W912QR21R0054_Specs_Volume1c-0001.pdf

PDF 24 MB Posted

Attached to
FFR JBMDL TT Bks 5503 Solicitation
Solicitation number
W912QR21R0054
Issued by

About this file

This document outlines a federal solicitation for full facility restoration services at a transient troop barracks in New Jersey. The solicitation seeks a firm-fixed-price contract to modernize an existing 39,770 square foot, three-story barracks building including interior renovations, life safety upgrades, and exterior improvements. Specific scope of work includes replacement of electrical, plumbing, HVAC and telecommunications systems, bathroom and interior finishes upgrades, and addition of anti-terrorism and sustainability features. The contract duration is 720 calendar days with a target ceiling of approximately $10 million. The solicitation is designated as a small business set-aside and will utilize a two-phase design/build evaluation process, first assessing past performance and management, then design/technical, small business participation, and price factors. The issuing agency is the Department of the Army Corps of Engineers Engineering District Louisville. Responses are due by September 2, 2021 according to the synopsis, with pre-proposal conference details to follow in the full solicitation releasing on or around May 25, 2021.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Barracks Bldg 5503 Full Facility Renovation, Joint Base McGuire-Dix-Lakehurst, New Jersey

P2: 473916

Design-Build RFP

Specifications Phase 2 Submittal Volume 1c

06 August 2021

W912QR21R0054

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

W912QR21R0054-0001

Phase 2 SUBMITTAL Specifications Volume 1c

BARRACKS BUILDING 5503

FULL FACILITY RENOVATION

DESIGN BUILD RFP

Joint Base McGuire-Dix-Lakehurst, New Jersey

Date:

Solicitation Number:

W912QR21R0054

P2#: 473916

Prepared For:

US Army Corps of Engineers Louisville District

Building 5503, Barracks D/B FFR P2 #473916 Joint Base McGuire-Dix-Lakehurst, NJ W912QR21R0054

TOC - 1

DESIGN/BUILD RFP for BUILDING 5503 FULL FACILITY

RENOVATION PROJECT

JOINT BASE McGUIRE-DIX-LAKEHURST, NJ

Table of Contents – Volume 1

Volume 1A

Division Zero Specifications

Section 00010 Solicitation Contract Form Section 00 80 00.00 06 Special Provisions Submittal Register Construction Project Signs

Division One Specifications

Section 01 02 00.00 48 Statement of Work

Volume 1B

Attachments to 01 02 00.00 48 - Statement of Work

Volume 1C

Section 01 03 00.00 48 Design Submission Requirements After Award Section 01 04 00.00 48 The Design/Build Process Section 01 32 01 00 06 Project Schedule Section 01 33 00.00 06 Submittal Procedures Section 01 33 29.00 06 Sustainability Reporting Section 01 35 26.00 06 Government Safety Requirements Section 01 42 00 Sources for Reference Publications Section 01 45 00.15 10 Resident Management System Contractor Mode (RMS CM) Section 01 45 04.10 06 Contractor Quality Control Section 01 45 35 Special Inspection Section 01 46 00.00 06 Total Building Commissioning (Contractor CxA) Section 01 50 00 Temporary Construction Facilities and Controls Section 01 57 19.00 06 Temporary Environmental Controls and Permits Section 01 74 19 Construction and Demolition Waste Management Section 01 78 23 Operation and Maintenance Data

Division Two Specifications

Section 02 82 00 Asbestos Remediation Section 02 83 13.00 06 Lead in Construction

TOC - 2

Section 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCB’s and Mercury

Section 02 84 33 Removal and Disposal of Polychlorinated Biphenyls (PCBs)

Division Three through Forty-One Technical Specifications

Section 27 05 28.36 48 Cable Trays for Communications Systems Section 27 10 00.00 48 Building Telecommunications Cabling System Section 33 82 00.00 48 Telecommunications Outside Plant (OSP)

See separate Table of Contents in Volume 2 for additional Technical Specifications

Reference Drawings

01 02 00.00 48 - 1

SECTION 01 02 00.00 48 – STATEMENT OF WORK

TABLE OF CONTENTS

Page

PART 1 DESIGN OBJECTIVES, AND FUNCTIONAL AND AREA REQUIREMENTS 5

1.1 SCOPE OF WORK. 5

1.2 DESIGN OBJECTIVES. 5

1.3 CONTRACTOR RESPONSIBILITY. 7

1.4 SURVEY AND GEOTECHNICAL INFORMATION. 8

1.5 RFP DRAWINGS. 8

1.6 SPECIFICATIONS. 8

1.7 SITE. 9

1.8 FUNCTIONAL AND AREA REQUIREMENTS. 11

1.9 OPTIONS 12

PART 2 APPLICABLE CRITERIA AND COORDINATION WITH LOCAL AUTHORITIES 13

2.1 APPLICABLE CRITERIA. 13

2.2 LOCAL AND STATE CODES OR STANDARDS. 14

2.3 MILITARY CRITERIA. 15

2.4 OTHER APPLICABLE CRITERIA. 16

2.5 SOURCES FOR GOVERNMENT PUBLICATIONS. 20

2.6 PERMITS AND COORDINATION WITH LOCAL AUTHORITIES. 21

PART 3 SITE CIVIL ENGINEERING 23

3.1 GRADING. 23

3.2 SURVEY, GEOTECHNICAL, AND EARTHWORK 23

3.3 UTILITIES. 25

3.4 CIRCULATION AND PARKING. 25

3.5 DEMOLITION. 25

3.6 CLEARING AND GRUBBING. 26

3.7 BORROW MATERIAL. 26

3.8 OFF-SITE WORK. 26

3.9 ANTI-TERRORISM STANDARDS 26

3.10 RECORD OF ENVIRONMENTAL CONSIDERATION (REC) 26

3.11 CONTRACTOR LAYDOWN AREA 26

3.12 SITE IMPROVEMENTS 26

PART 4 SITE ELECTRICAL ENGINEERING 28

4.1 UTILITY POWER. 28

4.2 CATHODIC PROTECTION 29

4.3 SITE SECONDARY POWER 29

PART 5 LANDSCAPE ARCHITECTURE 30

5.1 QUALITY ASSURANCE. 30

5.2 SOIL TESTING. 30

01 02 00.00 48 - 2

5.3 INSTALLATION. 30

5.4 ESTABLISHMENT PERIOD. 30

5.5 WARRANTY. 30

5.6 LANDSCAPE IRRIGATION. 30

5.7 TURF AND MEADOW GRASSES. 30

5.8 MISCELLANEOUS. 30

PART 6 ARCHITECTURAL AND INTERIOR DESIGN 32

6.1 DESIGN GOAL. 32

6.2 GENERAL CONSTRUCTION REQUIREMENTS. 33

6.3 OCCUPANCY AND BUILDING TYPE CLASSIFICATIONS. 34

6.4 EXTERIOR DESIGN. 35

6.5 INTERIOR DESIGN. 38

6.6 FURNITURE AND EQUIPMENT. 43

PART 7 STRUCTURAL DESIGN 45

7.1 GENERAL REQUIREMENTS. 45

7.2 STRUCTURAL WORK. 45

7.3 STRUCTURAL DESIGN CRITERIA. 48

7.4 STRUCTURAL SYSTEMS. 48

7.5 SPECIAL REQUIREMENTS. 48

PART 8 THERMAL DESIGN 50

8.1 THERMAL CHARACTERISTICS. 50

8.2 THERMAL INSULATION AND VAPOR RETARDER. 50

8.3 HUMID AREA DESIGN. 50

8.4 INFILTRATION. 50

PART 9 PLUMBING DESIGN 51

9.1 DESIGN CRITERIA. 51

9.2 DESIGN NARRATIVE AND CALCULATIONS. 51

9.3 DEMOLITION 52

9.4 PLUMBING FIXTURES AND EQUIPMENT. 52

9.5 PIPING SYSTEMS. 53

9.6 NATURAL GAS PIPING SYSTEMS. 55

PART 10 ELECTRICAL DESIGN 56

10.1 DESIGN CRITERIA 56

10.2 DESIGN CALCULATIONS 56

10.3 DEMOLITION 56

10.4 INTERIOR LIGHTING 57

10.5 EXTERIOR LIGHTING 57

10.6 BUILDING ELECTRICAL DISTRIBUTION 58

10.7 SPECIAL POWER REQUIREMENTS 58

10.8 LIGHTNING PROTECTION 59

10.9 EXISTING VAULT 59

01 02 00.00 48 - 3

PART 11 HVAC DESIGN 60

11.1 DESIGN CRITERIA. 60

11.2 DESIGN CALCULATIONS. 61

11.3 DEMOLITION 63

11.4 HVAC SYSTEMS 63

11.5 DUCTWORK, PIPING AND ACCESSORIES 66

11.6 TESTING, ADJUSTING, AND BALANCING. 67

11.7 BUILDING OCCUPANCY FOR ENERGY CALCULATIONS 67

PART 12 ENERGY CONSERVATION AND SUSTAINABLE DESIGN 68

12.1 ENERGY CONSERVATION. 68

12.2 ENERGY CONSERVATION STRATEGIES. 68

12.3 SUSTAINABLE DESIGN 68

PART 13 FIRE PROTECTION DESIGN 70

13.1 DESIGN CRITERIA. 70

13.2 FIRE PROTECTION SYSTEM DESIGN AND CALCULATIONS 71

13.4 FIRE ALARM AND MASS NOTIFICATION SYSTEM 73

13.5 PORTABLE FIRE EXTINGUISHER 76

PART 14 COMMISSIONING AND BUILDING ENVELOPE SEALING PERFORMANCE

REQUIREMENTS 77

14.1 COMMISSIONING. 77

14.2 BUILDING ENEVLOPE SEALING PERFORMANCE REQUIREMENTS. 77

PART 15 TELECOMMUNICATIONS DESIGN 78

15.1 DESIGN CRITERIA 78

15.2 DEMOLITION 78

15.3 SITE TELECOMMUNICATION SERVICE 78

15.4 TELECOMMUNICATIONS PREMISES DISTRIBUTION 79

15.5 CABLE TELEVISION (CATV) SERVICE 81

15.6 ACCESS CONTROL SYSTEM 81

PART 16 ADDITIONAL REQUIREMENTS 82

16.1 WARRANTIES. 82

16.2 CYBERSECURITY 82

16.3 RADON 82

16.4 SOLE SOURCE ITEMS 82

01 02 00.00 48 - 4

ATTACHMENTS TO THE STATEMENT OF WORK

Attachment A Room Requirements Attachment B Hazardous Material Report Attachment C Preliminary Geotechnical Report Attachment D Fire Flow Data Attachment E Seismic Evaluation, Structural Integrity, and Progressive Collapse Study Attachment F Fire Protection/Life Safety Code Analysis Template Attachment G LEED Checklist Attachment H Installation Design Guide Attachment I Historical Drawings of Similar Barracks Buildings Attachment J Gas Meter Information Attachment K Water Meter Information Attachment L Washer & Dryer Cut Sheets Attachment M USAR Network Enterprise Center Infrastructure Technical Criteria Attachment N Elevator Protection Attachment O AF Form 813 Attachment P Sample Form 1354 Attachment Q Existing Barracks 5503 Photographs Attachment R Antiterrorism Standards for Buildings Checklist

Section 01 02 00.00 48

ATTACHMENT ‘N

Elevator Protection

Attachment L

Holeless Hydraulic Elevator Protection

DETAIL

SCALE: NONE

1FX111

ELEVATOR CAB

ELEVATOR LOBBY

ELEVATOR LOBBY

ELEVATOR LOBBY

MACHINE ROOM

FS

CONNECTION".

ROOM FLOW TEST

INDICATING "MACHINE

SIGN AT TEST VALVE

& PP-102. PROVIDE

REFER TO PP-111

TO NEAREST DRAIN.

1" DRAIN TEST

S

SWITCH

TAMPER

VALVE WITH

SHUT OFF

TS H

GUARD

PIT FLOOR.

MORE THAN 24" ABOVE

SPRINKLER HEAD NO

P

S P

S P

S P

FSTS

TEST

195 F

195 F

S P

TS

GUARD

(155F)

F

24" MAX

H

(155F)

F

24" MAX

S P

H

(155F)

F AND RECALL ELEVATOR ACTIVATE FIRE ALARM

SWITCH TIME DELAY.

FIRE ALARM AND SHUNT TRIPS ELEVATOR MOTOR WITHOUT FLOW

AT MACHINE ROOM SPRINKLER AND TOP OF SHAFT ACTIVATESFS

- TAMPER SWITCHTS

FS - FLOW SWITCH

S P

- P: PHOTOELECTRIC SMOKE DETECTOR

H F

- F: FIXED TEMP HEAT DETECTOR (155F) SPRINKLER HEAD RATING

UFC 3-600-01, CHANGE 3

HOLELESS HYDRAULIC ELEVATOR PROTECTION

GUARD

ATTACHMENT ‘O

AF Form 813

87 CES\CEAN

Report Control Symbol

RCS:

REQUEST FOR ENVIRONMENTAL IMPACT ANALYSIS

INSTRUCTIONS: Section I to be completed by Proponent; Sections II and III to be completed by Environmental Planning Function. Continue on separate sheets as necessary. Reference appropriate item number(s).

SECTION I - PROPONENT INFORMATION

1. TO (Environmental Planning Function) 2. FROM (Proponent organization and functional address symbol) 2a. TELEPHONE NO.

3. TITLE OF PROPOSED ACTION

4. PURPOSE AND NEED FOR ACTION (Identify decision to be made and need date)

5. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES (DOPAA) (Provide sufficient details for evaluation of the total action.)

6. PROPONENT APPROVAL (Name and Grade) 6a. SIGNATURE 6b. DATE

SECTION II - PRELIMINARY ENVIRONMENTAL SURVEY. (Check appropriate box and describe potential environmental effects + 0 U - Including cumulative effects.) (+ = positive effect; 0 = no effect; - = adverse effect; U= unknown effect)

7. AIR INSTALLATION COMPATIBLE USE ZONE/LAND USE (Noise, accident potential, encroachment, etc.)

8. AIR QUALITY (Emissions, attainment status, state implementation plan, etc.)

9. WATER RESOURCES (Quality, quantity, source, etc.)

10. SAFETY AND OCCUPATIONAL HEALTH (Asbestos/radiation/chemical exposure, explosives safety quantity-distance, bird/wildlife aircraft hazard, etc.)

11. HAZARDOUS MATERIALS/WASTE (Use/storage/generation, solid waste, etc.)

12. BIOLOGICAL RESOURCES (Wetlands/floodplains, threatened or endangered species, etc.)

13. CULTURAL RESOURCES (Native American burial sites, archaeological, historical, etc.)

14. GEOLOGY AND SOILS (Topography, minerals, geothermal, Installation Restoration Program, seismicity, etc.)

15. SOCIOECONOMIC (Employment/population projections, school and local fiscal impacts, etc.)

16. OTHER (Potential impacts not addressed above.)

SECTION III - ENVIRONMENTAL ANALYSIS DETERMINATION

17. PROPOSED ACTION QUALIFIES FOR CATEGORICAL EXCLUSION (CATEX) # ; OR

PROPOSED ACTION DOES NOT QUALIFY FOR A CATEX; FURTHER ENVIRONMENTAL ANALYSIS IS REQUIRED.

18. REMARKS

19. ENVIRONMENTAL PLANNING FUNCTION CERTIFICATION 19a. SIGNATURE 19b. DATE (Name and Grade)

THIS FORM CONSOLIDATES AF FORMS 813 AND 814.

PREVIOUS EDITIONS OF BOTH FORMS ARE OBSOLETE.

PAGE 1 OF PAGE(S) AF IMT 813, 19990901, V1

V1

AF IMT 813, SEP 99, CONTINUATION SHEET

PAGE OF PAGE(S)

ATTACHMENT ‘P

Sample Form 1354

TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY

Form Approved OMB No. 0704-0188

PAGE OF PAGES

1. FROM (Installation/Activity/District and ZIP Code) 2. DATE PREPARED

(YYYYMMDD)

3. PROJECT/JOB

NUMBER

4. SERIAL NUMBER

7. CONTRACT

NUMBER(S)

5. TO (Installation/Activity/Service, ZIP Code & INSNO) 6. SITE/INSNO/

NAME

9. TRANSACTION DETAILS

a. NEW CONST.

EXISTING FAC.

CAPITAL IMP.

OTHER (Specify)

BENF/O

PHYS. COM. AVAIL.

FINANCIAL COM.

OTHER (Specify)

10.

ITEM

NO.

12.

CATEGORY

CODE

13.

CATCODE

DESCRIPTION

14.

TYPE

15.

UNIT OF

MEAS 1

16. TOTAL

QUANTITY

UM 1

19.

COST

23.

ITEM

REMARKS

24. STATEMENT OF COMPLETION. The facilities listed hereon are in accordance with maps, drawings, and specifications and change orders approved by the authorized representative of the using agency except for the deficiencies listed on the reverse side.

25.a. ACCEPTED BY (Typed Name and Signature) b. DATE SIGNED

(YYYYMMDD)

a. TRANSFERRED BY (Typed Name and Signature)

c. TITLE (Area Engr./Base Engr./DPW)

b. DATE SIGNED

(YYYYMMDD)

c. TITLE (DPW/RPAO) 26. PROPERTY

VOUCHER NUMBER

DD FORM 1354, MAR 2004 PREVIOUS EDITION IS OBSOLETE.

b.

8. DRAWING

NUMBER(S)

PARTIAL BOD

c. DRAFT

INTERIM

FINAL d. EFFECTIVE DATE (YYYYMMDD)

11.

FACILITY

NO.

AREA

17.

UNIT OF

MEAS 2

18. TOTAL

QUANTITY

UM 2

OTHER 20.

FUND

SOURCE

21.

FUND

ORG

22.

INTER-

EST

CODE

The public reporting burden for this collection of information is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.

1 2

Resident Engineer Corps of Engineers, Louisville District 20200527 92199

Joint Base McGuire-Dix-Lakehurst Building 5503 W912QR-??-?-??

1 Building 5503 P SF 39770.00 0.00 01 01 01

2 Paving P SY 0.00 0.00 01 01 01

3 Sidewalks P SF 0.00 0.00 01 01 01

Resident Engineer

27. CONSTRUCTION DEFICIENCIES (attach blank sheet for continuations) 28. PROJECT REMARKS (attach blank sheet for continuations)

INSTRUCTIONS

GENERAL. This form has been designed and issued for use in connection with the transfer of military real property between the military departments and to or from other government agencies. It supersedes ENG Forms 290 and 290B (formerly used by the Army and Air Force) and NAVDOCKS Form 2317 (formerly used by the Navy).

Existing instructions issued by the military departments relative to the preparation of DD Form 1354 are applicable to this revised form to the extent that the various items and columns on the superseded forms have been retained. The military departments may promulgate additional instructions, as appropriate.

For detailed instructions on how to fill out this form, please refer to Unified Facilities Criteria (UFC) 1-300-08, dated 17 December 2003.

SPECIFIC DATA ITEMS.

1. From. Name and address of the transferring agency.

2. Date Prepared. Date of actual preparation. Enter all dates in YYYYMMDD format (Example: March 31, 2004 = 20040331).

3. Project/Job Number. Project number on a DD Form 1391 or Individual Job Order Number.

4. Serial Number. Sequential serial number assigned by the preparing organization (e.g., 2004-0001).

5. To. Name and address of the receiving installation, activity, and service of the Real Property Accountable Officer (RPAO).

6. Site/INSNO and Name. Site or installation number and site name where the constructed facility is located.

7. Contract Number(s). Contract number(s) for this project.

8. Drawing Number(s). Drawing number(s) or CAD identifier(s) for project components.

9. Transaction Details.

a. Type of Transaction. Mark (X) only one box.

b. When/Event. When or event causing preparation of DD Form 1354. X only one box.

c. Version. Draft, interim, or final DD Form 1354. X only one box.

d. Effective Date. Effective date for transaction; start date for depreciation.

10. Item Number. Use a separate item number for each facility, no item number for additional usages.

11. Facility Number. Unique facility number identified in Real Property Inventory.

12. Category Code. The category code describes the facility usage.

13. Catcode Description. The category code name which describes the facility usage.

14. Type. Type of construction: P for Permanent; S for Semipermanent; T for Temporary.

15. Area: Unit of Meas 1. Area unit of measure; use SF, SY, AC only.

16. Total Quantity UM 1. The total area for the measure identified in Item 15. Use negative numbers for demolition.

17. Other: Unit of Meas 2. Unit of Measure 2 is the capacity or other measurement unit (e.g., LF, MB, EA, etc.).

18. Total Quantity UM 2. The total capacity/other for the measure identified in Item 17.

19. Cost. Cost for each facility; for capital improvements to existing facilities, show amount of increase only.

20. Fund Source. Enter the Fund Source Code for this item, i.e., 01-MILCON, 02-BRAC, 03-O&M, etc.

21. Funding Organization. Enter the code for the organization responsible for replacing this facility at the end of its useful life, i.e., 00-Army Active, 01-Army Reserve, 02-Army National Guard, etc.

22. Interest Code. Enter the code that reflects government interest or ownership in the facility, i.e., 01-Owned by DoD, 02-Owned by Federal Government (non-DoD), etc.

23. Item Remarks. Remarks pertaining only to the item number identified in Item 10; show cost sharing.

24. Statement of Completion. Typed name, signature, title, and date of signature by the responsible transferring individual or agent.

25. Accepted By. Typed name, signature, title, and date of signature by the RPAO or accepting official.

26. Property Voucher Number. Next sequential number assigned by the RPAO in voucher register.

27. Construction Deficiencies. List construction deficiencies in project during contractor turnover inspection.

28. Project Remarks. Project level remarks, continuation of blocks, and used to explain "other" entries in Item 9.

DD FORM 1354 (BACK), MAR 2004

ATTACHMENT ‘Q

Existing Barracks 5503 Photographs

BUILDING 5503

Site Photos

Northeast corner of Building 5503.

Northeast corner of the site with access drive to parking lot adjacent to 5503.

North side of the building and the site.

Northwest corner and north side of the building and site.

Northwest corner of the building and the site.

West side of the building and the site.

Window well along the west side of the building.

Window wells and grades along the west side of the building.

Southwest corner of the building.

Southeast corner of the building and east side of the site.

Canopy at the southeast corner of the site.

Entrance on the east side of the building.

South end of the existing parking lot.

Existing parking lot on the east side of the building.

Window well on the northeast side of the building.

Stairwell at the northeast corner of the building.

Bottom of the stairwell with drain

Drain in the stairwell.

Parking lot at the northeast corner of the building.

Northeast corner of the building.

ATTACHMENT ‘R

Antiterrorism Standards for Buildings Checklist

W912QR21R0054-0001W912QR21R0054-0001

YES NO

YES NO

This checklist is required to be completed for all DoD military funded projects contracted by Louisville District for new and existing building work. The design team members shall complete and sign this checklist for preliminary and final design milestones in the project's design analysis for record.

Describe intent and method to meet each Standard or indicate the Standard as Not Applicable (N/A).

Facility Name/Location/P2:

Is this facility new construction or is the 50% renovation threshold met? If yes, enter NEW or if renovation threshold exceeded, indicate which triggers from the list below apply.

Does a Design Basis Threat exist per UFC 4-020-

01 for more than minimum level of protection? If Yes, indicate required Level of

Protection or that minimum stds apply.

The Unified Facilities Criteria (UFC) system is prescribed by MIL-STD 3007, to provide planning, design, construction, sustainment, restoration, and modernization criteria, and to apply to the Military Departments, the Defense Agencies, and the DoD Field Activities in accordance with DoD Directive

4270.5 (Military Construction) and USD(AT&L) Memorandum dated 29 May 2002. UFC 4-010-01 are minimum standards set for DoD funded projects unless otherwise determined during project planning by the Installation using UFC 4-020-01.

DoD Minimum Antiterrorism Construction Standards - Checklist version 4 dated 2 May 2019

Date:

TRIGGERS

D. BUILDING ADDITIONS: Inhabited additions to existing buildings must comply with the minimum standards for new buildings. If the addition is 50% or more of the gross area of the existing building, the existing building will comply with the minimum standards for existing buildings in Chapter 3. Cost of building additions will not be included in calculating the 50% trigger for major investments. Throughout these standards references to new construction will be considered to be inclusive of additions to existing buildings.

E. LEASED BUILDINGS: In accordance with DoD Instruction 2000.12, the security standards established by the Interagency Security Committee (ISC) in

Physical Security Criteria for Federal Facilities must apply to all off-installation leased space managed by DoD and all DoD occupied space in buildings owned or operated by the U.S. General Services Administration (GSA). The ISC standards apply to leased space in the U.S. and in foreign countries.

Current tenants and tenants who initiated lease requests prior to 7 December 2012 must apply the ISC standards in accordance with existing lease agreements to the extent practicable.

F. PURCHASE OF EXISTING BLDGS: Existing inhabited buildings purchased for use by DoD will comply with the minimum standards for existing buildings.

A. MAJOR INVESTMENT: Implementation of these standards to bring entire inhabited buildings into compliance is mandatory for all DoD building renovations, modifications, repairs, revitalizations, and restorations where project costs exceed 50% of the replacement cost of the existing building in accordance with UFC 3-701-01 except as otherwise stated in these standards. The 50% cost is exclusive of the costs identified to meet these standards.

Where costs do not exceed the 50% threshold, compliance with these standards is recommended, but not required.

B. CHANGE OF OCCUPANCY: Implementation of these standards is mandatory when any building or portion of a building is converted from its current occupancy to a higher occupancy. Examples would include a warehouse (low occupancy) being converted to administrative (inhabited) use.

C. WINDOW/SKYLIGHT/GLAZED DOOR REPLACEMENT: Because of the significance of glazing hazards in a blast environment, implementation of all provisions of Standard 10 is mandatory for existing inhabited buildings any time a window, skylight, or glazing is being replaced. This also applies to installation of supplemental windows behind existing windows (inside face) and to installations of windows in new openings. Because of the significance of door hazards in a blast environment, implementation of all provisions of Standard 12 is mandatory for existing inhabited buildings any time doors are being replaced.

UFC Para# REQUIREMENT YES NO N/A DESIGNER RESPONSES

3-2

3-2.1 Is this on DoD property?

3-2.1

Are the minimum standoff distances inside and outside of the installation perimeter met?

3-2.1

If this bldg is outside an installation perimeter, has the standoff been met as established by UFC 4-020-01?

3-2.1.1

Are the clear zone requirements met and free of obstacles over 8" high?

3-3

3-3

Is the 33' unobstructed space provided to not obstruct a 6" cube?

3-3.2

Are trash containers located outside of the unobstructed space or enclosed per 3-

3.5?

3-3.3

Is mech/elec equipment located outside of the unobstructed space or enclosed per 3-3.5?

3-3.4

Are fuel tanks located outside of the unobstructed space or enclosed per 3-

3.5? Is distance between buildings & fuel tanks in accordance with NFPA 30?

STANDARD 1 - STANDOFF DISTANCE

STANDARD 2 - UNOBSTRUCTED SPACE

STANDARDS 1-21

G. NON-DoD TENANT BUILDINGS ON DoD INSTALLATIONS: Tenant buildings on DoD installations other than those that meet one of the exemptions below are required to comply with these standards because it is assumed that the tenant buildings are likely to be turned over to DoD sometime during their design life and that they will then be occupied by DoD personnel. For the purposes of these standards, occupancies for non-DoD tenant-built building will be calculated assuming that building occupants are DoD personnel.

H. NATIONAL GUARD BUILDINGS: National Guard buildings that use Federal funding for new construction, renovations, modifications, repairs, or restorations that meet the applicability provisions above, will comply with these standards.

I. VISITOR CENTERS AND MUSEUMS: Where DoD or non-DoD visitors to visitor centers, museums, and similar buildings on DoD property routinely increase the occupancy of those buildings to levels meeting the definition of inhabited buildings, those buildings will comply with these standards.

J. VISITOR CONTROL CENTERS AT ENTRY CONTROL FACILITIES / ACCESS CONTROL POINTS : Where DoD personnel and the average daily peak occupancy of visitors routinely increase the occupancy of those buildings to levels meeting the definition of inhabited buildings, those buildings will comply with these standards. See UFC 4-022-01 for average daily occupancy calculation.

K. EXPEDITIONARY STRUCTURES: Implementation of these minimum standards is mandatory for all expeditionary structures that meet the occupancy criteria for inhabited buildings. See Chapter 4 for structure types that meet the expeditionary structures criteria.

New Structures: These standards apply to all new expeditionary structures effective as of the implementation date of these standards.

Existing Structures: These standards will apply to all existing expeditionary structures as they undergo major modifications or renovations as of the implementation date of these standards.

3-3.7

Although parking is permitted within the unobstructed space, indicate if User or

Installation intention is to maintain parking outside the unobstructed space.

3-4

3-4

3-5

3-5

Although access roads are permitted within the unobstructed space, indicate if and how User or Installation intends to control access within the unobstructed space.

3-6

3-6

Is parking avoided under bldg or on roof?

If not, indicate access control measures taken.

3-7

3-7

Is this facility new construction of 3 or more stories, or is parking under or over inhabited space?

3-7

Has the risk category of the structure been defined?

3-7

Has the tie-force method or alternate path method of progressive collapse been incorporated into the design of the structure? Indicate which is used.

3-7

Has enhanced local resistance been incorporated into the design of this structure?

3-8

3-8.1

Are building additions structurally independent from adjacent existing buildings? If not, has analysis been completed which shows collapse of either the addition or the existing building will not result in collapse of the remainder of the building?

3-8.2

Are low occupancy areas of inhabited facilities designed structurally independent of the inhabited areas?

3-9

STANDARD 6 - PROGRESSIVE COLLAPSE RESISTANCE

STANDARD 7 - STRUCTURAL ISOLATION

STANDARD 8 - BUILDING OVERHANGS & BREEZEWAYS

STANDARD 4 - ACCESS ROADS

STANDARD 5 - PARKING BENEATH BUILDINGS OR ON ROOFTOPS

STANDARD 3 - DRIVE-UP/DROP-OFF AREAS

Standard removed; no longer applies.

3-9

Are overhangs with inhabited space above avoided?

3-9.1

If overhangs/breezeways with inhabited space above not avoidable, how do these areas comply with Standard 2 as extensions of Unobstructed Space?

3-10

3-10

Do all external masonry walls have vertical and horizontal reinforcement distributed throughout the wall section?

3-10

Is the vertical reinforcement ratio at least 0.05%, space no more than 4 ft with reinforcement within 1.3 ft of the ends of the walls?

3-10

Is the horizontal reinforcement ratio at least 0.025%, consisting of either joint reinforcement spaced no more than 1.3 ft, or bond beam reinforcement spaced no more than 4 ft, with reinforcement within 1.3 ft of the top and bottom of the wall?

3-11

3-11.1

Do all exterior windows, spandrel glass exposed to occupied space, and/or skylights include an inner pane of at least

1/4-in laminated glass consisting of two nominal 1/8-in annealed glass panes bonded together with a minimum of a

0.030-in interlayer of a material designed for bomb blast resistance?

3-11.1

Is glazing frame bite in accordance with

ASTM F2248 for laminated glass?

3-11.2

Do all windows, inner doors, sidelights, and transoms that are interior to exterior stairwells, vestibules, or covered/enclosed walkways, comply with the glazing in this Standard?

STANDARD 10 - GLAZING

STANDARD 9 - EXTERIOR MASONRY WALLS

3-11.3

If windows or skylights are being replaced by infill construction, is the same or similar construction as the adjacent wall or roof construction used?

Or is lightweight translucent fiberglass panels used?

3-11.4

Are alternative window treatments such as fragment retention film and blast curtains avoided since such treatments are not acceptable?

3-12

3-12.1

For new construction, is the main entrance to the facility screened or faced away from the DoD property line or installation perimeter or other uncontrolled vantage points having direct lines of sight?

3-12.2

For existing buildings, is the main entrance to the facility facing away from the DoD propoerty line or Installation perimeter, or is the main entrance screened from the direct lines of sight?

3-13

3-13

Do all exterior doors (other than sliding, revolving, or overhead doors) into routinely occupied space swing outwards, increasing the likelihood that the doors will not enter the building as hazardous debris?

3-13.1

Does glazing in and around exterior doors comply with Standard 10?

3-14

3-14.1

For new construction where mail rooms or loading docks initially receive mail or supplies (not thru central handling facility), is the mail room located on the perimeter of the facility?

STANDARD 11 - BUILDING ENTRANCE LAYOUT

STANDARD 12 - EXTERIOR DOORS

STANDARD 13 - MAIL ROOMS & LOADING DOCKS

3-14.1.1

For new construction where mail rooms or loading docks initially receive mail or supplies (not thru central handling facility), is the mail room located away from heavily populated areas of the building and critical infrastructure?

3-15

3-15.1

For new construction, is external roof access eliminated, using internal stairs or ladders only?

3-15.2

For existing buildings, have exterior roof access points been eliminated or secured with locked cages or similar mechanism?

3-16

3-16

Are overhead-mounted features weighing 31-lbs (14kg) or more mounted to resist forces of 0.5 times their weight in any horizontal direction and 1.5 times their weight in the downward direction?

3-17

3-17

Are outside air intakes located at least 10-ft above the ground or within enclosures constructed per paragraph 3-3.5? And if air intakes are within an enclosure, are the intakes a minimum of 10-ft from the enclosure perimeter?

3-18

3-18.1

For new construction do mail rooms and loading docks initially receiving mail or supplies (not thru central handling facility), have a separate, dedicated

HVAC or ventilation system?

3-18.2

For new construction do mail rooms and loading docks initially receiving mail or supplies (not thru central handling facility), have an exhaust system that maintains a slight negative air pressure?

STANDARD 14 - ROOF ACCESS

STANDARD 17 - MAIL ROOM & LOADING DOCK VENTILATION

STANDARD 16 - AIR INTAKES

STANDARD 15 - OVERHEAD MOUNTED ARCHITECTURAL FEATURES

3-18.3

For new construction do mail rooms or loading docks initially receiving mail or supplies (not thru central handling facility), have ventilation system outside air intakes, relief air, and exhausts with low leakage isolation dampers that have a maximum leakage rate of 3 cfm/sq-ft with a differential pressure of 1 inch of water gage across the damper that can be automatically closed?

3-18.4

For new construction do mail rooms or loading docks initially receiving mail or supplies (not thru central handling facility), have dampers that are switched to automatically close to isolate the mail room and loading dock?

3-18.5

For new construction do mail rooms or loading docks initially receiving mail or supplies (not thru central handling facility), have walls extending floor to deck with all joints sealed and doors to inhabited areas with gaskets or weatherstripping to minimize leakage?

3-19

3-19

Does the facility have an emergency shutoff switch in the HVAC control system that can immediately shut down the air handling system throughout the building?

3-19

Is the switch(s) located to be easily accessible by building occupants similar to mass notification local operating consoles so that the travel distance to the nearest shutoff switch will not be in excess of 200 feet?

3-19

Are shutoff switches labeled and of a different color than fire alarm pull stations?

STANDARD 18 - EMERGENCY AIR DISTRIBUTION SHUTOFF

3-19.1

Do all outside air intakes, relief air openings, and exhaust openings have low leakage dampers which automatically close when the emergency air distribution shutoff switch is activated?

3-19.1

Do the low leakage dampers have a maximum leakage rate of 3 cfm/sq-ft with a differential pressure of 1 inch of water gage across the damper?

3-19.2

Do critical area HVAC system dampers that lead to outside, close upon switch activiation, rather than shutting down

HVAC to the critical area?

3-19.3

Do unoccupied areas with direct access outside, have HVAC system dampers leading outside that close upon switch activiation, or do the HVAC systems in the unoccupied areas shutdown?

3-19.4

For new construction, have emergency shutoffs been provided for fan coil unit heaters and air conditioners?

3-20

3-20

Are all equipment mountings for equipment weighing 31 lbs or more, designed to resist forces 0.5 times the equipment weight in any horizontal direction and 1.5 times the equipment weight in the downward direction?

3-21

20.1

Are crawl spaces, utility tunnels, and other means of under building access controlled?

3-22

3-22

Is a mass notification system provided in accordance with UFC 4-021-01?

3-22

Does the capability exist to provide real-time info to building occupants during emergency situations, originating locally at the building and from a remote location in accordance with UFC 4-021-

01?

STANDARD 21 - MASS NOTIFICATION

STANDARD 19 - EQUIPMENT BRACING

STANDARD 20 - UNDER BUILDING ACCESS

3-22

For Existing Building having no mass notification system, is the fire alarm control panel being renovated in a manner that requires addition or renovation of mass notification system in accordance with UFC 4-021-01, 5-3.1?

Describe ATFP features not required by UFC 4-010-01 that are included in the project, if any:

Certification of Force Protection Requirements:

Preparers of this document certify the accuracy and completeness of the Antiterrorism Force

Protection features for this project with signatures on the following page/pages.

ADDITIONAL ATFP PROJECT FEATURES

Features are:

The next two pages are for AE Designed projects only.

ARCHITECT-ENGINEER

CERTIFICATION OF ANTITERRORISM FORCE PROTECTION REQUIREMENTS

PRELIMINARY DESIGN SUBMITTAL

Preparers of this document certify the accuracy and completeness of the Antiterrorism

Force Protection features of this project.

Civil Engineer of Record:

Signature Date

Architect of Record:

Signature Date

Structural Engineer of Record:

Signature Date

Mechanical Engineer of Record:

Signature Date

Electrical Engineer of Record:

Signature Date

ARCHITECT-ENGINEER

CERTIFICATION OF ANTITERRORISM FORCE PROTECTION REQUIREMENTS

FINAL DESIGN SUBMITTAL

Preparers of this document certify the accuracy and completeness of the

Antiterrorism Force Protection features of this project.

Civil Engineer of Record:

Signature Date

Architect of Record:

Signature Date

Structural Engineer of Record:

Signature Date

Mechanical Engineer of Record:

Signature Date

Electrical Engineer of Record:

Signature Date

The next two pages are for Louisville District In-House Designed projects only.

LOUISVILLE DISTRICT IN-HOUSE DESIGN

CERTIFICATION OF ANTITERRORISM FORCE PROTECTION REQUIREMENTS

PRELIMINARY DESIGN SUBMITTAL

The project specific Antiterrorism Force Protection Checklist has been completed and is attached.

The Antiterrorism Force Protection review, plans, and related design analysis documentation have been checked and approved by the in-house design team.

Project Design Team Leader Signature: Date

Engineering Division Antiterrorism Force Protection Team:

Civil Team Member Signature: Date

Architectural Team Member Signature: Date

Structural Team Member Signature: Date

Mechanical Team Member Signature: Date

Electrical Team Member Signature Date

LOUISVILLE DISTRICT IN-HOUSE DESIGN

CERTIFICATION OF ANTITERRORISM FORCE PROTECTION REQUIREMENTS

FINAL DESIGN SUBMITTAL

The project specific Antiterrorism Force Protection Checklist has been completed and is attached.

The construction contract plans, specifications, and related design analysis documentation have been checked and approved for accuracy and coordination.

Project Design Team Leader Signature: Date

District ATFP Team Approval:

Civil Team Member Signature: Date

Architectural Team Member Signature: Date

Structural Team Member Signature: Date

Mechanical Team Member Signature: Date

Electrical Team Member Signature: Date

W912QR21R0054-0001W912QR21R0054-0001

01 03 00.00 48

SECTION 01 03 00.00 48

DESIGN SUBMISSION REQUIREMENTS AFTER AWARD

1.1 INTRODUCTION

This section contains information needed after the successful Offeror has been selected.

The information contained in this section applies to the design required for the Renovation of Building 5503 project at Joint Base McGuire-Dix-Lakehurst, NJ.

1.2 DESIGNERS OF RECORD

1.2.1 The Design/Build Contractor shall identify, for Government Acceptance, the Designer of Record for each area of work. One Designer of Record may be responsible for no more than two disciplines. All Designers of Record shall be registered Professional Engineers or Architects as required by Section 00 80 00.00 06, Clause “Registration of Designers”.

1.2.2 In addition to these requirements, the design firm shall have a Design Project Manager (PM), see Section 01 45 04.10 06 for Design PM qualifications.

1.2.3 Provide the services of a Registered Communications Distribution Designer (RCDD) to design the telecommunications system in compliance with the Army Reserve Network Enterprise Criteria Infrastructure Technical Criteria (ARNEC ITC).

1.2.4 Provide the services of a Qualified Fire Protection Engineer (QFPE), as defined by UFC 3-600-01, to design, review, and oversee the fire and life safety system of the project in compliance with UFC 3-600-01. This includes but is not limited to preparing fire protection shop drawing submittals during construction, oversight of installation, as well as witnessing fire protection acceptance testing. Sufficient hydraulic calculation sets which will fully define the entire system sizing shall be provided.

1.2.5 The Furniture, Fixtures and Equipment (FF&E) design shall be developed by the Interior Designer, who shall be a registered NCIDQ certified designer and have a minimum of two years’ experience in space planning, and contract furniture & panel systems specifications.

1.2.6 The D/B Contractor is required to have a LEED Accredited Professional (LEED AP) for both design and construction involved with the project and responsible for ensuring correct interpretation of LEED credit requirements, tracking overall LEED accomplishments, providing documentation, and monitoring construction aspects of each LEED credit.

1.2.7 The Designers of Record shall stamp, sign, and date each design drawing under their responsible discipline for Certified Final design documentation stage. Designers of Record shall be a Prime Contractor employee, be contracted directly by the Prime

Contractor, be an employee of a design firm that is contracted directly by the Prime Contractor, be a subconsultant to the design firm that is contracted directly by the Prime Contractor, or be an employee of a Subcontractor that is contracted directly by the Prime Contractor (i.e a registered Mechanical Engineer as an employee of the Mechanical Subcontractor to the Prime Contractor).

1.2.8 Designers of Record are required to make critical site visits during construction.

The Architect, Structural, Mechanical, and Electrical shall make at least 3 site visits; the Civil Designer; and the Fire Protection and Communication Designers shall make at least 2 site visit.

1.3 CONTRACTOR DESIGN REQUIREMENTS AFTER AWARD

1.3.1 The Contractor must submit for Government Acceptance, a Design Quality Control Plan as required in Section 01 45 04.10 06, before design may proceed. The Design Quality Control Plan must indicate the designer’s integral role throughout design and construction. Resumes of each Designer of Record (DOR) shall be included to demonstrate compliance with the RFP requirements. A list of Designers of Record, Checkers, and Independent Reviewers must be included to define each person in each role, including professional registration for the position when required, and indicating three separate individuals per discipline. One person may fulfill two roles in different disciplines (i.e. a registered Architect who is also a Certified (registered) Interior Designer may be the Designer, Checker, or Independent Reviewer for one of the roles in both Architectural and Interior Design disciplines). One person cannot fulfill two roles within one discipline.

1.3.1.1 Designer of Record shall be the person responsible for the development of the project design. Professional registration is required.

1.3.1.2 Checker shall be a senior design team member who performs peer-review of the work of the discipline team members. Typically works with the team on the project, with day to day knowledge. Professional registration is not required, but preferred.

1.3.1.3 Independent Reviewer shall be a senior design team member not directly involved in the development of the project design. This person is considered a third party check, not necessarily detailed, but assuring coordination with other disciplines. Professional registration is required.

1.3.2 The Contractor must conduct Independent Technical Reviews, in accordance with requirements in Section 01 45 04.10 06.

1.3.3 The Contractor shall design and detail a complete and usable facility before construction begins, except for Fast Track projects. Fast Track design and construction will be permitted on this project. Fast-tracking may include site work, ordering long-lead materials, and mobilization. Design review packages submitted to the Government shall be limited to two; one for the fast track design and one for the remainder of the project design. Also refer to Section 00 80 00.00 06, clause Sequence of Design/Construction

(Fast Track). The Contractor shall design and construct the facility in Imperial (English inch-pounds-second “US Customary”) units.

1.3.4 The design shall be completed in accordance with the applicable criteria itemized in this RFP, including all requirements of the Army Reserve Design Process and Submittal Requirements Manual (DPSR) Part C, available at the Corps of Engineers, Louisville District, Army Reserve Customer Website.

1.3.5 A sample design schedule is provided in Section 01 04 00.00 48.

1.4 SUBMISSION OF DESIGN DOCUMENTS

1.4.1 The Contractor shall submit design documents with cover letter by overnight mail in accordance with the requirements of this section and the DPSR Part C. The letter shall indicate the project name, and due date for comments provided in DRCHECKS (Design Review and Checking System) via Projnet. Specifications, submittal register, design analysis and other technical information shall be bound. The CID (FF&E, SID) shall be submitted as indicated in the CID (FF&E, SID) Submittal Requirements attached to this specification.

1.4.2 Design Reviews shall not be taken as an approval and do not relieve the Contractor's responsibility for compliance with the RFP solicitation, codes, regulations, or other applicable criteria. Design reviews are considered Quality Assurance reviews, and may be performed by the A/E team which developed the RFP Solicitation package.

1.4.3 Once the Government has reviewed and accepted the contractor's final design, Contractor shall make no further changes to the accepted design without the written approval of the Contracting Officer. All costs for submitted variances, after Final Design Acceptance, shall be borne by the Contractor at no cost to the Government. For all requested design changes, complete submittals to all parties listed will be required for an additional review, in accordance with the procedures for original submittals stated above.

1.5 GENERAL DESIGN REQUIREMENTS

1.5.1 The Contractor is required to independently prepare and submit for Government Acceptance a complete Design. The Contractor's Design Professionals shall independently confirm and be responsible for the technical accuracy and adequacy of all aspects of the project design.

1.5.2 Document quantities and delivery addresses are specified at the end of this Section. Quantities and addresses apply for each submittal.

1.5.2.1 Division 00 and Division 01specifications shall not be edited by the Contractor, and shall be reproduced and included with the Contractor’s construction phase technical specifications. Divisions 00 and 01 are contract requirements; therefore, can only be changed by contract modification.

1.5.3 Submittal Register: The Contractor will be required to prepare a Submittal Register Engineering Form 4288 identifying all construction submittals. Each submittal item shall be identified and coded in accordance with Section 01 33 00. A completed Engineering Form 4288, accepted by the Contracting Officer, will be required prior to commencement of construction. The designers are required to provide a Submittal Register that is compatible with Construction Division's QCS system.

1.5.4 LEED Project Requirements:

1.5.4.1 Refer to Section 01 02 00.00 48 Part 12 for additional sustainability/LEED information.

1.5.4.2 Project designs (including multiple building projects and renovations) shall meet USACE Army LEED v4 Implementation Guide (dated September 2014) paragraphs 1 through 4, and paragraph 6. This document is available on the Corps of Engineers, Louisville District, Army Reserve Customer Website. If contradictions occur, the requirements of this RFP take precedence over the information in USACE Army LEED Implementation Guide.

1.5.4.3 LEED Related Meetings: Refer to Section 01 33 29.00 06 Sustainability Reporting for related meeting requirements.

1.5.4.4 LEED Online project Owner and Change of Owner at Certification. The US Army is the owner. The USACE geographic district PM (or delegated authority) will act as Owner’s representative through project design, construction, and certification and will be identified as the project Owner on LEED Online.

Immediately prior to acceptance of GBCI certification ruling, the Owner’s representative designation in LEED Online must be changed to the Army Reserve RD representative, or the Installation DPW Director (or delegated authority). The USACE geographic district PM is responsible for ensuring this change in Owner designation occurs at the correct time, and is to provide the contact information for the Contractor to utilize for the Change of Owner process.

1.5.5 LEED/Energy Requirements: Comply with the energy efficiency requirements of UFC 1-200-02 and performance identified in Section 01 02 00.00 Part 12. The percent energy reduction shall be calculated by subtracting the receptacle and process loads from the total energy usages for both the baseline and proposed buildings. The percentage formula shall be as follows: 100 x ((Baseline building consumption – receptacle and process loads) – (Proposed building consumption – receptacle and process loads)) / (baseline building consumption – receptacle and process loads). For determining LEED Optimize Energy Performance credit points, the percent energy cost reduction shall be calculated by applying the appropriate energy costs to the total energy usage for both the baseline and proposed buildings. The formula shall be as follows:

(Baseline energy cost – Proposed energy cost) / (Baseline energy cost).

1.6 DESIGN AND INVESTIGATION REQUIREMENTS

1.6.1 Geotechnical Requirements and Responsibilities

1.6.1.1 Refer to section 01 02 00.00 48, Part 3 for more geotechnical requirements. The contractor’s QC plan shall detail the geotechnical testing requirements and outline the plan to report the testing results.

1.6.1.2 Subsequent to award, the Contractor is required to perform and provide a complete geotechnical exploration of the proposed site to develop the final design. The geotechnical exploration shall be performed under the direction of a licensed professional engineer with at least 10 years’ experience specializing in geotechnical engineering. This exploration shall be the full responsibility of the Contractor and detailed requirements are outlined below. It is possible that site specific subsurface conditions encountered by the Contractor will differ from those appended herein. Therefore, it is the responsibility of the Contractor to establish a meeting with the COR subsequent to completion and evaluation of his site specific geotechnical exploration to outline any differences encountered that are not consistent with the information provided herein. Should those differences require changes in the foundation type, pavement and earthwork requirements proposed with the bid that result in more cost, these differences shall be clearly outlined for the meeting.

1.6.1.3 Contractor’s Geotechnical Report: A final geotechnical evaluation report shall be prepared by the Contractor’s licensed geotechnical engineer and submitted along with the first foundation design submittal. This report shall summarize the subsurface conditions; provide requirements for the design of appropriate foundations, floor slabs, retaining walls, embankments, and pavements. The Contractor’s Geotechnical Report shall specify the type foundation system to be used, lateral load resistance capacities for foundation systems, allowable bearing elevations for footings, grade beams, slabs, etc. An assessment of post-construction settlement potential including total and differential shall be provided. Requirements regarding lateral earth pressures (active, at-rest, passive) to be used in the design of retaining walls shall be provided. The report shall include the required spectral accelerations and Site Class for seismic design along with an evaluation of any seismic hazards and requirements for mitigation, if necessary. The spectral accelerations shall be based on the local building code. Calculations shall be included to support the requirements for bearing capacity, settlement, and pavement sections.

Supporting documentation shall be included for all required design parameters such as Site Class, shear strength, earth pressure coefficients, friction factors, subgrade modulus, California Bearing Ratio (CBR), etc. In addition, the report shall provide earthwork requirements, expected frost penetration, expected groundwater levels, requirements for dewatering and groundwater control, possible presence of any surface or subsurface features that may affect the construction of the project such as…