W912QR20R0005Specs-0004.pdf

PDF 3 MB Posted

Attached to
Scott Air Force Base Bldg. 1575 Add/Alt
Solicitation number
W912QR20R0005
Issued by

About this file

This request for proposal solicits construction services for renovations and an addition to an existing computer data center facility at Scott Air Force Base, Illinois. Work includes renovating 50,965 square feet of the existing facility for dedicated data center use through seismic retrofitting of the building and raised floor system, replacing air handling units and the chilled water loop, upgrading electrical systems, and installing new data cabinets anchored to a strengthened structural system. An additional 23,702 square foot secure administrative addition will be constructed. Furniture will also be provided. Proposals are due by May 13, 2020. The selected contractor will be responsible for renovating the existing facility and constructing the addition at Scott Air Force Base.

View the file

Other files

Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912QR20R0005-0004

ADD/ALTER CONSOLIDATED COMMUNICATIONS FACILITY 1575 W912QR-20-R-0005

SCOTT AFB, IL

CERTIFIED FINAL DESIGN

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0004 SUMMARY OF CHANGES

Design/Bid/Build Addition / Alteration Building 1575

SAFB, IL

W912QR20R0005 AMENDMENT 0004

SUMMARY OF CHANGES

1. The following PLAN SHEET(S) have been replaced in their entirety:

G-005 G-011 G-012 G-013

CD100A

C-004 C-004A

CS100

CS100A

CS504

CG100A

CU100

CU100A

CU101

S-001 S-514

AD101

A-311 A-312 A-313 A-314 A-320 A-321 A-601

I-101 I-101A

BASE ACCESS AND HAUL ROUTE

PROPOSED CONSTRUCTION PHASING PLAN - PHASE 1

PROPOSED CONSTRUCTION PHASING PLAN - PHASE 2

PROPOSED CONSTRUCTION PHASING PLAN - PHASE 3

DEMOLITION PLAN INDUSTRIAL AND PARKING ADDITION BID

OPTIONS

OVERALL SITE PLAN WITH AERIAL - BASE BID

OVERALL SITE PLAN WITH AERIAL INDUSTRIAL AND PARKING

ADDITION BID OPTIONS

SITE PLAN - BASE BID

SITE PLAN INDUSTRIAL AND PARKING ADDITION BID OPTIONS

RAMP & STAIR DETAILS INDUSTRIAL ADDITION BID OPTION

EROSION CONTROL INDUSTRIAL AND PARKING ADDITION BID

OPTIONS

UTILITY PLAN - BASE BID

UTILITY PLAN INDUSTRIAL AND PARKING ADDITION BID OPTIONS

UTILITY PROFILES

GENERAL NOTES

MISC. MECHANICAL SUPPORT

OVERALL MAIN LEVEL DEMOLITION FLOOR PLAN

WALL SECTIONS

WALL SECTIONS

WALL SECTIONS

WALL SECTIONS

ENLARGED SECTION DETAILS

ENLARGED SECTION DETAILS

DOOR SCHEDULE AND DOOR, WINDOW, STOREFRONT & LOUVER

TYPES

OVERALL MAIN LEVEL FINISH PLAN

MAIN LEVEL FINISH FLOOR PLAN - AREA A - BASE BID

I-101B MAIN LEVEL FINISH FLOOR PLAN - AREA B

I-101C MAIN LEVEL FINISH FLOOR PLAN - AREA C

I-101D MAIN LEVEL FINISH FLOOR PLAN - AREA D

I-101E MAIN LEVEL FINISH FLOOR PLAN - AREA E

CERTIFIED FINAL DESIGN

I-101F MAIN LEVEL FINISH FLOOR PLAN - AREA F

I-101G MAIN LEVEL FINISH FLOOR PLAN - AREA G - INDUSTRIAL

ADDITION BID OPTION

I-204 INTERIOR FINISH LEGED AND SCHEDULES

I-301F MAIN LEVEL FURNITURE PLAN - AREA F

I-306 WORK STATION PLAN - F

I-310 SYSTEMS FURNITURE PANEL PLANS

MH102A MAIN LEVEL MECHANICAL HVACL PLAN - AREA A - BASE BID

MH102B MAIN LEVEL MECHANICAL HVACL PLAN - AREA B

MH102C MAIN LEVEL MECHANICAL HVACL PLAN - AREA C

MH102D MAIN LEVEL MECHANICAL HVACL PLAN - AREA D

ED101A LOWER LEVEL ELECTRICAL DEMOLITION PLAN - AREA A

ED101B LOWER LEVEL ELECTRICAL DEMOLITION PLAN - AREA B

ED101C LOWER LEVEL ELECTRICAL DEMOLITION PLAN - AREA C

ED101D LOWER LEVEL ELECTRICAL DEMOLITION PLAN - AREA D

EG102A MAIN LEVEL GROUNDING PLAN - AREA A - BASE BID

EG102B MAIN LEVEL GROUNDING PLAN - AREA B

EG102C MAIN LEVEL GROUNDING PLAN - AREA C

EG102D MAIN LEVEL GROUNDING PLAN - AREA D

EP102A MAIN LEVEL POWER PLAN - AREA A - BASE BID

EP102B MAIN LEVEL POWER PLAN - AREA B

EP102C MAIN LEVEL POWER PLAN - AREA C

EP102D MAIN LEVEL POWER PLAN - AREA D

EP102E MAIN LEVEL POWER PLAN - AREA E

EP102F MAIN LEVEL POWER PLAN - AREA F

EP102G MAIN LEVEL POWER PLAN - AREA A INDUSTRIAL ADDITION BID

OPTION

EY102 OVERALL ELECTRICAL SYSTEMS PLAN

EY102A MAIN LEVEL SYSTEMS PLAN - AREA A - BASE BID

EY102B MAIN LEVEL SYSTEMS PLAN - AREA B

EY102C MAIN LEVEL SYSTEMS PLAN - AREA C

EY102D MAIN LEVEL SYSTEMS PLAN - AREA D

EY102E MAIN LEVEL SYSTEMS PLAN - AREA E

EY102F MAIN LEVEL SYSTEMS PLAN - AREA F

EY102G MAIN LEVEL SYSTEMS PLAN - AREA A INDUSTRIAL ADDITION BID

OPTION

E-606 CAMERA RISER DIAGRAM

T-509 TELECOMMUNICATIONS DETAILS

2. The following SPECIFICATION SECTION(S) have been replaced in their entirety:

PROJECT TABLE OF CONTENTS

00 10 00 PRICE BREAKOUT SCHEDULE

00 80 00.00 06 SPECIAL PROVISIONS

07 24 00 EXTERIOR INSULATION AND FINISH SYSTEMS

08 71 00 DOOR HARDWARE

09 69 13 RIGID GRID ACCESS FLOORING

12 59 00 SYSTEMS FURNITURE

28 10 05 ELECTRONIC SECURITY SYSTEMS ESS

3. The following SPECIFICATION SECTION(S) have been deleted in their entirety:

07 13 53 ELASTOMERIC SHEET WATERPROOFING

4. The FF&E binder has been replaced in its entirety.

5. General Decision IL7 (Building and Residential), Modification 4 is hereby replaced by General Decision IL7 (Building and Residential), Modification 5 (dated 17 April 2020) and must be adhered to.

6. The Proposal Due Date has been extended to 13 May 2020 at 2:00 PM (Eastern).

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 05-May-2020 02:00 PM to 13-May-2020 02:00 PM.

The following have been modified:

PRICE BREAKOUT SCHEDULE

SECTION 00 10 00

PRICE BREAKOUT SCHEDULE OFFEROR'S NAME: _______________________________

CONTRACT LINE ITEM SCHEDULE

CLIN Description Unit Unit Amount

BASE PROPOSAL

(MILCON)

All work, labor, materials, and equipment required to construct the Personnel Addition, excluding FF&E included in CLIN 0012 and Electronic Security System (ESS) devices included in CLIN 0006. Provide coordination and integration of FF&E installation, including wiring modular furniture.

Job

(MILCON)

All work, labor, materials, and equipment required to construct the site improvements.

All work, labor, materials, and equipment required to renovate/repair Building 1575, including basket type cable trays and structural supports, and excluding equipment included in CLIN’s 0004, 0005, 0006, 0013, 0014, and 0015.

TOTAL (BASE) ____________________

(O&M)

BID OPTION 1

All work, labor, materials, and equipment required to install government furnished 444 Data Cabinets-Server Floor, 21 Power Distribution Units (PDU’s), 34 Remote Power Panels (RPP’s), and cabling from the buss plugs to the PDU’s, RPP’s, and the Data Cabinets. Includes all work to install data cabinets, PDU’s, RPP’s, and cabling between buss plugs, PDU’s, RPP’s, and the Data Cabinets for the west half of Server Floor, room C-1, as indicated on T-100A. This option may be exercised within 365 calendar days from Notice to Proceed (NTP).

BID OPTION 2

All work, labor, materials, and equipment required to furnish and install Hot Aisle Containment Systems (HACS) associated with CLIN 0004. Includes all work to provide HACS for the west half of Server Floor, room C-1, as indicated on T-100A. This option may be exercised within 365 calendar days from NTP.

BID OPTION 3

All work, labor, materials, and equipment required to furnish and install Electronic Security System (ESS) devices, and to commission the system, for the Personnel Addition and Repair/Renovate Building 1575. The ESS consists of the Access Control System (ACS) and Intrusion Detection System (IDS). Equipment includes card readers, scanners, cameras, and cabling. Note: ESS infrastructure (conduit w/ pull string, boxes, and power) are included in CLIN’s 0001 and 0003. This option may be exercised within 365 calendar days from NTP.

BID OPTION 4

All work, labor, materials, and equipment required to construct the Industrial Addition.

All work, labor, materials, and equipment required to furnish and install Electronic Security System (ESS) devices, and to commission the system, for the Industrial Addition. The ESS consists of the Access Control System (ACS) and Intrusion Detection System (IDS). Equipment includes card readers, scanners, cameras, and cabling. Note: ESS infrastructure (conduit w/ pull string, boxes, and power) is included in CLIN 0007. This option (CLINs 0007 and 0008) may be exercised within 365 calendar days from NTP.

BID OPTION 5

All work, labor, materials, and equipment required to provide increased parking capacity as indicated on C-004A, CD100A, CS100A, CU100a, and LS100A. This option may be exercised within 365 calendar days from NTP.

BID OPTION 6

All work, labor, materials, and equipment required to upgrade Buss’ A & B to 2500A sprinkler-proof in lieu of the Buss A & B reconfiguration (utilizing existing buss duct) as included in

CLIN 0003.

NOTE: CLINs 0010 and 0011 will be exercised together, as Bid Option 6, should this option be exercised. This option (CLINs 0010 and 0011) may be exercised within 365 calendar days from NTP.

All work, labor, materials, and equipment required to upgrade Buss C to 2500A sprinkler-proof in lieu of the Buss C reconfiguration (utilizing existing buss duct) as included in CLIN 0003. This option (CLINs 0010 and 0011) may be exercised within 365 calendar days from NTP.

BID OPTION 7

All work, labor, materials, and equipment required to furnish and install Furniture, Fixtures & Equipment. Includes all work to provide loose furnishings as noted on the I-300 series drawings and in the FF&E package. NOTE: CLINs 0010 and 0011 will be exercised together, as Bid Option 6, should this option be exercised. This option may be exercised within 365 calendar days from NTP.

AMENDMENT 0004*************************************************************

(O&M)

BID OPTION 8

All work, labor, materials, and equipment required to install government furnished “module” (as shown on C1/T-509);

Data Cabinets, PDU’s (including cabling between buss plug and PDU), RPP’s, and cabling from the buss plugs to the PDU’s, RPP’s, and the Data Cabinets. Includes all work to install data cabinets, PDU’s, RPP’s, and cabling between buss plugs, PDU’s, RPP’s, and the Data Cabinets for a single “module” for the Server Floor, room C-1, as indicated on T- 100B.

Each

All work, labor, materials, and equipment required to furnish and install a Hot Aisle Containment System “module” associated with CLIN 0013. Includes all work to provide HACS for a single “module” for the Server Floor, room C-1, as indicated on T-100B.

Note: This is in direct support of Bid Option 8, CLIN 0013 and 0015.

All work, labor, materials, and equipment required to furnish and install overhead basket-type cable tray and structural supports for a single Data Cabinet/Hot Aisle Containment System “module” for the Server Floor, room C-1, as indicated on T-100B. Note: This is in direct support of Bid Option 8, CLIN 0013 and 0014.

This option (CLINs 0013, 0014 and 0015) may be exercised within 720 calendar days from NTP. This option may be exercised up to 11 times. CLINs 0013, 0014, and 0015 will be exercised together, as Bid Option 8, with each occurrence.

************************************************************* AMENDMENT 0004

(MILCON)

BID OPTION 9

All work, labor, materials, and equipment required to provide new dumpster enclosure including adjacent concrete pavement, barrier curb, and protective bollards as indicated on C-004A, CD100A, CS100A, CS502, CU100a, and LS100A.

This option may be exercised within 365 calendar days from

NTP.

TOTAL (BASE PLUS OPTIONS) ____________________

W912QR20R0005

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

For purposes of calculating the Total Evaluated Price (TEP), Bid Option 8 (CLINs 0013, 0014, and 0015) will be based on a single occurrence of the option. Offerors are to propose a price for a single occurrence on CLINs 0013, 0014, and 0015. The TEP will be based on the total of all CLINs, base and options.

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been modified:

WAGE RATES

"General Decision Number: IL20200007 04/17/2020

Superseded General Decision Number: IL20190007

State: Illinois

Construction Types: Building and Residential

Counties: Madison and St Clair Counties in Illinois.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories) & RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/24/2020 3 02/14/2020 4 02/21/2020 5 04/17/2020

ASBE0001-003 10/02/2017

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 38.70 23.17

BOIL0363-001 01/01/2017

Rates Fringes

BOILERMAKER......................$ 36.50 29.89

BRIL0008-006 08/01/2017

Rates Fringes

Bricklayer, Caulker, Cleaner, Pointer & Stonemason (including Marble Mason, Tile Layer)...........................$ 33.13 22.05

CARP0500-002 05/01/2019

ST. CLAIR COUNTY

Rates Fringes

CARPENTER (Lather, Piledriver, and Millwright) Building....................$ 39.58 17.77 Residential.................$ 30.00 17.77 Carpet Installer (Carpet, Linoleum, Hardwood, and Tile Layer)...........................$ 34.21 17.69

CARP0664-002 05/01/2019

MADISON COUNTY

Rates Fringes

CARPENTER (Lather, Piledriver, and Millwright) Building....................$ 39.58 17.77 Residential.................$ 30.00 17.77 Carpet Installer (Carpet, Linoleum, Hardwood, and Tile Layer)...........................$ 34.21 17.69

ELEC0309-005 09/02/2019

MADISON (Remainder) and ST. CLAIR COUNTIES

Rates Fringes

ELECTRICIAN

Building....................$ 41.83 32.41%+7.99 Residential.................$ 34.50 51.90%

ELEC0309-014 09/01/2019

MADISON (Remainder) and

ST. CLAIR COUNTIES

Rates Fringes

ELECTRICAL LOW VOLTAGE WIRING

INSTALLER........................$ 35.28 14.27

Installation, service and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems.

ELEC0649-003 09/01/2019

MADISON COUNTY (Area West of a North-South line 1 mile East of the West boundaries of Edwardsville, Fort Russell & Moro Twps and North of Hwy 66 West to Mississippi River)

ELECTRICAL LOW VOLTAGE WIRING

INSTALLER

Installation, service, and maintenance of low-voltage systems which utilizes the transmission and/or transference of voice, sound, vision, or digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background/foreground music, intercom and telephone interconnect, field programming, inventory control systems, microwave transmission, multi-media, multiplex, radio page, school, intercom and sound burglar alarms and low voltage master clock systems........$ 33.06 17.19

ELECTRICIAN

Building Construction.......$ 42.01 22.38 Residential Construction (Up to and including a six family apartment building, but excluding multi-building apartment complexes or apartment buildings that have commercial stores or professional quarters in conjunction with commercial ventures such as nursing homes, motels, inc.).......................$ 23.28 10.84

ELEV0003-003 01/01/2020

Rates Fringes

ELEVATOR MECHANIC................$ 51.73 34.765+a+b

FOOTNOTES:

a) Employer contributes 8% of regular basic hourly rate as as vacation pay credit for employees with more than 5 years of service, and 6% for less than 5 years of service

b) Eight paid holidays: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day Friday after Thanksgiving Day, Veterans' Day and Christmas Day.

ENGI0520-003 08/01/2018

POWER EQUIPMENT OPERATOR

Group 01....................$ 38.30 32.15 Group 02....................$ 37.17 32.15 Group 03....................$ 32.69 32.15 Group 04....................$ 32.75 32.15 Group 05....................$ 32.42 32.15 Group 06....................$ 40.85 32.15 Group 07....................$ 41.15 32.15 Group 08....................$ 41.43 32.15 Group 09....................$ 39.30 32.15 Group 10....................$ 40.30 32.15 Group 11....................$ 40.30 32.15 Group 12....................$ 41.30 32.15

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, DerrickType Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Toumapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gobhoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning ofbidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing sings used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and strawblowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transpmiers) heavy transport units and all Operators (except those listed below).

Group 2: Assistant Operators

GROUP 3: Air Compressor One; Water Pump regardless of size One; Welding Machine One; 1-Bag Mixer One; Conveyor One;

Siphon or Jet; Light Plant One; Heater One; Immobile Track Air One

GROUP 4: Firemen on Whirlies and Asphalt Spreader Oiler;

Heavy Equipment Oilers; Truck Cranes; Monigans; Large over 65 tons capacity; Concrete Plant OIler and Black Top Plant Oiler

GROUP 5: Oilers

GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft

GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft

GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes

GROUP 9: Certified crane Operators, Below 17.5 tons, when requested by the Contractor or required by the Owner.

GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner.

GROUP 11: Master Mechanic

GROUP 12: Licensed Boat Pilot

IRON0392-004 08/01/2018

Rates Fringes

IRONWORKER.......................$ 32.50 27.38

LABO0044-001 08/01/2017

MADISON COUNTY (Southwest)

Rates Fringes

LABORER

Group 1.....................$ 25.76 27.48 Group 2.....................$ 26.26 27.48 Group 3.....................$ 27.26 27.48

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0100-001 08/01/2017

ST CLAIR COUNTY (East St. Louis,Alcoa, Brooklyn,Cahokia, Caseyville,Centreville, Dupo, Fairmont City, French Village, Midway, Maplewood, National City)

LABORERS

Group 1.....................$ 30.79 22.45 Group 2.....................$ 31.29 22.45 Group 3.....................$ 32.29 22.45

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker, Hod Carrier

GROUP 3 - Dynamite Man

LABO0218-002 08/01/2017

MADISON COUNTY (Northwest)

Rates Fringes

LABORERS

Group 1.....................$ 30.59 22.65 Group 2.....................$ 31.09 22.65 Group 3.....................$ 32.09 22.65

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0338-001 08/01/2017

MADISON COUNTY (Westside)

Rates Fringes

LABORERS

Group 1.....................$ 30.13 23.11 Group 2.....................$ 30.63 23.11 Group 3.....................$ 31.63 23.11

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0397-001 08/01/2017

MADISON COUNTY (Southeast)

Rates Fringes

LABORERS

Group 1.....................$ 30.79 22.45 Group 2.....................$ 31.29 22.45 Group 3.....................$ 32.29 22.45

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0459-001 08/01/2017

ST. CLAIR COUNTY (South)

Rates Fringes

LABORERS

Group 1.....................$ 28.63 24.61 Group 2.....................$ 29.13 24.61 Group 3.....................$ 30.13 24.61

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0670-002 08/01/2017

ST CLAIR COUNTY (Northeast)

Rates Fringes

LABORERS

Group 1.....................$ 28.05 25.19 Group 2.....................$ 28.55 25.19 Group 3.....................$ 29.55 25.19

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

GROUP 3 - Dynamite Man

LABO0742-003 08/01/2017

ST. CLAIR COUNTY (Eastside)

Rates Fringes

LABORERS

Group 1.....................$ 26.37 26.87 Group 2.....................$ 26.87 26.87 Group 3.....................$ 27.87 26.87

LABORER CLASSIFICATIONS:

GROUP 1 - General Laborer

GROUP 2 - Asbestos Abatement Worker and Hazardous Waste Worker; Lead Base Paint Worker

Group 3 - Dynamite Man

PAIN0058-005 05/01/2017

Rates Fringes

PAINTER

Building....................$ 31.25 17.12 Residential.................$ 29.95 17.12

Epoxy or Toxic-Lead-Based Paint Work-$1.00 Premimum

PAIN0513-003 11/01/2016

BOND, CALHOUN, CLINTON, GREENE, JACKSON, JERSEY, MACOUPIN

(Southside), MADISON, MARION, MONROE, PERRY, RANDOLPH, ST.

CLAIR, AND WASHINGTON COUNTIES

GLAZIER..........................$ 33.40 24.80

PLAS0090-003 08/01/2017

Rates Fringes

CEMENT MASON.....................$ 33.90 24.25

PLASTERER........................$ 31.00 18.95

TERRAZZO WORKER/SETTER...........$ 17.55 0.00

TILE SETTER......................$ 11.70 1.605

PLUM0101-002 07/01/2019

ST. CLAIR COUNTY (BELLEVILLE, FAYETTEVILLE, FREESBURG, LEBANON,

LENZBERG, MASCOUTAH, MARISSA, MILLSTADT, NEW ATHENS, SCOTT AFB,

SHILOH, SMITHON, ST. LIBORY, SUMMERFIELD, and SWANSEE)

PLUMBER/PIPEFITTER...............$ 40.05 16.78

PLUM0360-002 07/01/2019

MADISON (GRANITE CITY & SOUTHERN HALF OF COUNTY) and ST. CLAIR

(EAST ST. LOUIS & VIC.) COUNTIES

PLUMBER..........................$ 39.95 16.85

PLUM0439-001 01/01/2019

MADISON (Grant City and Southern Half of County) and ST. CLAIR (East St. Louis and Vic) Counties

Steamfitter......................$ 40.25 19.14

PLUM0553-002 01/01/2020

MADISON COUNTY (North of East - West which is one mile North of South line of Chouteau, Edwardsville, Oak, Marine, and Saline Townships)

PLUMBER/PIPEFITTER...............$ 43.96 15.60

FOOTNOTES:

A. 4 HOURS PAID FOR CHRISTMAS EVE IF HOLIDAY FALLS ON MONDAY

THRU FRIDAY.

ROOF0002-004 03/01/2019

Rates Fringes

ROOFER...........................$ 33.30 18.41

SFIL0268-001 01/01/2020

WITHIN A 30 MILE RADIUS OF ST. LOUIS, MO

Rates Fringes

Sprinkler Fitters................$ 45.21 24.52

* SFIL0669-001 04/01/2020

REMAINDER OF COUNTIES

Rates Fringes

SPRINKLER FITTER.................$ 41.97 24.77

SHEE0268-002 07/01/2017

Rates Fringes

Sheet Metal Worker Building....................$ 34.27 20.20 Residential.................$ 23.12 12.23

TEAM0050-003 05/01/2019

ST CLAIR COUNTY

Rates Fringes

TRUCK DRIVER

Group 1.....................$ 38.17 19.85 Group 2.....................$ 38.71 19.85 Group 3.....................$ 39.01 19.85 Group 4.....................$ 39.34 19.85 Group 5.....................$ 40.39 19.85

CLASSIFICATIONS:

GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.

GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;

Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;

winch trucks; and four axle combiation units.

GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.

GROUP 4: Low Boy and Oil Distributors.

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

TEAM0525-002 05/01/2019

MADISON COUNTY

Rates Fringes

TRUCK DRIVER

Group 1.....................$ 38.17 19.85 Group 2.....................$ 38.71 19.85 Group 3.....................$ 39.01 19.85 Group 4.....................$ 39.34 19.85 Group 5.....................$ 40.39 19.85

CLASSIFICATIONS:

GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.

GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;

Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;

winch trucks; and four axle combiation units.

GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.

GROUP 4: Low Boy and Oil Distributors.

GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

"General Decision Number: IL20200017 02/21/2020

Superseded General Decision Number: IL20190017

State: Illinois

Construction Types: Heavy and Highway

Counties: Bond, Calhoun, Clinton, Greene, Jersey, Macoupin, Madison, Monroe, Montgomery, St Clair and Washington Counties in Illinois.

MACOUPIN (upper 1/2) & MONTGOMERY (upper 1/2, INCLUDING

WAGGONER, STANDARD CITY, & NORTH THEREOF) COUNTIES:

HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line Construction & Drainage Projects) & HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other major bridges).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 01/10/2020 2 01/17/2020 3 01/24/2020 4 02/21/2020

CARP0270-015 05/01/2017

Rates Fringes

CARPENTER........................$ 32.15 25.97

PILEDRIVERMAN....................$ 33.15 25.97

CARP0270-023 05/01/2017

GREENE COUNTY

Rates Fringes

CARPENTER........................$ 32.15 25.97

PILEDRIVERMAN....................$ 33.15 25.97

CARP0500-001 05/01/2019

CLINTON, MONROE, and WASHINGTON COUNTIES

Rates Fringes

Carpenter & Piledrivermen........$ 39.58 17.77

CARP0500-003 05/01/2019

ST. CLAIR COUNTY

Rates Fringes

Carpenter and Piledriver.........$ 39.58 17.77

CARP0664-003 05/01/2019

MADISON COUNTY

Rates Fringes

Carpenter and Piledriver.........$ 39.58 17.77

CARP0664-006 05/01/2019

BOND, CALHOUN, and JERSEY COUNTIES

Rates Fringes

CARPENTER........................$ 39.58 17.77

ELEC0146-012 06/01/2016

MONTGGOMERY COUNTY (East of Butler Grove, Grisham, Hillsboro & Raymond Twps)

ELECTRICIAN......................$ 36.27 16.36

ELEC0193-003 12/04/2019

MACOUPIN (Barr, Girard, Nilwood, North & South Otter, North & South Palmyra aand Virden Twps), AND MONTGOMERY (Bois D' Arc, Harvel and Pitman Twps) COUNTIES

ELECTRICIAN......................$ 36.63 4.5%+17.80

ELEC0193-011 01/06/2020

MACOUPIN (Townships of Scottville, North Palmyra, North Otter, Virden, Girard, Barr, South Palmyra, South Otter, and Nilwood) and MONTGOMERY (Townships of Bois D'Arc, Pitman, and Harvel)

COUNTIES

Line Construction Groundman - Equipment Operator (Class I, all crawler type equipment larger than D-4, 15 ton crane or larger)............$ 47.47 29.5%+6.50 Groundman - Truck Driver (with winch, may operate diggers, 5th wheel type trucks, crawler-type equipment, D-4 and smaller, backhoe 3/4 yard and under, rubber tire and crawler w/end loader, and may drive bucket truck and live boom type line trucks).$ 36.00 29.5%+6.50 Groundman - Truck Driver (without winch).............$ 33.89 29.5%+6.50 Groundman (Class A).........$ 32.24 29.5%+6.50 Lineman & Substation Tech...$ 52.84 29.5%+6.50

* ELEC0309-002 12/02/2019

BOND (Westside), CLINTON, GREENE (ALL WORK PERFORMED ON THE

ILLINOIS POWER COMPANY PROPERTY), JERSEY (ALL WORK PERFORMED ON

THE ILLINOIS POWER COMPANY PROPERTY), MACOUPIN (EXCEPT North 1/3 & Southwest Corner), MADISON (EXCEPT East ALTON, ALTON, WOOD RIVER & HARTFORD), MONROE, MONTGOMERY (East of ROUNDTREE, IRVING & East FORK TWP.), RANDOLPH (PORTION OF RED BUD TOWNSHIP), ST. CLAIR, and WASHINGTON (OKAWVILLE & VENEDY

TWPS.) COUNTIES

LINE CONSTRUCTION

Cable Splicer; Lineman Welder......................$ 57.19 43.67% Groundman Equipment Operator....................$ 47.37 43.67% Groundman Truck Driver......$ 38.66 43.67% Groundman...................$ 35.36 43.67% Lineman.....................$ 54.47 43.67%

ELEC0309-003 09/02/2019

BOND (Western Half), CLINTON (EXCLUDES HUEY, HOFFMAN, & VIC.), MACOUPIN (EXCLUDES BRIGHTON TWP., ATHENVILLE, SCOTTVILLE, GIRARD & AREA N. THEREOF), MADISON (EXCLUDES ALTON, E. ALTON, HARTFORD & WOOD RIVER), MONROE, MONTGOMERY (WEST OF BUTLER

GROVE, GRISHAM, HILLSBOROUGH & RAYMOND TWPS), ST. CLAIR and

WASHINGTON (VENEDY TWP) COUNTIES

ELECTRICIAN......................$ 41.83 32.41%+7.99

* ELEC0649-002 01/06/2020

CALHOUN, GREENE, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND

MADISON (E. ALTON, ALTON, WOOD RIVER & HARTFORD) COUNTIES

BLASTER.....................$ 53.45 29%+9.25

EQUIPMENT OPERATOR..........$ 45.78 29%+9.25

GROUNDMAN - TRUCK DRIVER

W/WINCH.....................$ 34.18 29%+9.25

GROUNDMAN - TRUCK DRIVER

WO/WINCH....................$ 30.18 29%+9.25

GROUNDMAN...................$ 29.38 29%+9.25

LINEMAN; AND LINEMAN HOLE

BORING MACHINE OPERATOR.....$ 53.45 29%+9.25

ELEC0649-008 12/30/2019

CALHOUN, GREEN, JERSEY, MACOUPIN (SOUTHWEST CORNER), AND

MADISON (ALTON, E. ALTON, HARTFORD & WOOD RIVER) COUNTIES

ELECTRICIAN......................$ 44.35 23.54

ELEC0702-002 12/30/2019

ALEXANDER, CLAY, CRAWFORD, EDWARDS, EFFINGHAM, FRANKLIN,

FAYETTE (Excludes portion North Avena), GALLATIN, HAMILTON, HARDIN, JACKSON, JASPER, JEFFERSON, JOHNSON, LAWRENCE, MARION, MASSAC, PERRY, POPE, PULASKI, RANDOLPH (Except Red Bud Twps), RICHLAND, SALINE, UNION, WABASH, WAYNE, WHITE, AND WILLIAMSON

COUNTIES;

CLARK, COLES (Southern Half), CUMBERLAND, MOULTRIE (Whitley TWP), and SHELBY (Except West of Holland, Prairie, Richland, & Windsor TWPS) COUNTIES;

BOND (Eastern Half), and WASHINGTON (OKAWVILLE & VENDY TWPS)

Groundman - Class A.........$ 32.13 29%+7.75 Groundman - Equipment Operator Class II (all other equipment)............$ 39.13 29%+7.75 Heavy - Equipment Operator Class I (all crawler type equipment D-4 and larger)...$ 43.88 29%+7.75 Lineman.....................$ 55.15 29%+7.75

ELEC0702-017 09/01/2019

BOND (Eastern Half), CLINTON (Huey, Hoffman, & Vicinity), AND WASHINGTON (Except Venedy TWP) COUNTIES

ELECTRICIAN......................$ 44.62 22.95

ENGI0520-005 08/01/2017

Rates Fringes

POWER EQUIPMENT OPERATOR

Group 01....................$ 36.20 31.35 Group 02....................$ 35.07 31.35 Group 03....................$ 30.59 31.35 Group 04....................$ 30.65 31.35 Group 05....................$ 30.32 31.35 Group 06....................$ 38.75 31.35 Group 07....................$ 39.05 31.35 Group 08....................$ 39.33 31.35 Group 09....................$ 37.20 31.35 Group 10....................$ 38.20 31.35 Group 11....................$ 38.20 31.35 Group 12....................$ 39.20 31.35

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, DerrickType Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Toumapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gobhoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning ofbidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing sings used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and strawblowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail launchers when mounted on a machine or self-propelled, con-cover machines, Goldhofer and similar S.P.M.T. (self-propelled modular transpmiers) heavy transport units and all Operators (except those listed below).

Group 2: Assistant Operators

GROUP 3: Air Compressor One; Water Pump regardless of size One; Welding Machine One; 1-Bag Mixer One; Conveyor One;

Siphon or Jet; Light Plant One; Heater One; Immobile Track Air One

GROUP 4: Firemen on Whirlies and Asphalt Spreader Oiler;

Heavy Equipment Oilers; Truck Cranes; Monigans; Large over 65 tons capacity; Concrete Plant OIler and Black Top Plant Oiler

GROUP 5: Oilers

GROUP 6: Operators on equipment with Booms, including Jibs, 100 ft and over, but less than 150 ft

GROUP 7: Operators on equipment with Booms, including Jibs, 150 ft and over, but less than 200 ft

GROUP 8: Operators on equipment with Boomns, including Jibs, 200 ft and over; Tower Cranes, and Whirley Cranes

GROUP 9: Certified crane Operators, Below 17.5 tons, when requested by the Contractor or required by the Owner.

GROUP 10: Certified crane Operators 17.5 tons and above, when requested by the Contractor or required by the Owner.

GROUP 11: Master Mechanic

GROUP 12: Licensed Boat Pilot

ENGI0520-012 08/01/2017

INCLUDING BUILDING CONSTRUCTION ON HEAVY INDUSTRIAL SITES &

HEAVY CONSTRUCTION EXCEPT DREDGING AND RIVER WORK

POWER EQUIPMENT OPERATOR

Group 01....................$ 37.70 31.35 Group 02....................$ 36.57 31.35 Group 03....................$ 32.09 31.35 Group 04....................$ 32.15 31.35 Group 05....................$ 31.82 31.35 Group 06....................$ 40.25 31.35 Group 07....................$ 40.55 31.35 Group 08....................$ 40.83 31.35 Group 09....................$ 38.70 31.35 Group 10....................$ 39.70 31.35 Group 11....................$ 39.70 31.35 Group 12....................$ 40.70 31.35

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Cranes, Draglines, Shovels, Skimmer Scoops, Clamshells or Derrick Boats, Pile Drivers, Crane-Type Backhoes, Asphalt Plant Operators, Concrete Plant Operators, Dredges, Asphalt Spreading Machines, Screws on Asphalt Spreading Machines, All Locomotives, Cable Ways or Tower Machines, Hoists, Hydraulic Backhoes, Ditching Machines, or Backfiller, Cherrypickers, overhead Cranes, Roller, Steam or Gas, Concrete Pavers, Excavator Concrete Breakers, Concrete Pumps, Bulk Cement Plants, Cement Pumps, Derrick-Type Drills, Boat Operators, Motor Graders or Pushcats, Scoops or Tournapulls, Bulldozers, Endloaders or Fork Lifts, Power Blade or Elevating Graders, Winch Cats, Boom or Winch Trucks or Boom Tractors, Pipe Wrapping or Painting Machines, Asphalt Plant Engineer, Journeyman Lubricating Engineer, Drills (other than derrick type), Mud Jacks, or Well Drilling Machines, Boring Machines or Track Jacks, Mixers, Conveyors (two), Air Compressors (two) Water Pumps, regardless of size (two), Welding Machines (two), Siphons or Jets (two), Winch Head or Apparatuses (two), Light Plants (two), Waterblasters (two), all Tractors, regardless of size (straight tractor only), Fireman on Stationary Boilers, Automatic Elevators, Form Grading Machines, Finishing Machines, Power Sub-Grader or Ribbon Machines, Longitudinal Floats, Distributor Operators on Trucks, Winch Heads or Apparatuses (one), Mobil Track air and heaters (two to five), Heavy Equipment Greaser, Relief Operator, Assistant Master Mechanic and Heavy Duty Mechanic, concrete saws of all types and sizes with their attachments, gob-hoppers, excavators all sizes, the repair, greasing, and fueling of all diesel hammers, the operation, set-up and cleaning of bidwells, concrete placement booms, the alterations, repair of all barges, water blasters of all sizes and their clutches, mobile lifts, hydraulic jacks where used for hoisting, diesel or gas powered flashing signs used for traffic control, micro pavers, log skiders, iceolators used on and off of pipeline, condor cranes, drill rigs of all sizes, bow boats, survey boats, ross carriers, bob-cats and all their attachments, skid steer loaders and all their attachments, creter crane, direct drive electric motors the bolting and unbolting the adjusting and shimming, (dewateringjobs, whirley crane, conveyor belts) etc., batch plants (all sizes), roto mills, conveyors systems of any size and any configuration, hydroseeders and straw-blowers all sizes, operation, repair, service of all vibratory hammers, all power pacs and their controls regardless of location, curtains or brush burning machines, stump cutter machines, grout machines regardless of size, Nail Launchers when mounted on a…

This is the start of the file's text. The full file is on GovTribe.