING POSITIONS (2 EACH IN ROWS C, D, E, F)
· TAXIWAY C NORTH OF TAXIWAY F
MAJOR WORK ITEMS:
· PLACE TEMPORARY PAVEMENT MARKINGS
·· RE-ALIGN TAXIWAY/TAXILANE CENTERLINES
·· RELOCATE RESTRICTED AREA BOUNDARY IN COORDINATION WITH THE CONTRACTING
OFFICER AND BASE OPS
· ASPHALT CONCRETE (AC) REMOVAL
· PORTLAND CEMENT CONCRETE (PCC) REMOVAL
· EXCAVATE BASE MATERIAL (PER SECTIONS)
· SOIL STABILIZATION, AS DIRECTED BY THE CONTRACTING OFFICER
· PLACE & COMPACT BASE/SUBBASE
· AC MILL AND INLAY
· PLACE PCC
· REMOVE TEMPORARY PAVEMENT MARKINGS
· PLACE PAVEMENT MARKINGS
ADDITIONAL COMMENTS:
· RADIO-EQUIPPED ESCORTS REQUIRED BETWEEN STAGING AREA AND WORK AREA
· ALL CONSTRUCTION DEBRIS AND MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR
AND DISPOSED OF OFF-SITE, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER, IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS
· REFER TO SHEET GC101 FOR GENERAL SAFETY AND PHASING NOTES
· HAUL ROUTES SHALL BE SUBMITTED AND APPROVED BY THE BASE PRIOR TO CONSTRUCTION.
HAUL ROUTES SHOWN MAY BE CHANGED AT BASE DIRECTION DUE TO MISSION REQUIREMENTS.
TAXIWAY G - AREA 1 (WEST)
SCALE = 1"=200'
TEMPORARY CENTERLINE LAYOUT
SCALE = 1"=100'
SCALE IN FEET
100 0
SCALE IN FEET
200 0
PLAN
NORTH
LIGHTED CHANNELIZER CONES (TYP.)
SEE DETAIL ON GC102
LEGEND (FOR SHEET GC103 ONLY):
LOW PROFILE BARRICADES (TYP.)
SEE DETAIL ON GC102
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
X I W
CIVILIAN AIRCRAFT
PARKING APRON
BID OPTION #1
TAXIWAY G/MPA
HAUL ROUTE SIGNAGE (TYP.)
SEE LEGEND, THIS SHEET
TRANSIENT
APRON
MPA
LOW PROFILE
BARRICADES (TYP.)
SEE DETAIL ON GC102
A
B
B
G R
I S
S O
M
A
V E
AIRSIDE
ACCESS GATE
LIGHTED CHANNELIZER
CONES (TYP.)
SEE DETAIL ON GC102
LIGHTED CHANNELIZER
CONES (TYP.)
SEE DETAIL ON GC102
~2 AC SITE CONTRACTOR
STAGING AREA
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #2
~5 AC SITE. SEE GI111.
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #1
~2.5 AC SITE. SEE GI111.
