This document provides finish board specifications for the construction of an addition and renovation project at Scott Air Force Base in Illinois. Major project components include renovating an existing 50,965 square foot computer data center into dedicated data center space which includes seismic retrofit of the building and raised floor system, replacement of air handling units and electrical upgrades, replacement of the chilled water loop, and installation of new data cabinets anchored to a new structural system. Additional work includes construction of a 23,702 square foot secure administrative addition and new furniture. The document specifies finishes for ceilings, flooring, partitions, casework and other materials for both the renovation and addition. Product information including manufacturer, color, size and contact are provided for each finish.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Add/Alter Consolidated Communications Facility B1575 Scott Air Force Base, IL
P2: 456269
Design Bid Build
SID Finish Boards Certified Final Submittal
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
27 February 2020
W912QR20R0005
W912QR20R0005-0000
Add / Alter Consolidated Communications Facility; B1575 Scott Air Force Base, Illinois Project No: VDVY 10-1053, Oppt. 1004297 P2 Number: 456269
August 2019
Finish Boards Certified Final Design Submittal
2Consolidated Communications Building Scott Air Force Base, Illinois
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
CEILINGS
ACT-1
LAY-IN CEILING – TYPICAL
MFR: ARMSTRONG
COLLECTION: CALLA LAY-IN
COLOR: WHITE
SIZE: 24” X 24”
CONTACT: BRETT LINDENMEYER
618-830-5462
3Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
FLOORING
CPT-1
CARPET TILE - FIELD
MFR: MILLIKEN
COLLECTION: SCATTERGRAPH
STYLE: SCA119-106
COLOR: SUBSPACE
INSTALLATION: ASHLAR
CONTACT: JUSTIN ALBERT 314-698-8995
CPT-1
CARPET TILE – FIELD
MFR: MILLIKEN
COLLECTION: SCATTERGRAPH
COLOR: SUBSPACE
INSTALLATION: ASHLAR
CONTACT: JUSTIN ALBERT
314-698-8995
CPT-2
CARPET TILE – ACCENT
MFR: MILLIKEN
COLLECTION: FORMWORK
STYLE: FWK79
COLOR: SPAR
SIZE: 50 CM x 50 CM
INSTALLATION: ASHLAR
CONTACT: JUSTIN ALBERT
314-698-8995
4Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
FLOORING
CONC
EXPOSED STAINED CONCRETE
MFR: SHERWIN WILLIAMS
COLLECTION: INTERIOR CONCRETE
SLAB – WATERBASED POLYAMINE EPOXY
PRIME COAT: B70T8164 ARMORSEAL 8100
WATER BASED EPOXY FLOOR COATING –
SATIN FINISH – CLEAR BASE
FINISH COAT: B70T8164 ARMORSEAL 8100
WATER BASED EPOXY FLOOR COATING –
SATIN FINISH – CLEAR BASE
CONTACT: HANK MEINKING 314-281-7485
*NO SAMPLE AVAILABLE
LVT-1
LUXURY VINYL TILE – STONE
MFR: MANNINGTON
COLLECTION: AMTICO
COLOR: KURA CARAWAY
AR0SKU38
SIZE: 18” X 18”
INSTALL: STRAIGHT
CONTACT: KRISTEN KOMIS
314-250-3040
5Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
FLOORING
LVT-2
LUXURY VINYL TILE FLOORING
MFR: MANNINGTON
COLLECTION: NATURE’S PATHS
PRODUCT: MADISON MAPLE
COLOR: MORGAN 12236
SIZE: 6” X 36”
INSTALL: THIRD DROP
CONTACT: JOANNIE MILLAR
314-239-6811
PT-1
PORCELAIN TILE – FLOOR
MFR: DALTILE
COLLECTION: CHORD
COLOR: FORTE GREY CH25
SIZE: 24” X 24”
FINISH: UNPOLISHED
INSTALL: STRAIGHT
CONTACT: JOANNA WHITTAKER
314-629-0125
GROUT TO BE: PER
MANUFACTURER
RECOMMENDATION
GROUT COLOR TO BE: MAPEI
DELOREAN GRAY
6Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
FLOORING
RF-1
RESILIENT SHEET FLOORING
STATIC DISSIPATIVE
MFR: TARKETT
PRODUCT: IQ GRANIT-SD
REFERENCE NUMBER:
314008726
COLOR: 726 SIDEWALK
WELDROD: 1291216
RAF
RAISED ACCESS FLOORING
NOTE: REFER TO STRUCTURAL
SPECIFICATIONS SECTION 09
69 13 FOR SERVER FLOOR
MATERIAL
*NO SAMPLE AVAILABLE
WB-1
RUBBER BASE
MFR: TARKETT
COLLECTION: TRADITIONAL
COVED WALL BASE
STYLE: TOELESS
COLOR: 48 GREY
SIZE: 4” H
7Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
PARTITIONS
AP-1
ACOUSTICAL WALL PANEL – TYPICAL
MFR: GOLTERMAN & SABO
COLLECTION: RESOLUTE PLUS RP2
PANEL
COLOR: CUMULUS 62516
SIZE: 48” X 48” X 2”
CONTACT: MARY ROTTER
314-336-2119
*SAMPLE TOO LARGE FOR BINDER -
INCLUDED IN PACKAGE
CT-1
CERAMIC TILE – WALL
MFR: DALTILE
COLLECTION: ARTICULO
COLOR: FEATURE BEIGE AR07
SIZE: 6” X 18”
INSTALL: THIRD DROP
CONTACT: JOANNA WHITTAKER
314-629-0125
GROUT TO BE: PER
MANUFACTURER
RECOMMENDATION
GROUT COLOR TO BE: MAPEI
CHARCOAL
CG-1
CORNER GUARD
MFR: INPRO CORP
STYLE: 150 SURFACE MOUNT
COLOR: CASTLE
SIZE: 4’ L, 3” WING
CONTACT: TOM FORSTER
314-409-5100
8Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
PARTITIONS
CT-2
CERAMIC TILE – WALL
MFR: AMERICAN OLEAN
COLLECTION: BRICKTOWN
COLOR: GREIGE PARKWAY
SIZE: 4” X 8”
INSTALL: THIRD DROP
GT-1: GROUT – WALL
GROUT TO BE: PER
MANUFACTURER
RECOMMENDATION
GROUT COLOR TO BE: MAPEI
DELOREAN GRAY
FRP-1
FIBER REINFORCED PANEL
MFR: MARLITE
COLLECTION: STANDARD FRP
COLOR: P 100 WHITE
FINISH: PEBBLE SURFACE
CONTACT: CAMERON CLEMENTS
972-660-6443
9Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
PARTITIONS
P-1: PAINT - FIELD
MFR: SHERWIN WILLIAMS
COLOR: TOQUE WHITE
NO: SW 7008
TYPE: EGGSHELL FINISH
CONTACT: HANK MEINKING
314-281-7485
P-2: PAINT - ACCENT
MFR: SHERWIN WILLIAMS
COLOR: ANTLER VELVET
NO: SW 9111
TYPE: EGGSHELL FINISH
CONTACT: HANK MEINKING
314-281-7485
P-3: PAINT - ACCENT
MFR: SHERWIN WILLIAMS
COLOR: AGREEABLE GRAY
NO: SW 7029
TYPE: EGGSHELL FINISH
CONTACT: HANK MEINKING
314-281-7485
P-4: PAINT - DOORFRAMES
MFR: SHERWIN WILLIAMS
COLOR: PEPPERCORN
NO: SW 7674
TYPE: SEMI-GLOSS FINISH
CONTACT: HANK MEINKING
314-281-7485
P-5: PAINT - ACCENT
MFR: SHERWIN WILLIAMS
COLOR: LABRADORITE
NO: SW 7619
TYPE: EGGSHELL FINISH
CONTACT: HANK MEINKING
314-281-7485
P-6: PAINT - ACCENT
MFR: SHERWIN WILLIAMS
COLOR: DEBONAIR
NO: SW 9139
TYPE: EGGSHELL FINISH
CONTACT: HANK MEINKING
314-281-7485
10Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
PARTITIONS
TP-1
TOILET PARTITION
MFR: BOBRICK
STYLE: SIERRA SERIES 1090
COLOR: DESERT BEIGE SC02
WP-1
WALL PROTECTION – CORRIDOR
MFR: INPRO
PRODUCT: WALL GUARD
COLOR: CASTLE
SIZE: 500
CONTACT: TOM FORSTER
314-409-5100
WP-2
WALL PROTECTION – CORRIDOR
MFR: INPRO
PRODUCT: CHAIR RAIL
COLOR: CASTLE
SIZE: 2500
CONTACT: TOM FORSTER
314-409-5100
11Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
CASEWORK
PLAM-1
PLASTIC LAMINATE – CABINETS
MFR: FORMICA
COLOR: NATURAL WALNUT 6401
FINISH: ARTISAN 43
GRADE: 20
CONTACT: RICHELE SMITH
816-377-6235
SS-2
SOLID SURFACE – COUNTER
RESTROOM VANITY
MFR: BRADLEY CORP
COLOR: ANTARCTICA
SS-1
SOLID SURFACE – COUNTER
TOP AND WINDOW SILLS
MFR: STARON
COLOR: ASPEN ALDER AA625
12Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
OTHER
BL-1
BLINDS
MFR: SWF CONTRACT
PRODUCT: CLASSICS 1”
ALUMINUM BLINDS
COLOR: SKYLINE 680
CU-1
CURTAIN
MFR: MOMENTUM
PRODUCT: CUBICLE CURTAIN
COLLECTION: BLITX
COLOR: GLADE
MOUNT: CURTAIN TRACK
CONTACT: MICHELE LAND
800-366-6839 X845
WS-1
WINDOW SHADES
MFR: MECHO SYSTEMS
PRODUCT: MECHO/5 SYSTEM
(MANUAL)
COLLECTION: 1350 ECOVEIL (5%)
COLOR: 6012 CHARCOAL
CONTACT: ANDREW HELLING
816-471-2259
13Consolidated Communications Building
August 2019 Certified Final Design Submittal
FINISH BOARDS
Consolidated Communications Building #1575 Scott Air Force Base, Illinois
Project No:
Date:
VDVY 101053 456269
07-29-2019
OTHER
MKB-1
MARKER BOARD
MFR: CLARIDGE
PRODUCT: CONCEPT DRY ERASE
MARKERBOARD WITH NARROW
5/16” ALUMINUM FRAME
COLOR: WHITE
SIZE: 48” X 48”
NOTE: INCLUDE FULL LENGTH
MARKER TRAY
*NO SAMPLE AVAILABLE
MKB-2
MARKER BOARD
MFR: CLARIDGE
PRODUCT: CONCEPT DRY ERASE
MARKERBOARD WITH NARROW
5/16” ALUMINUM FRAME
COLOR: WHITE
SIZE: 48” X 96”
*NO SAMPLE AVAILABLE
TK-1
TACK BOARD
MFR: CLARIDGE
PRODUCT: CONCEPT
FRAME: 5/16” WIDE ALUMINUM
FRAME
TACKABLE SURFACE: GUILDFORD
BAILEY KHAKI 299-7012
SIZE: 48” X 96”
*NO SAMPLE AVAILABLE