W912QR21R0068-0002.pdf

PDF 1 MB Posted

Attached to
New Construction for a Mission Support Group Facility in Minneapolis, MN
Solicitation number
W912QR21R0068
Issued by

About this file

This solicitation amendment modifies an existing solicitation for the new construction of a Mission Support Group Facility in Minneapolis, Minnesota. The amendment revises the drawings, wage determination, and adds a new clause requiring COVID-19 safety protocols for federal contractors.

The drawings and wage determination are replaced in their entirety. A new clause is incorporated to comply with an executive order ensuring adequate COVID-19 safety protocols. The response date is extended to October 27, 2021 at 1:00 PM Eastern time. The solicitation is for the new construction of a two-story, 22,564 square foot facility to house squadron operations for the Department of the Army Corps of Engineers Engineering District Louisville.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR21R0068 for the Mission Support Group Facility in Minneapolis, MN is hereby amended as follow s:

1. Please see Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0068

X 9B. DATED (SEE ITEM 11)

24-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Oct-2021

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR21R0068-0002

W912QR21R0068

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDMT 2 SUMMARY OF CHANGES

Amendment Number: 0002 Project Title: Mission Support Group Facility Project Location: Minneapolis-St. Paul ARS, MN Date of Amendment: October 12, 2021

The purpose of Amendment 0002 to the design documents for the new construction of the Mission Support Group Facility is to revise the Ready To Advertise documents. Changes are outlined below.

a. The following DRAWINGS have been REPLACED in their entirety:

1) ES101 ELECTRICAL SITE PLAN

b. The following DOCUMENTS have been REPLACED in their entirety:

1) Wage Decision MN20210117 Modification 9, dated 01 October 2021 hereby replaces Wage

Decision MN20210117 Modification 8, dated 24 September 2021 and must be adhered to.

c. The following CLAUSES have been ADDED:

1) Clause 252.223-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) is hereby incorporated and must be adhered to.

d. The Due Date for proposals has been extended to 1:00 PM Eastern on 27 October, 2021.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 13-Oct-2021 01:00 PM to 27-Oct-2021 01:00 PM.

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been added by full text:

252.203-7999 (DEV)

252.223-7999 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors (Deviation 2021-O0009) As prescribed in Class Deviation 2021-O0009, Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors, use the following clause:

ENSURING ADEQUATE COVID-19 SAFETY PROTOCOLS FOR FEDERAL

CONTRACTORS (DEVIATION 2021-O0009) (OCT 2021)

(a) Definition. As used in this clause –

United States or its outlying areas means—

(1) The fifty States;

(2) The District of Columbia;

(3) The commonwealths of Puerto Rico and the Northern Mariana Islands;

(4) The territories of American Samoa, Guam, and the United States Virgin Islands; and

(5) The minor outlying islands of Baker Island, Howland Island, Jarvis Island, Johnston Atoll, Kingman Reef, Midway Islands, Navassa Island, Palmyra Atoll, and Wake Atoll.

(b) Authority. This clause implements Executive Order 14042, Ensuring Adequate COVID Safety Protocols for Federal Contractors, dated September 9, 2021 (published in the Federal Register on September 14, 2021, 86 FR 50985).

(c) Compliance. The Contractor shall comply with all guidance, including guidance conveyed through Frequently Asked Questions, as amended during the performance of this contract, for contractor or subcontractor workplace locations published by the Safer Federal Workforce Task Force (Task Force Guidance) at https:/www.saferfederalworkforce.gov/contractors/.

(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph (d), in subcontracts at any tier that exceed the simplified acquisition threshold, as defined in Federal Acquisition Regulation 2.101 on the date of subcontract award, and are for services, including construction, performed in whole or in part within the United States or its outlying areas.

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE RATES

"General Decision Number: MN20210117 10/01/2021

Superseded General Decision Number: MN20200117

State: Minnesota

Construction Type: Building

County: Hennepin County in Minnesota.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 04/30/2021 2 05/21/2021 3 07/09/2021 4 07/30/2021 5 08/06/2021 6 08/20/2021 7 08/27/2021 8 09/24/2021 9 10/01/2021

ASBE0034-001 06/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 40.25 35.90

BOIL0647-008 04/01/2021

Rates Fringes

BOILERMAKER......................$ 40.94 28.44

* BRMN0001-003 05/03/2021

Rates Fringes

BRICKLAYER.......................$ 42.61 23.82

BRMN0001-018 05/01/2021

Rates Fringes

TERRAZZO FINISHER................$ 40.27 19.59

TERRAZZO WORKER/SETTER...........$ 41.96 19.90

TILE FINISHER....................$ 31.36 19.32

TILE SETTER......................$ 38.10 23.79

CARP0068-006 05/03/2021

Rates Fringes

LATHER...........................$ 41.10 23.59

CARP0068-010 05/01/2019

Rates Fringes

SOFT FLOOR LAYER.................$ 38.84 20.19

CARP0322-017 05/03/2021

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Batt and Foam Installation, Drywall Hanging, Hardwood Floor Laying, Form Work, and Metal Roofing, and Excluding Soft Floor Layer).....................$ 39.71 26.01

CARP0548-003 05/01/2021

Rates Fringes

MILLWRIGHT.......................$ 37.13 30.17

CARP1847-001 04/29/2019

Rates Fringes

PILEDRIVERMAN....................$ 38.18 22.45

ELEC0292-006 05/01/2021

Rates Fringes

ELECTRICIAN

Excludes Low Voltage Wiring.$ 47.94 25.93 Low Voltage Wiring Only.....$ 41.42 18.16

ENGI0049-018 05/01/2020

Rates Fringes

POWER EQUIPMENT OPERATOR

Bobcat/Skid Steer/Skid Loader......................$ 40.93 21.70 Bulldozer...................$ 40.93 21.70 Drill.......................$ 40.93 21.70 Forklift....................$ 40.93 21.70 Oiler.......................$ 38.30 21.70 Roller......................$ 40.93 21.70 Tractor.....................$ 40.93 21.70

IRON0512-029 05/03/2021

Rates Fringes

IRONWORKER (Reinforcing and Structural)......................$ 39.35 31.80

LABO0563-058 06/01/2020

Rates Fringes

LABORER

Asbestos Abatement Removal from Ceilings, Floors and Walls.......................$ 34.73 16.40 Blaster, Demolition.........$ 36.41 18.54 Bottom Person...............$ 34.68 17.34 Common or General...........$ 36.41 18.54 Concrete Saw (Handheld/Walk Behind)......$ 36.41 18.54 Driller.....................$ 36.41 18.54 Fireproofer.................$ 36.41 18.54 Landscape...................$ 26.30 14.66 Mason Tender- Brick/Cement/Concrete.......$ 36.41 18.54 Pipelayer...................$ 36.45 17.34 Plaster Tender..............$ 35.97 17.21 Scaffold Builder............$ 36.41 18.54 Top Person..................$ 33.95 17.34

PAIN0386-003 05/03/2021

Rates Fringes

DRYWALL FINISHER/TAPER...........$ 39.23 24.86

PAIN0386-008 05/03/2021

Rates Fringes

PAINTER

Brush & Roller..............$ 39.23 24.86 Spray.......................$ 39.23 24.86

PAIN0880-002 06/01/2018

Rates Fringes

PAINTER (Sign Installer).........$ 29.05 14.77

PAIN1324-001 03/01/2021

Rates Fringes

GLAZIER..........................$ 34.50 19.63

PLAS0265-001 06/01/2018

Rates Fringes

PLASTERER........................$ 33.32 23.45

PLAS0633-005 05/01/2021

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 41.51 22.72

PLUM0015-026 05/01/2021

Rates Fringes

PLUMBER (Excludes HVAC Pipe and Unit Installation)...........$ 51.24 27.46

PLUM0539-020 05/01/2021

Rates Fringes

PIPEFITTER (Includes HVAC Pipe and Unit Installation and Excludes HVAC Duct Installation)....................$ 42.84 35.95

ROOF0096-018 05/01/2021

Rates Fringes

ROOFER...........................$ 40.20 20.05

SFMN0417-001 06/01/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 46.38 28.20

SHEE0010-047 05/01/2020

Rates Fringes

SHEET METAL WORKER

Excludes HVAC Duct

Installation................$ 42.09 30.52 HVAC Duct Installation Only.$ 42.09 30.52

* UAVG-MN-0023 01/01/2019

Rates Fringes

OPERATOR: Crane.................$ 39.94 20.30 OPERATOR: Loader................$ 35.78 20.30

SUMN2015-052 06/22/2018

Rates Fringes

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 31.13 14.94

TRUCK DRIVER: Dump Truck........$ 23.43 12.33

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

1 2

PL PL

MDP - 19

2nd Street

Ea rh ar t A ve nu e

SCALE: 1" =

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

0 40 8040

40'-0"

US Army Corps of Engineers ® Louisville District

NORTH

CERTIFIED FINAL DESIGN SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

/6

/2

4:

:2

PM

C :\U se rs

\a oo

\D oc um en ts \M y R ev it\

0_ El ec _A

O ge nc he

.rv t

ES101

EL

EC

TR

IC

AL

S

IT

E

PL

AN

M . O

W

EN

SB

Y

G . N

E

LS

O N

G . N

E

LS

O N

W . M

AD

SO

N

SHEET KEYNOTES

1. EXISTING UNDERGROUND ELECTRICAL DUCT BANK

WITH EXISTING MV CABLE FED FROM EXISTING

MANHOLE P-29 TO TRANSFORMER 752.

DISCONNECT MEDIUM VOLTAGE (MV) CABLE FROM

EXISITNG TRANSFORMER 752 AND PULL BACK TO

EXISTING MANHOLE P-29. EXISTING CABLE TO BE

REUSED AND CONNECTED TO NEW MVS-01

THROUGH NEW P-29A MANHOLE. PROVIDE NEW

DEADBREAK CONNECTORS TO EXISTING CABLE

PRIOR TO CONNECTING TO NEW MVS-01. REFER

TO EP601.

2. EXISTING UNDERGROUND ELECTRICAL DUCT BANK

TO BE REUSED FOR NEW MV CABLE CONNECTED

FROM NEW MVS-01 THROUGH NEW MANHOLE

P-29A TO EXISTING TRANSFORMER 752. REFER TO

EP601.

3. INTERUPT EXISTING ELECTRICAL CONCRETE

ENCASED DUCT BANK AND PROVIDE NEW

MANHOLE P-29A. EXTEND EXISTING CONCRETE

ENCASED DUCK TO CONNECT TO MANHOLE P-29A

AS REQUIRED. REFER TO A1/ES503.

4. NEW UNDERGROUND CONCRETE ENCASED DUCT

BANK FROM MANHOLE P-29A TO NEW 6-

COMPARTMENT MV PAD MOUNTED SWITCH,

MVS-01. REFER TO EP601 FOR FEEDER SIZES.

REFER TO A3/ES502 & A4/ES502.

5. NEW 6 COMPARTMENT PAD MOUNTED MV

DISTRIBUTION SWITCH, MVS-01. REFER TO

C1/ES503.

6. FEEDER IN CONCRETE ENCASED DUCT BANK FROM

EXISTING SWITCH MVS-01 TO PRIMARY SIDE OF

NEW TRANSFORMER. SEE EP601 FOR SIZE AND

C1/ES504.

7. NEW 500KVA, 13.8KV-480Y/277V, OIL FILLED PAD

MOUNT TRANSFORMER. SEE C2/ES501.

8. FEED FROM SECONDARY SIDE OF NEW

TRANSFORMER TO MDP. SEE EP601 FOR FEEDER

SIZE.

9. ELECTRICAL METER FOR BUILDING. SEE A2/ES501.

10. NEW 60KW DIESEL GENERATOR. REFER TO

A4/ES501 FOR GENERATOR PAD DETAIL.

11. FEEDER IN CONCRETE ENCASED DUCT BANK

FROM NEW DIESEL GENERATOR TO DOCKING

STATION. SEE EP601 FOR FEEDER SIZE & C1/ES504.

12. NEW DOCKING STATION. REFER TO EP601.

13. FEEDER TO EXTERIOR LIGHT FIXTURES SHALL BE

IN CONCRETE ENCASED DUCT BANK. REFER TO

A4/ES502.

14. EXISTING TELECOMMUNICATION HANDHOLE, HH-1.

15. EXISTING TELECOMMUNICATION CABLES.

16. EXISTING TELECOMMUNICATION HANDHOLE.

17. EXISTING TELECOMMUNICATION HANDHOLE, HH-8.

18. EXISTING TELECOMMUNICATION HANDHOLE, HH-7.

19. 4-4" CONCRETE ENCASED CONDUITS FROM

EXISTING HANDHOLE, HH-7, TO TELECOM ROOM

152. STUB CONDUITS UP 2" AFF AND PROVIDE WITH

PULL STRING. PROVIDE FABRIC INNERDUCT IN

CONDUIT WITH (2) 24 STRAND SINGLE MODE FIBER

& 100 PAIR COPPER OSP AND ROUTE FROM COMM

ROOM 152 TO BUILDING B761 DEMARC ROOM 140.

SEE A3/ES502.

20. EXISTING TELECOMMUNICATION CABLES IN

CONCRETE ENCASED DUCT BANK.

21. BOLLARDS. SEE C-130 FOR DETAILS.

22. EXISTING TRANSFORMER 752.

23. EXISITNG MANHOLE P-1F.

24. EXISTING MANHOLE P-29.

25. EXISTING CONCRETE ENCASED ELECTRICAL DUCT

BANK.

26. EXISTING MANHOLE P-28.

27. EXISTING MANHOLE P-4.

28. EXISTING MV SWITCH AS #8.

29. EXISTING TRANSFORMER 750.

SCALE: 1" = 40'-0"

ELECTRICAL SITE PLAN1

M

AR

K D

E

SC

R

IP

TI

O

N D

A

TE

AM

EN

D

M

EN

T 0 0

/3 0/

AM

EN

D

M

EN

T 0 0

/0 6/

W

2Q R

R

-0

STANDARD FORM 30
SUMMARY OF CHANGES
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
General Decision Number: MN20210117 10/01/2021
ES101

File details come from the government source that posted it. Updated .