SCALE IN FEET
200 0
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
GC104
OPTION #1
PLAN
NORTH
SIGN LEGEND
A
ACCESS
WORK
AREA HERE
STOP WAIT
FOR
ESCORT
NOTES:
1. ALL SIGNS RED BACKGROUND AND WHITE LETTERS
2. ALL SIGNS SHALL BE 48" X 48" UNLESS OTHERWISE NOTED
3. SIGNS MUST BE MOUNTED ON TEMPORARY TRIPODS WITH
APPROPRIATE BALLASTS
4. ALL SIGNS MUST BE IN ACCORDANCE WITH MUTCD MANUAL
B
BID OPTION #1 PHASING/CLOSURE NOTES:
THIS SHEET SHALL BE ACTIVATED IF BID OPTION #1 IS AWARDED
DURATION:
· 140 DAYS
· 6 DAYS/WEEK, UNLESS OTHERWISE APPROVED BY THE GOVERNMENT
WORK HOURS:
· 0600-1800
· WORK OUTSIDE OF THESE HOURS SHALL REQUIRE PRIOR APPROVAL FROM BASE OPERATIONS
AND THE CONTRACTING OFFICER
CLOSURES:
· TAXIWAY G BETWEEN MPA ROW F AND CIVILIAN PARKING APRON
· 1 MPA PARKING POSITION IN ROW F
MAJOR WORK ITEMS:
· RELOCATE SECURITY LINE IN COORDINATION WITH THE CONTRACTING OFFICER AND BASE OPS
· ASPHALT CONCRETE (AC) REMOVAL
· PORTLAND CEMENT CONCRETE (PCC) REMOVAL
· EXCAVATE BASE MATERIAL (PER SECTIONS)
· SOIL STABILIZATION, AS DIRECTED BY THE CONTRACTING OFFICER
· PLACE & COMPACT BASE/SUBBASE
· AC MILL AND OVERLAY
· PLACE PCC
· PLACE PAVEMENT MARKINGS
ADDITIONAL COMMENTS:
· RADIO-EQUIPPED ESCORTS REQUIRED BETWEEN STAGING AREA AND WORK AREA
· ALL CONSTRUCTION DEBRIS AND MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR
AND DISPOSED OF OFF-SITE, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER, IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS
· REFER TO SHEET GC101 FOR GENERAL SAFETY AND PHASING NOTES
TAXIWAY G - AREA 2 (EAST)
SCALE = 1"=200'
SCALE IN FEET
200 0
LIGHTED CHANNELIZER CONES (TYP.)
SEE DETAIL ON GC102
LEGEND (FOR SHEET GC104 ONLY):
LOW PROFILE BARRICADES (TYP.)
SEE DETAIL ON GC102
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
X I W
BID OPTION #1
TAXIWAY C NORTH
THROAT
TRANSIENT
APRON
LOW PROFILE
BARRICADES (TYP.)
SEE DETAIL ON GC102
AIRSIDE
ACCESS GATE
LOW PROFILE
BARRICADES
(TYP.) SEE
DETAIL ON
GC102
~2 AC SITE CONTRACTOR
STAGING AREA
AVAILABLE OPTIONAL ON-SITE BATCH
PLANT SITE #2
~5 AC SITE. SEE GI111.
AVAILABLE OPTIONAL ON-SITE
BATCH PLANT SITE #1
~2.5 AC SITE. SEE GI111.
K
C
K
C
TAXIWAY G
N: 1970980.0571
E: 193622.1339
N: 1971087.3598
E: 193766.1425
N: 1970997.3614
E: 193766.6699
N: 1971065.6423
E: 194581.5676
N: 1971001.7654
E: 194518.1662
N: 1970986.7470
E: 194661.0546
N: 1971060.9823
E: 193703.0117
N: 1971091.7638
E: 194517.6388
R
R
T
E M
P O
R A
R Y
C E
N T
E R
L I N
E
T
O
L I M
W
O R
K
T A
X I W
W
I
N
G
T
I
P
C
L
E
A
R
A
N
C
E
T
Y
P
K
W
I
N
G
T
I
P
C
L
E
A
R
A
N
C
E
T
Y
P
LOW PROFILE
BARRICADES
(TYP.)
TEMPORARY BYPASS
CENTERLINE
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
D
D
A R
G I E
C
S
A W
Y E
R
C
S
A W
Y E
R
R
D
O W
N S
C O
N S
T R
U C
T I O
N
P
H A
S I N
G
GC105
OPTION #1
SCALE IN FEET
400 0
PLAN
NORTH
BID OPTION #1 PHASING/CLOSURE NOTES:
THIS SHEET SHALL BE ACTIVATED IF BID OPTION #1 IS AWARDED
DURATION:
· 36 DAYS
· 6 DAYS/WEEK UNLESS OTHERWISE APPROVED BY THE GOVERNMENT
WORK HOURS:
· 0600-1800
· WORK OUTSIDE OF THESE HOURS SHALL REQUIRE PRIOR APPROVAL FROM BASE OPERATIONS AND
THE CONTRACTING OFFICER
CLOSURES:
· 3 MPA PARKING POSITIONS (1 EACH IN ROWS D, E, F)
· TAXIWAY G TEMPORARILY REALIGNED
· TAXIWAY C (NORTH OF TAXIWAY F)
MAJOR WORK ITEMS:
· PLACE TEMPORARY PAVEMENT MARKINGS
·· RE-ALIGN TAXIWAY/TAXILANE CENTERLINE
·· RELOCATE RESTRICTED AREA BOUNDARY IN COORDINATION WITH THE CONTRACTING OFFICER
AND BASE OPS
· ASPHALT CONCRETE (AC) REMOVAL
· PORTLAND CEMENT CONCRETE (PCC) REMOVAL
· EXCAVATE BASE MATERIAL (PER SECTIONS)
· SOIL STABILIZATION, AS DIRECTED BY THE CONTRACTING OFFICER
· PLACE & COMPACT BASE/SUBBASE
· AC MILL AND OVERLAY
· PLACE PCC PAVEMENT
· REMOVE TEMPORARY PAVEMENT MARKINGS
· PLACE PAVEMENT MARKINGS
ADDITIONAL COMMENTS:
· TEMPORARY BYPASS CENTERLINE LAYOUT SHALL BE APPROVED BY THE CONTRACTING OFFICER
PRIOR TO PLACEMENT
· RADIO-EQUIPPED ESCORTS REQUIRED BETWEEN STAGING AREA AND WORK AREA
· ALL CONSTRUCTION DEBRIS AND MATERIALS SHALL BECOME PROPERTY OF THE CONTRACTOR
AND DISPOSED OF OFF-SITE, UNLESS OTHERWISE DIRECTED BY THE CONTRACTING OFFICER, IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS
· REFER TO SHEET GC101 FOR GENERAL SAFETY AND PHASING NOTES
TEMPORARY CENTERLINE LAYOUT
SCALE = 1"=100'
TAXIWAY C - NORTH
SCALE = 1"=400'
LIGHTED CHANNELIZER CONES (TYP.)
SEE DETAIL ON GC102
LEGEND (FOR SHEET GC105 ONLY):
LOW PROFILE BARRICADES (TYP.)
SEE DETAIL ON GC102
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
D
A R
G I E
M
E
L G
A M
M A
L
M
E
L G
A M
M A
L
R
D
O W
N S
C I V
I L
D
E T
A I
C-502
BASE BID
A N
S I
D
D E
C
L O
U I S
V I L
L E
K
E N
T U
C K
Y
D
R
M
A R
T
T
H E
R
K
I N
G
J R
P
L A
C E
L O
U I S
V I L
S
T R
I C
T V
A R
I O
O
J E
C T
S
A
T
G
A R
B
G R
I S
S O
M
A
S
E R
S
E
I N
D I A
N A
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
S U
B M
I T
T E
D
B
Y
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
I S
S U
E
D
A T
E
S I Z
E
M A
R K
D E
S C
R I P
T I O
N D
A T
E
SHEET ID
C E
R T
I F
I E
D
F
I N
A L
D
E S
I G
N
S
U B
M I T
T A
L
US Army Corps of Engineers
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
18.5"
WEAKENED PLANE CONTROL CRACK
18.5"
EXISTING PAVEMENT TO REMAIN (REFER TO NOTE 1)
NOTES:
1. CONC. TO CONC. PAVEMENT CONSTRUCTION JOINTS SHALL BE USED WHERE A COLD JOINT EXISTS DUE TO
TERMINATION OF DAILY ACTIVITIES OR AT THE INTERFACE OF THE PROJECT LIMITS. THE CONTRACTOR SHALL
TERMINATE CONCRETE PLACEMENT IN A MANNER TO ALIGN WITH EXISTING/ADJACENT CONCRETE JOINTS.
PROPOSED CONCRETE PAVEMENT
SEE DETAIL F11 ON C-504
9"
SEE DETAIL M17 ON C-504
10"
(TYP.)
DRILL AND GROUT DOWEL WITH
EPOXY BONDING AGENT
FULL-DEPTH PCC RUNWAY AS PER
DETAIL F5 ON C-501
1-1.5"Ø SMOOTH EPOXY COATED DOWEL, 20" LONG,
18" O.C. APPLY BOND BREAKER COATING TO END OF
THE DOWEL.
D
H
NOTES:
1. ALL REBAR AND/OR WWF EXPOSED AS A PART OF DEMOLITION OPERATION SHALL BE TREATED WITH AN EPOXY BASED
CORROSION-INHIBITING PAINT - 2 COATS.
2. THE CONTRACTOR SHALL TAKE ANY AND ALL PRECAUTIONS NOT TO UNDERMINE THE EXISTING PAVEMENT AND/OR BASE MATERIAL
IDENTIFIED TO REMAIN. ALL EXCAVATION OF BASE MATERIALS WITHIN 24-INCHES OF THE EXISTING PAVEMENTS TO REMAIN SHALL
BE COMPLETED BY HAND. ANY AREAS OF EXISTING PAVEMENT OR BASE MATERIAL UNDERMINED OR DAMAGED DURING
EXCAVATION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.
3. THE CONTRACTOR SHALL VACUUM EXISTING PCC SURFACE TO REMAIN AND REMOVE ALL LOOSE MATERIALS AND DEBRIS PRIOR TO
PLACEMENT CONCRETE PAVEMENT. EXPOSED FACE OF EXISTING CONCRETE PAVEMENT TO REMAIN UNDISTURBED SHALL BE FREE
OF DEBRIS AND LOOSE AGGREGATE PRIOR TO PLACEMENT OF PROPOSED CONCRETE PAVEMENT.
E
PROPOSED CONCRETE PAVEMENT EXISTING CONCRETE PAVEMENT TO REMAIN UNDISTURBED
STA 146+21
EXISTING PCC TO REMAIN
UNDISTURBED
EXISTING CONCRETE PAVEMENT PROPOSED CONCRETE PAVEMENT
STA 136+00
EXISTING PAVEMENT TO
REMAIN UNDISTURBED
18.5" REINFORCED PCC
4" BASE COURSE
8" SUBBASE COURSE
SCALE: NTS
PROPOSED FULL DEPTH RUNWAY
PCC TO EXISTING RUNWAY PCC (WEST) -
M4
SCALE: NTS
DOWELED CONSTRUCTION JOINT -
D10
SCALE: NTS
NON-DOWELED CONTRACTION JOINT -
D18
D
± 9.5" REINFORCED PCC
± 3" ASPHALT CONCRETE
± 8" NON-REINFORCED PCC
EXISTING SUBGRADE
± 9" NON-REINFORCED PCC
18.5" NON-REINFORCED PCC
4" BASE COURSE
8" SUBBASE COURSE
10" TYP.
D
1"Ø SMOOTH EPOXY COATED DOWEL, 20" LONG, 18"
O.C. APPLY BOND BREAKER COATING TO END OF THE
DOWEL (IN PROPOSED PCC CONCRETE SIDE).
DRILL AND GROUT DOWEL WITH
EPOXY BONDING AGENT
SEE DETAIL M17 ON C-504
SEE DETAIL F11 ON C-504
10" TYP.
D = 1-1.5"Ø SMOOTH EPOXY COATED DOWEL, 20" LONG,
18" O.C. APPLY BOND BREAKER COATING TO END OF
THE DOWEL (IN PROPOSED PCC CONCRETE SIDE).
NOTES:
1. EXISTING PCC PAVEMENT SHALL BE CUT BACK 20-FEET FROM EDGE OF PROPOSED PAVEMENT. REMOVE ALL ASSOCIATED MATERIAL TO A DEPTH SUFFICIENT TO CONSTRUCT
THE PROPOSED FULL DEPTH RUNWAY PCC PAVEMENT SECTION AS SHOWN.
2. THE PAVEMENT 'CUT BACK' LIMIT OF 20-FEET SHALL BE REPLACED WITH PCC. THE PCC SHALL FORMED AND ADJUSTED TO MATCH THE ALIGNMENT OF THE EXISTING ADJACENT
SLABS TO REMAIN.
3. THE CONTRACTOR SHALL VACUUM EXISTING PCC SURFACE TO REMAIN AND REMOVE ALL LOOSE MATERIALS AND DEBRIS PRIOR TO PLACEMENT CONCRETE PAVEMENT.
EXPOSED FACE OF EXISTING CONCRETE PAVEMENT TO REMAIN UNDISTURBED SHALL BE FREE OF DEBRIS AND LOOSE AGGREGATE PRIOR TO PLACEMENT OF PROPOSED
CONCRETE PAVEMENT.
4. ALL REBAR AND/OR WWF EXPOSED AS A PART OF DEMOLITION OPERATION SHALL BE TREATED WITH AN EPOXY BASED CORROSION-INHIBITING PAINT - 2 COATS.
5. THE CONTRACTOR SHALL TAKE ANY AND ALL PRECAUTIONS NOT TO UNDERMINE THE EXISTING PAVEMENT AND/OR BASE MATERIAL IDENTIFIED TO REMAIN. ALL EXCAVATION OF
BASE MATERIALS WITHIN 24-INCHES OF THE EXISTING PAVEMENTS TO REMAIN SHALL BE COMPLETED BY HAND. ANY AREAS OF EXISTING PAVEMENT OR BASE MATERIAL
UNDERMINED OR DAMAGED DURING EXCAVATION OPERATIONS SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT.
6. A GUILLOTINE-BREAKER IS PROHIBITED FOR CONCRETE DEMOLITION PURPOSES IN AN EFFORT TO PRESERVE AND PROTECT UNDERLYING PAVEMENT COURSES AND ADJACENT
PAVEMENT TO REMAIN.
7. IN THE EVENT THERE ARE EXISTING DOWELS DISCOVERED IN THE EXPOSED FACE OF THE EXISTING CONCRETE TO REMAIN. THE CONTRACTOR SHALL CAREFULLY CUT EXISTING
DOWELS AND OFFSET PROPOSED DOWELS A MINIMUM OF 12".
SCALE: NTS
PROPOSED FULL DEPTH RUNWAY
PCC TO EXISTING RUNWAY PCC (EAST)
M12
1"
2"
EXPANSION
CAP, SLIP FIT
10" TYP.
3"
DRILL AND GROUT DOWEL
WITH EPOXY BONDING AGENT
D = 1-1.5"Ø SMOOTH EPOXY COATED DOWEL, 20" LONG,
18" O.C. APPLY BOND BREAKER COATING TO END OF
THE DOWEL (IN PROPOSED PCC CONCRETE SIDE).
SEE DETAIL M11 ON C-504
CUT BACK EXISTING PCC ± 20' (SEE
CD-109) REMOVE EXISTING PCC
SLAB TO EXISTING BASE MATERIAL
5' MIN. (TYP.)
10"
(TYP.)
18.5"
1-1.5"Ø SMOOTH EPOXY COATED DOWEL, 20" LONG, 18" O.C.
APPLY BOND BREAKER COATING TO END OF THE DOWEL.
SEE DETAIL F5 ON C-503 FOR TYPICAL DOWEL BAR ASSEMBLY.
WEAKENED PLANE CONTROL CRACK
SEE DETAIL F11 ON C-504
9"
F
SCALE: NTS
DOWELED CONTRACTION JOINT -
D4
JOINT SEAL DETAIL M11 ON C-504
STA 146+01
STA 145+67.5
NON-EXTRUDING
PREFORMED
COMPRESSIBLE
MATERIAL
F
S J
WEAKENED PLANE
CONTROL CRACK
EXCAVATE EXISTING BASE
MATERIAL TO DEPTH
REQUIRED FOR
CONSTRUCTION OF PCC
THICKENED EDGE
EXISTING BASE
MATERIAL
COMPACT AND PROOF ROLL EXISTING
SUBGRADE AS SPECIFIED IN 31 00 00.00 06
STABILIZE UNSUITABLE SUBGRADE AS SPECIFIED
IN SECTION 31 00 00.00 06 AND 32 11 13.13 AND AS
AUTHORIZED BY THE CONTRACTING OFFICER
COMPACT AND PROOF ROLL EXISTING SUBGRADE AS SPECIFIED IN
31 00 00.00 06 STABILIZE UNSUITABLE SUBGRADE AS SPECIFIED IN
SECTION 31 00 00.00 06 AND 32 11 13.13 AND AS AUTHORIZED BY
THE CONTRACTING OFFICER
A M
E N
D M
E N
T
J A
N
W
2Q R
R
_P la ns -0
| GI111 |
| GI112 |
| GC101 |
| GC102 |
| GC103 |
| GC104 |
| GC105 |
| C-502 |
File details come from the government source that posted it. Updated .