W912QR20Q0038 0001.pdf
PDF 291 KB Posted
- Attached to
- JT Myers Lock & Dam Concrete Core Drilling
- Solicitation number
- W912QR20Q0038
About this file
This document summarizes an amendment to a solicitation for concrete core drilling services at JT Myers Locks and Dam in Mount Vernon, Indiana. The U.S. Army Corps of Engineers seeks a contractor to core drill four vertical holes at eight floating mooring bitts per provided design drawings from elevation 362.00 to 305.00. Work is to be completed within 80 calendar days of the notice to proceed. The solicitation is set aside for small businesses with a size standard of $16.5 million. Interested offerors are to submit quotes by April 13, 2020 and register in the System for Award Management to receive payment via electronic funds transfer. An unscheduled site visit may be arranged by contacting provided points of contact.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR20Q0038 0003.pdf | ||
| W912QR20Q0038 0002.pdf | ||
| W912QR20Q0038.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: JESSICA MCCALL
600 DR M L KING JR PL RM 821
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
a. The site visit scheduled for 25 March 2020 has been canceled due to the recently provided guidance urging to avoid groups of more than 10 in an effort to f ight the spread of COVID-19.
b. All potential offerors who would like to arrange a site visit may contact Dallas Jackson, Lockmaster, or Patrick Buttry at (812) 838-5836.
Offerors are encouraged to bring only the minimum number of necessary individuals to the site visit and the number of attendees must be provided to the Lockmaster prior to arriving at the site.
c. Subsequently, FAR 52.236-27 Alternate I has been deleted and FAR 52.236-27 has been added by full text to the Solicitation.
d. The Technical Point of Contact has been changed from Josh Saylor to Chris Magee.
e. All other terms and conditions remain the same.
f. The due date has not been extended as a result of this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20Q0038
X 9B. DATED (SEE ITEM 11)
13-Mar-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
As a result of Amendment 0001, Solicitation W912QR20Q0038 for Floating Mooring Bit Concrete Core Drilling at JT Myers Locks and Dam in Mt. Vernon, Indiana is hereby amended as follows:
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Mar-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20Q0038
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
SPECIAL INSTRUCTIONS
Amendment 0001highlighted in yellow
This Request for Quote (RFQ) is for Floating Mooring Bitt Concrete Core Drilling at JT Meyers Locks and Dam in Mt Vernon, Indiana.
The contractor shall core drill four (4) vertical holes at eight (8) different floating mooring bitts per design drawings attached to this contract. Core drilling will be as per the drawings from elevation 362.00 to 305.00. All work shall be completed in accordance with the attached Scope of Work and Drawings.
Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 80 calendar days after
NTP.
Location:
JT Myers Locks and Dam 16501 Raben Road Mt Vernon, IN 47620
This procurement is 100% set-aside for Small Business, 238990-All Other Specialty Trade Contractors. Size Standard: $16,500,000.00.
Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.
Note: The contract award will be based on the lowest price to the Government with one firm fixed-price award from this RFQ. In addition to the completed price breakout schedule quote, the Offeror must complete and submit the Representations and Certifications located within the solicitation.
Please submit quotes to:
U.S. Army Corps of Engineers Room 821, ATTN: Jessica L. McCall 600 Dr. Martin Luther King, Jr. Place Louisville, KY 40202
Quotes are due 13 April 2020, 10:00AM Eastern Time. Fax quotes will not be accepted. Electronic submittals will be accepted and may be emailed to jessica.l.mccall@usace.army.mil.
UNSCHEDULED SITE VISIT: All potential offerors who would like to arrange a site visit may contact Dallas Jackson, Lockmaster, or Patrick Buttry at (812) 838-5836. They can be reached Monday through Friday between 0700 nd 1700 Central Time. Offerors are encouraged to bring only the minimum number of necessary individuals to the site visit and the number of attendees must be provided to the Lockmaster prior to arriving at the site.
NOTE: All POC’s listed in the SOW shall NOT be contacted until after award.
mailto:jessica.l.mccall@usace.army.mil
At no time should the Contractor perform additional work outside the scope of this contract without the prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the Contract Price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the Contract, any additional work determined to be needed may be requested by Contracting Officer for a Contract Modification. Each interested Contractor should examine the contract drawings, perform pre-bid and assume the responsibility for quantities, materials, critical dimensions, and work conditions used in order to calculate a proposal.
All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.
Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.
ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.
Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (formally known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards.
Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
http://www.sam.gov/
SECTION 00 20 00 - INSTRUCTIONS FOR PROCUREMENT
The following have been modified:
SCOPE OF WORK
Ohio River JT Myers Locks & Dam
Floating Mooring Bitt Concrete Core Drilling Amendment 0001 highlighted in yellow 03/17/2020
1. GENERAL
I. Scope of Work: This contract will be to core drill four (4) vertical holes at eight (8) different floating mooring bitts per design drawings attached to this contract. Core drilling will be as per the drawings from elevation 362.00 to 305.00. Stations can be referenced on the attached drawing ON-200.1/5.
II. Completion Dates: All core drilling will be completed within 80 calendar days after NTP.
III. Corps of Engineers Inspection: Corps of Engineers personnel shall be allowed to inspect the progress of any portion of this project.
IV. Technical Point of Contact (TPOC): All technical questions regarding this contract shall be directed to Chris Magee by telephone: (502) 315-6684, or email: Christopher.R.Magee@usace.army.mil.
V. Days and Hours of Work: All work will be done during the hours of 0700-1700 Central Time. Work on weekends or federal holidays will be determined by Lock Master.
VI. Work Site Address: The contractor will be working at JT Myers Locks and Dam.
JT Myers Locks and Dam 16501 Raben Road
Mt Vernon, IN 47620
VII. Project Point Of Contact:
Lockmaster: Dallas Jackson
JT Myers Locks and Dam 16501 Raben Road
Phone number: (812) 838-5836
E-mail: Dallas.W.Jackson@usace.army.mil
2. RESPONSIBILITIES AND SITE CONDITIONS
I. Contractor shall be fully responsible for the purchase/rental, delivery, and placement of necessary equipment to complete the job without assistance from the lock staff.
II. Contractor shall verify core drill locations with Lock Master and Technical Representative prior to starting.
III. Any requests for use of lock equipment must be directed to and approved by the Technical
Representative.
mailto:Dallas.W.Jackson@usace.army.mil
IV. Fueling of equipment will follow all local, state and federal Spill Prevention and Countermeasure (SPCC) regulations. Fuel shall not be provided by the Government.
V. Existing break areas, offices, latrines, and showers are not available for the contractor's use . It is recommended that the contractor bring portable restrooms and a break room.
VI. Parking of vehicles is to be coordinated with the Lock Master before the first day of drilling.
VII. All deliveries will be coordinated with the Lockmaster at least 48 hours in advance.
VIII. The contractor is also responsible for the timely and proper disposal of all waste and removed materials related to their repairs from the facility each day.
3. DRAWINGS
*****The construction process shall conform to the attached drawings, which forms a part of these specifications. ***** Sheet Title and Description G-000 G-100 G-101
Cover sheet General notes and index Photos and typical guide section key
S-100 Existing guide recess core drilling plan
OU-200.1/1 Monolith layout OU-200.1/3 Gallery Layout OU-200.1/5 Wall Armor and Appurtenances (SHEET 1) OL-200.1/16 Monoliths R-34 thru R-36
OL-200.1/17
OL-200.1/19
OL-200.1/20
OL-200.1/22
Monoliths R-37 thru R-40 Monoliths R-45 thru R-48 Monoliths R-49 thru R-53 Monoliths R-58 thru R-61
OL-200.1/23 Monoliths R-62 thru R-66
OL-200.1/140
Miscellaneous Metals Floating Mooring Bitt General Arrangement And Details
A. General conditions
1. Contract will consist of core drilling as shown on s-100 (in preparation of government performed wire cutting)
2. All dimensions and elevations shown on the structural drawings shall be verified by the contractor. All changes or variances shall be approved by the government.
3. Governing codes:
a. Concrete sawing and drilling association (csda-c-101, latest addition)
b. EM 385-1-1, safety and health requirements manual
4. Contractor is responsible to visually field verify the existing conditions prior to the start of any work affecting the drilling operations. Contractor is to report any changes or discrepancies from those shown by the government.
5. The area of drilling shall not exceed the extents shown on the contract drawings.
B. Tolerance - horizontal deviation shall not exceed 1/2" per height (56'-1 3/4")
C. The floating mooring bitt recesses are protected by removable safety chains. The contractor is to remove and reattach these safety chains as necessary to perform the contract work. The contractor shall adhere to EM 385 1- 1, "Safety and Health Requirement Manual" in regards to fall protection and securing the area from accidental falls. When not working on site, the contractor is responsible re-installing the safety chains, or erecting a temporary barrier.
4. WORKMANSHIP
I. General: Workmanship shall be of the highest grade in accordance with the best modern practices to conform to the specifications and drawings.
II. Quality Control: The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirement. The Contractor’s Quality Control staff will ensure that workmanship is of the highest quality and provide documentation that supports this quality for all work performed by the Contractor, any Sub-Contractor, Fabricator or Supplier.
5. SUBMITTALS
I. Contractor shall submit quality control plan per 4-II under workmanship.
II. Contractor shall submit a construction execution schedule for verification from Lock Master.
6. PAYMENTS
Payment will be made by Electronic Funds Transfer (EFT), upon acceptance of the completed work and providing final invoice. Invoices shall be mailed to:
JT Myers Locks and Dam Attn: Dallas Jackson, Lockmaster 16501 Raben Road
7. WAGE RATES
The U.S. Department of Labor (DoL) wage rates apply to this work and are included. The Contractor is required to provide payroll documentation for all work performed under this Contract.
8. TIME EXTENS IONS FOR UNUSUALLY SEVERE WEATHER ER 415-1-15
This provision specifies the procedure for the determination of the time extensions for unusually severe weather in accordance with the contract clause entitled "Default (Fixed Price Construction)" FAR 52.249-10 in section 00 70 00 of the base contract. In order for a time extension, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe. That is, more severe than the adverse weather anticipated for the project location during any given month. If, in the judgment of the Contracting Officer, the findings of fact warrant such action, the time for completing the work shall be extended. The delay must be beyond the control and without the fault or negligence of the contractor.
The following schedule of the monthly anticipated adverse weather delay is based on the national oceanic and atmospheric administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5)
DAY WORK WEEKS
JAN FEB MAR APR MAY JUN JUL
16 12 7 5 4 4 4
Upon acknowledgment of the notice to proceed (NTP) and continuing throughout the contract, the contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual or more of the contractor's scheduled work day. The number of actual adverse weather delay days must prevent work on critical activities for 50 percent weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated, listed above, the contracting officer will convert any qualifying delays days, and issue a modification in accordance with the contract clause entitled to calendar days, giving full consideration for equivalent fair weather work "payments under fixed price construction contracts".
9. SAFETY
The Contractor shall complete all work in accordance with the most current U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in addition to the current provisions of the Occupational Safety and Health Act, and all applicable Federal, State and local laws, codes and regulations. The Contractor shall submit a safety plan in writing prior to any on-site work. The safety plan may be turned in by the time of the pre-work conference.
Personal Protective Equipment (PPE) and Apparel. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize safety hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers, and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side shields, or goggles, and hearing protection shall be worn by employees when required by the Safety Manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided an easily accessible to all employees.
http://www.publications.usace.army.mil/Portals/76/Publicat ions/EngineerManuals/EM_385-1- 1.pdf
10. SECURITY
All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Technical Point of Contact or to the Contracting Officer, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the TPOC NLT 5 calendar days after the completion of the training.
All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the TPOC or to the contracting officer (if a TPOC is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award
11. ACCIDENT REPORTING
The Contractor shall maintain accurate accident records and report all accidents as prescribed by the TPOC. Accidents shall be reported within twenty-four (24) hours of occurrence (not including weekends and holidays), and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.
12. DAMAGE REPORTS
In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the TPOC. A full report of the incident and extent of such damage shall be submitted to the TPOC within two (2) calendar days of occurrence, excluding weekends and holidays.
13. CONTRACT EMPLOYEES
All contract employees shall conduct themselves in a proper and courteous manner at all times.
Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of work under this contract. Being under the influence of or consuming alcoholic beverages or any controlled substances by the Contractor or employees while on duty is prohibited.
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Dallas Jackson (Lock Master) Address: 16501 Raben Road
Mt Vernon, IN 47620 Telephone: 812-838-5836
OR
Name: Patrick Buttry Address: 16501 Raben Road
Mt Vernon, IN 47620 Telephone: 812-838-5836 (End of provision)
The following have been deleted:
52.236-27 Alt I
(End of Summary of Changes)