W912QR20R0001Specs-0003.pdf
PDF 2 MB Posted
- Solicitation number
- W912QR20R0001
About this file
This pre-solicitation notice describes a planned Request for Proposal to construct a new Army Reserve Center in Newark, Delaware. The U.S. Army Corps of Engineers Louisville District intends to issue the RFP to construct facilities including a combined 43,000 square foot Army Reserve Center building and Branch Maintenance Activity building, as well as an optional 3,000 square foot organizational storage building. The project includes site work such as land clearing, paving, vehicle wash facilities, fencing and utilities. Facilities will incorporate antiterrorism/force protection measures and be designed for a 40-year lifespan. The contract duration is estimated at 670 calendar days.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR20R0001Plans-0003.pdf | ||
| Interested Vendor List.pdf | ||
| W912QR20R0001-0002.pdf | ||
| W912QR20R0001Specs-0001.pdf | ||
| W912QR20R0001Plans-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: JOSHUA GITCHEL
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0001 for the construction of a new Army Reserve Center located at New ark, DE is hereby amended as follow s:
See Continuation Sheet:
1. CONTRACT ID CODE PAGE OF PAGES
1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0001
X 9B. DATED (SEE ITEM 11)
01-Nov-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jan-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0001-0003
W912QR20R0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 3
W912QR20R0001
Newark Army Reserve Center Newark, DE P2 472444
AMENDMENT 0003
SUMMARY OF CHANGES
1. The following Specification Sections have been revised and replaced entirely
01 33 29.00 06 SUSTAINABILITY REPORTING
07 22 00 ROOF AND DECK INSULATION
13 34 19 METAL BUILDING SYSTEMS
10 56 13 METAL STORAGE SHELVING
2. The following drawings have been revised and replaced entirely:
CS102 SITE PLAN 1 OF 7
CS103 SITE PLAN 2 OF 7
CS104 SITE PLAN 3 OF 7
CS105 SITE PLAN 4 OF 7
CS106 SITE PLAN 5 OF 7
CS107 SITE PLAN 6 OF 7
CS108 SITE PLAN 7 OF 7
CG102 GRADING PLAN 1 OF 4
CG103 GRADING PLAN 2 OF 4
CG104 GRADING PLAN 3 OF 4
CG104A GRADING PLAN – BOD OPTION 3 FO 4
CG105 GRADING PLAN 4 OF 4
CG201 PROFILES
CG202 PROFILES
CU101 OVERALL UTILITY PLAN
CU102 UTILITY PLAN 1 OF 7
CU103 UTILITY PLAN 2 OF 7
CU104 UTILITY PLAN 3 OF 7
CU105 UTILITY PLAN 4 OF 7
CU106 UTILITY PLAN 5 OF 7
CU107 UTILITY PLAN 6 OF 7
CU108 UTILITY PLAN 7 OF 7
A-110 FIRST FLOOR PLAN – COMPREHENSIVE
A-111 FIRST FLOOR PLAN – AREA 1A
A-120 SECOND FLOOR PLAN – COMPREHENSIVE
A-121 SECOND FLOOR PLAN – AREA 2A
A-420 ENLARGED VAULT AND CAGING PLAN
I-110 FIRST FLOOR FINISH PLAN-COMPREHENSIVE
I-111 FIRST FLOOR FINISH AND SPECIAL ITEMS PLAN-AREA 1A
I-112 FIRST FLOOR FINISH AND SPECIAL ITEMS PLAN-AREA 1B
I-112A FIRST FLOOR FINISH AND SPECIAL ITEMS PLAN-AREA 1B OPTION 7
I-113 FIRST FLOOR FINISH PLAN AND SPECIAL ITEMS PLAN-AREA 1C
I-120 SECOND FLOOR FINISH AND SPECIAL ITEMS PLAN--COMPREHENSIVE I-I-
I-121 SECOND FLOOR FINISH AND SPECIAL ITEMS PLAN-AREA 2A
I-601 INTERIOR ROOM FINISH SCHEDULE
IF001 FURNITURE LEGEND
IF002 DESK DETAILS
IF110 FIRST FLOOR FURNITURE PLAN- COMPREHENSIVE
IF111 FIRST FLOOR FURNITURE PLAN- AREA 1A
IF112 FIRST FLOOR FURNITURE PLAN- AREA 1B
IF113 FIRST FLOOR FURNITURE PLAN- AREA 1C
IF120 SECOND FLOOR FURNITURE PLAN- COMPREHENSIVE
IF121 SECOND FLOOR FURNITURE PLAN- AREA 2A
IF401 PANEL PLAN
A-101 (UHS DRAWINGS) FIRST FLOOR & ROOF PLANS & RCP
A-401 (UHS DRAWINGS) ENLARGED CAGING PLAN AND DETAILS
3. WD DE20200005 dated 3 January 2020 hereby supercedes WD DE20190005 dated 4 January 2019 and must be adhered to.
4. WD DE20200008 dated 3 January 2020 hereby supercedes WD DE20190008 Modification 2 dated 26 July 2019 and must be adhered to.
END OF SUMMARY OF CHANGES
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
WAGE RATES
"General Decision Number: DE20200005 01/03/2020
Superseded General Decision Number: DE20190005
State: Delaware
Construction Type: Highway
County: New Castle County in Delaware.
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
SUDE2018-002 03/15/2018
Rates Fringes
BRICKLAYER.......................$ 53.89
CARPENTER........................$ 54.62
CEMENT MASON/CONCRETE FINISHER...$ 34.63
ELECTRICIAN
Electrician.................$ 68.70 Line Workers................$ 24.02
IRONWORKER.......................$ 63.68
LABORER..........................$ 43.30
MILLWRIGHT.......................$ 17.20
PAINTER..........................$ 68.79
POWER EQUIPMENT OPERATOR
Piledriver..................$ 70.92 Power Equipment Operators...$ 45.46
SHEET METAL WORKER...............$ 24.30
TRUCK DRIVER.....................$ 36.49
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
"General Decision Number: DE20200008 01/03/2020
Superseded General Decision Number: DE20190008
State: Delaware
Construction Type: Building
County: New Castle County in Delaware.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate, if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020
BOIL0013-009 01/01/2016
Rates Fringes
BOILERMAKER......................$ 42.26 37.02
* BRDE0001-001 05/01/2019
BRICKLAYER
Brick Refractory/Brick Placement Worker............$ 35.00 24.57 Bricklayer..................$ 33.37 24.57
CARP0173-009 05/01/2017
Rates Fringes
CARPENTER (Includes Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation, Scaffold Building, Excludes Masonry/Brick, and Excludes Soft Floor Layer)................$ 31.62 22.94
CARP0251-008 05/01/2016
Rates Fringes
SOFT FLOOR LAYER.................$ 29.96 21.04
CARP1906-003 07/01/2015
Rates Fringes
MILLWRIGHT.......................$ 36.05 30.63
ELEC0313-002 06/01/2019
Rates Fringes
ELECTRICIAN (Includes Low Voltage Wiring and Installation of Alarms, HVAC/Temperature Controls and Sound and Communication Systems).........................$ 40.75 31.31
ELEV0005-003 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 55.76 32.645+A&B
FOOTNOTES FOR ELEVATOR MECHANICS:
A. PAID VACATION: Employer contributes 8% of basic hourly rate for 5 years or more of service or 6% for 6 months to 5 years of service.
B. Eight Paid Holidays (provided employee has worked 5 consecutive days before and the working day after the holiday): New Years's Day; Memorial Day; Independence Day;
Labor Day; Veteran's Day; Thanksgiving Day and the Friday after Thanksgiving Day, and Christmas Day.
ENGI0542-003 05/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
(Forklift).......................$ 39.85 27.11+A
FOOTNOTE: A. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day, and Election Day (provided the employee works the scheduled work day following the holiday.)
IRON0451-005 07/01/2018
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, and Structural).....$ 35.10 30.35
The following holidays shall be observed, and when work is performed thereon it shall be paid for at twice the base wage rate: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day.
LABO0199-005 05/01/2019
Rates Fringes
LABORER
Backfiller, Common or General, Jack Hammer, Mason Tender - Brick, Pipelayer, Scaffold Builder (Brick and Masonry), Tamper (Hand Held).......................$ 25.70 21.25 Mason Tender - Cement/Concrete.............$ 25.95 21.25
* PAIN0252-002 05/01/2019
Rates Fringes
GLAZIER..........................$ 43.87 32.60
* PLAS0008-006 05/01/2019
PLASTERER (Fireproofer)..........$ 37.72 30.54
PLAS0592-009 05/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 31.79 27.18
* PLUM0074-002 07/01/2019
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation and Excludes Industrial Work)........$ 53.18 34.99
FOOTNOTE A: PAID HOLIDAYS: New Year's Day, Memorial Day,Independence Day, Thanksgiving Day,Labor Day, Christmas Day, and General Election Day.
* PLUM0074-003 07/01/2019
Rates Fringes
PIPEFITTER (INDUSTRIAL)..........$ 53.18 34.99
FOOTNOTE A: PAID HOLIDAYS: New Year's Day, Memorial Day,Independence Day, Thanksgiving Day,Labor Day, Christmas Day, and General Election Day.
* SFDE0669-002 04/01/2019
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 37.33 23.74
SHEE0019-021 07/01/2018
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 32.37 39.06
SUDE2014-005 01/20/2016
Rates Fringes
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 33.96 0.00
OPERATOR: Bulldozer.............$ 25.89 0.00
OPERATOR: Crane.................$ 32.40 18.27
PAINTER (Brush and Roller).......$ 38.80 0.91
PLUMBER..........................$ 47.73 18.40
ROOFER (Installation of Metal Roofs Only)......................$ 39.09 30.77
ROOFER, Excludes Installation of Metal Roofs...................$ 27.98 27.90
TILE FINISHER....................$ 35.40 4.31
TILE SETTER......................$ 57.98 1.11
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
472444 Army Reserve Center Newark, Delaware
SECTION 01 33 29.00 06
SUSTAINABILITY REPORTING
11/17
AMDT 0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING
ENGINEERS (ASHRAE)
ASHRAE 189.1 (2014; ERTA 1 2017) Standard for the Design of High-Performance Green Buildings Except Low-Rise Residential Buildings
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
ANSI/SMACNA 008 (2007) IAQ Guidelines for Occupied Buildings Under Construction, 2nd Edition
U.S. DEPARTMENT OF AGRICULTURE (USDA)
FSRIA 9002 Farm Security and Rural Investment Act Section 9002 (USDA Biopreferred Program)
U.S. DEPARTMENT OF ENERGY (DOE)
Energy Star (1992; R 2006) Energy Star Energy Efficiency Labeling System (FEMP)
U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)
SNAP (2016) EPA's Significant New Alternatives Policy Program
U.S. GREEN BUILDING COUNCIL (USGBC)
LEED BDC Ref Guide (2013) USGBC LEED Reference Guide for Building Design and Construction, v4
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
40 CFR 247 Comprehensive Procurement Guideline for Products Containing Recovered Materials
1.2 SUMMARY
This specification includes general requirements and procedures for this
SECTION 01 33 29.00 06 Page 1
AMDT 0003
project to be constructed and documented per the federally mandated High Performance and Sustainable Building Guiding Principles (GP), LEED certification requirements, and other requirements identified in this specification.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following that "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with LRL Section 01 33 00.00 06 Submittal Procedures:
SD-01 Preconstruction Submittals
Sustainability Action Plan; G, AE
LEED Final Design Review Results
LEED Implementation Plan; G, AE
LEED AP BD+C; G, RO
Sustainability Progress Report;G
SD-05 Design Data
LEED Correction Plan; G, RO
SD-11 Closeout Submittals
Final Sustainability eNotebook; G
Amended Final Sustainability eNotebook; G
Final High Performance and Sustainable Building Checklist; G
LEED Plaque and Certificate; G
1.4 LEED Accredited Professional (LEED AP BD+C)
A LEED Accredited Professional with specialty in Building Design + Construction (LEED AP BD+C), accredited by the Green Building Certification Institute, on the Contractor's Quality Control Staff must assemble documentation and ensure that Guiding Principles Compliance documentation is prepared in accordance with this specification section and ensure that Third Party Certification requirements are achieved. Identify the LEED AP BD+C on the Contractor's Quality Control Staff in accordance with specification LRL Section 01 45 04.10 06 CONTRACTOR QUALITY CONTROL.
Provide a statement of qualifications of the LEED AP BD+C submitted to the Government with the QC Plan. Includes name and date of expiration of the current credential.
The LEED AP BD+Cmust review all requests for information, Contractor proposals, contract modifications, deviations from the design documents, or any other items that could potentially impact the compliance and Third Party Certification and rating of the project. Bring any actions that could negatively impact the Third Party Certification rating or ability to comply with Guiding Principles to the attention of the Contracting Officer.
SECTION 01 33 29.00 06 Page 2
1.5 Guiding Principles Compliance
Provide construction related sustainability documentation to verify compliance with Federal High Performance and Sustainable Building requirements. Refer to paragraph Guiding Principle Requirements for requirements and associated documentation to include in the Sustainability eNotebook.
1.5.1 Construction Phase
1.5.1.1 Sustainability Action Plan
Provide a Sustainability Action Plan to demonstrate planned methods to comply with the Guiding Principles requirements and comply with Third Party Certification requirements identified herein. Submit the LEED Implementation Plan as a part of the Sustainability Action Plan. Provide three (3) copies submitted to the Government on compact disk with the QC Plan . The Government will consider an interim Sustainability Action Plan and LEED Implementation Plan for the first 60 calendar days of the Contractor's operation. Construction will be permitted to begin only after acceptance of the plans or acceptance of an interim plan applicable to the work to be started related to the Guiding Principles requirements identified in the interim plan. Include a detailed description of all activities that relate to accomplishing each project Guiding Principle requirement, including construction practices and procurement practices.
Include any plans required by the Guiding Principle Requirements including the Indoor Air Quality Plan and Waste Management Plan. Include a schedule for completion and documentation of each requirement. Include the template to be used for Sustainability Progress Reports, a plan for indoctrinating employees to sustainable goals and responsibilities, a team structure identifying responsibility for documentation, and a process for reviewing sustainability related submittals and documentation.
1.5.1.2 Sustainability eNotebook
Provide and maintain a comprehensive Sustainability eNotebook to document compliance with the Guiding Principles requirements identified herein. All materials requirements must be updated each month. The Sustainability eNotebook must contain all required data to support compliance with the Guiding Principles requirements. The Sustainability eNotebook must be in the form of an Adobe PDF file; bookmarked at each requirement, and sub-bookmarked at each document. Include the Final High performance and Sustainable Building Checklist. Include all "S" submittals through the specification sections of this contract.
Provide three (3) copies of the Final Sustainability eNotebook and Final High Performance and Sustainable Building Checklist to the Government on DVD 30 calendar days prior to the Contract Required Completion Date.Include a separate section in the Final Sustainability eNotebook with a copy of all Third Party Certification documentation, bookmarked at each separate requirement. Final progress payment retainage may be held by the Contracting Officer until the documentation is complete. Provide an Amended Final Sustainability eNotebook including any updates to documentation based on post-occupancy corrections or based on Third Party Certification requirements.
SECTION 01 33 29.00 06 Page 3
1.5.1.3 High Performance and Sustainable Building Checklist
Complete the Army Energy & Sustainability Record Card shown in Attachment A as required in paragraph Sustainability eNotebook. Obtain the electronic copy of the Army Energy & Sustainability Record Card from the Contracting Officer's Representative. Only the RECYCLED MATERIALS section of the Building Data Worksheet is required. If any deviations from contract result in a change in status to compliance with a listed requirement in the checklist, update the status of that item in the checklist. The LEED worksheet of the Army Energy & Sustainability Record Card is not required.
1.5.1.4 Progress Report
Submit a monthly Sustainability Progress Report, on the same day each month, that identifies the Guiding Principles requirements completed and documented to date. The Sustainability Progress Report must also include the Third Party Certification requirements and documentation completed to date. The Government will compare the Sustainability Progress Report and the available data in the current Sustainability eNotebook and Third Party Certification documentation to the schedule in the Sustainability Action Plan and LEED Implementation Plan. Failure to adhere to the schedule for completion of requirements, including the associated documentation, in the Sustainability Action Plan and LEED Implementation Plan will be cause for withholding the monthly progress payment until the information is updated and in accordance with the Sustainability Action Plan.
1.6 Guiding Principles Requirements
Incorporate each of the following Guiding Principles requirements into the project construction, and provide documentation that proves compliance with each listed requirement. For each of the following paragraphs that require the use of products listed on Government-required websites, provide documentation of the process used to select products, or process used to determine why listed products do not meet project performance requirements.
1.6.1 Commissioning
Comply with the requirements of section 01 916 00.15 TOTAL BUILDING
COMMISSIONING.
1.6.2 Energy Efficient Products
Provide only energy-using products that are Energy Star rated, or have the Federal Energy Management Program (FEMP) recommended efficiency for products with established Energy Star or FEMP requirements. Provide only energy using products that meet FEMP requirements for low standby power consumption. Energy efficient products can be found at:
https://energy.gov/eere/femp/federal-energy-management-program and https://www.energystar.gov/. Provide the following documentation:
Proof that products are labeled energy efficient and comply with the cited requirements.
1.6.3 Indoor Water Use
Provide only water-consuming products that are EPA WaterSense labeled, or water fixtures available that meet the requirements of ASHRAE 189.1 Section 6.3.2, whichever is most water-efficient. Provide the following
SECTION 01 33 29.00 06 Page 4 documentation:
For products available with EPA WaterSense labeling, proof that fixtures are labeled EPA WaterSense or Energy Star; for all other fixtures, proof they comply with the cited efficiency requirements.
1.6.4 Reduce Volatile Organic Compound (VOC) (Low Emitting Materials)
Meet the requirements of Table 3-1 at the end of this specification.
Provide the following documentation:
Provide certifications or labels that demonstrate compliance with cited requirements.
1.6.5 Indoor Air Quality During Construction
Prior to construction, create indoor air quality plan. Implement IAQ plan during construction and flush building air before occupancy.
For new construction and for renovation of unoccupied existing buildings, indoor air quality plan must meet the requirements of ASHRAE 189.1 Section
10.3.1.4. (Indoor Air Quality (IAQ) Construction Management), with maximum outdoor air consistent with achieving relative humidity no greater than 60 percent.
Provide documentation showing that after construction ends and prior to occupancy, HVAC filters were replaced and building air was flushed out in accordance with the cited standard.
1.6.6 Regional Materials
Comply with ASHRAE 189.1 paragraph 9.4.1.2 Regional Materials. Provide documentation demonstrating that 15% of the cost of building materials or products used were extracted, harvested, recovered or manufactured within 500 miles of the project site.
1.6.7 Recycled Content
Comply with 40 CFR 247. Refer to https://www.epa.gov/smm/comprehensive-procurement-guidelines-construction-products for assistance identifying products cited in 40 CFR 247. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:
a. Manufacturers’ documents stating the recycled content by material, or written justification for claiming one of the exceptions allowed on the cited website.
b. Substitutions: Submit for Government approval, proposed alternative products or systems that provide equivalent performance and appearance and have greater contribution to project recycled content requirements. For all such proposed substitutions, submit with the Sustainability Action Plan accompanied by product data demonstrating equivalence.
1.6.8 Bio-Based Products
Provide products and material composed of the highest percentage of
SECTION 01 33 29.00 06 Page 5 biobased materials (including rapidly renewable resources and certified sustainably harvested products), consistent with FSRIA 9002 USDA Biopreferred Program, to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. Use only supplies and materials of a type and quality that conform to applicable specifications and standards.
Comply with FSRIA 9002 USDA BioPreferred Program. Refer to https://www.biopreferred.gov/BioPreferred/ for the product categories and BioPreferred Catalog. Selected products must comply with non-proprietary requirements of the Federal Acquisition Regulation, and must meet performance requirements. Provide the following documentation:
USDA Biopreferred label for each product; for bio-based products used on project but not listed with Biopreferred program, provide bio-based content and percentage.
1.6.9 Ozone Depleting Substances
Meet the requirements of ASHRAE 189.1 Section 9.3.3 Refrigerants for no CFC-based refrigerants in heating ventilation, air conditioning and refrigeration systems. Where feasible, use products from U.S. EPA Significant New Alternatives Policy (SNAP) (https://www.epa.gov/snap) or meet the criteria of SNAP. Provide the following documentation:
a. MSDS sheets for all refrigerants.
b. Provide label for each product meeting the cited standards.
1.6.10 Waste Material Management (Recycling – Construction)
Divert construction debris from landfill disposal where markets or on-site recycling exists, and provide documentation in accordance with UFGS Section
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT.
A minimum of 60% of nonhazardous construction and demolition waste material generated prior to the issuance of the final certificate of occupancy shall be diverted from disposal in landfills and incinerators by recycling or reuse. Reuse includes donation of materials to charitable organization, salvage of existing materials onsite, and packaging materials returned to the manufacturer, shipper, or other source that will reuse the packaging in future shipments. Excavated soil and land clearing debris shall not be included in the calculation. Calculations are allowed to be done by either weight or volume, but shall be consistent throughout. Specific areas on the construction site shall be designated for collection of recyclable and reusable materials. Off-site storage and sorting of materials shall be allowed. Diversion efforts shall be tracked by the contractor throughout the construction process and documentation provided to the Government prior to contract closeout.
1.7 Third Party Certification
Comply with all requirements and provide all required documentation for the project to achieve certification in the Third Party Certification system identified herein. The Contractor must bear all costs and perform all administrative actions necessary to complete Third Party Certification.
SECTION 01 33 29.00 06 Page 6
1.7.1 LEED
AMDT 0003*****************************************************************
This project has been designed for a rating of Silver in the Leadership in Energy and Environmental Design (LEED) version 4 certification system.
Certify the project at the designed LEED rating through the Green Building Certification Institute. The project has been registered with the Green Building Certification Institute. The Final Design Review of the Split Design & Construction Review path has been initiated. Complete all remaining activities necessary for LEED certification.
Some LEED prerequisites and credits are similar to Guiding Principle Requirements. Comply with both the LEED and Guiding Principle Requirements. Refer to LEED BDC Ref Guide for additional information regarding LEED and LEED certification processes.
***************************************************************AMDT 0003
1.7.1.1 Registration
The project has been registered with the Green Building Certification Institute on LEED Online by others. Coordinate with the Government to obtain a Project Manager role for the project in LEED Online. The Government will retain the Project Administrator role.
1.7.1.2 LEED Project Checklist
Attachment B, LEED Project Checklist, identifies the LEED credits and prerequisites that are designed into or required for this project and identifies which are Construction Phase credits. Comply with the requirements of the Construction Phase credits and prerequisites identified in the LEED Project Checklist including providing all associated documentation required by the Green Building Certification Institute for LEED certification.
1.7.1.3 LEED Correction Plan
No variation or substitutions to the LEED credits and prerequisites identified for this contract are permitted without written consent from the Contracting Officer. Should there be a case where there is any current or projected problem meeting the full requirements of a LEED credit or prerequisite identified for this project, notify the Contracting Officer in writing immediately. Submit a LEED Correction Plan to the Government for acceptance detailing the method by which the LEED rating for the project will be preserved. Include the LEED credit or prerequisite impacted, the reason for non-compliance, the proposed correction or solution, an alternate credit, and a schedule for completion of the correction, solution, or alternate credit. If an alternate credit is proposed, submit, with the LEED Correction Plan, an explanation of associated documentation required by LEED certification requirements.
1.7.1.4 LEED Interpretations
Apply existing US Green Building Council or Green Building Certification Institute LEED Interpretations when pursuing credits using non-standard compliance paths or when there are special circumstances making compliance difficult. Applicable LEED Interpretations are those that apply to the LEED version under which the project has been registered. The Contractor may apply for a LEED Interpretation from the Green Building Certification Institute or US Green Building Council for any new proposed strategy, SECTION 01 33 29.00 06 Page 7 non-standard compliance path, or special circumstances. If a LEED Interpretation is to be used to substantiate compliance with attempted credits and prerequisites, a copy of the request and ruling, including the dates, must be included in the documentation on LEED Online for the associated credit or prerequisite. Compliance methods that are not addressed by existing or new LEED Interpretations may be submitted for LEED certification but are not permitted to be necessary to achieve the required LEED rating.
1.7.1.5 LEED Implementation Plan
Submit the LEED Implementation Plan as a part of the Sustainability Action Plan. Include a detailed description of all activities that relate to accomplishing project LEED requirements, including construction practices and procurement practices. Also include:
a. The name of the LEED Accredited Professional Building Design + Construction (LEED AP BD+C).
b. Copies of the LEED calculators or forms to be used for tracking and documenting LEED credits and prerequisites. Provide a list of proposed materials, estimated material costs, purchasing plans for materials and resources credits, and other calculation details to demonstrate that the requirements of the specified LEED credits and prerequisites can be attained.
c. The schedule for completion of the requirements and documentation for each credit and prerequisite.
d. List all plans required by the attempted LEED credits and prerequisites and the proposed completion date of each plan. Add the plans to the LEED Implementation Plan and LEED Online as they are completed.
Include the Indoor Air Quality Management Plan and the Construction and Demolition Waste Management Plan, coordinated with the Guiding Principle Requirements, in the LEED Implementation Plan.
e. List all applicable LEED Interpretations that will be used to substantiate compliance with credits and prerequisites. Include the complete text of each LEED Interpretation and the date of each.
f. Provide proposed language to be included on Public Education Signage as required by Drawings IG501 and IG601 for DOR approval based on achieved Design and anticipated Contruction LEED credits.
1.7.1.6 LEED Documentation
Maintain LEED documentation using LEED Online. Complete the documentation in LEED Online in accordance with the schedule in the LEED Implementation Plan. Update the LEED calculators or forms used for tracking and documenting LEED Materials and Resources credits in LEED Online monthly with the information available at that time.
Within the Sustainability eNotebook, include a copy of all completed documentation in LEED Online including both Design Phase and Construction Phase documentation. Include correspondence occurring during construction with the Green Building Certification Institute. Include a copy of each LEED Correction Plan.
SECTION 01 33 29.00 06 Page 8
1.7.1.7 LEED Plaque and Certificate
Provide and install a LEED Plaque. The LEED Plaque must be 16" diameter by 3/4" brushed aluminum with clear coat and must be machined from solid aluminum sheet. Provide brushed aluminum mounting brackets and concealed mounting screws. Mount the LEED Plaque to wall at a location directed by the Contracting Officer's Representative. Provide the LEED Certificate, framed in 1 inch deep metal frames, with double matt, and wire hangars, concurrent with the LEED Plaque. The name of the project and installation on the plaque and certificate must be the final building name provide by the Contracting Officer's Representative.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
SECTION 01 33 29.00 06 Page 9
3.1 SUSTAINABILITY IMPLEMENTATION MEETING
The LEED AP BD+C , QC System Manager, and Contracting Officer's Representative must meet within 60 calendar days after notice to proceed to review project sustainability goals with respect to the Sustainability Action Plan and LEED Implementation Plan, identify potential difficulties related to meeting the Guiding Principle Requirements, and discuss mitigation strategies.
3.2 Sustainability Pre-Closeout Meeting
The LEED AP BD+C , QC System Manager, and Contracting Officer's Representative must meet 60 calendars days prior to Contract Required Completion Date to review completion status of sustainability requirements including level of completion of Third Party Certification, Guiding Principles Requirements documentation and the High Performance and Sustainable Building Checklist. Discuss any potential difficulties in completing Third Party Certification, outstanding requirements and documentation. Provide a copy of the Sustainability eNotebook with up-to-date documentation.
3.3 TABLE 3-1 VOLATILE ORGANIC COMPOUNDS (VOC) (LOW EMITTING MATERIALS)
REQUIREMENTS
Refer to following table, based on ASHRAE 189.1 section 8.4.2 (Materials), for compliance criteria.
SECTION 01 33 29.00 06 Page 10
TABLE 3-1 Volatile Organic Compounds (VOC) (Low Emitting Materials) Requirements
MATERIAL
CATEGORY
EMISSIONS
REQUIREMENT
MATERIALS WITH
ADDED VOC
REQUIREMENT
MATERIAL
CATEGORY
Adhesives and Sealants
CDPH/EHLB/Standard method V1.1 (California Section 01350) (Use "office" or "classroom" space limits for all applications) or Adhesives (carpet, resilient, wood flooring;
panel; primers) Sealants (acoustical;
firestop; HVAC Air duct;
primers) Caulks
SCAQMD Rule 1168 (Use "other" category for…