New Construction for a Mission Support Group Facility in Minneapolis, MN
Solicitation number
W912QR21R0068
Issued by

About this file

This solicitation is for the new construction of a two-story, 22,564 square foot Mission Support Group facility in Minneapolis, Minnesota. Functional requirements for the facility include administrative office space, honor guard equipment storage, conference rooms, and operational areas such as break rooms and kitchen spaces. The facility must also comply with antiterrorism and force protection standards.

The solicitation was issued by the Department of the Army Corps of Engineers Louisville District. Responses are due within 120 days of award. The facility will house squadron operations functions including offices for the MSG Commander, an emergency operations center, military personnel section, ID processing, testing section, sustainment section, and Honor Guard storage. Conference areas, training rooms, and other operational spaces are also required.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Mission Support Group Facility Minneapolis St-Paul ARS, MN

P2: 480584

Design Bid Build

Structural Interior Design (SID) Certified Final

24 August 2021

W912QR21R0068

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR21R0068-0000

This page is intentionally left blank

MISSION SUPPORT GROUP FACILITY

MINNEAPOLIS ST-PAUL ARS

MINNESOTA

PROJECT #: QJKL090004

P2# 480584

FY 2020

DESIGN Consultant Team:

Structural Interior Design Certified Final Submittal

01 July 2021

Mission Support Group Facility Structural Interior Design Minneapolis – Saint Paul ARS, Minnesota 01 July 2021

Table of Contents

1. Narrative of Interior Design Objective ...................................................................................Tab 1

2. Floor Plan..............................................................................................................................Tab 2

3. Reflected Ceiling Plan........................................................................................................... Tab 3

4. Color Schedule ..................................................................................................................... Tab 4

5. Interior Color Boards .............................................................................................................Tab 5

6. Room Finish Schedule ...........................................................................................................Tab 6

7. Finish Plans ...........................................................................................................................Tab 7

8. Signage Plans and Details ......................................................................................................Tab 8

9. Interior Elevations .................................................................................................................Tab 9

10. Exterior Elevations .............................................................................................................. Tab 10

11. Exterior Color Boards .......................................................................................................... Tab 11

Mission Support Group Facility Minneapolis – Saint Paul ARS, Minnesota

Statement of Interior Design Objective The design team’s main focus for the interior design is to provide a comfortable environment for the new facility that will include the Mission Support Group, Force Support Squadron, Honor Guard, Chaplain, Airmen and Family Readiness, Contracting, Recruiting, Accounting and Financial Services, and the Emergency Operations Center.

The design shall deliver a professional environment that is aesthetically pleasing, sustainable, efficient, and can be easily maintained. Our objective is to instill pride in the facility and promote productivity and excellence within the user. A structural interior design (SID) package is provided which addresses floors, walls, ceilings, and miscellaneous interior finishes.

The overall color palette will increase the comfort and productivity of the users. All finish selections will be in accordance with all applicable codes and standards.

The majority of the interior spaces will be provided with painted gypsum wallboard.

Porcelain wall tile will be provided in restrooms for ease of maintenance. Wall protection such as corner guards will be provided where required.

The floor finishes throughout the facility are durable and enhance the design whenever possible. The main corridors and lobby shall receive a 18” x 18” luxury vinyl tile. The office areas are carpeted in a medium toned carpet tile with a nondirectional pattern.

Sealed concrete floors are to be provided in janitorial closets. Communication rooms will have static dissipative tile.

The restrooms have 12” x 24” neutral colored porcelain floor tile as well as a 12” x 24” porcelain wall tile with a 4” x 8” blue accent band. Floor tile will have a dark grout color, selected for ease of maintenance. The countertops in the restrooms will be a solid surface material. Toilet partitions are to be stainless steel.

Interior doors are painted hollow metal with painted hollow metal frames to match.

Offices have solid-core wood doors with a stained finish and painted hollow metal frames. The wood stain and hollow metal frame paint color are selected to coordinate with other finishes and furnishings in the building.

Signage will be designed in accordance with the AMC sign standards and UFC 3-120-

01. They will be professionally made and appropriately sized for viewing distance and provided with tactical lettering (braille) as required for ABA standards.

Ceilings will be primarily 2’ x 2’ lay-in acoustical ceiling tiles. Toilets and wet areas will be provided with a water-resistant paint finish on a suspended gypsum board ceiling.

CR

CR

VS

UP

EBS

T

T

VEST.

MSG STOR.

MEN

WOMEN

XO'S

108CA / RA

UDM / UTM

106 RECEPT

DEPUTY

COMMANDER

MSG

COMMANDER

CORRIDOR

CONFERENCE

ROOM 1

SUPR

STAIR

S2

CORRIDOR

DATA

STOR.

COMMUNICATIONS

BREAK OUT 3

BREAK OUT 2

BREAK OUT 1

MAP

OFFICE

OPS

TOILET

BREAKROOM

/ TRAINING

RECEPT

TRAP

ELEV.

COMM

CORRIDOR

BREAK ROOM

JAN.

ELEC

132MECH

CONFERENCE

SUSTAINMENT

CIVILIAN

PERSONNEL

CORRIDOR

STAIR

S3

VEST.

130B

A1

AE402

B.7B.7

10" 9' - 2" 1' - 0" 20' - 0" 20' - 0" 20' - 0" 6' - 4" 16' - 8" 3' - 0" 20' - 0" 20' - 0" 20' - 0" 1' - 0" 9' - 2" 10"

S3AB

136A

131A

123A 122A 121A 120A

119A

118A

117A

126A

111A 115A S2AB

115B

114A

113A

111A

C2

AE403

C1

AE403 AE301

C1

AE301

C1

LOBBY

10" 10' - 2" 20' - 0" 20' - 0" 20' - 0" 26' - 0" 20' - 0" 20' - 0" 20' - 0" 10' - 2" 10"

102A

104A

BB

CC

AE301

A1

AE301

A1

AA

B.6B.6

101A

B3

AE401

STAIR

S1

S2AS3A

A1

AE401

F

B

135A

ED

129A

129BPERSON

CONF

UPM

110A

124A

125A

139A

AE301

A3

AE301

A3

AE303

A2

138A

BB

4.4

4.4

5.3

E4 M1

M1E1

6' - 11 1/2" 10' - 4 1/2" 9' - 7 1/4" 20' - 1" 3"

6'

1/

8"

152A

4.8

4.8

19' - 6 3/4" 19' - 0 1/2" 17' - 1 1/4" 14' - 2 1/2"

E8

5'

1/ 2"

9'

1/

2"

E1

E1

E1

E7 E1

E1

E1

E1E1 E1 E1

E8

E1

E1

A2

A2

A2 E8

6'

4"

7' -2

/4

'-0

/4

B3

1'

6" 9'

8"

1'

6"

4' - 4" 6' - 0" 12' - 8" 6' - 0" 3' - 4" 6' - 0" 24' - 8" 6' - 10" 6' - 4" 2' - 8" 4' - 2" 5' - 4" 6' - 0" 13' - 4" 6' - 0" 3' - 4" 6' - 0" 12' - 8" 6' - 0" 4' - 4"

10' - 0" 17' - 4" 3' - 4" 13' - 4" 3' - 4" 17' - 4" 30' - 0" 16' - 8" 10' - 0"

RECEPTION

CUSTOMER

SUPPORT

FM

FAMILY

READINESS

CA

CAREER

DEVELOPMENT

SC / CAR

3" 10' - 5" 38' - 2" 10' - 10" 9' - 11 1/2" 7' - 0 3/4" 22' - 0 1/2"

8' - 6 5/8" 8' - 0" 10' - 9 1/2" 137A

144A 151A

151B

MPS

NAF

E4

A1

E1

100A

E4

A2

A2

A1

AE501

A1

AE501

OH

A4

AE501

C1

AE501

C2

AE501

A4

AE501

A4

AE501

A4

AE501

A4

AE501

A4

AE501

A3

AE501

C2

AE501

OH

C1

AE501

OH

C3

AE501

C3

AE501

/2

/2

1'

1/

2"

143A

SC/CAR

OFFICE

144 105A

48' - 10" 36' - 10" 29' - 6 3/4" 17' - 9" 12' - 9 1/4"

A2

A2

43' - 10 1/2" 5' - 9 3/4"

1"

5'

4"

A2

AE404

E8

8'

2"

C2

AE201

A1

AE201

A1

AE202

C2

AE202

AE302

A1

5.7

5.7

D D

C.2 C.2

B1

AE502

8' - 11 3/4" 13' - 0 3/4"

9' - 7" 7' - 0 3/4" 9' - 6" 12' - 9" 10' - 5 3/4" 10' - 9 1/4" 10' - 9 1/4" 10' - 9 1/4" 14' - 8 3/4"

6'

0" 9'

8"

3'

4" 2'

6"

1'

2"

3'

4"

0"

3'

4" 2'

6"

1'

2"

3'

4"

B B

C B B B

4' - 6" 3' - 4" 14' - 0" 6' - 0" 4' - 0" 6' - 0" 4' - 0" 6' - 0" 13' - 4" 6' - 4" 7' - 2" 3' - 4" 2' - 0" 6' - 4" 8' - 10"

1'

6" 9'

8"

3'

4"

1'

6"

BB

72' - 0" 24' - 0" 72' - 0"

5'

4"

8'

1'

6"

S2AA

116A140A

S3AA

AE403

A3

5.2

5.2

B

133A

132A 130A

168' - 0"

B2

AE406

G

AE304

A4

6 3/4"

AE406

A1

AE304

A2 130C

134A

1' -2

E4 B3

A4

AE401

GATE

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:3

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

AE101

G R

O U

N D

F

LO

O R

P

LA

N M

. O W

EN

SB

Y

J.

O

SB

O

R N

E

J.

B

R U

ZA

J.

IS

C H

SCALE: 1/8" = 1'-0"

GROUND FLOOR PLANA3

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING ADJUSTMENTS AT ALL EXTERIOR

NOMINAL OPENINGS TO ACCOUNT FOR DOOR AND

GLAZING FRAMES.

B. ALL INTERIOR DIMENSIONS ARE FROM FACE OF STUD

TO FACE OF STUD OR FACE OF CMU OR CONCRETE

AS INDICATED - UNLESS NOTED OTHERWISE.

C. ALL INTERIOR PARTITIONS SHALL BE TYPE "A1" -

UNLESS NOTED OTHERWISE.

GENERAL NOTES

D. CONTRACTORS ARE FREE TO USE ANY PRODUCT

WHICH MEETS THE GOVERNMENT'S MINIMUM

REQUIREMENTS AND NOT IN CONFLICT WITH OTHER

CONTRACT PROVISIONS. UNLESS INDICATED

OTHERWISE ON THE PLANS OR SPECIFICATIONS

(E.G. SOLE-SOURCE), ALL LISTED MANUFACTURERS

ARE THE BASIS OF DESIGN. FOR THESE BASIS OF

DESIGN PRODUCTS, OTHER MANUFACTURERS MAY

BE SUBSTITUTED AS LONG AS THE STANDARD OF

QUALITY AND CHARACTERISTICS OF THE

SUBSTITUTED MANUFACTURER MEET OR EXCEED

THE STANDARD OF QUALITY AND CHARACTERISTICS

OF THE BASIS OF DESIGN.

UP

S1C

MEN

WOMEN

CHAPLAIN

OPEN OFFICE

CHAPLAIN

CHAPLAIN

REFLECTION

CONF. RM. 1

FM MOB

STORAGE

S2B

UNION

ADMIN. /

STOR.

CORRIDOR

FM STAFF

FM LEAD

COMPTROLLER

FINANCIAL

OFFICER /

SUPR

FMA/FM

TRAINING

217VAULT

FM STAFF

MAJOR

RECRUITING

LOBBY

FORCE

DEVEL.

FLIGHT

RECRUITING

CHIEF

SECURE

STOR.

PRINT / COPY

SUPR

VEST.

CONTRACTING

STAFF

CONF. 3

CONTRACTING

LEAD

HONOR

GUARD

ADMIN.

CORRIDOR

S3C

B.7B.7

229A 223A

226A

230A

222A

221A

207A

206A

208A

215A

218A

219A

214A

209A

6 3/4" 9' - 2" 21' - 0" 20' - 0" 20' - 0" 26' - 0" 20' - 0" 20' - 0" 21' - 0" 9' - 2" 6 3/4"

AE301

C1

AE301

C1

BB

COMM

CC

AE301

A1

AE301

A1

AA

205A

203A

B.6B.6

A2

AE403A1

AE403

248A

A3

AE402

S1B

S2C

S3B

ELEC

220A

249A

ELEV.

212A 210A

AE301

A3

AE301

A3

16' - 6 1/2" 13' - 8 1/4" 10' - 1 1/2" 8' - 2 3/4"

JAN

202A

AE303

A2

B B B

E6

E1

246A

21' - 3 1/4" 2' - 1 1/4"

11' - 8" 14' - 3 1/4" 10' - 2 1/4"

E1

228A

B1

AE401

231A

E1

A2

A2

A2 E8

E8E1

M1

7'

/4

6'

4'

7"

M1 A2

A2 A2

A2

D4

E3E3

E3

E1

A2

A2

E1

A2

A2

E8E8

E4

A2 E8

E4E1

E1

A1

AE502

E1

E1

9'

1/

2"

/2

5'

4"

/2

/2

9' - 11" 11' - 1 3/4" 13' - 9 1/2" 25' - 2 3/4" 9' - 3 1/4" 7' - 1"

/4

5'

9'

8"

26'-1 1/4"

4'-11 3/4"

12'-1 3/4" 16'-6 1/2" 7'-3" 8'-2 1/4" 17'-3 1/2" 5'-10" 19'-6 3/4"

E8

14' - 9" 42' - 11" 11' - 2 1/2" 17' - 5 1/4" 1' - 6"

10' - 6 3/4" 52' - 8 1/2" 14' - 9"

A2

7' - 1 5/8"

12'-1 1/4" 15'-1" 11'-4" 19'-6 3/4" 13'-3"

FSS

READINESS 2

FSS 1ST

SERGEANT

FSR CMDR

TESTING

RECEPT

CSS

MAN PWR

UTM

US

SPUR

OPS

FSS

READINESS 1

MPS

237A 238A

S3CA 245A

235A 236A 234A

S2CA

217A

E3

HUDDLE

M2

M1

A2

E6

A2A2 A2A2

A2A2

201A

M1

M3

M2

E6

5'

5"

A2

A2

E4

E1

E1

A1

AE502

C1

AE501

OH

A4

AE501

A4

AE501

A4

AE501

A4

AE501

A4

AE501

A4

AE501

C1

AE501

OH

A3

AE501

A3

AE501

D1

AE502

C3

AE502

D1

AE502

OH

C3

AE502

OH

RECRUIT

STOR

247A

E3 E1

E1

E1 A2

A2

E1

6'

0"E8

1'

3/

4"

3'

4"

9'

8" 1'

6"

3'

4" 9'

8"

1'

6"

M1

224A

C2

AE201

A1

AE201

A1

AE202

C2

AE202

5.7

5.7

E8

6 3/4" 10' - 2" 20' - 0" 20' - 0" 20' - 0" 18' - 10" 7' - 2" 20' - 0" 20' - 0" 20' - 0" 10' - 2" 6 3/4"

70' - 8 3/4" 26' - 0" 70' - 8 3/4"

/2

/4

1'

3/

4"

3/

4"

/4

4' - 4" 6' - 0" 12' - 8" 6' - 0" 3' - 4" 6' - 0" 29' - 1" 11' - 2" 9' - 9" 6' - 0" 13' - 4" 6' - 0" 3' - 4" 6' - 0" 12' - 8" 6' - 0" 4' - 4"

B B B B

C

B

CBBBCCBBBC

B

C

A

9' - 8 3/4" 16' - 8" 30' - 0" 54' - 8" 30' - 0" 16' - 8"

6'

0"

3'

4"

3/

6'

0"

3'

4"

3/

C CB

4' - 6" 3' - 4" 14' - 0" 6' - 0" 4' - 0" 6' - 0" 4' - 0" 6' - 0" 13' - 4" 3' - 4" 9' - 0" 3' - 4"3' - 4" 6' - 0" 3' - 4"3' - 4" 8' - 4" 3' - 4" 14' - 0" 6' - 0" 4' - 0" 6' - 0" 4' - 0" 6' - 0" 14' - 0" 3' - 4" 4' - 6"

AE403

A3

AE506

C2

5.2

5.2

211A

MECH 2

MECH 1

A2

/4

167' - 5 1/2"

AE304

A4

AE304

A2

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:1

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

AE102

SE

C

O N

D F

LO

O

R P

LA

N

M . O

W

EN

SB

Y

J.

O

SB

O

R N

E

J.

B

R U

ZA

J.

IS

C H

SCALE: 1/8" = 1'-0"

SECOND FLOOR PLANA1

SCALE: = 1'-0"

0 8 168

1/8"

GENERAL NOTES

D. CONTRACTORS ARE FREE TO USE ANY PRODUCT

WHICH MEETS THE GOVERNMENT'S MINIMUM

REQUIREMENTS AND NOT IN CONFLICT WITH OTHER

CONTRACT PROVISIONS. UNLESS INDICATED

OTHERWISE ON THE PLANS OR SPECIFICATIONS

(E.G. SOLE-SOURCE), ALL LISTED MANUFACTURERS

ARE THE BASIS OF DESIGN. FOR THESE BASIS OF

DESIGN PRODUCTS, OTHER MANUFACTURERS MAY

BE SUBSTITUTED AS LONG AS THE STANDARD OF

QUALITY AND CHARACTERISTICS OF THE

SUBSTITUTED MANUFACTURER MEET OR EXCEED

THE STANDARD OF QUALITY AND CHARACTERISTICS

OF THE BASIS OF DESIGN.

GENERAL NOTES

A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR

COORDINATING ADJUSTMENTS AT ALL EXTERIOR

NOMINAL OPENINGS TO ACCOUNT FOR DOOR AND

GLAZING FRAMES.

B. ALL INTERIOR DIMENSIONS ARE FROM FACE OF STUD

TO FACE OF STUD OR FACE OF CMU OR CONCRETE

AS INDICATED - UNLESS NOTED OTHERWISE.

C. ALL INTERIOR PARTITIONS SHALL BE TYPE "A1" -

UNLESS NOTED OTHERWISE.

B.7B.7

CIVILIAN

PERSONNEL

SUSTAINMENT

CONFERENCE

MECH

BREAK ROOM

JAN.

ELEC

BREAKROOM

/ TRAINING

TOILET

OFFICE

OPS

MAP

BREAK OUT 1

BREAK OUT 2

BREAK OUT 3

COMMUNICATIONS

STOR.

DATA

SUPR

CONFERENCE

ROOM 1

MSG

COMMANDER

DEPUTY

COMMANDER

UDM / UTM

CA / RA

MEN

WOMEN

RECEPT

CORRIDOR

XO'S

MSG STOR.

VEST.

CORRIDOR

COMM

ELEV.

STAIR

S3

CORRIDOR

TRAP

RECEPT

CORRIDOR

STAIR

S2

AE301

C1

AE301

C1

BB

CC

AE301

A1

AE301

A1

AA

B.6B.6

PERSONNEL

CONFERENCE

AE301

A3

AE301

A3

FAMILY

READINESS

SC/CAR

OFFICE

CAREER

DEVELOPMENT

SC / CAR

NAF

LOBBY

VEST.

RECEPTION

5.7

5.7

D D

C.2 C.2

5.2

5.2

A5

AE104

TYPICAL CEILING LEGEND

2' x 2' CEILING GRID

GYP BD CEILING

2' x 4' FLUORESCENT FIXTURE - EMERGENCY

RECESSED DOWNLIGHT

EXIT SIGNS

SUPPLY AIR DIFFUSERS

RETURN AIR GRILLES

2' x 4' FLUORESCENT FIXTURE

1' x 4' LED FIXTURE - SUSPENDED

RECESSED DOWNLIGHT - EMERGENCY

ACCESS DOORS

4' LED FIXTURE - STRIP

EIFS CEILING

SOFFIT LIGHT FIXTURE

B

B.6

5.3 5.75.2

AE506

B4

AE506

C3

CORRIDOR

LOBBY

MEN

WOMEN

COMM

ELEV.

AE506

B3

1' - 0" 1' - 0"

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:3

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

AE104

G R

O U

N D

F

LO

O R

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

M . O

W

EN

SB

Y

J.

O

SB

O

R N

E

J.

B

R U

ZA

J.

IS

C H

SCALE: 1/8" = 1'-0"

GROUND FLOOR REFLECTED CEILING PLANA1

SCALE: = 1'-0"

0 8 168

1/8"

SHEET KEYNOTES

1. NO CEILING - OPEN TO STRUCTURE (PAINTED)

2. CANOPY

SCALE: 1/4" = 1'-0"

ENLARGED PLANA5

0 2' 4' 8'

1/4" = 1'-0"

GENERAL NOTES

A. CEILING HEIGHTS ARE PROVIDED ON ROOM FINISH

SCHEDULES: SHEETS AE601 & AE602

B. CONTRACTORS ARE FREE TO USE ANY PRODUCT

WHICH MEETS THE GOVERNMENT'S MINIMUM

REQUIREMENTS AND NOT IN CONFLICT WITH

OTHER CONTRACT PROVISIONS. UNLESS

INDICATED OTHERWISE ON THE PLANS OR

SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED

MANUFACTURERS ARE THE BASIS OF DESIGN. FOR

THESE BASIS OF DESIGN PRODUCTS, OTHER

MANUFACTURERS MAY BE SUBSTITUTED AS LONG

AS THE STANDARD OF QUALITY AND

CHARACTERISTICS OF THE SUBSTITUTED

MANUFACTURER MEET OR EXCEED THE STANDARD

OF QUALITY AND CHARACTERISTICS OF THE BASIS

OF DESIGN.

B.7B.7

HONOR

GUARD

ADMIN.

CONTRACTING

LEAD

CONTRACTING

STAFF

CONF. 3

VEST.

SECURE

STOR.

FORCE

DEVEL.

FLIGHT

PRINT / COPY

SUPR

RECRUITING

CHIEF

CORRIDOR

MEN

WOMEN

CHAPLAIN

OPEN OFFICE

CORRIDOR

VAULT

FMA/FM

TRAINING

FM STAFF

MAJOR

RECRUITING

FM STAFF

FINANCIAL

OFFICER /

SUPR

FM LEAD

COMPTROLLER

FM MOB

STORAGE

UNION

ADMIN. /

STOR.

REFLECTION

CHAPLAIN

CHAPLAIN

CONF. RM. 1

LOBBY

AE301

C1

AE301

C1

BB

CC

AE301

A1

AE301

A1

AA

S2B

S3C

B.6B.6

COMM

ELEC

AE301

A3

AE301

A3

JAN

OPS

FSR CMDR

FSS 1ST

SERGEANT

FSS

READINESS 2

RECRUIT

STOR

US

MPS

TESTING

FSS

READINESS 1

HUDDLE

LANDING

S1C

5.7

5.7

C.2 C.2

5.2

5.2

CSS

MAN PWR

SPUR

UTM

MECH 2

249 MECH 1

A5

AE105

TYPICAL CEILING LEGEND

2' x 2' CEILING GRID

GYP BD CEILING

2' x 4' FLUORESCENT FIXTURE - EMERGENCY

RECESSED DOWNLIGHT

EXIT SIGNS

SUPPLY AIR DIFFUSERS

RETURN AIR GRILLES

2' x 4' FLUORESCENT FIXTURE

1' x 4' LED FIXTURE - SUSPENDED

RECESSED DOWNLIGHT - EMERGENCY

ACCESS DOORS

4' LED FIXTURE - STRIP

EIFS CEILING

SOFFIT LIGHT FIXTURE

B.7B.7

BB

B.6B.6

5.3

5.3

5.7

5.7

5.2

5.2

AE506

B4

AE506

C4

LANDING

S1C

LOBBY

COMM

ELEV.

WOMEN

MEN

1' - 0" 1' - 0"

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:3

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

AE105

SE

C

O N

D F

LO

O

R R

EF

LE

C

TE

D C

EI

LI

N G

P

LA

N M

. O W

EN

SB

Y

J.

O

SB

O

R N

E

J.

B

R U

ZA

J.

IS

C H

SCALE: 1/8" = 1'-0"

SECOND FLOOR REFLECTED CEILING PLANA1

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/4" = 1'-0"

ENLARGED PLANA5

0 2' 4' 8'

1/4" = 1'-0"

GENERAL NOTES

A. CEILING HEIGHTS ARE PROVIDED ON ROOM FINISH

SCHEDULES: SHEETS AE601 & AE602

B. CONTRACTORS ARE FREE TO USE ANY PRODUCT

WHICH MEETS THE GOVERNMENT'S MINIMUM

REQUIREMENTS AND NOT IN CONFLICT WITH

OTHER CONTRACT PROVISIONS. UNLESS

INDICATED OTHERWISE ON THE PLANS OR

SPECIFICATIONS (E.G. SOLE-SOURCE), ALL LISTED

MANUFACTURERS ARE THE BASIS OF DESIGN. FOR

THESE BASIS OF DESIGN PRODUCTS, OTHER

MANUFACTURERS MAY BE SUBSTITUTED AS LONG

AS THE STANDARD OF QUALITY AND

CHARACTERISTICS OF THE SUBSTITUTED

MANUFACTURER MEET OR EXCEED THE STANDARD

OF QUALITY AND CHARACTERISTICS OF THE BASIS

OF DESIGN.

Minneapolis-St. Paul ARS, MN (P2: 480584) CERTIFIED FINAL SUBMITTAL Mission Support Group Facility 01 JULY 2021

SECTION 09 06 00

SCHEDULES FOR FINISHES

05/09

PART 1 GENERAL

1.1 SUMMARY

This section covers only the color of exterior and interior materials and products that are exposed to view in the finished construction. The word "color", as used herein, includes surface color and pattern. Requirements for quality, product specifications, and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings if not identified in this specification. Items not designated for color in this section may be specified in other sections. When color is not designated for items, propose a color for approval.

PART 2 PRODUCTS

2.1 COLOR SCHEDULE

The color schedule information provided in the following paragraphs lists the colors, patterns and textures required for exterior and interior finishes, including both factory applied and field applied colors. Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from other manufacturers. In the case of difference between the drawings and specifications, colors identified in this specification govern.

2.2 EXTERIOR FINISHES

2.2.1 Exterior Walls

Exterior wall colors apply to exterior wall surfaces including recesses at entrances and projecting vestibules. When applicable, paint conduit to closely match the adjacent surface color. Provide wall colors to match the colors listed below.

2.2.1.1 Brick Veneer

MV1 - Minnesota Brick - Sioux City Wellington Signiture Series

2.2.1.2 Mortar

Standard Gray

2.2.1.3 Metal Wall Panels, Hardware, and Associated Trim

IMWP1 - Smooth - Centria Formawall Dimension Series Graphix, FWDS

- 99767 XL Pewter IMWP2 - Horizontal - Centria Formawall Dimension Series Graphix, FWDS - 99767 XL Pewter

SECTION 09 06 00 Page 1

2.2.1.4 Insulation and Finish System

EIFS1: Dryvit, Pebble Texture, Pearl Gray, Basis-of-Design

2.2.1.5 Precast Concrete

PC1 - Dark Buff Limestone Federal Standard 595B #23685, Basis-of-Design

2.2.1.6 Glass and Glazing

GL1: Vitro Architectural Glass - Solar Bronze, Basis-of-Design

2.2.2 Exterior Trim

Provide exterior trim to match the colors listed below.

2.2.2.1 Aluminum Doors and Door Frames

Clear Anodized

2.2.2.2 Bollards

Safety Yellow

2.2.2.3 Control Joints

Match adjacent material in color.

2.2.2.4 Expansion Joint and/or Covers

Match adjacent material in color.

2.2.3 Exterior Roof

Apply roof color to exterior roof surfaces including sheet metal flashings and copings, snow guards, mechanical units, mechanical penthouses, roof trim, pipes, conduits, electrical appurtenances, and similar items.

Provide roof color to match the colors listed below.

2.2.3.1 Membrane Roofing

Sika Sarnafil PVC, White, Basis of Design

2.2.3.2 Penetrations

Match roof in color.

2.3 INTERIOR FINISHES

2.3.1 Interior Floor Finishes

Provide flooring materials to match the colors listed below.

2.3.1.1 Carpet Tile

CPT1:Bentley Drawing Room / Redacted 8RF23 / Document 801532, 18" x 36", NexStep Cushion Tile 8RF230AA0T, Ashlar Installation; Basis

SECTION 09 06 00 Page 2 of Design

2.3.1.2 Luxury Vinyl Tile

LVT1: Mannington - Spacia / Abstract / Linen Weave SS5A3800,17.7" x 17.7", Monolithic Installation; Basis of Design

2.3.1.3 Static-Dissipative Vinyl Tile

SDT1: Tarkett - iQ Granit SD / Granit Flannel Blanket 0722, 12" x 12", Monolithic Installation; Basis of Design

2.3.1.4 Stair Flooring

RSN1: Tarkett - 1/8" Material on Step w/ Square Nose, 32 Pebble;

Basis of Design

LVT1: Mannington - Spacia / Abstract / Linen Weave SS5A3800,17.7" x 17.7", Monolithic Installation; Basis of Design

RST1: Tarkett - ANgle Fit Rubbr Stair Treads, 32 Pebble, Hammered Texture w/ Black Grit Tape, VIHMNT 32SQ; Basis of Design

2.3.1.5 Stair Landings

LVT1: Mannington - Spacia / Abstract / Linen Weave SS5A3800,17.7" x 17.7", Monolithic Installation; Basis of Design

2.3.1.6 Porcelain Tile

PRC1: Crossville Studios - Color Blox / Slinky A1103.11224UPS, Unpolished, 12" x 24"; Basis of Design

2.3.1.7 Grout

GR1: Mapei - Epoxy, 09 Gray; Basis of Design

2.3.1.8 Transition Strips

TS1: Tarkett, CTA-32-J, 32 Pebble; Basis of Design TS2: Schluter, Reno-U, Satin Anodized Aluminum; Basis of Design TS3: Schluter, Reno-TK, Satin Anodized Aluminum; Basis of Design TS4: Schluter, Reno-V, Satin Anodized Aluminum; Basis of Design TS5: Johnsonite, SSR-32-B, 32 Pebble; Basis of Design TS6: Schluter, Schiene, Satin Anodized Aluminum; Basis of Design

2.3.1.9 Entrance Flooring

EF1: Milliken and Company - Obex Tile / Cutx / Fizz / Mocha FZC145, 19.7" x 19.7"; Basis of Design

2.3.1.10 Concrete Sealed

CONC1: Clear Penetrating Sealer; Basis of Design

2.3.2 Interior Base Finishes

Provide base materials to match the colors listed below.

SECTION 09 06 00 Page 3

2.3.2.1 Resilient Base and Moldings

RB1: Tarkett - Traditional Duracove Thermoplastic Rubber 1/8", 32 Pebble, 4" High Cove Base; Basis of Design

2.3.2.2 Porcelain Tile

PRCB1: Crossville - Color Blox / Slinky / Cove Base A1103.10612CBS, 6" x 12"; Basis of Design

2.3.2.3 Grout

GR1: Mapei - Epoxy, 09 Gray; Basis of Design

2.3.3 Interior Wall Finishes

Apply interior wall color to the entire wall surface, including reveals, vertical furred spaces and columns, grilles, diffusers, electrical and access panels, and piping and conduit adjacent to wall surfaces unless otherwise specified. Paint items not specified in other paragraphs to match adjacent wall surface. Provide wall materials to match the colors listed below.

2.3.3.1 Paint

PT1: Sherwin Williams - SW7015 Repose Gray, Eggshell; Basis of Design

2.3.3.2 Porcelain Tile

PRC1: Crossville Studios - Color Blox / Slinky A1103.11224UPS, Unpolished, 12" x 24"; Basis of Design

2.3.3.3 Glass Tile

GL1: Crossville Studios - Groove Glass / Rumba GG30/.10408, 4" x 8"; Basis of Design

2.3.3.4 Grout

GR1: Mapei - Epoxy, 09 Gray; Basis of Design

2.3.3.5 Exposed Structural Columns

PT1: Sherwin Williams - SW 7015 REPOSE GRAY - EGGSHELL; Basis of Design

2.3.4 Interior Ceiling Finishes

Apply ceiling colors to ceiling surfaces including soffits, furred down areas, grilles, diffusers, registers, and access panels. In addition, apply ceiling color to joists, underside of roof deck, and conduit and piping where joists and deck are exposed and required to be painted.

Provide ceiling materials to match the colors listed below.

2.3.4.1 Acoustical Tile and Grid

ACP1: USG – Mars Acoustical Panel 86985, White, 24” x 24” x 3/4”, Fine Line Beveled; Basis of Design

SECTION 09 06 00 Page 4

ACP1 Grid: USG - Donn Brand Centricitee DXT/DXLT 9/16", Acoustical Suspension System, White; Basis of Design

2.3.4.2 Paint (Ceilings)

PT3: Sherwin Williams - SW7005 Pure White, Flat; Basis of Design

2.3.4.3 Paint (Soffits)

PT3: Sherwin Williams - SW7005 Pure White, Flat; Basis of Design

2.3.4.4 Metal Deck

PT3: Sherwin Williams - SW7005 Pure White, Flat; Basis of Design

2.3.4.5 Structural Framing

PT3: Sherwin Williams - SW7005 Pure White, Flat; Basis of Design

2.3.5 Interior Trim

Provide interior trim to match the colors listed below.

2.3.5.1 Steel Doors

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.2 Steel Door Frames

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.3 Steel Windows (mullion, muntin, sash, trim, and stool)

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.4 Wood Doors

ST1: Sherwin Williams Minwax, Toasted Barrel MW405; Basis of Design

2.3.5.5 Wood Stain

ST1: Sherwin Williams Minwax, Toasted Barrel MW405; Basis of Design

2.3.5.6 Fire Extinguisher Cabinets

White

2.3.5.7 Handrails

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.8 Guardrails

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

SECTION 09 06 00 Page 5

2.3.5.9 Ladders

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.10 Metal Stairs

PT2: Sherwin Williams - SW7642 Pavestone, Semi Gloss; Basis of Design

2.3.5.11 Exposed Ductwork

PT3: Sherwin Williams - SW7005 Pure White, Flat; Basis of Design

2.3.6 Interior Window Treatment

Provide window treatments to match the colors listed below.

2.3.6.1 Window Shades

RS1: Mecho Shade Systems - SoHo 1600 Series / 1617 Onyx Tweed, Visible Light Transmittance 3%, Manual Operation; Basis of Design

2.3.7 Interior Miscellaneous

Provide miscellaneous items to match the colors listed below.

2.3.7.1 Toilet Partitions and Urinal Screens

Brushed Stainless Steel

2.3.7.2 Plastic Laminate

PLAM1: Wilsonart - Phantom Cocoa 8213K-28, Gloss Line Finish with Aeon; Basis of Design

2.3.7.3 Solid Surfacing Material

SSM1: Wilsonart - Dusk Ice 9203CE; Basis of Design

2.3.7.4 Window Sills (Solid Surface)

SSM1: Wilsonart - Dusk Ice 9203CE; Basis of Design

2.3.7.5 Corner Guards

CG1: CG1: Constuction Specialties - VA-034N / 314 Ozark - 3/4" Legs, .060" Thick Acrovyn, 4' Height; Basis of Design

2.3.7.6 Protective Wall Covering/Panel

FRP1: Marlite - Standard FRP, P100 White Pebbled; Basis of Design

2.3.7.7 Signage Message Color

SG1: Systems 2|90 - Slide Modular - 708 Soft White; Basis of Design

SECTION 09 06 00 Page 6

2.3.7.8 Signage Background Color

SG2: Systems 2|90 - Slide Modular - 7 05 Medium Gray ; Basis of Design

2.3.7.9 Siganage Frame Color

SG3: Slide Modular - 101 Satin Natural; Basis of Design

2.3.7.10 Wall Switch Handles and Standard Receptacle Bodies

White

2.3.7.11 Electrical Device Cover Plates

White

2.3.7.12 Electrical Panels

Painted to Match Adjacent Surface

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 09 06 00 Page 7

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 09 06 00 Page 8

INTERIOR FINISHES

Mission Support Group Facility (QJKL090004) Minneapolis - Saint Paul ARS, Minnesota SID Color Boards - Structural Interior Design

CPT1: Carpet Tile

Installation PhotoRB1: Rubber Base

Minneapolis - Saint Paul ARS, Minnesota SID Color Boards - Structural Interior Design

LVT Luxury Vinyl Tile1:

Installation Photo

RB1: Rubber Base RST1: Rubber Stair Tread

PT3: Ceiling Paint

PT1: Field Paint

PT2: oor / Door Frame D Paint

Minneapolis - Saint Paul ARS, Minnesota SID Color Boards - Structural Interior Design

ACP Acoustical Ceiling Panel1:

Installation PhotoPT3: Ceiling Paint

Minneapolis - Saint Paul ARS, Minnesota SID Color Boards - Structural Interior Design

PRC1/PRCB1: Porcelain Tile (Field) and Base

GL Glass Tile (Accent)1:

PLAM1: Plastic Laminate

GR1: Grout

SSM1: Solid Surface Material

PT1: Field Paint

Minneapolis - Saint Paul ARS, Minnesota SID Color Boards - Structural Interior Design

C 1: CG orner Guard

SG1: Signage Message SG3: Signage FrameSG2: Signage Background

RS1: Roller ShadeSDT1 Static Dissipative Tile:

FRP1: Fiberglass Reinforced Panel

EF Entrance Flooring1:

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M B

ER

US Army Corps of Engineers ® Louisville District

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

2:

:5

PM

C :\U se rs

\tb \D oc um en ts

\M y

R ev it\

0_

Ar ch

_T Br un ga rd .rv t

AE601

R O

O M

F

IN

IS

H

S C

H

ED

U

LE

F

IN

IS

H L

EG

EN

D M

. O W

EN

SB

Y

S.

G

R E

EN

S.

G

R E

EN

J.

IS

C H

ROOM FINISH SCHEDULE GROUND FLOOR

ROOM

NUMBER ROOM NAME

FLOOR

FINISH

BASE

FINISH

WALL FINISHES

CEILING FINISH

CEILING

HEIGHT

FINISH

SCHEDULE

NOTESNORTH SOUTH EAST WEST

100 VESTIBULE EF1 RB1 PT1 PT1 PT1 PT1 GYP BD, PT3 9'-0"

101 LOBBY LVT1 RB1 PT1 PT1 PT1 -- ACP1 10'-6"

102 MEN PRC1 PRCB1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 GYP BD, PT3 8'-0" 2,5

103 VESTIBULE LVT1 RB1 PT1 PT1 PT1 PT1 GYP BD, PT3 9'-0"

104 WOMEN PRC1 PRCB1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 GYP BD, PT3 8'-0" 2,5

105 MSG STORAGE CONC1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

106 UDM / UTM CPT1 RB1 -- PT1 -- PT1 ACP1 9'-0" 4

107 CA / RA CPT1 RB1 PT1 PT1 -- PT1 ACP1 9'-0"

108 XO'S CPT1 RB1 PT1 -- -- -- ACP1 9'-0" 4

109 UPM CPT1 RB1 -- -- PT1 -- ACP1 9'-0"

110 RECEPTION CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

111 SUPERVISOR CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

112 CORRIDOR LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

113 DEPUTY COMMANDER CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

114 MSG COMMANDER CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

115 CONFERENCE ROOM 1 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

116 CORRIDOR LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

117 DATA SDT1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

118 STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

119 COMMUNICATIONS SDT1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

120 BREAK OUT 3 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

121 BREAK OUT 2 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

122 BREAK OUT 1 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

123 MAP CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

124 OFFICE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

125 TOILET PRC1 PRCB1 PT1 PT1 PT1 PRC1 / GL1 GYP BD, PT3 9'-0" 2

126 OPS CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 10'-0"

127 BREAK RM / TRAINING LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

128 RECEPTION CPT1 RB1 PT1 -- -- PT1 ACP1 10'-0"

129 TRAP CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

130 CORRIDOR LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 / GYP BD, PT3 9'-6" / 9'-0"

131 JANITOR CONC1 RB1 PT1 / FRP1 PT1 / FRP1 PT1 / FRP1 PT1 / FRP1 EXP, PT3 - 1, 2, 3

132 ELEC CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

133 MECH CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

134 BREAK ROOM LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

135 CONFERENCE 2 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

136 SUSTAINMENT CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

137 NAF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

138 CIVILIAN PERSONNEL CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

139 PERSONNEL CONFERENCE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

140 CORRIDOR LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

143 FAMILY READINESS CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

144 SC/CAR OFFICE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

145 FM CPT1 RB1 -- PT1 -- PT1 ACP1 9'-0" 4

146 CA CPT1 RB1 -- PT1 -- PT1 ACP1 9'-0"

147 MPS CPT1 RB1 -- -- -- PT1 ACP1 9'-0"

148 CAREER DEVELOPMENT CPT1 RB1 PT1 -- PT1 PT1 ACP1 9'-0" 4

149 CUSTOMER SUPP. CPT1 RB1 PT1 PT1 PT1 -- ACP1 9'-0" 4

150 SC / CAR CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

151 RECEPTION CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

152 COMM SDT1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

153 ELEVATOR LVT1 -- SS SS SS SS SS -

S1 STAIRS LVT1 RB1 PT1 PT1 -- PT1 GYP BD, PT3 VARIES 1

S2 STAIRS RST1 RB1 PT1 PT1 PT1 PT1 ACP1 12'-0"

S2A LANDING RST1 RB1 -- PT1 PT1 PT1 ACP1 12'-0"

S3 STAIRS RST1 RB1 PT1 PT1 PT1 PT1 ACP1 12'-0"

S3A LANDING RST1 RB1 -- PT1 PT1 PT1 ACP1 12'-0"

GENERAL NOTES

FINISH SCHEDULE NOTES

1. ALL EXPOSED CEILINGS AND STRUCTURES TO BE

PAINTED (PT3).

2. ALL WALLS WITH AREAS OF EXPOSED GYP BD ARE

TO BE PAINTED WITH EPOXY PAINT.

3. (FRP1) AT 6'-0" ABOVE FLOOR FINISH LEVEL WITH

PAINT ABOVE.

4. WALLS WITH AREAS OF EXPOSED GYP BD ARE TO

RECEIVE RUBBER BASE.

5. TILE WAINSCOT TO 5'-2" AFF.

A. ALL DOOR FRAMES ARE TO BE PAINTED, (PT2) U.N.O.

B. ALL WINDOWS SHALL RECEIVE ROLLER SHADES

(RS1) U.N.O.

C. LISTED BASIS-OF-DESIGN PRODUCTS ARE

INCLUDED TO ILLUSTRATE MINIMUM QUALITY AND

PERFORMANCE REQUIREMENTS ONLY. ANY

PRODUCT MAY BE USED THAT INCLUDES THE SAME

SALIENT QUALITIES AS THOSE INDICATED.

D. ALL WINDOW SILLS ARE TO BE (SSM1).

ABBREVIATION LEGEND

ACP ACOUSTICAL CEILING PANEL

CONC CONCRETE

CPT CARPET TILE

EF ENTRANCE FLOORING

EXP EXPOSED TO STRUCTURE

FRP FIBERGLASS REINFORCED PANEL

GL GLASS TILE

GYP BD GYPSUM BOARD

LVT LUXURY VINYL TILE

PLAM PLASTIC LAMINATE

PT PAINT

PRC PORCELAIN TILE

PRCB PORCELAIN TILE BASE

RB RUBBER BASE

RST RUBBER STAIR TREAD

SDT STATIC DISSIPATIVE TILE

SS STAINLESS STEEL

INTERIOR FINISH LEGEND

CODE MATERIAL MANUFACTURER PATTERN / COLOR SIZE NOTES

BASE MATERIAL

PRCB1 PORCELAIN TILE CROSSVILLE STUDIOS; BASIS OF DESIGN COLOR BLOX / SLINKY / COVE BASE /

A1103.10612CBS

6" X 12"

RB1 RUBBER BASE TARKETT; BASIS OF DESIGN TRADITIONAL VINYL 1/8" / 32 PEBBLE / COVE 4" H

CEILING MATERIAL

ACP1 ACOUSTICAL CEILING

PANEL

USG; BASIS OF DESIGN MARS ACOUSTICAL PANEL 86985 24" X 24"

ACP1 -

GRID

ACOUSTICAL

SUSPENSION SYSTEM

USG; BASIS OF DESIGN DONN BRAND CENTRICITEE DXT/DXLT 9/16"

FINISH TRANSITION

TS1 RESILIENT

TRANSITION

TARKETT; BASIS OF DESIGN CTA-32-J, 32 PEBBLE CPT TO CONC

TS2 ALUMINUM

TRANSITION STRIP

SCHLUTER; BASIS OF DESIGN RENO-U, SATIN ANODIZED ALUMINUM CPT TO SDT;

LVT TO CPT

TS3 ALUMINUM

TRANSITION STRIP

SCHLUTER; BASIS OF DESIGN RENO-TK, SATIN ANODIZED ALUMINUM CPT TO PRC

TS4 ALUMINUM

TRANSITION STRIP

SCHLUTER; BASIS OF DESIGN RENO-V, SATIN ANODIZED ALUMINUM PRC TO LVT

TS5 RESILIENT

TRANSITION

JOHNSONITE; BASIS OF DESIGN SSR-32-B, 32 PEBBLE LVT TO CONC

TS6 ALUMINUM

TRANSITION STRIP

SCHLUTER; BASIS OF DESIGN SCHIENE, SATIN ANODIZED ALUMINUM LVT TO SDT;

PRC TO GYP BD

FLOOR MATERIAL

CONC1 SEALED CONCRETE -- CLEAR PENETRATING SEALER --

CPT1 CARPET TILE BENTLEY; BASIS OF DESIGN DRAWING ROOM / REDACTED 8RF23 / DOCUMENT

801532

18" X 36" ASHLAR

INSTALLATION

EF1 ENTRANCE FLOORING MILLIKEN AND COMPANY; BASIS OF

DESIGN

OBEX TILE / CUTX / FIZZ / MOCHA FZC145 19.7" X 19.7" MONOLITHIC

INSTALLATION

LVT1 LUXURY VINYL TILE MANNINGTON; BASIS OF DESIGN SPACIA / ABTRACT / LINEN WEAVE SS5A3800 17.7" X 17.7" MONOLITHIC

INSTALLATION

PRC1 PORCELAIN TILE CROSSVILLE STUDIOS; BASIS OF DESIGN COLOR BLOX / SLINKY A1103.11224UPS 12" X 24"

RSN1 STAIR TARKETT; BASIS OF DESIGN 1/8" MATERIAL ON STEP W/ SQUARE NOSE, 32

PEBBLE

RST1 STAIR TARKETT; BASIS OF DESIGN ANGLE FIT RUBBER STAIR TREAD, 32 PEBBLE,

HAMMERED TEXTURE W/ BLACK GRIT TAPE,

VIHMNT 32SQ

SDT1 STATIC DISSIPATIVE

TILE

TARKETT; BASIS OF DESIGN IQ GRANIT SD / GRANIT FLANNEL BLANKET 0722 --

MISCELLANEOUS MATERIAL

- TOILET PARTITIONS &

URINAL SCREENS

- BRUSHED STAINLESS STEEL

CG1 CORNER GUARDS CONSTRUCTION SPECIALTIES; BASIS OF

DESIGN

VA-034N / 314 OZARK 4' HEIGHT;

3/4" LEGS

GR1 GROUT MAPEI; BASIS OF DESIGN 09 GRAY -- EPOXY

PLAM1 PLASTIC LAMINATE WILSONART; BASIS OF DESIGN PHANTOM COCOA 8213K-28 / GLOSS LINE FINISH

WITH AEON

RS1 ROLLER SHADES MECHO SHADE SYSTEMS; BASIS OF

DESIGN

THERMOVEIL SCREENS / 3014 PEWTER -- MANUAL

OPERATION

SG1 SIGNAGE MESSAGE SYSTEMS 2|90; BASIS OF DESIGN 708 SOFT WHITE -- SLIDE MODULAR

SYSTEM

SG2 SIGNAGE

BACKGROUND

SYSTEMS 2|90; BASIS OF DESIGN 705 MEDIUM GRAY -- SLIDE MODULAR

SYSTEM

SG3 SIGNAGE FRAME SYSTEMS 2|90; BASIS OF DESIGN 101 SATIN NATURAL -- SLIDE MODULAR

SYSTEM

SSM1 SOLID SURFACE

MATERIAL

WILSONART; BASIS OF DESIGN DUSK ICE 9203CE --

ST1 WOOD DOORS - STAINED TO MATCH SHERWIN WILLIAMS, MINWAX,

TOASTED BARREL MW405

PAINT

PT1 PAINT SHERWIN WILLIAMS; BASIS OF DESIGN SW 7015 REPOSE GRAY / EGGSHELL FINISH -- FIELD PAINT PT2 PAINT SHERWIN WILLIAMS; BASIS OF DESIGN SW 7642 PAVESTONE / SEMI GLOSS -- DOORS / DOOR

FRAMES

PT3 PAINT SHERWIN WILLIAMS; BASIS OF DESIGN SW 7005 PURE WHITE / FLAT FINISH -- CEILING PAINT

WALL MATERIAL

FRP1 FIBERGLASS

REINFORCED PANEL

MARLITE; BASIS OF DESIGN STANDARD FRP, P100 WHITE PEBBLED --

GL1 GLASS TILE CROSSVILLE STUDIOS; BASIS OF DESIGN GROOVE GLASS / RUMBA GG30 / .10408 4" X 8" PRC1 PORCELAIN TILE CROSSVILLE STUDIOS; BASIS OF DESIGN COLOR BLOX / SLINKY A1103.11224UPS /

UNPOLISHED

12" X 24"

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

AC

T

N O

FI

LE

N U

M B

ER

US Army Corps of Engineers ® Louisville District

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

E

ER

S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

1:

:0

PM

C :\U se rs

\tb \D oc um en ts

\M y

R ev it\

0_

Ar ch

_T Br un ga rd .rv t

AE602

R O

O M

F

IN

IS

H

S C

H

ED

U

LE

M . O

W

EN

SB

Y

S.

G

R E

EN

S.

G

R E

EN

J.

IS

C H

ROOM FINISH SCHEDULE SECOND FLOOR

ROOM

NUMBER ROOM NAME

FLOOR

FINISH

BASE

FINISH

WALL FINISHES

CEILING FINISH

CEILING

HEIGHT FINISH SCHEDULE NOTESNORTH SOUTH EAST WEST

201 HUDDLE ROOM LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

202 JAN CONC1 RB1 PT1 / FRP1 PT1 / FRP1 PT1 / FRP1 PT1 / FRP1 EXP, PT3 - 1, 2, 3

203 MEN PRC1 PRCB1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 GYP BD, PT3 8'-0" 2,5

204 LOBBY LVT1 RB1 PT1 PT1 PT1 PT1 ACP1 / GYP BD, PT3 9'-6" / 9'-0"

205 WOMEN PRC1 PRCB1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 PRC1 / GL1 / PT1 GYP BD, PT3 8'-0" 2,5

206 CHAPLAIN CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

207 CHAPLAIN CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

208 REFLECTION CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

209 CHAPLAIN OPEN OFFICE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

210 CONFERENCE 1 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

211 UNION ADMIN. / STOR. CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

212 FM MOB STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

213 CORRIDOR LVT1 RB1 PT1 PT1 PT1 -- ACP1 9'-0"

214 FM STAFF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

215 FM LEAD COMPTROLLER CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

216 FINANCIAL OFFICER / SUPR CPT1 RB1 -- PT1 PT1 -- ACP1 9'-0" 4

217 FMA/FM TRAINING CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

218 VAULT CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

219 FM STAFF MAJOR CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

220 ELECTRICAL CONC1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

221 RECRUITING CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

222 RECRUITING CHIEF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

223 FORCE DEVELOPMENT

FLIGHT

CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

224 SECURE STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 8'-0"

225 SUPR CPT1 RB1 -- PT1 PT1 -- ACP1 9'-0" 4

226 CONTRACTING STAFF CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

227 PRINT / COPY CPT1 RB1 PT1 -- -- PT1 ACP1 9'-0"

228 CONTRACTING LEAD CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

229 VEST. CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

230 CONFERENCE 3 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

231 HONOR GUARD ADMIN. CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

232 CORRIDOR LVT1 RB1 PT1 PT1 -- PT1 ACP1 9'-0"

233 FSS READINESS 2 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

234 FORCE SUPPORT

SQUADRON 1ST SERGEANT

CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

235 FSR CMDR CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

236 OPS CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

237 FSS READINESS 1 CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0" 4

238 RECEPTION CPT1 RB1 -- PT1 PT1 PT1 ACP1 9'-0" 4

239 COMPUTER SUPPORT

SPECIALIST (CSS)

CPT1 RB1 -- -- PT1 PT1 ACP1 9'-0" 4

240 MAN POWER CPT1 RB1 PT1 -- PT1 PT1 ACP1 9'-0" 4

241 UTM CPT1 RB1 PT1 PT1 -- PT1 ACP1 9'-0" 4

242 MPS CPT1 RB1 PT1 -- PT1 PT1 ACP1 9'-0" 4

243 US CPT1 RB1 PT1 -- PT1 PT1 ACP1 9'-0"

244 SPUR CPT1 RB1 -- PT1 PT1 -- ACP1 9'-0"

245 TESTING CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

246 COMM SDT1 RB1 PT1 PT1 PT1 PT1 EXP, PT3 - 1

247 RECRUITING STORAGE CPT1 RB1 PT1 PT1 PT1 PT1 ACP1 9'-0"

248 MECH 1 CONC1 -- -- -- -- -- EXP, PT3 - 1

249 MECH 2 CONC1 -- -- -- -- -- EXP, PT3 - 1

S1B LANDING LVT1 RB1 PT1 PT1 -- PT1 GYP BD, PT3 11'-6"

S1C LANDING LVT1 RB1 PT1 PT1 PT1 PT1 GYP BD, PT3 11'-6"

S2B LANDING RST1 RB1 PT1 -- PT1 PT1 ACP1 12'-0"

S2C LANDING RST1 RB1 -- PT1 PT1 PT1 ACP1 12'-0"

S3B LANDING RST1 RB1 PT1 -- PT1 PT1 ACP1 12'-0"

S3C LANDING RST1 RB1 -- PT1 PT1 PT1 ACP1 12'-0"

GENERAL NOTES

FINISH SCHEDULE NOTES

1. ALL EXPOSED CEILINGS AND STRUCTURES TO BE

PAINTED (PT3).

2. ALL WALLS WITH AREAS OF EXPOSED GYP BD ARE

TO BE PAINTED WITH EPOXY PAINT.

3. (FRP1) AT 6'-0" ABOVE FLOOR FINISH LEVEL WITH

PAINT ABOVE.

4. WALLS WITH AREAS OF EXPOSED GYP BD ARE TO

RECEIVE RUBBER BASE.

5. TILE WAINSCOT TO 5'-2" AFF.

1. ALL DOOR FRAMES ARE TO BE PAINTED, (PT2)

U.N.O

2. ALL WINDOWS SHALL RECEIVE ROLLER SHADES

(RS1) U.N.O.

3. LISTED BASIS-OF-DESIGN PRODUCTS ARE

INCLUDED TO ILLUSTRATE MINIMUM QUALITY AND

PERFORMANCE REQUIREMENTS ONLY. ANY

PRODUCT MAY BE USED THAT INCLUDES THE

SAME SALIENT QUALITIES AS THOSE INDICATED.

4. ALL WINDOW SILLS ARE TO BE (SSM1).

ABBREVIATION LEGEND

ACP ACOUSTICAL CEILING PANEL

CPT CARPET TILE

CONC CONCRETE

EF ENTRANCE FLOORING

EXP EXPOSED TO STRUCTURE

FRP FIBERGLASS REINFORCED PANEL

GYP BD GYPSUM BOARD

LVT LUXURY VINYL TILE

PLAM PLASTIC LAMINATE

PT PAINT

PRC PORCELAIN TILE

PRCB PORCELAIN TILE BASE

RB RUBBER BASE

RST RUBBER STAIR TREAD

SDT STATIC DISSIPATIVE TILE

SS STAINLESS STEEL

108107

113 114

115111

S2

120121122123124

136138

S3

S1

S2AS3A

CG

CG CG CG CG CG CG

CG

CG CG CG CG CG

CG

CG

CGCG

CG

CGCG

CG CG

CG

CG

CG

CG

CGCG

CG CG

CGCG

CG

CG

CG

CG

CG

CG

CG

CG

CG CGCG CG

CG

CG CG

CG

146 145

CG

CG

CG

CG

CG

CG

FINISH LEGEND

CPT1: CARPET TILE

LVT1: LUXURY VINYL TILE

PRC1: PORCELAIN TILE, 12" X 24"

CONC1: CONCRETE

EF1: ENTRANCE FLOORING

CG CORNER GUARD LOCATION

SDT1: STATIC DISSIPATIVE TILE

EP1: EPOXY FLOORING

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:0

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

IN101

G R

O U

N D

F

LO

O R

F

IN

IS

H

P

LA

N M

. O W

EN

SB

Y

S.

G

R

EE

N

S.

G

R

EE

N

J.

IS

C H

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

GROUND FLOOR FINISH PLANA1

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE AE601 FOR

FLOOR FINISHES NOT SHOWN ON FINISH PLAN.

B. PROVIDE SMOOTH TRANSITION BETWEEN

DIFFERENT FLOORING MATERIALS. REFER TO

TRANSITION SCHEDULE AE601.

C. THERE SHALL BE NO FLOOR TILE PIECES INSTALLED

LESS THAN 3". COORDINATE WITH CONTRACTING

OFFICER'S TECHNICAL REPRESENTATIVE PRIOR TO

INSTALLATION.

D. ALL TILED FLOORING INSTALLATIONS SHALL BEGIN

WITH A FULL TILE CENTERED IN ROOM, UNLESS

NOTED OTHERWISE. IF CENTERING FULL TILE

RESULTS IN LESS THAN 3" WIDE AT THE PERIMETER

OF THE ROOM, ADJUST THE START POINT BY HALF

TILE WIDTH IN BOTH DIRECTIONS.

E. USE GRIDS PROVIDED FOR BASIS OF FLOOR TILE

INSTALLATION.

F. ALL OUTSIDE CORNERS ARE TO RECEIVE A CORNER

GUARD, (CG1).

1ST FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

1ST FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

146 CA

147 MPS

148 CAREER DEVELOPMENT

149 CUSTOMER SUPP.

150 SC / CAR

151 RECEPTION

152 COMM

153 ELEVATOR

S1 STAIRS

S2 STAIRS

S2A LANDING

S3 STAIRS

S3A LANDING

1ST FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

122 BREAK OUT 1

123 MAP

124 OFFICE

125 TOILET

126 OPS

127 BREAK RM / TRAINING

128 RECEPTION

129 TRAP

130 CORRIDOR

131 JANITOR

132 ELEC

133 MECH

134 BREAK ROOM

135 CONFERENCE 2

136 SUSTAINMENT

137 NAF

138 CIVILIAN PERSONNEL

139 PERSONNEL CONFERENCE

140 CORRIDOR

143 FAMILY READINESS

144 SC/CAR OFFICE

145 FM

1ST FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

100 VESTIBULE

101 LOBBY

102 MEN

103 VESTIBULE

104 WOMEN

105 MSG STORAGE

106 UDM / UTM

107 CA / RA

108 XO'S

109 UPM

110 RECEPTION

111 SUPERVISOR

112 CORRIDOR

113 DEPUTY COMMANDER

114 MSG COMMANDER

115 CONFERENCE ROOM 1

116 CORRIDOR

117 DATA

118 STORAGE

119 COMMUNICATIONS

120 BREAK OUT 3

121 BREAK OUT 2

209207

S2B

215216

223224

S3C

S1B

S2C

S3B

CG

CG

CG

CG

CG

CG

CG CG CG CG CG CG

CG

CG

CG

CG

CG

CG

CGCG

CG CG

CG

CG

CG CG

CG

CG

CG

CG

CG

CG CGCGCGCGCG

CG

CG

CG

CG

CG

235 236

241 244

243 201

CG

CGCG

CGCG

LANDING

S1C

CG

CGCG

249 248

FINISH LEGEND

CPT1: CARPET TILE

LVT1: LUXURY VINYL TILE

PRC1: PORCELAIN TILE, 12" X 24"

CONC1: CONCRETE

EF1: ENTRANCE FLOORING

CG CORNER GUARD LOCATION

SDT1: STATIC DISSIPATIVE TILE

EP1: EPOXY FLOORING

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:0

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

IN102

SE

C

O N

D F

LO

O

R F

IN

IS

H P

LA

N

M . O

W

EN

SB

Y

S.

G

R

EE

N

S.

G

R

EE

N

J.

IS

C H

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

SECOND FLOOR FINISH PLANA1

GENERAL NOTES

A. REFER TO ROOM FINISH SCHEDULE AE602 FOR

FLOOR FINISHES NOT SHOWN ON FINISH PLAN.

B. PROVIDE SMOOTH TRANSITION BETWEEN

DIFFERENT FLOORING MATERIALS. REFER TO

TRANSITION SCHEDULE AE601.

C. THERE SHALL BE NO FLOOR TILE PIECES INSTALLED

LESS THAN 3". COORDINATE WITH CONTRACTING

OFFICER'S TECHNICAL REPRESENTATIVE PRIOR TO

INSTALLATION.

D. ALL TILED FLOORING INSTALLATIONS SHALL BEGIN

WITH A FULL TILE CENTERED IN ROOM, UNLESS

NOTED OTHERWISE. IF CENTERING FULL TILE

RESULTS IN LESS THAN 3" WIDE AT THE PERIMETER

OF THE ROOM, ADJUST THE START POINT BY HALF

TILE WIDTH IN BOTH DIRECTIONS.

E. USE GRIDS PROVIDED FOR BASIS OF FLOOR TILE

INSTALLATION.

F. ALL OUTSIDE CORNERS ARE TO RECEIVE A CORNER

GUARD, (CG1).

G. CARPET TILE (CPT1) AND LUXURY VINYL TILE (LVT1)

ARE TO RUN HORIZONTALLY.

2ND FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

2ND FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

239 COMPUTER SUPPORT SPECIALIST (CSS)

240 MAN POWER

241 UTM

242 MPS

243 US

244 SPUR

245 TESTING

246 COMM

247 RECRUITING STORAGE

248 MECH 1

249 MECH 2

S1B LANDING

S1C LANDING

S2B LANDING

S2C LANDING

S3B LANDING

S3C LANDING

2ND FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

220 ELECTRICAL

221 RECRUITING

222 RECRUITING CHIEF

223 FORCE DEVELOPMENT FLIGHT

224 SECURE STORAGE

225 SUPR

226 CONTRACTING STAFF

227 PRINT / COPY

228 CONTRACTING LEAD

229 VEST.

230 CONFERENCE 3

231 HONOR GUARD ADMIN.

232 CORRIDOR

233 FSS READINESS 2

234 FORCE SUPPORT SQUADRON 1ST SERGEANT

235 FSR CMDR

236 OPS

237 FSS READINESS 1

238 RECEPTION

2ND FLOOR ROOM NAME SCHEDULE

ROOM NUMBER ROOM NAME

201 HUDDLE ROOM

202 JAN

203 MEN

204 LOBBY

205 WOMEN

206 CHAPLAIN

207 CHAPLAIN

208 REFLECTION

209 CHAPLAIN OPEN OFFICE

210 CONFERENCE 1

211 UNION ADMIN. / STOR.

212 FM MOB STORAGE

213 CORRIDOR

214 FM STAFF

215 FM LEAD COMPTROLLER

216 FINANCIAL OFFICER / SUPR

217 FMA/FM TRAINING

218 VAULT

219 FM STAFF MAJOR

VEST.

MSG STOR.

MEN

WOMEN

XO'S

CA / RA

UDM / UTM

RECEPT

DEPUTY

COMMANDER

MSG

COMMANDER

CORRIDOR

CONFERENCE

ROOM 1

SUPR

STAIR

S2

CORRIDOR

DATA

STOR.

COMMUNICATIONS

119BREAK OUT 3

BREAK OUT 2

BREAK OUT 1

MAP

OFFICE

OPS

TOILET

BREAKROOM

/ TRAINING

RECEPT

TRAP

ELEV.

COMM

CORRIDOR

BREAK ROOM

JAN.

ELEC

MECH

CONFERENCE

SUSTAINMENT

CIVILIAN

PERSONNEL

CORRIDOR

STAIR

S3

VEST.

LOBBY

101STAIR

S1

S2AS3A

PERSON

CONF

UPM

1.02 TYPE 4

1.11 TYPE 2

1.21 TYPE 2

1.48 TYPE 2 1.49 TYPE 2 1.50 TYPE 2 1.51 TYPE 2

1.52 TYPE 2

1.53 TYPE 2

1.54 TYPE 2

1.22 TYPE 2

1.39 TYPE 2 1.38 TYPE 2 1.36 TYPE 4

1.32 TYPE 2

1.33 TYPE 21.31 TYPE 2

1.23 TYPE 2

x.xx TYPE 2

1.44 TYPE 2

1.27 TYPE 3

1.24 TYPE 3

1.20 TYPE 1

1.12 TYPE 2

1.04 TYPE 2

1.40 TYPE 2

1.29 TYPE 2

1.47 TYPE 2

1.28 TYPE 1

1.46 TYPE 3

1.26 TYPE 5

1.25 TYPE 2

1.06 TYPE 2

RECEPTION

CUSTOMER

SUPPORT

SC / CAR

150CAREER

DEVELOPMENT

MPS

CA

146 FM

FAMILY

READINESS

NAF

1.08 TYPE 2

1.07 TYPE 2

1.16 TYPE 2

1.14 TYPE 2

1.09 TYPE 2

SC/CAR

OFFICE

1.03 TYPE 1

1.13 TYPE 1

1.15 TYPE 1

1.42 TYPE 2

1.45 TYPE 1

1.55 TYPE 1

1.37 TYPE 1

1.30 TYPE 1

1.18 TYPE 1

1.19 TYPE 2

1.41 TYPE 1

1.35 TYPE 1

1.34 TYPE 1

1.05 TYPE 1

1.10 TYPE 1 1.17 TYPE 1

1.56 TYPE 6

1.01 TYPE 1

1.43 TYPE 1

SIGNAGE PLAN LEGEND

TYPE

LEVEL

SIGN NUMBER SIGN TYPE

X.XX

1 2 3 4 5

A

B

C

D

SHEET ID

P ar kw ay

L an e, S ui te

Pe ac ht re e C or ne rs , G

A

Ph on e (6

) 3

-7

Fa x

(6

) 3

-7

SI

ZE

AN

SI

D

FI

LE

N

AM

E:

SU

BM

IT

TE

D B

Y:

C H

EC

K

ED

B

Y:

D R

AW

N

B Y:

D

ES

IG

N

E D

B Y:

IS

SU

E D

AT

E:

SO

LI

C

IT

AT

IO

N N

O

C O

N

TR

A C

T N

O

FI

LE

N U

M

BE

R

US Army Corps of Engineers ® Louisville District

NORTH

REVISED CERTIFIED FINAL SUBMITTAL

J

U

LY

XX

-X

-X

XX

X

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

LO

U

IS

VI

LL

E

D

IS

C

TI

R C

T

FI

LE

N

AM

E:

PR

O

JE

C

T N

O

Q

JK

L9

P2

: 4

M

SP

M

IS

SI

O

N S

U

PP

O R

T G

R O

U P

FA

C

IL

IT

Y M

IN

N

EA

PO

LI

S-

SA

IN

T

PA

U L

IA

P

AR

S

M

IN

N

ES

O

TA

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

6/

/2

5:

:5

PM

C :\U se rs

\jd b\

D oc um en ts \M y R ev it\

0_ Ar ch _j db ru za fs b-ae .c om .rv t

IG101

G R

O U

N D

F

LO

O R

S

IG

N

AG

E

PL

AN

M

. O W

EN

SB

Y

S.

G

R

EE

N

S.

G

R

EE

N

J.

IS

C H

SCALE: = 1'-0"

0 8 168

1/8"

SCALE: 1/8" = 1'-0"

GROUND FLOOR SIGNAGE PLANA1

SIGNAGE SCHEDULE GROUND FLOOR

SIGN NUMBER TYPE MARK SIGN MESSAGE

1.35 TYPE 1

1.36 TYPE 4 STAIR

1.37 TYPE 1 EXIT

1.38 TYPE 2

1.39 TYPE 2

1.40 TYPE 2

1.41 TYPE 1

1.42 TYPE 2

1.43 TYPE 1

1.44 TYPE 2

1.45 TYPE 1 EXIT

1.46 TYPE 3 UNISEX

1.47 TYPE 2

1.48 TYPE 2

1.49 TYPE 2

1.50 TYPE 2

1.51 TYPE 2

1.52 TYPE 2

1.53 TYPE 2

1.54 TYPE 2

1.55 TYPE 1 EXIT

1.56 TYPE 6 MAXIMUM OCCUPANCY 56 PERSONS

SIGNAGE SCHEDULE GROUND FLOOR

SIGN NUMBER TYPE MARK SIGN MESSAGE

1.18 TYPE 1

1.19 TYPE 2

1.20 TYPE 1 EXIT

1.21 TYPE 2

1.22 TYPE 2

1.23 TYPE 2

1.24 TYPE 3 WOMEN

1.25 TYPE 2

1.26 TYPE 5

1.27 TYPE 3 MEN

1.28 TYPE 1 EXIT

1.29 TYPE 2

1.30 TYPE 1 EXIT

1.31 TYPE 2

1.32 TYPE 2

1.33 TYPE 2

1.34 TYPE 1

SIGNAGE SCHEDULE GROUND FLOOR

SIGN NUMBER TYPE MARK SIGN MESSAGE

1.01 TYPE 1

1.02 TYPE 4 STAIR

1.03 TYPE 1 EXIT

1.04 TYPE 2

1.05 TYPE 1

1.06 TYPE 2

1.07 TYPE 2

1.08 TYPE 2

1.09 TYPE 2

1.10 TYPE 1

1.11 TYPE 2

1.12 TYPE 2

1.13 TYPE 1 EXIT

1.14 TYPE 2

1.15 TYPE 1 EXIT

1.16 TYPE 2

1.17 TYPE 1

GENERAL NOTES

A. REFER TO SHEETS IG501 FOR SIGNAGE

SCHEDULE, ELEVATIONS, AND DETAILS.

B. CONTRACTOR IS TO VERIFY FINAL DIMENSIONS,

MATERIALS, FINISHES, AND ROOM NAMES /

NUMBERS WITH CONTRACTING OFFICER'S

TECHNICAL REPRESENTATIVE PRIOR TO

PROCUREMENT OF SIGNAGE.

C. FOR SIGNS MOUNTED TO GLASS, PROVIDE A

MATCHING OPAQUE FILM ON REVERSE SIDE OF

GLASS TO CONCEAL MOUNTING TAPE. COLOR TO

MATCH SIGN.

D. SIGNS MUST MEET ADA REQUIREMENTS.

MEN

WOMEN

CHAPLAIN

OPEN OFFICE

CHAPLAIN

CHAPLAIN

REFLECTION

CONF. RM. 1

FM MOB

STORAGE

S2B

UNION

ADMIN. /

STOR.

CORRIDOR

FM STAFF

FM LEAD

COMPTROLLER

FINANCIAL

OFFICER /

SUPR

FMA/FM

TRAINING

VAULT

FM STAFF

MAJOR

RECRUITING

LOBBY

FORCE

DEVEL.

FLIGHT

RECRUITING

CHIEF

SECURE

STOR.

PRINT / COPY

SUPR

VEST.

CONTRACTING

STAFF

CONF. 3

CONTRACTING

LEAD

HONOR

GUARD

ADMIN.

CORRIDOR

S3C

COMM

S1B

S2C

S3B

ELEC

ELEV.

2.01 TYPE 4

2.3…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .