W912QR20R0001Specs-0001.pdf

PDF 2 MB Posted

Attached to
Construction of a new Army Reserve Center (ARC) at Newark, DE
Solicitation number
W912QR20R0001
Issued by

About this file

This document provides details for a federal construction contract opportunity to build a new Army Reserve Center in Newark, Delaware. The U.S. Army Corps of Engineers Louisville District intends to issue a Request for Proposal for the construction of a 300-member Army Reserve Center facility, including a combined 43,000 square foot Army Reserve Center building and Branch Maintenance Activity building, as well as an optional 3,000 square foot organizational storage building. Supporting facilities will include site work such as land clearing, paving, vehicle wash areas, fencing, and utility connections. Facilities must meet accessibility standards and incorporate antiterrorism/force protection and sustainability measures. The contract duration is estimated at 670 calendar days.

View the file

Other files

File Type Posted
W912QR20R0001Plans-0003.pdf PDF
W912QR20R0001Specs-0003.pdf PDF
Interested Vendor List.pdf PDF
W912QR20R0001-0002.pdf PDF
W912QR20R0001Plans-0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0001 for the construction of a new Army Reserve Center located at New ark, DE is hereby amended as follow s:

See Continuation Sheet.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0001

X 9B. DATED (SEE ITEM 11)

01-Nov-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

06-Dec-2019

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0001-0001

W912QR20R0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 1

W912QR20R001

Newark Army Reserve Center Newark, DE P2 472444

AMENDMENT 0001

SUMMARY OF CHANGES

1. The following Specification Sections have been revised and replaced entirely:

08 33 23 HIGH SPEED INSULATED OVERHEAD COILING DOORS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

11 46 00.00 KITCHEN

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

2. The following drawings have been revised and replaced entirely:

GC001-GC105 EROSION AND SEDIMENT CONTROL PLAN

GC505-GC506 EROSION CONTROL DETAILS

CG505-CG506 STORMWATER CHAMBER DETAIL

S-001 GENERAL STRUCTURAL NOTES, DESIGN LOADS & ABBREVIATIONS

S-002 GENERAL STRUCTURAL NOTES

S-111 FOUNDATION PLAN – AREA 1A

S-112 FOUNDATION PLAN – AREA 1B

S-113 FOUNDATION PLAN – AREA 2C

S-121 SECOND FLOOR FRAMING PLAN – AREA 2A

S-131 ROOF FRAMING PLAN – AREA 3A

S-132 ROOF FRAMING PLAN – AREA 2B

S-133 ROOF FRAMING PLAN – AREA 2C

S-201-S-204 WALL ELEVATIONS

S-401 ENLARGED FOUNDATION PLANS

S-501-S-502 FOUNDATION DETAILS

S-504 FOUNDATION DETAILS

S-505-S506 FOUNDATION SECTIONS

S-511-S-514 FRAMING DETAILS

S-515-S-518 FRAMING SECTIONS

S-519 MISCELLANEOUS DETAILS

S-521 MASONRY DETAILS

S-522 ARMS VAULT DETAILS

S-523 ARMS VAULT SECTIONS

S-524 CRANE DETAILS

S-611 COLUMN SCHEDULE

A-113 FIRST FLOOR PLAN – AREA 1C

A-201 EXTERIOR ELEVATIONS

A-403 RESTROOM INTERIOR ELEVATIONS

A-405 BREAK ROOM AND TROPHY CASE INTERIOR ELEVATIONS

A-615 DOOR DETAILS

M-103 HVAC PLAN – HEAT PUMP SYSTEM FIRST FLOOR

M-406 ENLARGED HVAC PLAN AND SECTIONS - KITCHEN

M-602 MECHANICAL EQUIPMENT SCHEDULES

P-414 ENLARGED WATER RISER DIAGRAM – MECHANICAL ROOM 119

E-120 FIRST FLOOR MECHANICAL POWER PLAN – COMPREHENSIVE

E-121 FIRE FLOOR MECHANICAL POWER PLAN – AREA 1A

E-123 FIRE FLOOR MECHANICAL POWER PLAN – AREA 1A

E-601 PANEL SCHEDULES

E-605 PANEL SCHEDULES

E-606 PANEL SCHEDULES

E-608 MECHANICAL EQUIPMENT CONNECTION SCHEDULE

E-701 ONE-LINE DIAGRAM AND FEEDER SCHEDULE

3. The site visit roster from 19 November is hereby incorporated.

4. Block 13 D on the SF1442 has been changed from 90 calendar days to 120 calendar days for Government acceptance after the date offers are due.

- END OF SUMMARY OF CHANGES -

SECTION 00 10 00 - SOLICITATION

The offeror acceptance period has increased by 30 from 90 to 120.

SECTION 00 21 00 - INSTRUCTIONS

The following have been modified:

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap

(End of provision)

SECTION 00 70 00 - CONDITIONS OF THE CONTRACT

The following have been modified:

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap

(End of clause)

(End of Summary of Changes)

472444 Army Reserve Center Newark, Delaware

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 57 19.00 06

TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

09/17

PART 1 GENERAL

1.1 REFERENCES

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

1.2.2 Contractor Generated Hazardous Waste

1.2.3 Electronics Waste

1.2.4 Environmental Pollution and Damage

1.2.5 Environmental Protection

1.2.6 Hazardous Debris

1.2.7 Hazardous Materials

1.2.8 Hazardous Waste

1.2.9 Installation Pest Management Coordinator

1.2.10 Land Application

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

1.2.12 National Pollutant Discharge Elimination System (NPDES)

1.2.13 Oily Waste

1.2.14 Pesticide

1.2.15 Pesticide Treatment Plan

1.2.16 Pests

1.2.17 Project Pesticide Coordinator

1.2.18 Regulated Waste

1.2.19 Sediment

1.2.20 Solid Waste

1.2.20.1 Debris

1.2.20.2 Green Waste

1.2.20.3 Material not regulated as solid waste

1.2.20.4 Non-Hazardous Waste

1.2.20.5 Recyclables

1.2.20.6 Surplus Soil

1.2.20.7 Scrap Metal

1.2.20.8 Wood

1.2.21 Surface Discharge

1.2.22 Wastewater

1.2.22.1 Stormwater

1.2.23 Waters of the United States

1.2.24 Wetlands

1.2.25 Universal Waste

1.3 SUBMITTALS

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

1.4.1 Conformance with the Environmental Management System

1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS

1.6 QUALITY ASSURANCE

1.6.1 Preconstruction Survey and Protection of Features

1.6.2 Regulatory Notifications

1.6.3 Environmental Brief

SECTION 01 57 19.00 06 Page 1

AMDT 0001

1.6.4 Environmental Manager

1.6.5 Employee Training Records

1.6.6 Non-Compliance Notifications

1.7 ENVIRONMENTAL PROTECTION PLAN

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

1.7.1.2 Duties

1.7.1.3 Procedures

1.7.1.4 Communications

1.7.1.5 Contact Information

1.7.2 General Site Information

1.7.2.1 Drawings

1.7.2.2 Work Area

1.7.2.3 Documentation

1.7.3 Management of Natural Resources

1.7.4 Protection of Historical and Archaeological Resources

1.7.5 Stormwater Management and Control

1.7.6 Protection of the Environment from Waste Derived from

Contractor Operations

1.7.7 Prevention of Releases to the Environment

1.7.8 Regulatory Notification and Permits

1.7.9 Clean Air Act Compliance

1.7.9.1 Haul Route

1.7.9.2 Pollution Generating Equipment

1.7.9.3 Stationary Internal Combustion Engines

1.7.9.4 Refrigerants

1.7.9.5 Air Pollution-engineering Processes

1.7.9.6 Compliant Materials

1.8 LICENSES AND PERMITS

1.9 ENVIRONMENTAL RECORDS BINDER

1.10 PESTICIDE DELIVERY, STORAGE, AND HANDLING

1.10.1 Delivery and Storage

1.10.2 Handling Requirements

1.11 SOLID WASTE MANAGEMENT PERMIT

1.11.1 Solid Waste Management Report

1.12 BORROW SOILS

1.13 MANAGEMENT OF BORROW MATERIAL AND EXCESS SOIL

1.14 FACILITY HAZARDOUS WASTE GENERATOR STATUS

1.15 SUBCONTRACTORS

1.16 PAYMENT

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 PROTECTION OF NATURAL RESOURCES

3.1.1 Flow Ways

3.1.2 Vegetation

3.1.3 Streams

3.2 STORMWATER

3.2.1 Stormwater Pollution Prevention Plan (SWPPP)

3.2.1.1 Personnel Requirements

3.2.2 Construction General Permit Requirements

3.2.2.1 General

3.2.2.2 Inspection Reports

3.2.2.3 Stormwater Pollution Prevention Plan Compliance Notebook

3.2.2.4 Stormwater Notice of Termination for Construction Activities

3.2.3 Erosion and Sediment Control Measures

SECTION 01 57 19.00 06 Page 2

3.2.3.1 Erosion Control

3.2.3.2 Sediment Control Practices

3.2.4 Work Area Limits

3.2.5 Contractor Facilities and Work Areas

3.2.6 Municipal Separate Storm Sewer System (MS4) Management

3.3 SURFACE AND GROUNDWATER

3.3.1 Waters of the United States

3.4 PROTECTION OF CULTURAL RESOURCES

3.4.1 Archaeological Resources

3.5 AIR RESOURCES

3.5.1 Preconstruction Air Permits

3.5.2 Oil or Dual-fuel Boilers and Furnaces

3.5.3 Burning

3.5.4 Class I and II ODS Prohibition

3.5.5 Accidental Venting of Refrigerant

3.5.6 EPA Certification Requirements

3.5.7 Dust Control

3.5.7.1 Particulates

3.5.7.2 Abrasive Blasting

3.5.8 Odors

3.6 WASTE MINIMIZATION

3.6.1 Salvage, Reuse and Recycle

3.6.2 Nonhazardous Solid Waste Diversion Report

3.7 WASTE MANAGEMENT AND DISPOSAL

3.7.1 Waste Determination Documentation

3.7.2 Solid Waste Management

3.7.2.1 Solid Waste Management Report

3.7.2.2 Control and Management of Solid Wastes

3.7.3 Chemicals and Chemical Wastes

3.7.4 Control and Management of Hazardous Waste

3.7.4.1 Hazardous Waste/Debris Management

3.7.4.2 Waste Storage/Satellite Accumulation/90 Day Storage Areas

3.7.4.3 Hazardous Waste Disposal

3.7.4.3.1 Responsibilities for Contractor's Disposal

3.7.4.3.1.1 Services

3.7.4.3.1.2 Samples

3.7.4.3.1.3 Analysis

3.7.4.3.1.4 Labeling

3.7.4.3.2 Contractor Disposal Turn-In Requirements

3.7.4.4 Universal Waste Management

3.7.4.5 Electronics End-of-Life Management

3.7.4.6 Disposal Documentation for Hazardous and Regulated Waste

3.7.5 Releases/Spills of Oil and Hazardous Substances

3.7.5.1 Response and Notifications

3.7.5.2 Clean Up

3.7.6 Mercury Materials

3.7.7 Wastewater

3.7.7.1 Disposal of wastewater must be as specified below.

3.7.7.1.1 Treatment

3.7.7.1.2 Surface Discharge

3.7.7.1.3 Land Application

3.8 HAZARDOUS MATERIAL MANAGEMENT

3.9 PREVIOUSLY USED EQUIPMENT

3.10 PETROLEUM, OIL, LUBRICANT (POL) STORAGE AND FUELING

3.10.1 Used Oil Management

3.10.2 Oil Storage Including Fuel Tanks

3.11 INADVERTENT DISCOVERY OF PETROLEUM-CONTAMINATED SOIL OR HAZARDOUS

WASTES

3.12 PEST MANAGEMENT

SECTION 01 57 19.00 06 Page 3

3.12.1 Pesticide Delivery and Storage

3.12.2 Pesticide Handling Requirements

3.12.3 Qualifications

3.12.4 Application

3.12.5 Pesticide Treatment Plan

3.13 CHLORDANE

3.14 SOUND INTRUSION

3.15 RADON MITIGATION SYSTEMS

3.16 POST CONSTRUCTION CLEANUP

PART 4 ENVIRONMENTAL PERMITS AND COMMITMENTS

4.1 LIST OF PRECONSTRUCTION PERMITS

4.2 ENVIRONMENTAL REGULATIONS AND OTHER DOCUMENTS THAT MAY CONTAIN

INFORMATION TO IDENTIFY PRECONSTRUCTION PERMITS AND

CONSTRUCTION-RELATED COMMITMENTS

4.2.1 National Environmental Policy Act (NEPA)

4.2.2 Endangered Species Act

4.2.3 National Historic Preservation Act

4.2.4 Clean Water Act

4.2.4.1 National Pollutant Discharge Elimination System (NPDES)

4.2.4.2 Section 404 Permit for Dredge/Fill Operations

4.2.4.3 Waste Water Discharge Permits

4.2.4.4 Aquatic Resources Alteration Permit (NOT APPLICABLE -

Tennessee Permit)

4.2.5 Resource Conservation and Recovery Act

4.2.5.1 Solid Waste Disposal

4.2.5.2 Hazardous Waste Disposal

4.2.5.3 Underground Storage Tank Systems

4.2.6 Safe Drinking Water Act (SDWA)

4.2.6.1 Water Distribution

4.2.6.2 Groundwater Protection

4.2.7 Occupational Safety and Health Act

4.2.7.1 Employee Right to Know

4.2.7.2 Occupational Exposure Limits (OELs)

4.2.7.3 Confined Spaces

4.2.8 Coastal Zone Management Act

4.2.9 Burning Permits

4.2.10 Floodplain Construction Permits (applicable to both 401 and

404 permits)

4.2.11 Air Quality Permits

4.2.12 Excavation Permit

4.2.13 Vegetation and Revegetation Permit

4.2.14 Water Withdrawal Permits

4.2.15 Zoning Permits

4.2.16 Noise Permits

4.2.17 Pesticide Permits

4.2.18 Munitions and Explosives of Concern (MEC)/Unexploded Ordnance

(UXO)

4.2.19 Driveway / Curb Cut Permit

4.2.20 Demolition/Renovation Permit

4.2.21 Utility Permits

4.2.22 Aquatic Resource Alteration Permits (Not Applicable -

Tennessee Permit)

4.2.23 Construction Permit

4.2.24 Permit Variances

-- End of Section Table of Contents --

SECTION 01 57 19.00 06 Page 4

SECTION 01 57 19.00 06

TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

09/17

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM E1527-05 Standard Practice for Environmental Site Assessments: Phase I Environmental Site Assessment Process

U.S. ENVIRONMENTAL PROTECTION AGENCY (EPA)

EPA SW-846 (Third Edition; Update IV) Test Methods for Evaluating Solid Waste:

Physical/Chemical Methods

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

ER 200-2-2 (1988) Environmental Quality - Procedures for Implementing NEPA

WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands Delineation Manual

Wetland Supplement Regional Supplement to the Corps of Engineers Wetland Delineation Manual;

Midwest Region (Version 2.0) April 2010

ERDC/R; TR-10-16

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.120 Hazardous Waste Operations and Emergency Response

29 CFR 1915 Confined and Enclosed Spaces and Other Dangerous Atmospheres in Shipyard Employment

29 CFR 1926 Safety and Health Regulations for Construction

SECTION 01 57 19.00 06 Page 5

29 CFR 1926.1101 Asbestos

29 CFR 1926.62 Lead

40 CFR 112 Oil Pollution Prevention

40 CFR 152 Pesticide Registration and Classification Procedures

40 CFR 152 - 186 Pesticide Programs

40 CFR 241 Guidelines for Disposal of Solid Waste

40 CFR 243 Guidelines for the Storage and Collection of Residential, Commercial, and Institutional Solid Waste

40 CFR 258 Subtitle D Landfill Requirements

40 CFR 260 Hazardous Waste Management System: General

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 261.7 Residues of Hazardous Waste in Empty Containers

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 262.31 Standards Applicable to Generators of Hazardous Waste-Labeling

40 CFR 262.34 Standards Applicable to Generators of Hazardous Waste-Accumulation Time

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 264 Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 265 Interim Status Standards for Owners and Operators of Hazardous Waste Treatment, Storage, and Disposal Facilities

40 CFR 266 Standards for the Management of Specific Hazardous Wastes and Specific Types of Hazardous Waste Management Facilities

40 CFR 268 Land Disposal Restrictions

40 CFR 273 Standards For Universal Waste Management

40 CFR 273.2 Standards for Universal Waste Management - Batteries

40 CFR 273.3 Standards for Universal Waste Management -

SECTION 01 57 19.00 06 Page 6

Pesticides

40 CFR 273.4 Standards for Universal Waste Management - Mercury Containing Equipment

40 CFR 273.5 Standards for Universal Waste Management - Lamps

40 CFR 279 Standards for the Management of Used Oil

40 CFR 300 National Oil and Hazardous Substances Pollution Contingency Plan

40 CFR 300.125 National Oil and Hazardous Substances Pollution Contingency Plan - Notification and Communications

40 CFR 355 Emergency Planning and Notification

40 CFR 372-SUBPART D Specific Toxic Chemical Listings

40 CFR 403 General Pretreatment Regulations for Existing and New Sources of Pollution

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 60 Standards of Performance for New Stationary Sources

40 CFR 61 National Emission Standards for Hazardous Air Pollutants

40 CFR 63 National Emission Standards for Hazardous Air Pollutants for Source Categories

40 CFR 64 Compliance Assurance Monitoring

40 CFR 745 Lead-Based Paint Poisoning Prevention in Certain Residential Structures

40 CFR 761 Polychlorinated Biphenyls (PCBs) Manufacturing, Processing, Distribution in Commerce, and Use Prohibitions

49 CFR 171 General Information, Regulations, and Definitions

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous Materials Communications, Emergency Response Information, and Training Requirements

49 CFR 172.101 Hazardous Material Regulation-Purpose and Use of Hazardous Material Table

49 CFR 173 Shippers - General Requirements for Shipments and Packagings

SECTION 01 57 19.00 06 Page 7

49 CFR 178 Specifications for Packagings

1.2 DEFINITIONS

1.2.1 Class I and II Ozone Depleting Substance (ODS)

Class I ODS is defined in Section 602(a) of The Clean Air Act. A list of Class I ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classone.html.

Class II ODS is defined in Section 602(s) of The Clean Air Act. A list of Class II ODS can be found on the EPA website at the following weblink.

http://www.epa.gov/ozone/science/ods/classtwo.html.

1.2.2 Contractor Generated Hazardous Waste

Contractor generated hazardous waste is materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene), waste thinners, excess paints, excess solvents, waste solvents, excess pesticides, and contaminated pesticide equipment rinse water.

1.2.3 Electronics Waste

Electronics waste is discarded electronic devices intended for salvage, recycling, or disposal.

1.2.4 Environmental Pollution and Damage

Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;

affect other species of importance to humankind; or degrade the environment aesthetically, culturally or historically.

1.2.5 Environmental Protection

Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.

1.2.6 Hazardous Debris

As defined in paragraph SOLID WASTE, debris that contains listed hazardous waste (either on the debris surface, or in its interstices, such as pore structure) in accordance with 40 CFR 261. Hazardous debris also includes debris that exhibits a characteristic of hazardous waste in accordance with

40 CFR 261.

1.2.7 Hazardous Materials

Hazardous materials as defined in 49 CFR 171 and listed in 49 CFR 172.

SECTION 01 57 19.00 06 Page 8

Hazardous material is any material that: Is regulated as a hazardous material in accordance with 49 CFR 173; or requires a Safety Data Sheet (SDS) in accordance with 29 CFR 1910.120; or during end use, treatment, handling, packaging, storage, transportation, or disposal meets or has components that meet or have potential to meet the definition of a hazardous waste as defined by 40 CFR 261 Subparts A, B, C, or D.

Designation of a material by this definition, when separately regulated or controlled by other sections or directives, does not eliminate the need for adherence to that hazard-specific guidance which takes precedence over this section for "control" purposes. Such material includes ammunition, weapons, explosive actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, medical waste and infectious materials, bulk fuels, radioactive materials, and other materials such as asbestos, mercury, and polychlorinated biphenyls (PCBs).

1.2.8 Hazardous Waste

Hazardous Waste is any material that meets the definition of a solid waste and exhibit a hazardous characteristic (ignitability, corrosivity, reactivity, or toxicity) as specified in 40 CFR 261, Subpart C, or contains a listed hazardous waste as identified in 40 CFR 261, Subpart D.

1.2.9 Installation Pest Management Coordinator

Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.

1.2.10 Land Application

Land Application means spreading or spraying discharge water at a rate that allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" must occur.

Comply with federal, state, and local laws and regulations.

1.2.11 Municipal Separate Storm Sewer System (MS4) Permit

MS4 permits are those held by installations to obtain NPDES permit coverage for their stormwater discharges.

1.2.12 National Pollutant Discharge Elimination System (NPDES)

The NPDES permit program controls water pollution by regulating point sources that discharge pollutants into waters of the United States.

1.2.13 Oily Waste

Oily waste are those materials that are, or were, mixed with Petroleum, Oils, and Lubricants (POLs) and have become separated from that POLs. Oily wastes also means materials, including wastewaters, centrifuge solids, filter residues or sludges, bottom sediments, tank bottoms, and sorbents which have come into contact with and have been contaminated by, POLs and may be appropriately tested and discarded in a manner which is in compliance with other state and local requirements.

SECTION 01 57 19.00 06 Page 9

This definition includes materials such as oily rags, "kitty litter" sorbent clay and organic sorbent material. These materials may be land filled provided that: It is not prohibited in other state regulations or local ordinances; the amount generated is "de minimus" (a small amount); it is the result of minor leaks or spills resulting from normal process operations; and free-flowing oil has been removed to the practicable extent possible. Large quantities of this material, generated as a result of a major spill or in lieu of proper maintenance of the processing equipment, are a solid waste. As a solid waste, perform a hazardous waste determination prior to disposal. As this can be an expensive process, it is recommended that this type of waste be minimized through good housekeeping practices and employee education.

1.2.14 Pesticide

Pesticide is any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.

1.2.15 Pesticide Treatment Plan

A plan for the prevention, monitoring, and control to eliminate pest infestation.

1.2.16 Pests

Pests are arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.

1.2.17 Project Pesticide Coordinator

The Project Pesticide Coordinator (PPC) is an individual who resides at a Civil Works Project office and who is responsible overseeing of pesticide application on project grounds.

1.2.18 Regulated Waste

Regulated waste are solid wastes that have specific additional federal, state, or local controls for handling, storage, or disposal.

1.2.19 Sediment

Sediment is soil and other debris that have eroded and have been transported by runoff water or wind.

1.2.20 Solid Waste

Solid waste is a solid, liquid, semi-solid or contained gaseous waste. A solid waste can be a hazardous waste, non-hazardous waste, or non-Resource Conservation and Recovery Act (RCRA) regulated waste. Types of solid waste typically generated at construction sites may include:

1.2.20.1 Debris

Debris is non-hazardous solid material generated during the construction, SECTION 01 57 19.00 06 Page 10 demolition, or renovation of a structure that exceeds 2.5-inch particle size that is: a manufactured object; plant or animal matter; or natural geologic material (for example, cobbles and boulders), broken or removed concrete, masonry, and rock asphalt paving; ceramics; roofing paper and shingles. Inert materials maybe reinforced with or contain ferrous wire, rods, accessories and weldments. A mixture of debris and other material such as soil or sludge is also subject to regulation as debris if the mixture is comprised primarily of debris by volume, based on visual inspection.

1.2.20.2 Green Waste

Green waste is the vegetative matter from landscaping, land clearing and grubbing, including, but not limited to, grass, bushes, scrubs, small trees and saplings, tree stumps and plant roots. Marketable trees, grasses and plants that are indicated to remain, be re-located, or be re-used are not included.

1.2.20.3 Material not regulated as solid waste

Material not regulated as solid waste is nuclear source or byproduct materials regulated under the Federal Atomic Energy Act of 1954 as amended;

suspended or dissolved materials in domestic sewage effluent or irrigation return flows, or other regulated point source discharges; regulated air emissions; and fluids or wastes associated with natural gas or crude oil exploration or production.

1.2.20.4 Non-Hazardous Waste

Non-hazardous waste is waste that is excluded from, or does not meet, hazardous waste criteria in accordance with 40 CFR 263.

1.2.20.5 Recyclables

Recyclables are materials, equipment and assemblies such as doors, windows, door and window frames, plumbing fixtures, glazing and mirrors that are recovered and sold as recyclable, wiring, insulated/non-insulated copper wire cable, wire rope,and structural components. It also includes commercial-grade refrigeration equipment with Freon removed, household appliances where the basic material content is metal, clean polyethylene terephthalate bottles, cooking oil, used fuel oil, textiles, high-grade paper products and corrugated cardboard, stackable pallets in good condition, clean crating material, and clean rubber/vehicle tires. Metal meeting the definition of lead contaminated or lead based paint contaminated may be included as recyclable if sold to a scrap metal company. Paint cans that meet the definition of empty containers in accordance with 40 CFR 261.7 may be included as recyclable if sold to a scrap metal company.

1.2.20.6 Surplus Soil

Surplus soil is existing soil that is in excess of what is required for this work, including aggregates intended, but not used, for on-site mixing of concrete, mortars, and paving. Contaminated soil meeting the definition of hazardous material or hazardous waste is not included and must be managed in accordance with paragraph HAZARDOUS MATERIAL MANAGEMENT.

SECTION 01 57 19.00 06 Page 11

1.2.20.7 Scrap Metal

This includes scrap and excess ferrous and non-ferrous metals such as reinforcing steel, structural shapes, pipe, and wire that are recovered or collected and disposed of as scrap. Scrap metal meeting the definition of hazardous material or hazardous waste is not included.

1.2.20.8 Wood

Wood is dimension and non-dimension lumber, plywood, chipboard, hardboard.

Treated or painted wood that meets the definition of lead contaminated or lead based contaminated paint is not included. Treated wood includes, but is not limited to, lumber, utility poles, crossties, and other wood products with chemical treatment.

1.2.21 Surface Discharge

Surface discharge means discharge of water into drainage ditches, storm sewers, creeks or "waters of the United States". Surface discharges are discrete, identifiable sources and require a permit from the governing agency. Comply with federal, state, and local laws and regulations.

1.2.22 Wastewater

Wastewater is the used water and solids from a community that flow to a treatment plant.

1.2.22.1 Stormwater

Stormwater is any precipitation in an urban or suburban area that does not evaporate or soak into the ground, but instead collects and flows into storm drains, rivers, and streams.

1.2.23 Waters of the United States

Waters of the United States means Federally jurisdictional waters, including wetlands, that are subject to regulation under Section 404 of the Clean Water Act or navigable waters, as defined under the Rivers and Harbors Act.

1.2.24 Wetlands

Wetlands are those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Official determination of whether or not an area is classified as a wetland must be done in accordance with the WETLANDS DELINEATION MANUAL and Wetland Supplement.

1.2.25 Universal Waste

The universal waste regulations streamline collection requirements for certain hazardous wastes in the following categories: batteries, pesticides, mercury-containing equipment (for example, thermostats), and lamps (for example, fluorescent bulbs). The rule is designed to reduce hazardous waste in the municipal solid waste (MSW) stream by making it easier for universal waste handlers to collect these items and send them for recycling or proper disposal. These regulations can be found at

40 CFR 273.

SECTION 01 57 19.00 06 Page 12

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance with LRL Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with LRL Section 01 33 00.00 06 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Preconstruction Survey

Solid Waste Management Permit; G,RO

Regulatory Notifications; G,RO

Environmental Protection Plan; G,RO

Dirt and Dust Control Plan; G,RO

Employee Training Records; G

Environmental Manager Qualifications; G

Notice Of Soil Treatment; G

SD-06 Test Reports

Laboratory Analysis

Inspection Reports

Solid Waste Management Report; G

SD-07 Certificates

Employee Training Records; G

Certificate of Competency

Erosion and Sediment Control Inspector Qualifications

SD-11 Closeout Submittals

Stormwater Pollution Prevention Plan Compliance Notebook; G

Stormwater Notice of Termination (for NPDES coverage under the general permit for construction activities); G, RO

Waste Determination Documentation; G

Disposal Documentation for Hazardous and Regulated Waste; G

Assembled Employee Training Records; G

Solid Waste Management Permit; G

SECTION 01 57 19.00 06 Page 13

Solid Waste Management Report; G

Hazardous Waste/Debris Management; G

Regulatory Notifications; G

Sales Documentation; G

Contractor Certification

As-Built Topographic Survey

1.4 ENVIRONMENTAL PROTECTION REQUIREMENTS

Provide and maintain, during the life of the contract, environmental protection as defined. Plan for and provide environmental protective measures to control pollution that develops during construction practice.

Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Protect the environmental resources within the project boundaries and those affected outside the limits of permanent work during the entire duration of this Contract. Comply with federal, state, and local regulations pertaining to the environment, including water, air, solid waste, hazardous waste and substances, oily substances, and noise pollution.

Tests and procedures assessing whether construction operations comply with Applicable Environmental Laws may be required. Analytical work must be performed by qualified laboratories; and where required by law, the laboratories must be certified.

1.4.1 Conformance with the Environmental Management System

Perform work under this contract consistent with the policy and objectives identified in the installation's Environmental Management System (EMS).

Perform work in a manner that conforms to objectives and targets of the environmental programs and operational controls identified by the EMS.

Support Government personnel when environmental compliance and EMS audits are conducted by escorting auditors at the Project site, answering questions, and providing proof of records being maintained. Provide monitoring and measurement information as necessary to address environmental performance relative to environmental, energy, and transportation management goals. In the event an EMS nonconformance or environmental noncompliance associated with the contracted services, tasks, or actions occurs, take corrective and preventative actions. In addition, employees must be aware of their roles and responsibilities under the installation EMS and of how these EMS roles and responsibilities affect work performed under the contract.

Coordinate with the installation's EMS coordinator to identify training needs associated with environmental aspects and the EMS, and arrange training or take other action to meet these needs. Provide training documentation to the Contracting Officer. The Installation Environmental Office will retain associated environmental compliance records. Make EMS Awareness training completion certificates available to Government auditors during EMS audits and include the certificates in the Employee Training Records. See paragraph EMPLOYEE TRAINING RECORDS.

SECTION 01 57 19.00 06 Page 14

1.5 SPECIAL ENVIRONMENTAL REQUIREMENTS

Comply with the special environmental requirements listed here and attached at the end of this section.

1.6 QUALITY ASSURANCE

1.6.1 Preconstruction Survey and Protection of Features

This paragraph supplements the Contract FAR 52.236-9 - Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements.

Prior to start of any onsite construction activities, perform a Preconstruction Survey of the project site with the Contracting Officer, and take photographs showing existing environmental conditions in and adjacent to the site. Submit a report for the record. Include in the report a plan describing the features requiring protection under the provisions of the Contract Clauses, which are not specifically identified on the drawings as environmental features requiring protection along with the condition of trees, shrubs and grassed areas immediately adjacent to the site of work and adjacent to the Contractor's assigned storage area and access route(s), as applicable. The Contractor and the Contracting Officer will sign this survey report upon mutual agreement regarding its accuracy and completeness. Protect those environmental features included in the survey report and any indicated on the drawings, regardless of interference that their preservation may cause to the work under the Contract.

1.6.2 Regulatory Notifications

Provide regulatory notification requirements in accordance with federal, state and local regulations. In cases where the Government will also provide public notification (such as stormwater permitting), coordinate with the Contracting Officer. Submit copies of regulatory notifications to the Contracting Officer within 10days prior to commencement of work activities. Typically, regulatory notifications must be provided for the following (this listing is not all-inclusive): demolition, renovation, NPDES defined site work, construction, removal or use of a permitted air emissions source, and remediation of controlled substances (asbestos, hazardous waste, lead paint).

1.6.3 Environmental Brief

Attend an environmental brief to be included in the preconstruction meeting. Provide the following information: types, quantities, and use of hazardous materials that will be brought onto the installation; and types and quantities of wastes/wastewater that may be generated during the Contract. Discuss the results of the Preconstruction Survey at this time.

Prior to initiating any work on site, meet with the Contracting Officer and installation Environmental Office to discuss the proposed Environmental Protection Plan (EPP). Develop a mutual understanding relative to the details of environmental protection, including measures for protecting natural and cultural resources, required reports, required permits, permit requirements (such as mitigation measures), and other measures to be taken.

1.6.4 Environmental Manager

Appoint in writing an Environmental Manager for the project site. The Environmental Manager is directly responsible for coordinating contractor compliance with federal, state, local, and installation requirements. The

SECTION 01 57 19.00 06 Page 15

Environmental Manager must ensure compliance with Hazardous Waste Program requirements (including hazardous waste handling, storage, manifesting, and disposal); implement the EPP; ensure environmental permits are obtained, maintained, and closed out; ensure compliance with Stormwater Program requirements; ensure compliance with Hazardous Materials (storage, handling, and reporting) requirements; and coordinate any remediation of regulated substances (lead, asbestos, PCB transformers). This can be a collateral position; however, the person in this position must be trained to adequately accomplish the following duties: ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure Contractor personnel are trained in 40 CFR requirements in accordance with their position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

Submit Environmental Manager Qualifications to the Contracting Officer.

1.6.5 Employee Training Records

Prepare and maintain Employee Training Records throughout the term of the contract meeting applicable 40 CFR requirements. Provide Employee Training Records in the Environmental Records Binder.Submit these Assembled Employee Training Records to the Contracting Officer at the conclusion of the project, unless otherwise directed.

Train personnel to meet staterequirements. Conduct environmental protection/pollution control meetings for personnel prior to commencing construction activities. Contact additional meetings for new personnel and when site conditions change. Include in the training and meeting agenda:

methods of detecting and avoiding pollution; familiarization with statutory and contractual pollution standards; installation and care of devices, vegetative covers, and instruments required for monitoring purposes to ensure adequate and continuous environmental protection/pollution control;

anticipated hazardous or toxic chemicals or wastes, and other regulated contaminants; recognition and protection of archaeological sites, artifacts, waters of the United States, and endangered species and their habitat that are known to be in the area. Provide copy of the Erosion and Sediment Control Inspector Certification as required by Delaware.

1.6.6 Non-Compliance Notifications

The Contracting Officer will notify the Contractor in writing of any observed noncompliance with federal, state or local environmental laws or regulations, permits, and other elements of the Contractor's EPP. After receipt of such notice, inform the Contracting Officer of the proposed corrective action and take such action when approved by the Contracting Officer. The Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No time extensions will be granted or equitable adjustments allowed for any such suspensions. This is in addition to any other actions the Contracting Officer may take under the contract, or in accordance with the Federal Acquisition Regulation or Federal Law.

1.7 ENVIRONMENTAL PROTECTION PLAN

The purpose of the EPP is to present an overview of known or potential environmental issues that must be considered and addressed during construction. Incorporate construction related objectives and targets from the installation's EMS into the EPP. Include in the EPP measures for

SECTION 01 57 19.00 06 Page 16 protecting natural and cultural resources, required reports, and other measures to be taken. Meet with the Contracting Officer or Contracting Officer Representative to discuss the EPP and develop a mutual understanding relative to the details for environmental protection including measures for protecting natural resources, required reports, and other measures to be taken. Submit the EPP within15days after notice to proceed and not less than 10 days before the preconstruction meeting.

Revise the EPP throughout the project to include any reporting requirements, changes in site conditions, or contract modifications that change the project scope of work in a way that could have an environmental impact. No requirement in this section will relieve the Contractor of any applicable federal, state, and local environmental protection laws and regulations. During Construction, identify, implement, and submit for approval any additional requirements to be included in the EPP. Maintain the current version onsite.

The EPP includes, but is not limited to, the following elements:

1.7.1 General Overview and Purpose

1.7.1.1 Descriptions

A brief description of each specific plan required by environmental permit or elsewhere in this Contract such as stormwater pollution prevention plan, solid waste management plan, wastewater management plan, air pollution control plan, contaminant prevention plan, pesticide treatment plan, a historical, archaeological, cultural resources, biological resources and wetlands plan, traffic control plan Hazardous, Toxic and Radioactive Waste (HTRW) Plan Non-Hazardous Solid Waste Disposal Plan borrowing material plan.

1.7.1.2 Duties

The duties and level of authority assigned to the person(s) on the job site who oversee environmental compliance, such as who is responsible for adherence to the EPP, who is responsible for spill cleanup and training personnel on spill response procedures, who is responsible for manifesting hazardous waste to be removed from the site (if applicable), and who is responsible for training the Contractor's environmental protection personnel.

1.7.1.3 Procedures

A copy of any standard or project-specific operating procedures that will be used to effectively manage and protect the environment on the project site.

1.7.1.4 Communications

Communication and training procedures that will be used to convey environmental management requirements to Contractor employees and subcontractors.

1.7.1.5 Contact Information

Emergency contact information contact information (office phone number, cell phone number, and e-mail address).

SECTION 01 57 19.00 06 Page 17

1.7.2 General Site Information

1.7.2.1 Drawings

Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, jurisdictional wetlands, material storage areas, structures, sanitary facilities, storm drains and conveyances, and stockpiles of excess soil.

1.7.2.2 Work Area

Work area plan showing the proposed activity in each portion of the area and identify the areas of limited use or nonuse. Include measures for marking the limits of use areas, including methods for protection of features to be preserved within authorized work areas and methods to control runoff and to contain materials on site, and a traffic control plan.

1.7.2.3 Documentation

A letter signed by an officer of the firm appointing the Environmental Manager and stating that person is responsible for managing and implementing the Environmental Program as described in this contract.

Include in this letter the Environmental Manager's authority to direct the removal and replacement of non-conforming work. Per LRL Section 01 45 04.10 06, Contractor Quality Control and more specifically paragraph Construction Quality Control Organization, the Environmental Manager shall be included as part of the CQC organization.

1.7.3 Management of Natural Resources

a. Land resources

b. Tree protection

c. Replacement of damaged landscape features

d. Temporary construction

e. Stream crossings

f. Fish and wildlife resources

g. Wetland areas

1.7.4 Protection of Historical and Archaeological Resources

a. Objectives

b. Methods

1.7.5 Stormwater Management and Control

a. Ground cover

b. Erodible soils

c. Temporary measures

(1) Structural Practices

SECTION 01 57 19.00 06 Page 18

(2) Temporary and permanent stabilization

d. Effective selection, implementation and maintenance of Best Management Practices (BMPs).

1.7.6 Protection of the Environment from Waste Derived from Contractor Operations

Control and disposal of solid and sanitary waste. Control and disposal of hazardous waste.

If the project is located on a military installation, management procedures for hazardous waste to be generated shall be followed. The elements of those procedures will coincide with the Installation Hazardous Waste Management Plan. The Contracting Officer will provide a copy of the Installation Hazardous Waste Management Plan. For all projects, as a minimum, include the following:

a. List of the types of hazardous wastes expected to be generated

b. Procedures to ensure a written waste determination is made for appropriate wastes that are to be generated

c. Sampling/analysis plan, including laboratory method(s) that will be used for waste determinations and copies of relevant laboratory certifications

d. Methods and proposed locations for hazardous waste accumulation/storage (that is, in tanks or containers)

e. Management procedures for storage, labeling, transportation, and disposal of waste (treatment of waste is not allowed unless specifically noted)

f. Management procedures and regulatory documentation ensuring disposal of hazardous waste complies with Land Disposal Restrictions (40 CFR 268)

g. Management procedures for recyclable hazardous materials such as lead-acid batteries, used oil, and similar

h. Used oil management procedures in accordance with 40 CFR 279; Hazardous waste minimization procedures

i. Plans for the disposal of hazardous waste by permitted facilities; and Procedures to be employed to ensure required employee training records are maintained.

1.7.7 Prevention of Releases to the Environment

Procedures to prevent releases to the environment

Notifications in the event of a release to the environment

1.7.8 Regulatory Notification and Permits

List what notifications and permit applications must be made. Some permits require up to 180 days to obtain. Demonstrate that those permits have been obtained or applied for by including copies of applicable environmental

SECTION 01 57 19.00 06 Page 19 permits. The EPP will not be approved until the permits have been obtained.

1.7.9 Clean Air Act Compliance

1.7.9.1 Haul Route

Submit truck and material haul routes along with a Dirt and Dust Control Plan for controlling dirt, debris, and dust on Installation roadways. As a minimum, identify in the plan the subcontractor and equipment for cleaning along the haul route and measures to reduce dirt, dust, and debris from roadways.

1.7.9.2 Pollution Generating Equipment

Identify air pollution generating equipment or processes that may require federal, state, or local permits under the Clean Air Act. Determine requirements based on any current installation permits and the impacts of the project. Provide a list of all fixed or mobile equipment, machinery or operations that could generate air emissions during the project to the Installation Environmental Office (Air Program Manager).

1.7.9.3 Stationary Internal Combustion Engines

Identify portable and stationary…