W912QR21R0040_Specs-0003.pdf
PDF 3 MB Posted
- Attached to
- Fort Knox Van Voorhis Elementary School
- Solicitation number
- W912QR21R0040
About this file
This federal contract opportunity announcement provides details for the Construction of Van Voorhis Elementary School located at Fort Knox, KY. The project includes constructing a new 100,500 square foot elementary school and demolishing an existing 83,000 square foot school. The construction will be a firm-fixed-price contract with a magnitude between $25-100 million. A best value tradeoff source selection process will be used to evaluate proposals on technical approach, past performance, and price factors. The solicitation will be posted on SAM.gov and no paper copies will be issued. The point of contact is the listed Contract Specialist.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR21R0040
X 9B. DATED (SEE ITEM 11)
29-Apr-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0003
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jun-2021
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR21R0040-0003
W912QR21R0040
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0003 SUMMARY OF CHANGES
W912QR21R0040 for the construction of the Fort Knox Van Voorhis Elementary School is hereby modified as follows:
a. The following PLAN SHEETS has been added in its entirety:
L-402 PRE-K / KINDER PLAYGROUND EQUIPMENT
L-403 PLAYGROUND ENLARGEMENT
b. The following PLAN SHEETS have been replaced in their entirety:
G-0001 SHEET INDEX VOLUME 1
G-0002 SHEET INDEX VOLUME 2
G-0003 SHEET INDEX VOLUME 3
G-0004 SHEET INDEX VOLUME 4
G-0005 SHEET INDEX VOLUME 5
G-0006 SHEET INDEX VOLUME 6
G-0006A SHEET INDEX VOLUME 6 – CONTINUED
G-300 CONSTRUCTION PHASING PLAN- PHASE 1
G-301 CONSTRUCTION PHASING PLAN- PHASE 2
G-302 CONSTRUCTION PHASING PLAN- PHASE 3
G-303 CONSTRUCTION PHASING PLAN- PHASE 4
CD105 DEMOLITION PLAN-AREA 5
CD110 DEMOLITION PLAN-AREA 10
CS100 SITE PLAN OVERALL
CS103 SITE PLAN-AREA 3
CS105 SITE PLAN-AREA 5
CS106 SITE PLAN-AREA 6
CS108 SITE PLAN-AREA 8
CS113 GEOMETRY POINT DATA
CG105 GRADING AND DRAINAGE PLAN-AREA 5
CG106 GRADING AND DRAINAGE PLAN-AREA 6
CG108 GRADING AND DRAINAGE PLAN-AREA 8
CU105 UTILITY PLAN-AREA 5
CU500 UTILITY DETAILS
L-001 MATERIAL SCHEDULE
L-100 OVERALL HARDSCAPE PLAN
L-102 HARDSCAPE PLAN-AREA 02
L-103 HARDSCAPE PLAN-AREA 03
L-105 HARDSCAPE PLAN-AREA 05
L-106 HARDSCAPE PLAN-AREA 06
L-108 HARDSCAPE PLAN-AREA 08
L-200 OVERLL PLANTING PLAN
L-208 PLANTING PLAN-OVERALL-AREA 08
L-209 PLANTING PLAN-OVERALL-AREA 09
L-210 PLANTING PLAN-OVERALL-AREA 10
L-211 PLANTING PLAN-OVERALL-AREA 11
L-401 OUTDOOR CLASSROOM ENLARGEMENT
L-502 HARDSCAPE DETAILS
L-503 HARDSCAPE DETAILS
S-001 GENERAL NOTES
S-105 LIVE LOAD KEY PLANS
S-122 SECOND FLOOR ROOF FRAMING PLAN 2B
S-123 SECOND FLOOR ROOF FRAMING PLAN 2C
S-131 ROOF FRAMING PLAN 2A
S-134 ROOF FRAMING PLAN 2D
S-204 FRAMING ELEVATIONS
S-501 TYPICAL FOUNDATION DETAILS
S-601 SCHEDULES
A-101 FIRST FLOOR PLAN – 1A
A-105 FIRST FLOOR PLAN – 1E
A-106 FIRST FLOOR PLAN – 1F
A-108 WALKWAY CANOPY PLANS – ENLARGED
A-121 SECOND FLOOR PLAN - 2A
A-123 SECOND FLOOR PLAN – 2D
A-124 SECOND FLOOR PLAN – 2E
A-141 ROOF PLAN – 1A
A-143 ROOF PLAN – 1C
A-144 ROOF PLAN - 1D
A-145 ROOF PLAN – 1E
A-163 REFLECTED CEILING PLAN – FIRST FLOOR – 1C
A-164 REFLECTED CEILING PLAN – FIRST FLOOR – 1D
A-305 BUILDING SECTIONS
A-316 WALL SECTIONS
A-317 WALL SECTIONS
A-318 WALL SECTIONS
A-319 WALL SECTIONS
A-320 WALL SECTIONS
A-321 WALL SECTIONS
A-322 WALL SECTIONS
A-323 WALL SECTIONS
A-324 WALL SECTIONS
A-325 WALL SECTIONS
A-404 ENLARGED PLANS
A-405 ENLARGED PLANS
A-407 ENLARGED PLANS
A-408 ENLARGED PLANS
A-513 SECTION DETAILS
A-541 ROOF DETAILS
A-611 DOOR SCHEDULE
A-612 DOOR SCHEDULE
A-613 DOOR TYPES
A-631 WINDOW TYPES
A-700 INSTRUCTIONAL SIGNAGE
I-502 MILLWORK SECTIONS
QF601 FOOD SERVICE EQUIPMENT AND UTILITY SCHEDULE
M-100 DUCTWORK PLAN-FIRST FLOOR-OVERALL
M-101 DUCTWORK PLAN-FIRST FLOOR-AREA 1A
M-102 DUCTWORK PLAN-FIRST FLOOR-AREA 1B
M-103 DUCTWORK PLAN-FIRST FLOOR-AREA 1C
M-104 DUCTWORK PLAN-FIRST FLOOR-AREA 1D
M-105 DUCTWORK PLAN-FIRST FLOOR-AREA 1E
M-106 DUCTWORK PLAN-FIRST FLOOR-AREA 1F
M-120 DUCTWORK PLAN-SECOND FLOOR-OVERALL
M-121 DUCTWORK PLAN-SECOND FLOOR-AREA 2A
M-122 DUCTWORK PLAN-SECOND FLOOR-AREA 2B
M-123 DUCTWORK PLAN-SECOND FLOOR-AREA 2C
M-124 DUCTWORK PLAN-SECOND FLOOR-AREA 2D
M-125 DUCTWORK PLAN-SECOND FLOOR-AREA 2E
M-126 DUCTWORK PLAN-SECOND FLOOR-AREA 2F
M-130 HVAC-ROOF PLAN-OVERALL
M-301 HVAC SECTIONS
M-302 HVAC SECTIONS
M-303 HVAC SECTIONS
TY001 SYMBOLS, ABBREVIATIONS & GENERAL NOTES
TY010 SECURITY SITE PLAN – ESS ROUGH IN
TY101 PARTIAL SECURITY PLAN – FIRST FLOOR – 1A – ESS ROUGH IN
TY102 PARTIAL SECURITY PLAN – FIRST FLOOR – 1B – ESS ROUGH IN
TY104 PARTIAL SECURITY PLAN – FIRST FLOOR – 1D – ESS ROUGH IN
TY105 PARTIAL SECURITY PLAN – FIRST FLOOR – 1E – ESS ROUGH IN
TY106 PARTIAL SECURITY PLAN – FIRST FLOOR – 1F - ESS ROUGH IN
TY121 PARTIAL SECURITY PLAN – SECOND FLOOR – 2A – ESS ROUGH IN
TY122 PARTIAL SECURITY PLAN – SECOND FLOOR – 2B – ESS ROUGH IN
TY501 SECURITY DETAILS – ESS ROUGH IN.
TY502 SECURITY DETAILS – ESS ROUGH IN
c. The following SPECIFICATION SECTIONS have been added in their entirety:
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
34 71 13.19 CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS
d. The following SPECIFICATION SECTIONS have been replaced in their entirety:
Table of Contents Submittal Register 07 81 00 Spray Applied Fireproofing 08 14 00 Wood Doors 09 90 00 Painting 21 12 00 Standpipe Systems
e. The following SPECIFICATION SECTION have been deleted in their entirety:
08 60 50 TUBULAR DAYLIGHTING SKYLIGHTS
f. All available construction drawings for the existing school are hereby provided FOR INFORMATIONAL
PURPOSES ONLY.
g. The due date is hereby extended from 1:00pm ET on 09 June 2021 to 1:00pm ET on 23 June 2021.
h. All other terms and conditions remain unchanged.
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 09-Jun-2021 01:00 PM to 23-Jun-2021 01:00 PM.
(End of Summary of Changes)
Replace Van Voorhis Elementary School February 8, 2021 Fort Knox, KY Certified Final Design Submission
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 07 SEALS PAGE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.10 06 TOTAL BUILDING COMMISSIONING (INDEPENDENT CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 82 00 ASBESTOS REMEDIATION
02 83 00 LEAD REMEDIATION
02 83 13.00 06 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 42 13.00 10 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
04 72 00 CAST STONE MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
PROJECT TABLE OF CONTENTS Page 1 Amendment 0003
Amendment 0003
AMENDMENT 0003****************************************************************************************************************************
************************************************************************************************************AMENDMENT 0003
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 42 13 METAL WALL PANELS
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 62 00 SHEET METAL FLASHING AND TRIM
07 72 00 ROOF ACCESSORIES
07 81 00 SPRAY-APPLIED FIREPROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 COILING COUNTER DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 00 CURTAIN WALL AND GLAZED ASSEMBLIES
08 60 50 TUBULAR DAYLIGHTING SKYLIGHTS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 35 16 CHEMICAL-RESISTANT QUARRY TILING
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 68 00 CARPETING
09 80 00 ACOUSTICAL METAL WALL PANELS
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 21 23.16 CUBICLE TRACK AND HARDWARE
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
PROJECT TABLE OF CONTENTS Page 2 Amendment 0003
AMENDMENT 0003****************************************************************************************************************************
************************************************************************************************************AMENDMENT 0003
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 75 00 FLAGPOLES
10 85 00 BUILDING SPECIALTIES
DIVISION 11 - EQUIPMENT
11 05 40 COMMON WORK RESULTS FOR FOODSERVICE EQUIPMENT
11 06 00 STAGE/THEATRICAL EQUIPMENT
11 06 40.13 FOODSERVICE EQUIPMENT SCHEDULE
11 13 19.13 LOADING DOCK LEVELERS
11 30 13 RESIDENTIAL APPLIANCES
11 41 11 REFRIGERATED AND FROZEN FOOD STORAGE EQUIPMENT
11 42 00 FOOD PREPARATION EQUIPMENT
11 44 00 FOOD COOKING EQUIPMENT
11 46 00 FOOD DISPENSING EQUIPMENT
11 47 00 ICE MACHINES
11 48 00 CLEANING AND DISPOSAL EQUIPMENT
11 66 23 GYMNASIUM EQUIPMENT
11 66 53 GYMNASIUM DIVIDERS
11 68 13 PLAYGROUND EQUIPMENT
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 93 00 SITE FURNISHINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC BRACING FOR MISCELLANEOUS EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 24 23 HYDRAULIC PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 12 00 STANDPIPE SYSTEMS
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING FOR KITCHEN CABINET
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
PROJECT TABLE OF CONTENTS Page 3 Amendment 0003
AMENDMENT 0002**************************************************************************************************************************** ************************************************************************************************************AMENDMENT 0002
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 63 00.00 10 COLD STORAGE REFRIGERATION SYSTEMS
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT
23 81 47 WATER-LOOP AND GROUND-LOOP HEAT PUMP SYSTEMS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.21 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
LIFE SAFETY
25 05 11.23 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS UTILITY
MONITORING CONTROL SYSTEM (UMCS) TO INCLUDE HVAC AND
LIGHTING CONTROL SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 23.10 INTEGRATED INTERCOM, PUBLIC ADDRESS AND MASTER CLOCK SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 06 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 21 13 RADON MITIGATION
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 23 AGGREGATE BASE COURSES
32 11 23.23 BASE COURSE DRAINAGE LAYERS
32 12 13 BITUMINOUS TACK AND PRIME COATS
32 12 16.16 ROAD-MIX ASPHALT PAVING
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 18 16.13 PLAYGROUND PROTECTIVE SURFACING
PROJECT TABLE OF CONTENTS Page 4 Amendment 0003
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
32 92 23 SODDING
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 11 23 NATURAL GAS PIPING
33 30 00 SANITARY SEWERAGE
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 34 - TRANSPORTATION
34 71 13.19 ACTIVE VEHICLE BARRIERS AND CONTROLS
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 5 Amendment 0003
AMENDMENT 0003****************************************************************************************************************************
************************************************************************************************************AMENDMENT 0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 121 PAGES
Van Voorhis Elementary
00 80 00.00 06 SD-01 Preconstruction Submittals
1.21 GLabor, Equipment, and Material
Report
1.21 GDaily Equipment Report
1.10 GFingerprints of all persons
employed or to be employed
SD-02 Shop Drawings
1.31 G AEMechanical/Electrical Room
Layout
SD-04 Samples
1.12 GEquipment Warranty Identification
Tags
SD-05 Design Data
1.6.1.1 GEquipment-in-Place List
1.6.1.2 GMaintenance and Parts Data
1.10 GLocal Agency Check
1.34Progress Photographs
SD-07 Certificates
1.12 GWarranty of Construction
1.11 GNO ASBESTOS - CONTAINING
MATERIAL (ACM)
CERTIFICATION
1.25 GInsurance
1.23 GSales and Use Tax
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Amendment 0003
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 121 PAGES
00 80 00.00 06 1.5.4 GPreliminary (Working) As-Built
Drawings
1.5.1 G DOFinal As-Built Drawings
1.5.1.2 G DOCAD Working As-Built Drawings
1.12 GWarranty Management Plan
01 14 00 SD-01 Preconstruction Submittals
1.4.1.1 GList of Contact Personnel
01 32 01.00 06 SD-01 Preconstruction Submittals
3.4.1 G ROPreliminary Project Schedule
3.4 G ROProject Schedule
SD-05 Design Data
3.5.2Narrative Report
3.5.4Schedule Reports
3.4.3 G ROPeriodic Schedule Updates
01 33 00.00 06 SD-01 Preconstruction Submittals
3.6 G ROSubmittal register
01 33 29.00 06 SD-01 Preconstruction Submittals
1.5.1.1 G SSustainability Action Plan
LEED Final Design Review
Results
1.7.1.5 G SLEED Implementation Plan
1.4 G SLEED AP BD+C
G SDesign Phase High Performance and Sustainable Building Checklist
1.5.1.4 G SSustainability Progress Report
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 121 PAGES
01 33 29.00 06 1.7.1.3 G SLEED Correction Plan
SD-11 Closeout Submittals
1.5.1.2 G SFinal Sustainability eNotebook
1.5.1.2 G SAmended Final Sustainability
eNotebook
1.5.1.2 G SFinal High Performance and
Sustainable Building Checklist
1.7.1.7 GLEED Plaque and Certificate
01 35 26.00 06 SD-01 Preconstruction Submittals
1.7Accident Prevention Plan (APP)
1.7Fatigue Management Plan
1.7Bloodborne Pathogen Plan
1.7Exposure Control Plan
1.7Automatic External Defibrillator
(AED) Program
1.7Site Layout Plan
1.7Access/Haul Road Plan
1.7Hearing Conservation Program
1.7Respiratory Protection Plan
1.7Health Hazard Control Program
1.7Hazard Communication Program
1.7Process Safety Management
Plan
1.7Lead Compliance Plan &
Specifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 121 PAGES
01 35 26.00 06 1.7Asbestos Abatement Plan &
Specifications
1.7Radiation Safety Program
1.7Abrasive Blasting Plan
1.7Heat Stress Monitoring Plan
1.7Cold Stress Monitoring Plan
1.7Indoor Air Quality Management
Plan
1.7Mold Remediation Plan
1.7Chromium (VI) Exposure
Evaluation
1.7Crystalline Silica Assessment
1.7Lighting Plan for Night Operations
1.7Traffic Control Plan
1.7Fire Prevention Plan
1.7Wild Land Fire Management Plan
1.7Arc Flash Hazard Analysis
1.7Assured Equipment Grounding
Control Program (AEGCP)
1.7Hazardous Energy Control Plan
1.7Standard Pre-Lift Plan (LHE)
1.7Critical Lift Plan - LHE
1.7Naval Architectural Analysis-LHE
(Floating)
1.7Floating Plant Inspection and
Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 121 PAGES
01 35 26.00 06 1.7Severe Weather Plan for Marine
Activities
1.7Emergency Plan for Marine
Activities
1.7Man Overboard/Abandon Ship
Procedures
1.7Float Plan for Launches, Motorboats, Skiffs
1.7Fall Protection and Prevention
Plan
1.7Demolition/Renovation Plan (to include engineering survey)
1.7Rope Access Work Plan
1.7Excavation/Trenching Plan
1.7Fire Prevention & Protection Plan for Underground Construction
1.7Compressed Air Plan for
Underground Construction
1.7Erection and Removal Plan for
Formwork and Shoring
1.7PreCast Concrete Plan
1.7Lift-Slab Plans
1.7Masonry Bracing Plan
1.7Steel Erection Plan
1.7Explosives Safety Site Plan
(ESSP)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 121 PAGES
01 35 26.00 06 1.7Blasting Plan
1.7Dive Operations Plan
1.7Safe Practices Manual for Diving
Activities
1.7Emergency Management Plan for
Diving
1.7Tree Felling/Maintenance
Program
1.7Aircraft/Airfield Construction
Safety & Phasing Plan (CSPP)
1.7Aircraft/Airfield Safety Plan
Compliance Document (SPCD)
1.7Site Safety and Health Plan
(HTRW)
1.7Confined Space Entry
Procedures
1.7Confined Space Program
1.8 G ROActivity Hazard Analysis (AHA)
1.5.1.1 G ROSite Safety and Health Officer
Qualifications(SSHO)
1.12.7 G ROProof of qualification for Crane
Operators
1.12.7 G ROCritical Lift Plan
SD-06 Test Reports
1.12Reports
1.12.1Accident Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 121 PAGES
01 35 26.00 06 1.12.3Monthly Exposure Reports
1.12.5Crane Reports
1.12.4Regulatory Citations and
Violations
SD-07 Certificates
1.12.8Confined Space Entry Permit
1.13Hot work permit
1.12.6Crane Certificate of Compliance
01 45 04.10 06 SD-01 Preconstruction Submittals
3.2 G ROConstruction Quality Control Plan
01 45 35 SD-06 Test Reports
3.1.2Daily Reports
3.1.1Weekly Reports
SD-07 Certificates
2.1Aisc Certified Steel Fabricator
2.1Steel Joist Institute Membership
2.1Certificate of Compliance
1.5 GSpecial Inspector
SD-11 Closeout Submittals
3.1.2 GInterim Report
3.1.2 GComprehensive Final Report
01 46 00.10 06 SD-01 Preconstruction Submittals
1.4.2 GCommissioning Representatives
1.5.2 GProject Schedule
SD-06 Test Reports
3.2.2 G DOPre-Functional Checklists
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 121 PAGES
01 46 00.10 06 3.2.1 G DOBuilding Envelope Inspection
Checklists
3.2.3Trend Logs
SD-10 Operation and Maintenance
Data
3.3 G DOSystems Training
3.4 G ROTraining Plan
3.5 G DOSystems Manual
3.6 G DOMaintenance and Service Life
Plans
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.4.1 GTraffic Control Plan
2.2.1 GHaul Road Plan
SD-06 Test Reports
2.5Backflow Preventer Tests
SD-07 Certificates
1.4.1Backflow Tester
1.4Backflow Preventers
01 57 19.00 06 SD-01 Preconstruction Submittals
1.6.1Preconstruction Survey
1.11 G DOSolid Waste Management Permit
1.6.2 G DORegulatory Notifications
1.7 G DOEnvironmental Protection Plan
1.7.9.1 GDirt and Dust Control Plan
1.6.5 GEmployee Training Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 121 PAGES
01 57 19.00 06 1.6.4 GEnvironmental Manager
Qualifications
3.14 GNotice Of Soil Treatment
SD-06 Test Reports
3.5.2Laboratory Analysis
3.1.2.2Inspection Reports
3.5.3.1 GSolid Waste Management Report
SD-07 Certificates
1.6.5 GEmployee Training Records
1.6.5.1Certificate of Competency
1.6.5Erosion and Sediment Control
Inspector
SD-11 Closeout Submittals
3.1.2.3 G DOStormwater Pollution Prevention
Plan Compliance Notebook
3.1.2.4 G DOStormwater Notice of Termination
3.5.1 GWaste Determination
Documentation
3.5.5.6 GDisposal Documentation for
Hazardous and Regulated Waste
1.6.5 GAssembled Employee Training
Records
1.11 GSolid Waste Management Permit
3.5.3.1 GSolid Waste Management Report
3.5.5.1 GHazardous Waste/Debris
Management
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 121 PAGES
01 57 19.00 06 1.6.2 GRegulatory Notifications
3.5.3.1 GSales Documentation
3.5.3.1Contractor Certification
3.1.2.4 G AEAs-Built Topographic Survey
01 74 19 SD-01 Preconstruction Submittals
1.7 G SConstruction Waste Management
Plan
SD-06 Test Reports
1.9.2Quarterly Reports
1.9.3Annual Report
SD-11 Closeout Submittals
1.10 SFinal Construction Waste
Diversion Report
01 78 23 SD-10 Operation and Maintenance
Data
1.4 G ROO&M Database
3.1.1 G ROTraining Plan
3.1.3 G ROTraining Outline
3.1.2 G ROTraining Content
SD-11 Closeout Submittals
3.1.4 G ROTraining Video Recording
3.1.6 G ROValidation of Training Completion
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 121 PAGES
02 41 00 1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GDust-Control Measures
1.4.2 GPacking and Transportation
Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
02 82 00 SD-03 Product Data
1.2.2 GAmended Water
1.3.9 GSafety Data Sheets (SDS) for All
Materials
1.2.15 GEncapsulants
3.1.2.1 GRespirators
3.1.7 GLocal Exhaust Equipment
3.1.7 GPressure Differential Automatic
Recording Instrument
3.1.8 GVacuums
3.1.10 GGlovebags
SD-06 Test Reports
1.5.5 GAir Sampling Results
1.5.6 GPressure Differential Recordings
for Local Exhaust System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 121 PAGES
02 82 00 3.2.11.5 GClearance Sampling
3.3.3.2 GAsbestos Disposal Quantity
Report
SD-07 Certificates
1.3.4 GEmployee Training
1.3.5 GNotifications
1.3.7 GRespiratory Protection Program
1.3.10 GAsbestos Hazard Abatement Plan
1.3.11 GTesting Laboratory
1.3.12 GLandfill Approval
1.3.12 GDelivery Tickets
1.3.12 GWaste Shipment Records
1.3.13 GTransporter Certification
1.3.14 GMedical Certification
1.5.1 GPrivate Qualified Person
Documentation
1.5.2 GDesignated Competent Person
1.5.3 GWorker's License
1.5.4 GContractor's License
1.5.9 GFederal, State or Local Citations
on Previous Projects
1.2.15 GEncapsulants
3.1 GEquipment Used to Contain
Airborne Asbestos Fibers
3.1.3.3 GWater Filtration Equipment
3.1.8 GVacuums
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 121 PAGES
02 82 00 3.1.8 GVentilation Systems
SD-11 Closeout Submittals
1.3.5 GPermits and Licenses
1.3.5 GNotifications
1.3.7.1 GRespirator Program Records
1.5.7 GProtective Clothing
Decontamination Quality Control
Records
1.5.8 GProtective Clothing
Decontamination Facility
Notification
1.7.1 GRental Equipment
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 121 PAGES
02 83 00 3.1.1.6 GLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 GInitial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
3.1.1.5 GLocal Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
3.1.1.6 GPressure Differential Log
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 121 PAGES
02 83 00 3.1.1.1 GOccupant Notification
3.1.1.1 GNotification of the
Commencement of LBP Hazard
Abatement
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 83 13.00 06 SD-01 Preconstruction Submittals
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead waste management plan
3.4.2.1 GWritten evidence
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 GSampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3 GTesting laboratory
SD-11 Closeout Submittals
3.4.2.1 Ghazardous waste manifest
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 121 PAGES
02 84 16 SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.2DD Form 1348-1
3.3.1Testing results
02 84 33 SD-07 Certificates
1.7.1Training Certification
1.7.2Qualifications of CIH
1.7.3Pcb Removal Work Plan
1.7.4Pcb Disposal Plan
1.7.5Notification
3.8Transporter certification
3.5.4Certification of Decontamination
3.5.5Post cleanup sampling
3.8.1Certificate of disposal
03 30 00 SD-01 Preconstruction Submittals
1.7.3.1Concrete Curing Plan
1.7.5 GQuality Control Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 121 PAGES
03 30 00 1.7.6 GQuality Control Personnel
Certifications
1.7.6Quality Control Organizational
Chart
1.7.8 GLaboratory Accreditation
SD-02 Shop Drawings
1.7.2.1Formwork
1.7.2.2 GReinforcing Steel
3.11.1 GConstruction Joint
SD-03 Product Data
2.4.4Joint Sealants
2.4.3Joint Filler
2.1Formwork Materials
2.3.1Cementitious Materials
2.4.5Vapor Retarder
3.5.2Vapor Retarder
2.4.1Concrete Curing Materials
2.6Reinforcement
2.3.4Admixtures
2.6.2 GMechanical Reinforcing Bar
Connectors
2.2.2 GWaterstops
2.2.3Biodegradable Form Release
Agent
2.4.2 GNonshrink Grout
2.1.3 GCarton Forms
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 121 PAGES
03 30 00 3.3.8 GCarton Forms
SD-05 Design Data
1.7.1.1 GConcrete Mix Design
SD-06 Test Reports
1.7.1.1 GConcrete Mix Design
1.7.4.1Fly Ash
1.7.4.1Pozzolan
1.7.4.2Slag Cement
1.7.4.3Aggregates
3.14.2.3 GCompressive Strength Tests
3.14.2.4Air Content
3.14.2.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.10Welder Qualifications
1.7.3.3VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.7.3.4Safety Data Sheets
1.9.1Forest Stewardship Council
(FSC) Certification
1.7.6.2Field Testing Technician and
Testing Agency
SD-08 Manufacturer’s Instructions
2.4.4Joint Sealants
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 121 PAGES
03 30 00 2.4.1Curing Compound
03 42 13.00 10 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.5Accessories
SD-05 Design Data
2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
SD-11 Closeout Submittals
2.2.1 SRecycled content for fly ash and
pozzolan
2.2.1 SRecycled content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled content for Silica Fume
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 121 PAGES
03 42 13.00 10 2.2.1 SRecycled content for Synthetic
Fiber Reinforcement
2.2.1 SRecycled content for steel
04 20 00 SD-02 Shop Drawings
3.3.8.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay Brick
2.4.1.1 GCementitious Materials
2.6.8 GInsulation
SD-04 Samples
1.3.1.1 GMock-Up Panel
3.3.6.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.4.1.3 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
2.6.8 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 121 PAGES
04 20 00 2.2.3.3Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.3Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.3.2Concrete Masonry Units (CMU)
2.4.1.1Cementitious Materials
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.8Insulation
SD-08 Manufacturer’s Instructions
2.4.1.3Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 121 PAGES
04 20 00 SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.1 SRecycled Content
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 GErection and Erection Bracing
Drawings
SD-02 Shop Drawings
1.5.2 GFabrication Drawings
SD-03 Product Data
2.6.2Shop Primer
2.4.1Welding Electrodes and Rods
2.3.1.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.2Tension Control Bolts
SD-05 Design Data
1.5.3 GDesign Calculations for Steel
Connections
1.5.2 GShoring and Temporary Bracing
SD-06 Test Reports
2.6.2Class B Coating
2.3Bolts, Nuts, and Washers
3.7.1.2Weld Inspection Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 121 PAGES
05 12 00 3.7.2.1Direct Tension Indicator Washer
Inspection Reports
3.7.3.1Bolt Testing Reports
SD-07 Certificates
2.2Steel
2.3Bolts, Nuts, and Washers
2.5Galvanizing
1.4AISC Structural Steel Fabricator
Quality Certification
1.4AISC Structural Steel Erector
Quality Certification
1.5.4.1Welding Procedures and
Qualifications
2.4.1Welding Electrodes and Rods
3.7.1.1Certified Welding Inspector
3.7.1.2NDT Technicians
3.4Welding Procedure Specifications
(WPS)
05 21 00 SD-01 Preconstruction Submittals
1.4.2Welder Qualification
SD-02 Shop Drawings
1.4.1 GSteel Joist Framing
SD-03 Product Data
2.3 SRecycled Content Of Steel
Products
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 121 PAGES
05 21 00 2.2 GDesign Calculations
1.5.2 GBlast Report
1.5.2 GBlast Design Calculation
SD-06 Test Reports
3.3Erection Inspection
3.3Welding Inspections
SD-07 Certificates
1.4.2Certification of Compliance
1.4.3 GBlast Consultant Qualifications
05 30 00 SD-02 Shop Drawings
1.4.4Fabrication Drawings
SD-03 Product Data
2.2Accessories
2.1Deck Units
2.1.6Galvanizing Repair Paint
2.1.6Touch-Up Paint
2.1.2Sound Absorbing Materials
1.4.3Welding Equipment
1.4.3Welding Rods and Accessories
SD-04 Samples
2.2.4Flexible Closure Strips
2.2.16Acoustical Material
SD-05 Design Data
2.1Deck Units
SD-07 Certificates
1.4.2Powder-Actuated Tool Operator
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 121 PAGES
05 30 00 1.4.3Welder Qualifications
1.4.3Welding Procedures
1.4.1Manufacturer's Certificate
2.2.11Stud Manufacture's Certification
2.2.11Stud Manufacture's Test Reports
05 40 00 SD-02 Shop Drawings
1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
2.1 SRecycled Content of Steel
Products
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
3.1.1Welds
05 50 13 SD-02 Shop Drawings
3.9 GCover Plates and Frames
3.8 GExpansion Joint Covers
2.6 GAngles and Plates
2.7 GRoof Hatches
SD-03 Product Data
2.4Corner Guards
3.9 GCover Plates and Frames
2.7 GRoof Hatches
2.5 GDownspout Terminations
2.1 SRecycled Content
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 121 PAGES
05 50 13 2.1 GCertificates of Compliance
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.3.3 GConcrete Inserts
2.3.4 GMasonry Anchorage Devices
2.2.3 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 121 PAGES
05 51 00 2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.2.3 GProtective Coating
2.3.4 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
SD-03 Product Data
2.3Ladders
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 121 PAGES
05 52 00 2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .