W912QR20Q0038.pdf

PDF 3 MB Posted

Attached to
JT Myers Lock & Dam Concrete Core Drilling
Solicitation number
W912QR20Q0038
Issued by

About this file

This request for quote (RFQ) solicits floating mooring bitt concrete core drilling services at JT Myers Locks and Dam in Mount Vernon, Indiana. The contractor shall core drill four vertical holes at eight different floating mooring bitts per design drawings from elevation 362.00 to 305.00. Work will begin within 10 days of notice to proceed and conclude 80 days after, to be completed in accordance with the attached scope of work and drawings. Quotes are due by 13 April 2020 to the Louisville District Corps of Engineers and will be evaluated for lowest price. This procurement is set aside solely for small businesses under NAICS code 238990 with a size standard of $16,500,000. Payment will be made by electronic funds transfer.

View the file

Other files

File Type Posted
W912QR20Q0038 0003.pdf PDF
W912QR20Q0038 0002.pdf PDF
W912QR20Q0038 0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Floating Mooring Bitt Concrete Core Drilling at JT Myers Lock and Dam.

The estimated construction cost is betw een $100,000.00 and $250,000.00.

One firm-fixed price construction contract w ill be aw arded based on the low est quote.

NAICS Code: 238990 All Other Specialty Trade Contractors, size standard $16,500,000.00.

This project is 100% set-aside for Small Businesses.

Central Contractor Registration and ORCA are now available through the System for Aw ard Management (SAM), available at w w w .sam.gov.

Offerors must comply w ith the requirements of FAR 52.204-7, FAR 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge to registrants and users.

JESSICA L MCCALL 502.315.6137

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13-Mar-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________80 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________13 Apr 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:

W912QR20Q0038 83

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR20Q0038

Section 00 10 00 - Solicitation

SPECIAL INSTRUCTIONS

This Request for Quote (RFQ) is for Floating Mooring Bitt Concrete Core Drilling at JT Meyers Locks and Dam in Mt Vernon, Indiana.

The contractor shall core drill four (4) vertical holes at eight (8) different floating mooring bitts per design drawings attached to this contract. Core drilling will be as per the drawings from elevation 362.00 to 305.00. All work shall be completed in accordance with the attached Scope of Work and Drawings.

Work will begin within 10 calendar days of the Notice to Proceed (NTP) and will conclude 80 calendar days after

NTP.

Location:

JT Myers Locks and Dam 16501 Raben Road Mt Vernon, IN 47620

This procurement is 100% set-aside for Small Business, 238990-All Other Specialty Trade Contractors. Size Standard: $16,500,000.00.

Method of Payment under this contract will be Electronic Funds Transfer (EFT) to a commercial bank account specified by the Contractor.

Note: The contract award will be based on the lowest price to the Government with one firm fixed-price award from this RFQ. In addition to the completed price breakout schedule quote, the Offeror must complete and submit the Representations and Certifications located within the solicitation.

Please submit quotes to:

U.S. Army Corps of Engineers Room 821, ATTN: Jessica L. McCall 600 Dr. Martin Luther King, Jr. Place Louisville, KY 40202

Quotes are due 13 April 2020, 10:00AM Eastern Time. Fax quotes will not be accepted. Electronic submittals will be accepted and may be emailed to jessica.l.mccall@usace.army.mil.

SCHEDULED SITE VISIT: A site visit on Wednesday 25 March 2020 at 10:30am Central Time has been scheduled at 16501 Raben Road, Mt. Vernon, IN 47620.

NOTE: All POC’s listed in the SOW shall NOT be contacted until after award.

At no time should the Contractor perform additional work outside the scope of this contract without the prior authorization of the Contracting Officer, and no work shall be performed that will cause the Contractor to exceed the Contract Price. Work performed without a binding contract document authorizing such work shall result in the Contractor not being paid for that work performed. During the course of the Contract, any additional work determined to be needed may be requested by Contracting Officer for a Contract Modification. Each interested Contractor should examine the contract drawings, perform pre-bid and assume the responsibility for quantities, materials, critical dimensions, and work conditions used in order to calculate a proposal.

