W912QR20R0031Specs-0002.pdf

PDF 6 MB Posted

Attached to
Install Fire Sprinkler System and Upgrades in B-708 Homestead, FL
Solicitation number
W912QR20R0031
Issued by

About this file

This federal contract opportunity announcement describes a solicitation for construction services. The U.S. Army Corps of Engineers Louisville District intends to issue a request for proposal to renovate an air traffic control tower and construct an adjacent facility at Homestead Air Reserve Base in Florida. The project includes interior and exterior renovation of the approximately 9,000 square foot tower, demolition of an 800 square foot break room, and construction of a new 1,500 square foot facility to house radar approach control functions. The contract value is estimated between $5-10 million. The solicitation will use a best value tradeoff selection process. Proposals are due in February 2020, and award is anticipated in spring 2020. The project delivery method is design-bid-build, and construction duration is estimated at 480 calendar days.

View the file

Other files

File Type Posted
W912QR20R0031-0006.pdf PDF
W912QR20R0031Plans-0004.pdf PDF
W912QR20R0031Specs-0004.pdf PDF
W912QR20R0031 0003.pdf PDF
W912QR20R0031Plans-0002.pdf PDF
W912QR20R0031Specs-0001.pdf PDF
W912QR20R0031Specs_Vol1-0000.pdf PDF
W912QR20R0031Plans-0000.pdf PDF
W912QR20R0031Specs_Vol2-0000.pdf PDF
W912QR20R0031Specs_Vol3-0000.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CIVIL/OPS/ENVIRONMENTAL BR

ATTN: STEPHEN D RAMSEY

600 DR M L KING JR PL RM 821

LOUISVILLE KY 40202-2236

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0031 for Construction Renovation of Air Traff ic Control Tow er located at Homestead AFB, FL is hereby amended as follow s:

SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0031

X 9B. DATED (SEE ITEM 11)

14-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-May-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE 964860

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0031-0002

W912QR20R0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been modified:

SUMMARY OF CHANGES

Construction Renovation of Air Traffic Control Tower Homestead AFB, FL.

W912QR20R0031

Amendment 0002

A. The due date for proposals is hereby extended from 2:00 PM EST 26 May 2020, to 2:00 PM EST 02 June 2020.

B. Wage General Decision Number: FL20190018 dated 10 April 2020 were the incorrect wage rates, and wage rates FL20200215 dated 15 May 2020 are hereby incorporated.

C. Site visit sign in sheet is hereby incorporated in this Amendment.

D. The following drawings and specifications have been revised:

AD101 General Note 11 Updated, General Note 12 Added, and Keynote 10 updated

AD102 keynote 10 updated and detail

AD104, AD105, and AD106 details A1 and C7 updated locations for keynote 1

AD109 detail A6 note added

AD901 detail A8 note added

AS100 and AS101 keynote 8 updated

Sheets A-101 thru A-109; general note 4 deleted

Sheets A-102 thru A-107; Traction elevator keynotes updated

A-108 Keynote 2 updated

A-138 Wall Section Mark updated

A-401 detail C8 updated

A-531 details A1 and D1 updated

A-532 detail A1 added and detail A6 note updated

A-551 detail A1 notes updated

Sheet I-601 Finish Legend, Walls, PWT-1 updated and Finish Legend, Misc., SN updated

Sheets IG102 and IG106 Additional Signage Tags added/updated

Sheet IG601 Signage Schedule General Note 10 added

Sheet F-001 Note 7 updated

Sheet M-601 Air Cooled Chiller Schedule CH-1 and CH-2; Design Flow GPM

Sheet M-701 Controls General Notes 1 updated

Sheet E-001 General Note 24 Updated and General Note 27 added.

Sheet ES101 Keynotes 15 and 21 updated/added

ED102 keynote 5 updated

ED108 keynote 6 added

E-601 Sheet Note 5 added

Table of Contents 05 51 33 and 07 26 26 added

Submittal Register Sections 05 51 33 and 07 27 26 added

Specification 01 45 35 paragraph 1.2 updated

Specification Section 05 51 33 METAL LADDERS added

Specification Section 07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS added

- END OF SUMMARY OF CHANGES -

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 26-May-2020 02:00 PM to 02-Jun-2020 02:00 PM.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE RATES

"General Decision Number: FL20200215 05/15/2020

Superseded General Decision Number: FL20190215

State: Florida

Construction Type: Building

County: Miami-Dade County in Florida.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/21/2020 2 02/28/2020 3 05/15/2020

ASBE0060-001 03/02/2016

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 34.58 12.57

CARP1809-002 08/01/2016

Rates Fringes

CARPENTER: PILEDRIVERMAN.........$ 25.20 10.36

ELEV0071-002 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 45.91 34.765

FOOTNOTE:

A: Employer contributes 8% basic hourly rate for 5 years or more of service or 6% basic hourly rate for 6 months to 5 years of service as Vacation Pay Credit; Paid Holidays:

New Year's Day; Memorial Day; Independence Day; Labor Day;

Veteran's Day; Thanksgiving Day; plus the Friday after Thanksgiving; and Christmas Day.

ENGI0487-019 07/01/2016

Rates Fringes

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 23.75 9.20

ENGI0487-020 05/01/2016

Rates Fringes

OPERATOR: Concrete Pump.........$ 26.04 9.23

ENGI0487-021 07/01/2016

Rates Fringes

OPERATOR: Crane All Cranes 160 Ton Capacity and Over...........$ 33.05 9.20 All Cranes Over 15 Ton Capacity....................$ 32.05 9.20

OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20

IRON0272-001 10/01/2019

Rates Fringes

IRONWORKER, STRUCTURAL...........$ 25.49 11.99

IRON0402-001 01/01/2019

Rates Fringes

IRONWORKER, ORNAMENTAL...........$ 23.69 12.70

PLUM0519-001 10/31/2019

Rates Fringes

PLUMBER..........................$ 30.63 11.64

PLUM0725-001 07/16/2018

Rates Fringes

PIPEFITTER (Includes HVAC Pipe, Unit and Temperature Controls Installations)..........$ 35.63 14.15

* SFFL0821-004 01/01/2020

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 29.18 19.75

SHEE0032-001 12/01/2013

Rates Fringes

SHEET METAL WORKER, Includes HVAC Duct Installation...........$ 23.50 12.18

SUFL2014-024 08/16/2016

Rates Fringes

CARPENTER, Includes Acoustical Ceiling Installation, Drywall Finishing/Taping, Drywall Hanging, Form Work, Metal Stud Installation................$ 18.04 3.24

CEMENT MASON/CONCRETE FINISHER...$ 13.06 0.70

ELECTRICIAN, Includes Low Voltage Wiring...................$ 29.60 9.38

IRONWORKER, REINFORCING..........$ 17.72 0.00

LABORER: Common or General, Including Cement Mason Tending...$ 11.79 0.70

LABORER: Pipelayer..............$ 13.56 1.34

OPERATOR: Bulldozer.............$ 15.40 1.90

OPERATOR: Grader/Blade..........$ 18.97 0.00

OPERATOR: Loader................$ 16.00 2.82

OPERATOR: Roller................$ 14.43 4.78

PAINTER: Brush, Roller and Spray............................$ 16.00 3.48

ROOFER...........................$ 19.98 4.77

TILE SETTER......................$ 18.01 0.00

TRUCK DRIVER: Dump Truck........$ 13.22 2.12

TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

COMPANY NAME: _______________ REQUESTER NAME:_______________

JOBSITES: _______________ REQUEST DATE: _______________

JOB END DATE: _______________ REQUESTER PHONE #: ____________

*MAX 1 YEAR*

BACKGROUND INVESTIGATION REQUEST

FOR OFFICIAL USE ONLY

HOMESTEAD ARB

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF ALIEN / RESIDENT

A NUMER

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

LAST NAME FIRST NAME M DOB SSN DRIVER'S LICENSE # STATE OF

ISSUE

US CITIZEN?

YES OR NO

IF NO, ALIEN

REGISTRATION #

VCC / BDOC USE

ONLY

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 33 29.00 06 SUSTAINABILITY REPORTING

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 45 35 SPECIAL INSPECTIONS

01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

01 78 23 OPERATION AND MAINTENANCE DATA

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION AND DECONSTRUCTION

02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS

02 83 13.00 06 LEAD IN CONSTRUCTION

02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)

02 85 00 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 40 00 COLD-FORMED METAL FRAMING

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 51 33 METAL LADDERS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS

JacksonN Typewritten Text Amdt. #0002

JacksonN Text Box

Amdt. #0002

07 21 13 BOARD AND BLOCK INSULATION

07 22 00 ROOF AND DECK INSULATION

07 27 10.00 10 BUILDING AIR BARRIER SYSTEM

07 27 19.01 SELF-ADHERING AIR BARRIERS

07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS

07 41 13 METAL ROOF PANELS

07 42 13 METAL WALL PANELS

07 54 19 POLYVINYL-CHLORIDE ROOFING

07 60 00 FLASHING AND SHEET METAL

07 61 14.00 20 STEEL STANDING SEAM ROOFING

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 14 00 WOOD DOORS

08 31 00 ACCESS DOORS AND PANELS

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 62 38 STATIC-CONTROL FLOORING

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 69 19 STRINGERLESS ACCESS FLOORING

09 90 00 PAINTS AND COATINGS

09 96 00 HIGH-PERFORMANCE COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 28 13 TOILET ACCESSORIES

10 51 13 METAL LOCKERS

DIVISION 12 - FURNISHINGS

12 24 13 ROLLER WINDOW SHADES

12 48 13 ENTRANCE FLOOR MATS AND FRAMES

12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION

DIVISION 13 - SPECIAL CONSTRUCTION

13 34 23 FABRICATED STRUCTURES

DIVISION 14 - CONVEYING EQUIPMENT

14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS

DIVISION 21 - FIRE SUPPRESSION

21 12 00 STANDPIPE SYSTEMS

JacksonN Typewritten Text Amdt. #0002

JacksonN Text Box

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

21 30 00 FIRE PUMPS

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

23 81 00 DECENTRALIZED UNITARY HVAC EQUIPMENT

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT

26 08 00 APPARATUS INSPECTION AND TESTING

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 27 13.10 30 ELECTRIC METERS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS

26 32 13.00 20 SINGLE OPERATION GENERATOR SETS

26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

26 56 20 AIRFIELD AND HELIPORT LIGHTING AND VISUAL NAVIGATION AIDS

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID

PAVEMENTS

32 05 33 LANDSCAPE ESTABLISHMENT

32 11 23 AGGREGATE BASE COURSES

32 12 13 BITUMINOUS TACK AND PRIME COATS

32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS

32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE

FACILITIES

32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 23 SODDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 12 33.00 30 WATER METERS

33 30 00 SANITARY SEWERAGE

33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 86 PAGES

1190686

00 80 00.00 06 SD-01 Preconstruction Submittals

G1413 Statement and

Acknowledgement Form

1.21 GLabor, Equipment, and Material

Report

1.21 GDaily Equipment Report

GNuclear Gauges or Equipment

SD-02 Shop Drawings

1.33 GMechanical/Electrical Room

Layout

SD-04 Samples

1.12 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.6.1Equipment-in-Place List

1.6.1Maintenance and Parts Data

SF1413 Statement and

Acknowledgement

1.10Local Agency Check

SD-07 Certificates

1.12Warranty of Construction

1.11 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.25Insurance

1.23Sales and Use Tax

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 86 PAGES

00 80 00.00 06 SD-11 Closeout Submittals

1.5.4 GPreliminary (Working) As-Built

Drawings

1.5.1 GFinal As-Built Drawings

GCAD Working As-Built Drawings

1.12 GWarranty Management Plan

01 11 00 SD-01 Preconstruction Submittals

1.7.1 GUtility Outage Requests

1.7.1 GUtility Connection Requests

1.7.2 GBorrow Permits

1.7.2 GExcavation Permits

1.7.2 GWelding Permits

GSalvage Plan

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4 GProject Schedule

SD-05 Design Data

3.5.2Narrative Report

3.5.4Schedule Reports

3.4.4 GPeriodic Schedule Updates

01 33 00.00 06 SD-01 Preconstruction Submittals

GSubmittal register

01 33 29.00 06 SD-01 Preconstruction Submittals

1.5.2.1 GSustainability Action Plan

1.4 GGBI GPCP

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 86 PAGES

01 33 29.00 06 1.5.1 GSustainability Final Design

Documentation

1.5.1 GDesign Phase High Performance

and Sustainable Building Checklist

1.5.2.4 GSustainability Progress Report

SD-11 Closeout Submittals

1.5.2.2 GFinal Sustainability eNotebook

1.5.2.2 GAmended Final Sustainability

eNotebook

1.5.2.2 GFinal High Performance and

Sustainable Building Checklist

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Automatic External Defibrillator

(AED) Program

1.7Site Layout Plan

1.7Access/Haul Road Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

1.7Process Safety Management

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 86 PAGES

01 35 26.00 06 1.7Lead Compliance Plan &

Specifications

1.7Asbestos Abatement Plan &

Specifications

1.7Radiation Safety Program

1.7Abrasive Blasting Plan

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Chromium (VI) Exposure

Evaluation

1.7Crystalline Silica Assessment

1.7Lighting Plan for Night Operations

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Wild Land Fire Management Plan

1.7Arc Flash Hazard Analysis

1.7Assured Equipment Grounding

Control Program (AEGCP)

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

1.7Critical Lift Plan - LHE

1.7Naval Architectural Analysis-LHE

(Floating)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 86 PAGES

01 35 26.00 06 1.7Floating Plant Inspection and

Certification

1.7Severe Weather Plan for Marine

Activities

1.7Emergency Plan for Marine

Activities

1.7Man Overboard/Abandon Ship

Procedures

1.7Float Plan for Launches, Motorboats, Skiffs

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Rope Access Work Plan

1.7Excavation/Trenching Plan

Fire Prevention & Protection Plan for Underground Construction

1.7Compressed Air Plan for

Underground Construction

1.7Erection and Removal Plan for

Formwork and Shoring

1.7PreCast Concrete Plan

1.7Lift-Slab Plans

1.7Masonry Bracing Plan

1.7Steel Erection Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 86 PAGES

01 35 26.00 06 1.7Explosives Safety Site Plan

(ESSP)

1.7Blasting Plan

1.7Dive Operations Plan

1.7Safe Practices Manual for Diving

Activities

1.7Emergency Management Plan for

Diving

1.7Tree Felling/Maintenance

Program

1.7Aircraft/Airfield Construction

Safety & Phasing Plan (CSPP)

1.7Aircraft/Airfield Safety Plan

Compliance Document (SPCD)

1.7Site Safety and Health Plan

(HTRW)

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 GActivity Hazard Analysis (AHA)

1.5.1.1 GSite Safety and Health Officer

Qualifications(SSHO)

GCertified Safety

Professional/Certified Industrial

Hygienist Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 86 PAGES

01 35 26.00 06 1.12.7 GProof of qualification for Crane

Operators

1.12.7 GCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 GConstruction Quality Control Plan

GConstruction Quality Control

(CQC) System Manager

Qualifications

Manager Qualifications

01 45 35 SD-01 Preconstruction Submittals

3.1.1 GSIOR Letter of Acceptance

3.1.1 GProject Manual

3.1.1 GProject Manual

3.1.1Written Practices

3.1.3Written Practices

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 86 PAGES

01 45 35 3.1.1NDT Procedures and Equipment

Calibration Records

3.1.3NDT Procedures and Equipment

Calibration Records

SD-06 Test Reports

3.1.1Daily Reports

3.1.3Daily Reports

3.1.3Daily Reports

3.1.1Biweekly Reports

3.1.2Biweekly Reports

SD-07 Certificates

2.1Fabrication Plant

2.1Steel Truss Plant

2.1AC472 Accreditation

2.1Steel Joist Institute Membership

2.1Certified Plant

2.1Certificate of Compliance

1.5.17 GSpecial Inspector of Record

1.5 GSpecial Inspector

3.1.1Qualification Records

3.1.3Qualification Records

SD-11 Closeout Submittals

3.1.1Interim Final Report

3.1.3Interim Final Report

3.1.1 GComprehensive Final Report

3.1.3 GComprehensive Final Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 86 PAGES

01 46 00.00 06 SD-01 Preconstruction Submittals

1.3 GCommissioning Specialists

1.6.2 GProject Schedule

SD-05 Design Data

3.1.3 GDesign Review Report

SD-06 Test Reports

3.1.2 GConstruction Phase

Commissioning Plan

3.1.5.5PVT Procedures

3.1.5.5PVT Report

1.4Issues Log

3.1.5.6Trend Log Report

3.3Trend Log Report

3.2 GCommissioning Report

SD-07 Certificates

1.5 GCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.1.6 GSystems Training

3.1.7 GTraining Plan

3.1.8 GSystems Manual

3.1.9 GMaintenance and Service Life

Plans

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 86 PAGES

01 50 00 2.2.1 GHaul Road Plan

SD-03 Product Data

1.4 GBackflow Preventers

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.5.1Preconstruction Survey

1.9 GSolid Waste Management Permit

1.5.2 GRegulatory Notifications

1.6 GEnvironmental Protection Plan

1.6.9.1 GDirt and Dust Control Plan

1.5.5 GEmployee Training Records

1.5.4 GEnvironmental Manager

Qualifications

GNotice Of Soil Treatment

GStormwater Pollution Prevention

Plan (Swppp)

SD-06 Test Reports

3.7.1.1.2Laboratory Analysis

3.2.1.2Inspection Reports

3.7.2.1 GSolid Waste Management Report

GCrane Permit (FAA Form 7460-1)

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 86 PAGES

01 57 19.00 06 1.5.5 GEmployee Training Records

Certificate of Competency

1.5.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

GStormwater Pollution Prevention

Plan Compliance Notebook

3.7.1 GWaste Determination

Documentation

3.7.4.6 GDisposal Documentation for

Hazardous and Regulated Waste

1.5.5 GAssembled Employee Training

Records

1.9 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.4.1 GHazardous Waste/Debris

Management

1.5.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

As-Built Topographic Survey

01 74 19 SD-01 Preconstruction Submittals

1.7 GConstruction Waste Management

Plan

SD-06 Test Reports

1.9.2Quarterly Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 86 PAGES

01 74 19 1.9.3Annual Report

SD-11 Closeout Submittals

1.10Final Construction Waste

Diversion Report

01 78 23 SD-10 Operation and Maintenance

Data

1.4 GO&M Database

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.2 GDeconstruction Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

Notification of Demolition and

Renovation Form

SD-11 Closeout Submittals

3.3.4Receipts

02 81 00 SD-03 Product Data

2.1.1Packaging Notifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 86 PAGES

02 81 00 3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

3.6Waste Minimization

02 83 13.00 06 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 GLead Compliance Plan

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 86 PAGES

02 83 13.00 06 1.5.2.8 GLead waste management plan

3.5.2.1 GWritten evidence

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 GSampling results

1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

1.5.1.4 GThird party consultant

qualifications

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

02 84 33 SD-07 Certificates

1.7.1Training certification

1.7.2Qualifications of CIH

1.7.3PCB removal work plan

1.7.4PCB disposal plan

1.7.5Notification

3.8Transporter certification

3.5.4Certification of Decontamination

3.5.5Post cleanup sampling

3.8.1Certificate of disposal

02 85 00 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 86 PAGES

02 85 00 1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 GIH Daily Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 86 PAGES

02 85 00 SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 30 00 SD-01 Preconstruction Submittals

1.6.5 GQuality Control Plan

1.6.7 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 G AEReinforcing Steel

SD-03 Product Data

2.4.5Joint Sealants

2.4.4Joint Filler

2.3.1Cementitious Materials

Vapor Retarder and or Vapor

Barrier

2.4.1Concrete Curing Materials

2.6Reinforcement

2.3.4Admixtures

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

1.6.4.1Fly Ash

1.6.4.2Aggregates

3.9.2.1Tolerance Report

3.12.2.3 GCompressive Strength Tests

3.12.2.4Air Content

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 86 PAGES

03 30 00 3.12.2.1Slump Tests

2.3.2Water

1.6.3.1Concrete Curing Plan

2.6.2Mechanical Reinforcing Bar

Connectors

3.3.8Maturity Method Data

SD-07 Certificates

2.6.1Reinforcing Bars

1.6.3.2Safety Data Sheets

SD-08 Manufacturer’s Instructions

2.4.1Curing Compound

04 20 00 SD-02 Shop Drawings

3.4.1.1 G AEDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2.2.1 GCement

2.4.1.1 GCementitious Materials

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

Fire-Rated Concrete Masonry

Units

3.2.5 GBracing Calculations

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 86 PAGES

04 20 00 Prism Tests

SD-07 Certificates

1.3.1Special Masonry Inspector

Qualifications

2.2.2.2Concrete Masonry Units (CMU)

2.2.2.4Concrete Brick

2.4.1.1Cementitious Materials

2.4.1.2Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

SD-08 Manufacturer’s Instructions

2.4.1.2Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

05 21 00 SD-01 Preconstruction Submittals

1.3.2Welder Qualification

SD-02 Shop Drawings

1.3.1 G AESteel Joist Framing

SD-05 Design Data

2.2 GDesign Calculations

SD-06 Test Reports

3.4Erection Inspection

3.4Welding Inspections

SD-07 Certificates

1.3.2Certification of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 86 PAGES

05 30 00 SD-02 Shop Drawings

1.3.3 G AEFabrication Drawings

SD-03 Product Data

2.2Accessories

2.1Deck Units

Galvanizing Repair Paint

2.2.16Mechanical Fasteners

Welding Rods and Accessories

SD-05 Design Data

2.1 GDeck Units

SD-07 Certificates

Powder-Actuated Tool Operator

Welder Qualifications

Welding Procedures

05 40 00 SD-02 Shop Drawings

1.5.1 G AEFraming Components

SD-03 Product Data

2.1Studs, Joists

SD-05 Design Data

1.5.2 GMetal Framing Calculations

SD-07 Certificates

3.2.1Welds

05 50 13 SD-02 Shop Drawings

G AECover Plates

G AEExpansion Joint Covers

2.5 G AEAngles and Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 86 PAGES

05 50 13 G AEMetal Prefabricated Canopy

SD-03 Product Data

2.4 GCover Plates and Frames

GExpansion Joint Covers

GStructural Steel Door Frames

GRoof Hatches

SD-04 Samples

Expansion Joint Covers

GCertificates of Compliance

2.1 GCertified Mill

05 51 33 SD-02 Shop Drawings

2.3Ladders

Ship's Ladder

SD-03 Product Data

2.3Ladders

Ship's Ladder

Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 G AEFabrication Drawings

3.2 G AEIron and Steel Hardware

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

W912QR20R0031-0002

BrownAY Typewritten Text Amdt. #0002

BrownAY Text Box

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 86 PAGES

05 52 00 3.2 G AESteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

2.1.3 GProtective Coating

2.2.10 GSteel Railings and Handrails

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

GNailing Strips

SD-03 Product Data

Underlayment

1.8Fire-retardant Treatment

2.4.2Adhesives

SD-06 Test Reports

1.4.4Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

SD-10 Operation and Maintenance

Data

Take-back Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 86 PAGES

06 41 16.00 10 SD-02 Shop Drawings

2.11Shop Drawings

3.1Installation

SD-03 Product Data

2.1Wood Materials

Wood Finishes

2.11.8.3Finish Schedule

Certification

SD-04 Samples

2.3Plastic Laminates

2.7Cabinet Hardware

SD-07 Certificates

1.4Quality Assurance

3.1Laminate Clad Casework

06 61 16 SD-02 Shop Drawings

GDetail Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.4.1Qualifications

2.3Fabrications

SIndoor air quality for solid surface seam and sealant products

SD-04 Samples

2.1 GMaterial

GCounter and Vanity Tops

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROV…

This is the start of the file's text. The full file is on GovTribe.