All contractors must be registered in the System for Award Management (www.SAM.gov) prior to award of a contract. All proposed contractors are highly encouraged to review FAR Clause 52.232-33 Payments by Electronic Funds Transfer – System for Award Management, which indicates “All payments by the Government under this contract shall be made by electronic funds transfer (EFT).” Those not currently registered can obtain registration by mailto:jessica.l.mccall@usace.army.mil going to the website http://www.SAM.gov. The process can usually be completed from 24 to 48 hours after submission. Contractors will need to obtain a Unique Entity Identifier (formerly DUNS number) for processing their registration. If you do not already have a Unique Entity Identifier, one can be obtained from http://www.SAM.gov.

Refer to www.SAM.gov for information formerly found in CCR, EPLS, ORCA and FedReg. Please begin the registration process immediately in order to avoid delay of the contract award should your firm be selected.

ALERT: You must submit a notarized letter appointing the authorized Entity Administrator before your registration will be activated. This requirement now applies to both new and existing entities. Effective 29 April 2018, the notarized letter process is now mandatory on all CURRENT registrants at SAM who have a requirement to update data on their SAM record. The notarized letter is mandatory and is required before the GSA Federal Service Desk (FSD) will activate the entity's registration.

Effective 29 June 2018, vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.

Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (formally known as DUNS). The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards.

Remember, there is no cost to use SAM.

To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).

http://www.sam.gov/

PRICE BREAKOUT SCHEDULE

Description Quantity Unit Total for Each Unit Total FMB Track at station 0 + 30

4 EA $ $

FMB Track at station 0 + 80

4 EA $ $

FMB Track at station 2 + 02

4 EA $ $

FMB Track at station 4 + 80

4 EA $ $

FMB Track at station 7 + 52

4 EA $ $

FMB Track at station 10 + 20

4 EA $ $

FMB Track at station 11 + 48

4 EA $ $

FMB Track at station 11 + 98

4 EA $ $

Total $:______________

Section 00 20 00 - Instructions for Procurement

SCOPE OF WORK

Ohio River

JT Myers Locks & Dam Floating Mooring Bitt Concrete Core Drilling

1. GENERAL

I. Scope of Work: This contract will be to core drill four (4) vertical holes at eight (8) different floating mooring bitts per design drawings attached to this contract. Core drilling will be as per the drawings from elevation 362.00 to 305.00. Stations can be referenced on the attached drawing ON-200.1/5.

II. Completion Dates: All core drilling will be completed within 80 calendar days after NTP.

III. Corps of Engineers Inspection: Corps of Engineers personnel shall be allowed to inspect the progress of any portion of this project.

IV. Technical Point of Contact (TPOC): All technical questions regarding this contract shall be directed to Josh Saylor by telephone: (502) 315-7331, or email: Joshua.A.Saylor@usace.army.mil

V. Days and Hours of Work: All work will be done during the hours of 0700-1700 Central Time. Work on weekends or federal holidays will be determined by Lock Master.

VI. Work Site Address: The contractor will be working at JT Myers Locks and Dam.

JT Myers Locks and Dam 16501 Raben Road

Mt Vernon, IN 47620

VII. Project Point Of Contact:

Lockmaster: Dallas Jackson

JT Myers Locks and Dam 16501 Raben Road

Mt Vernon, IN 47620 Phone number: 812-838-6191

E-mail: Dallas.W.Jackson@usace.army.mil

2. RESPONSIBILITIES AND SITE CONDITIONS

I. Contractor shall be fully responsible for the purchase/rental, delivery, and placement of necessary equipment to complete the job without assistance from the lock staff.

II. Contractor shall verify core drill locations with Lock Master and Technical Representative prior to starting.

III. Any requests for use of lock equipment must be directed to and approved by the Technical Representative.

IV. Fueling of equipment will follow all local, state and federal Spill Prevention and Countermeasure (SPCC) regulations. Fuel shall not be provided by the Government.

mailto:Joshua.A.Saylor@usace.army.mil mailto:Dallas.W.Jackson@usace.army.mil

V. Existing break areas, offices, latrines, and showers are not available for the contractor's use . It is recommended that the contractor bring portable restrooms and a break room.

VI. Parking of vehicles is to be coordinated with the Lock Master before the first day of drilling.

VII. All deliveries will be coordinated with the Lockmaster at least 48 hours in advance.

VIII. The contractor is also responsible for the timely and proper disposal of all waste and removed materials related to their repairs from the facility each day.

3. DRAWINGS

*****The construction process shall conform to the attached drawings, which forms a part of these specifications. *****

Sheet Title and Description G-000 G-100 G-101

Cover sheet General notes and index Photos and typical guide section key

S-100 Existing guide recess core drilling plan

OU-200.1/1 Monolith layout OU-200.1/3 Gallery Layout OU-200.1/5 Wall Armor and Appurtenances (SHEET 1) OL-200.1/16 Monoliths R-34 thru R-36

OL-200.1/17

OL-200.1/19

OL-200.1/20

OL-200.1/22

Monoliths R-37 thru R-40 Monoliths R-45 thru R-48 Monoliths R-49 thru R-53 Monoliths R-58 thru R-61

OL-200.1/23 Monoliths R-62 thru R-66 OL-200.1/140 Miscellaneous Metals Floating Mooring Bitt General Arrangement And

Details

A. General conditions

1. Contract will consist of core drilling as shown on s-100 (in preparation of government performed wire cutting)

2. All dimensions and elevations shown on the structural drawings shall be verified by the contractor. All changes or variances shall be approved by the government.

3. Governing codes:

a. Concrete sawing and drilling association (csda-c-101, latest addition)

b. EM 385-1-1, safety and health requirements manual

4. Contractor is responsible to visually field verify the existing conditions prior to the start of any work affecting the drilling operations. Contractor is to report any changes or discrepancies from those shown by the government.

5. The area of drilling shall not exceed the extents shown on the contract drawings.

B. Tolerance - horizontal deviation shall not exceed 1/2" per height (56'-1 3/4")

C. The floating mooring bitt recesses are protected by removable safety chains. The contractor is to remove and reattach these safety chains as necessary to perform the contract work. The contractor shall adhere to EM 385 1- 1, "Safety and Health Requirement Manual" in regards to fall protection and securing the area from accidental falls. When not working on site, the contractor is responsible re-installing the safety chains, or erecting a temporary barrier.

4. WORKMANSHIP

I. General: Workmanship shall be of the highest grade in accordance with the best modern practices to conform to the specifications and drawings.

II. Quality Control: The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirement. The Contractor’s Quality Control staff will ensure that workmanship is of the highest quality and provide documentation that supports this quality for all work performed by the Contractor, any Sub-Contractor, Fabricator or Supplier.

5. SUBMITTALS

I. Contractor shall submit quality control plan per 4-II under workmanship.

II. Contractor shall submit a construction execution schedule for verification from Lock Master.

6. PAYMENTS

Payment will be made by Electronic Funds Transfer (EFT), upon acceptance of the completed work and providing final invoice. Invoices shall be mailed to:

JT Myers Locks and Dam Attn: Dallas Jackson, Lockmaster 16501 Raben Road Mt Vernon, IN 47620

7. WAGE RATES

The U.S. Department of Labor (DoL) wage rates apply to this work and are included. The Contractor is required to provide payroll documentation for all work performed under this Contract.

8. TIME EXTENS IONS FOR UNUSUALLY SEVERE WEATHER ER 415-1-15

This provision specifies the procedure for the determination of the time extensions for unusually severe weather in accordance with the contract clause entitled "Default (Fixed Price Construction)" FAR 52.249-10 in section 00 70 00 of the base contract. In order for a time extension, the following conditions must be satisfied:

The weather experienced at the project site during the contract period must be found to be unusually severe. That is, more severe than the adverse weather anticipated for the project location during any given month. If, in the judgment of the Contracting Officer, the findings of fact warrant such action, the time for completing the work shall be extended. The delay must be beyond the control and without the fault or negligence of the contractor.

The following schedule of the monthly anticipated adverse weather delay is based on the national oceanic and atmospheric administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The contractor's progress schedule must reflect these anticipated adverse weather delays in all-weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS BASED ON (5)

DAY WORK WEEKS

JAN FEB MAR APR MAY JUN JUL

16 12 7 5 4 4 4

Upon acknowledgment of the notice to proceed (NTP) and continuing throughout the contract, the contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual or more of the contractor's scheduled work day. The number of actual adverse weather delay days must prevent work on critical activities for 50 percent weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated, listed above, the contracting officer will convert any qualifying delays days, and issue a modification in accordance with the contract clause entitled to calendar days, giving full consideration for equivalent fair weather work "payments under fixed price construction contracts".

9. SAFETY

The Contractor shall complete all work in accordance with the most current U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, in addition to the current provisions of the Occupational Safety and Health Act, and all applicable Federal, State and local laws, codes and regulations. The Contractor shall submit a safety plan in writing prior to any on-site work. The safety plan may be turned in by the time of the pre-work conference.

Personal Protective Equipment (PPE) and Apparel. Protective apparel and equipment, as identified in the AHA, shall be provided to eliminate or minimize safety hazards to personnel. As a minimum, each employee shall wear a sleeved shirt, long trousers, and safety-toe shoes or boots during all contract work. Hard hats, face shields, safety glasses with side shields, or goggles, and hearing protection shall be worn by employees when required by the Safety Manual. Fire extinguisher(s) and first aid kit(s) meeting the Safety Manual standards shall also be provided an easily accessible to all employees.

http://www.publications.usace.army.mil/Portals/76/Publicat ions/EngineerManuals/EM_385-1- 1.pdf

10. SECURITY

All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the Technical Point of Contact or to the Contracting Officer, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.

All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf

Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the TPOC NLT 5 calendar days after the completion of the training.

All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the TPOC or to the contracting officer (if a TPOC is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations-security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.

All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.

The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award

11. ACCIDENT REPORTING

The Contractor shall maintain accurate accident records and report all accidents as prescribed by the TPOC. Accidents shall be reported within twenty-four (24) hours of occurrence (not including weekends and holidays), and all serious accidents (those resulting in death or injury requiring medical attention or lost time) shall be reported immediately.

12. DAMAGE REPORTS

In all instances where Government property, equipment, natural features, landscape, or trees are damaged by contract employees, an immediate notification shall be made to the TPOC. A full report of the incident and extent of such damage shall be submitted to the TPOC within two (2) calendar days of occurrence, excluding weekends and holidays.

13. CONTRACT EMPLOYEES

All contract employees shall conduct themselves in a proper and courteous manner at all times.

Contract employees shall comply with all provisions of Title 36, Chapter III, Part 327, CFR and obey all posted signs and regulations in the performance of work under this contract. Being under the influence of or consuming alcoholic beverages or any controlled substances by the Contractor or employees while on duty is prohibited.

DRAWINGS

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

G

1 98765432

A N

S I

D

O H

IO

R

IV

E R

J .T

M Y

E R

S L

O C

K S A

N D D

A M

F L

O A

T

IN

G M

O O

R

IN

G B

IT

T R

E C

E S

S R

E P

A

IR

S

P

®of Engineers

US Army Corps

L

O U

IS

V

IL

L E

K Y

D

R

M A

R T

IN

L

U T

H E

R K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

T B

D

C O

N T

R A

C T N

O

CERTIFIED FINAL

S O

L

IC

IT

A T

IO

N N

O

N O

V

LRL_Screen.dscriptLRL_pdf.pltcfg12:51:23 PM 10/24/2019

...\128624_CORE DRILLING_G-000xxx.dgn

S I

G-000

LOUISVILLE DISTRICT

of Engineers

AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.

SIGNATURES AFFIXED BELOW INDICATE OFFICAL RECOMMENDATION

Quality Control

Approval Recommended: *

PE/A

Approved: *

THE SCOPE OF THIER EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.

DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN

LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION

* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,

Reviewed by:*

DATE

DATE

DATEENGINEERING DIVISION, CHIEF

John Bock, P.E.

AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON THIS SHEET.

SIGNATURES AFFIXED BELOW INDICATE OFFICAL RECOMMENDATION

Quality Control

Approval Recommended: *

PE/A

Approved: *

THE SCOPE OF THIER EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.

DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN

LOUISVILLE DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION

* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,

Reviewed by:*

DATE

DATE

DATEENGINEERING DIVISION, CHIEF

John Bock, P.E.

OHIO RIVER

FLOATING MOORING BITT RECESS REPAIRS

P2 128624 FY 21

T

W E

S S

E L

S

G A

L L

A G

H

R

C

V E

R S

H E

J.T. MYERS LOCKS AND DAM

N N

J.T. MYERS

VICINITY MAP

M S

T

IV

E R

S

CORE DRILLING CONTRACT

SOLICITATION NO:

CONTRACT NO: TBD

ISSUE DATE: NOV 2019

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

S I

D

O H

IO

R

IV

E R

J .T

M Y

E R

S L

O C

K S A

N D D

A M

F L

O A

T

IN

G M

O O

R

IN

G B

IT

T R

E C

E S

S R

E P

A

IR

S

P

U

IS

V

IL

L E

K Y

D

R

M A

R T

IN

L

U T

H E

R K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

T B

D

C O

N T

R A

C T N

O

CERTIFIED FINAL

S O

L

IC

IT

A T

IO

N N

O

N O

V

LRL_Screen.dscriptLRL_pdf.pltcfg12:51:26 PM 10/24/2019

...\128624_CORE DRILLING_G-100xxx.dgn

S

G A

L L

A G

H E

G-100

W E

S S

E L

G E

N E

R A

L N

O T

D I

N D

E X

M S

T

IV

E R

S

OFFICER REPRESENTATIVE.

THE SAFETY CHAINS, OR ERECTING A TEMPORARY BARRIER AS APPROVED BY THE CONTRACTING

ACCIDENTAL FALLS. WHEN NOT WORKING ON SITE, THE CONTRACTOR IS RESPONSIBLE RE-INSTALLING

REQUIREMENTS MANUAL" IN REGARDS TO FALL PROTECTION AND SECURING THE AREA FROM

CONTRACT WORK. THE CONTRACTOR SHALL ADHERE TO EM 385-1-1, "SAFETY AND HEALTH

CONTRACTOR IS TO REMOVE AND REATTACH THESE SAFETY CHAINS AS NECESSARY TO PERFORM THE

THE FLOATING MOORING BITT RECESSES ARE PROTECTED BY REMOVABLE SAFETY CHAINS. THE C.

TOLERANCE - HORIZONTAL DEVIATION SHALL NOT EXCEED 1/2" PER HEIGHT (56'-1 3/4")B.

THE AREA OF DRILLING SHALL NOT EXCEED THE EXTENTS SHOWN ON THE CONTRACT DRAWINGS.5.

CHANGES OR DISCREPANCIES FROM THOSE SHOWN BY THE GOVERNMENT.

START OF ANY WORK AFFECTING THE DRILLING OPERATIONS. CONTRACTOR IS TO REPORT ANY

CONTRACTOR IS RESPONSIBLE TO VISUALLY FIELD VERIFY THE EXISTING CONDITIONS PRIOR TO THE 4.

EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS MANUALB.

CONCRETE SAWING AND DRILLING ASSOCIATION (CSDA-C-101, LATEST ADDITION)A.

GOVERNING CODES: 3.

THE CONTRACTOR. ALL CHANGES OR VARIANCES SHALL BE APPROVED BY THE GOVERNMENT.

ALL DIMENSIONS AND ELEVATIONS SHOWN ON THE STRUCTURAL DRAWINGS SHALL BE VERIFIED BY 2.

PERFORMED WIRE CUTTING).

CONTRACT WILL CONSIST OF CORE DRILLING AS SHOWN ON S-100 (IN PREPARATION OF GOVERNMENT 1.

GENERAL CONDITIONSA.

GENERAL NOTES:

= WITHW/

= VERTICALVERT

= TYPICALTYP

= SPACINGSPA

= PLACESPLCS

= PLATEPL

= OPENINGOPNG

= ON CENTEROC

= LONG LEG HORIZONTALLLH

= FLOATING MOORING BITTFMB

= EXISTINGEXIST

= EACH SIDEES

= ELEVATIONELEV

= CLEARCLR

= CORROSIVECORR

= CONTRACTING OFFICER'S REPRESENTATIVECOR

= CONCRETECONC

= CENTERLINECL

ABBREVIATIONS

LOCK WALL

FACE OF EXISTING

/4

/4

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

S I

D

O H

IO

R

IV

E R

J .T

M Y

E R

S L

O C

K S A

N D D

A M

F L

O A

T

IN

G M

O O

R

IN

G B

IT

T R

E C

E S

S R

E P

A

IR

S

P

U

IS

V

IL

L E

K Y

D

R

M A

R T

IN

L

U T

H E

R K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

T B

D

C O

N T

R A

C T N

O

CERTIFIED FINAL

S O

L

IC

IT

A T

IO

N N

O

N O

V

LRL_Screen.dscriptLRL_pdf.pltcfg12:51:29 PM 10/24/2019

...\128624_CORE DRILLING_G-101xxx.dgn

G A

L L

A G

H E

G-101

W E

S S

E L

P H

O T

O S A

N D T

Y P

IC

A L G

U

ID

E

S E

C T

IO

N K

E Y

EL. ± 305.00

EL. 362.00

TYPICAL GUIDE SECTION - KEY

NO SCALE

S-100

NO SCALE

NO SCALE

NO SCALE

NO SCALE

PHOTO #1 - SOUTH LOCK

PHOTO #4 - FLOATING MOORING BITT (TYP) PHOTO #5 - FLOATING MOORING BITT RECESS (TYP) 3/8"=1'-0" 6'4'2'0

M S

T

IV

E R

S

EL. 361.15

PHOTO #2 - FLOATING MOORING BITTS R36 & R37 PHOTO #3 - FLOATING MOORING BITTS R62 & R63

R63 STA 0+30 DS ONLY

EL. ± 308.00 FOR FMB

/4 F

O R F

M B O

N R -6

A

T S

T A

D

S O

N

Y

RECESS OPENING

FRAMING AND

FACE OF EXIST

FACE OF EXIST LOCK WALL

/2

/2

/2

1'-7"3'-7 7/8 "1'-7"

/2

ROLLER SLOT STEEL

EXIST MOORING BITT

1'-7"

EXTENT SHOWN (TYP)

EXIST CONC & FRAMING

FUTURE WIRE CUT OF

STEEL FRAMING

EXIST EMBEDDED

STEEL FRAMING

EXIST EMBEDDED 1'-7" 1'-9 15/16 " 1'-9 15/16 " 1'-7"

SLOT STEEL

BITT ROLLER

EXIST MOORING

(TYP 4 PLCS).

DRILL HOLE

3 1/2" DIA. CORE

DRILL HOLE (BEYOND).

3 1/2" DIA. CORE

EXIST CONC WALL

/2

ANCHORS

EXIST FRAMING

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N M

A R

K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

A

B

C

D

E

F

S I

D

O H

IO

R

IV

E R

J .T

M Y

E R

S L

O C

K S A

N D D

A M

F L

O A

T

IN

G M

O O

R

IN

G B

IT

T R

E C

E S

S R

E P

A

IR

S

P

U

IS

V

IL

L E

K Y

D

R

M A

R T

IN

L

U T

H E

R K

IN

G J

R P

L A

C E

L O

U

IS

V

IL

L E D

IS

T R

IC

T

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

T B

D

C O

N T

R A

C T N

O

CERTIFIED FINAL

S O

L

IC

IT

A T

IO

N N

O

N O

V

LRL_Screen.dscriptLRL_pdf.pltcfg12:51:38 PM 10/24/2019

...\128624_CORE DRILLING_S-100xxx.dgn

G A

L L

A G

H E

S-100

W E

S S

E L

SECTION

1" = 1'-0" 2'1'0

ELEV = 362.00

TOP OF WALL

ELEV = 361.15

TYP

CL

2'1'0

(RECESS OPNG)

S-100

CL

M S

T

IV

E R

S

EXISTING GUIDE RECESS CORE DRILLING PLAN - AT TOP OF WALL (EL 362.00)

1" = 1'-0"

E X

IS

T

IN

G G

U

ID

E R

E C

E

C

R E D

R

IL

L

IN

G P

L A

N

ELEV ± 305.00

CORE DRILL BOTTOM

FOR FUTURE WIRE SAW ACCESS.

3 1/2" DIA. CORE DRILL HOLE IS NOTE:

R63 STA 0+30 DS ONLY

ELEV ± 308.00 FOR FMB

Section 00 21 00 - Instructions

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

CLAUSES INCORPORATED BY FULL TEXT

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (DEC 2019)

The Offeror shall not complete the representation in this provision if the Offeror has represented that it “does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument” in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v) of the provision at 52.212-3, Offeror Representations and Certifications--Commercial Items.

(a) Definitions. As used in this provision--

Covered telecommunications equipment or services, critical technology, and substantial or essential component have the meanings provided in clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.

(b) Prohibition. Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Contractors are not prohibited from providing--

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.

(d) Representation. The Offeror represents that it [ ] will, [ ] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation.

(e) Disclosures. If the Offeror has represented in paragraph (d) of this provision that it “will'' provide covered telecommunications equipment or services”, the Offeror shall provide the following information as part of the offer-https://www.sam.gov/

(1) A description of all covered telecommunications equipment and services offered (include brand; model number, such as original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable);

(2) Explanation of the proposed use of covered telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b) of this provision;

(3) For services, the entity providing the covered telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known); and

(4) For equipment, the entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).

(End of provision)

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

4.8% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Posey County, Indiana

52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT--CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American --Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for-- 25 March 2020 at 10:30am Central Time

(c) Participants will meet at— JT Myers Locks and Dam

16501 Raben Road Mt Vernon, IN 47620

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov and https://www.acq.osd.mil/dpap/

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defesne Federal Acquisition Regulation Supplemnt (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

Section 00 45 00 - Representations and Certifications

REPRESENTATIONS & CERTIFICATIONS

COMPANY NAME AND ADDRESS: _______________________________________

PHONE NUMBER ________________ FAX NUMBER ________________

EMAIL ADDRESS ______________________________________________________

BUSINESS SIZE (select one)

Large Business _____ Small Business_____ HUBZone Business_____ 8A _____

Woman-Owned ____ Service-Disabled Veteran-Owned ____

Contractor is registered with System for Award Management (SAM): _____ YES _____ NO (See FAR 52.204-7)

INDICATE UNIQUE ENTITY IDENTIFIER (formerly DUNS No.). ___________________ (Note: See FAR 52.204-6. The DUNS Number is a 9 digit numeric code.)

CAGE NO. ______________

52.203-19 Prohibition on Requiring Certain Internal Confidentiality

Agreements or Statements

JAN 2017

52.204-19 Incorporation by Reference of Representations and Certifications.

DEC 2014

52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

NOV 2011

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2020)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238990.

(2) The small business size standard is $16,500,000.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2; Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5; Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .