W912QR20B0024_Plans-0000.pdf
PDF 41 MB Posted
- Attached to
- Repair Airfield Lighting at Grissom ARB, IN
- Solicitation number
- W912QR20B0024
About this file
This document provides details on a federal contract opportunity to repair airfield lighting at Grissom Air Reserve Base in Indiana. The opportunity involves replacing existing taxiway and runway lighting circuits and conduit, replacing wind socks, and upgrading runway edge lights, taxiway edge lights, runway distance remaining signs, runway approach lights, and PAPI lights. The contract will have a duration of 540 calendar days. A pre-bid site visit may be held. The solicitation will be a firm-fixed-price contract under NAICS code 238210 with selection based on lowest price. The magnitude of the construction project is estimated between $5 million to $10 million. The procuring agency is the Department of the Army Corps of Engineers Louisville District.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR20B0024 (Abtsract of Bidders).pdf | ||
| W912QR20B0024_Plans-0002.pdf | ||
| W912QR20B0024_Specs-0002.pdf | ||
| W912QR20B0024-0001.pdf | ||
| W912QR20B0024_Specs-0000.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
NOT TO SCALE
VICINITY MAP
NOT TO SCALE
LOCATION MAP
LAFAYETTE
EVANSVILLE
TERRE
INDIANAPOLIS
FORT
WAYNE
SOUTH
BEND
HAUTE
LOUISVILLE
KOKOMO
PERU
MIAMI
COUNTY
PROJECT LOCATION
AIRFIELD LIGHTING
IMPROVEMENTS-PHASE A
GRISSOM AIR RESERVE BASE
INDIANA
N.T.S
SOLICITATION NO.: W912QR-19-B-0010
P2 NO. 472105
CONTRACT NO.:
ISSUE DATE:
VOLUME
United States Army
Corps of Engineers
Louisville District
INDEX
DESIGN FILE SHEET NO.
DESCRIPTION
GI
GC
GC
GC
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
102-103
111, 118, 119
218-224
227-228
503-504
TITLE SHEET
HAUL ROUTE AND STAGING AREA PLAN
SCOPE OF WORK
HAUL ROUTE AND STAGING AREA NOTES & DETAILS
STORM DRAIN & EROSION CONTROL PLAN KEY MAP
STORM DRAIN PLAN
STORM DRAIN PLAN
STORM DRAIN PLAN
EROSION CONTROL PLAN
STORM DRAIN PLAN-PROFILE
EROSION CONTROL & STORM DRAIN PLAN-PROFILE
SWPPP NOTES
SWPPP DETAILS
DRAINAGE DETAILS & NOTES
EG 001 ELECTRICAL LEGEND
EG 002 ELECTRICAL NOTES
E 001 SCOPE OF WORK-BASE BID
E 002 SCOPE OF WORK-OPTIONS
E 100 ELECTRICAL LAYOUT KEYPLAN
E 101-115 PROPOSED ELECTRICAL
E 100A
E 501-503
E 504
E 505
E 506
E 507
E 508
E
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
ELECTRIC LAYOUT OPTIONS KEY PLAN
E 102A
PROPOSED ELECTRIC OPTIONS
E 110A-111A
PROPOSED ELECTRIC OPTIONS
E 118A-128A
PROPOSED ELECTRIC OPTIONS
E 118-128 PROPOSED ELECTRICAL
E 003 EXISTING TAXIWAY CIRCUITS
C 100 CIVIL LEGEND
E
509-511
512A-513A
ELECTRICAL DETAILS CONDUIT TRENCH
ELECTRICAL DETAILS PULL-CAN PLAZA (TYPE A)
ELECTRICAL DETAILS PULL-CAN PLAZA (TYPE B)
ELECTRICAL DETAILS CABLE TAGS & CONNECTORS
ELECTRICAL DETAILS WINDCONES
ELECTRICAL DETAILS ONE-LINE DIAGRAM
ELECTRICAL DETAILS AIRFIELD LIGHTING VAULT
ELECTRICAL DETAILS OPTIONS
ELECTRICAL DETAILS MOCKUP
CS
CS
102,103,111
HORIZONTAL CONTROL KEY MAP
HORIZONTAL CONTROL PLAN
CS 118-128 HORIZONTAL CONTROL PLAN
CG 126 EROSION CONTROL & STORM DRAIN PLAN
7/31/2020
E
18 August 2020
W912QR20B0024
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
GI-101
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text 07/31/2020
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L
C
L
C
L
C
L
C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
LC
LC
LCLC
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
CONSTRUCTION PHASING NOTES
LEGEND
LOW PROFILE BARRICADES
HAUL ROUTE
AIRFIELD OPERATIONS AREA
STAGING AREA
CONTRACTOR PARKING AREA
T A
X I W
A Y
B
TAXIWAY G
T A
X I W
R
U
N
W
T
A
X
I
W
T
A
X
I
W
H
A
X
I
W
G
A
X
I
W
F
MAIN GATE FOR AIR RESERVE
BASE
VISITOR'S
CENTER
BUILDING
AIRFIELD
ACCESS GATE #
INDIA 1 ECP SEE
NOTE 7
STAGING AND MAIN
LAYDOWN AREA FOR
MATERIAL, EQUIPEMENT,
PORTABLE TOILETS ETC.
DEAN
BALDWIN
PAINTING
1. OBTAIN BASE ID BEFORE ENTERING GRISSOM ARB.
OBTAIN AIRFIELD DRIVERS LICENSE FROM AIRFIELD
MANAGEMENT (BUILDING # 600) BEFORE ENTERING THE
AIRFIELD OPERATIONS AREA.
2. MAINTAIN FOD FREE HAUL ROUTES AT ALL TIMES AND
CHECK FOR FOD ON ALL VEHICLES BEFORE LEAVING
THE WORK AREA
3. DO NOT ENTER RESTRICTED AREA.
4. MAXIMUM EQUIPMENT HEIGHT INSIDE WORK AREA IS 25
FEET. ALL EQUIPMENT NOT IN USE SHALL BE STORED IN
THE LAYDOWN / STORAGE AREA, NOT AT THE WORK
AREA. THE LAYDOWN AND STORAGE AREA ARE SHOWN
ON THIS SHEET.
5. ALL APRONS, TAXIWAYS AND AIRFIELD PAVEMENT
OUTSIDE WORK AREA SHALL REMAIN OPERATIONAL
DURING CONSTRUCTION; CONTRACTOR TO MAINTAIN
MINIMUM CLEARANCES SHOWN FOR CENTERLINES OF
TAXILANES / TAXIWAYS.
6. THE CONTRACTOR SHALL PARK WORK VEHCILES, WHEN
NOT BEING UTILIZED, IN THE CONTRACTOR'S STAGING
AND LAYDOWN AREA SHOWN ON THIS SHEET.
PERSONAL VESICLES SHALL BE PARKED OUTSIDE THE
AOA SECURITY FENCE AT THE LOCATION SHOWN ON
THE PLANS
7. AIRFIELD ACCESS GATE IS CONTROLLED BY SECURE
KEYPAD. THE CONTRACTOR SHALL RECEIVE A CODE
FROM THE 434 ARW SECURITY FORCES.
8. THE CONTRACTOR SHALL WORK WITH THE OFFICE OF
AIRFIELD MANAGEMENT TO SHUT OFF THE POWER
PRIOR TO WORKING ON ALL CIRCUITS.
9. THE PROPOSED LAYDOWN AREAS WITHIN THE RUNWAY
LATERAL CLEARANCE ZONE WILL BE TEMPORARY AND
LIMITED AS DETERMINED BY AIRFIELD OPERATIONS.
10. CONTRACTOR SHALL BE RESPONSIBLE FOR GROUND
MAINTENANCE (MOWING) INSIDE PROPOSED LAY DOWN
AREA.
11. CONTRACTOR SHALL SUBMIT A PHASING PLAN THAT
WILL NOT IMPACT THE RUNWAY EDGE LIGHTING SYSTEM
FROM 7 AM TO 11 PM, 7 DAYS A WEEK, UNLESS
COORDINATED WITH THE AOM.
H
O
O
S
I
E
V
D
H
O
O
S
I
V
D
H
O
O
S
I
V
D
CONTRACTOR
PERSONAL VEHICLE
PARKING AREA
AIRFIELD
OPERATIONS AREA
BOUNDARY
(TYPICAL)
T
A
X
I
W
D
A
X
I
W
PROPOSED LAYDOWN AREA
THIS AREA MUST BE A MIN.
OF 30 FEET FROM THE
FENCE LINE, BUT NEAR
PERIMETER ROAD.
SECURITY FORCES SHALL
BE ABLE TO CONDUCT
ROUTINE PATROLS.
PROPOSED LAYDOWN AREA
THIS AREA MUST BE A MIN.
OF 30 FEET FROM THE
FENCE LINE, BUT NEAR
PERIMETER ROAD.
SECURITY FORCES SHALL
BE ABLE TO CONDUCT
ROUTINE PATROLS.
PROPOSED LAYDOWN AREA
THIS AREA MUST BE A MIN. OF 50 FEET
FROM THE 731 ANTENNA, STAY CLEAR OF
THE 05 GLIDE SLOPE CRITICAL AREA, AND
REMAIN A MIN OF 30 FEET CLEAR OF THE
FENCE LINE, BUT NEAR PERIMETER ROAD.
SECURITY FORCES SHALL BE ABLE TO
CONDUCT ROUTINE PATROLS.
GRAPHIC SCALE (FEET)
300 600 1200
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
CONSTRUCTION LIMITS
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text
U.S. HIGHWAY 31
AutoCAD SHX Text
HOOSIER BLVD
AutoCAD SHX Text
U.S. HIGHWAY 31
AutoCAD SHX Text
STATE HWY. 218
AutoCAD SHX Text
WARTHOG ST
AutoCAD SHX Text
GRISSOM AVE
AutoCAD SHX Text
BAKALAR LN
AutoCAD SHX Text
GC-101
AutoCAD SHX Text
HAUL ROUTE AND STAGING AREA PLAN
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
INSTALL NEW PULL
CAN PLAZA DUCT
BANK SYSTEM
RE-CIRCUIT
RUNWAY EDGE
LIGHTING SYSTEM
INSTALL ENTIRE
DRAINAGE
SYSTEM
INSTALL NEW
RUNWAY 5 WIND
CONES
MODIFY AIRFIELD
LIGHTING VAULT
RE-CIRCUIT
TAXIWAY EDGE
LIGHTING SYSTEM
TAXIWAY F
RUNWAY 5-23
RE-CIRCUIT
RUNWAY DISTANCE
REMAINING SIGNS
RE-CIRCUIT
RUNWAY HOLD
SIGNS
INSTALL NEW
RUNWAY 23
WIND CONES
REPLACE
RUNWAY 5
APPROACH
LIGHTING
SYSTEM HOME
RUN CABLES
REPLACE RUNWAY 23
APPROACH LIGHTING
SYSTEM HOME RUN CABLES
REPLACE RUNWAY
5 PAPI HOME RUN
CABLES
REPLACE RUNWAY
23 PAPI HOME RUN
CABLES
INSTALL PAPI 23
CONCRETE HOUSE
KEEPING PAD
INSTALL RDR
CONCRETE HOUSE
KEEPING PAD
SEE SHEETS E-001 & E-002
FOR ADDITIONAL
CLARIFICATION OF
ELECTRICAL SCOPE OF WORK
L C
L C
L
C
L
C
L
C
L
C
L C
L C
CO
CO CO COCO
CO
CO
CO
CO
S
D
S
D
S
D
S
D
S
D
S
D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S D
S D
S D
S D
S D
S D
LC LC LC LC LC LC
LCLCLCLCLC
LC LC LC LC LC LC
LCLCLCLCLCLC
L C
L C
L C
L C
L C
LC
LC LC
LC
LC LC
LC LC
LC LC LC
LC LC LC LC
LC
L C
L C
LC
LC LC LC
LC LC LC
L C
L C
LC
LC LC
L C
L C
LC LC LC
L C
L C
LC
L C
L C
L C
L C
LC
LC
L C
L C
LC LC LC LC LC
LC LC
LC LC LC
LC
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
LC
LC
LC
LC
LC
LC
LC
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
L C
L C
S
D
S
D
S
D
S
D
S
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
DS
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
D S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
LC
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
L C
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
L C
L C
LC LC
L C
L C
LC
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D S
D
D S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D
S
D
S
D
S
D
S
D
L
C
LC
S
D
S
D
S
D
S
D
S
COCOCO COCOCO
CO
COCO CO CO CO COCO CO COCOCO CO
COCOCO
CO
CO
CO
CO
CO
CO
CO
CO CO CO COCO CO COCO COCO COCO COCO COCO
COCOCO
L
C
LC LC LC
L C
L C
LC LC
LC
L C
L C
LC LC LC
L C
L C
LC
LC LC
L C
L C
LC
L C
L C
LC
L C
L C
LC LC LC
L C
L C
LC LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
L
C
L
C
LC LC
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
LC
LC LC
L
C
L
C
LC
LC LC
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
LCLCLCLCLCLCLCLCLC
LC
L
C
L
C
L
C
L
C
LC
L C
L C
LCLC
L C
L C
LCLC
L C
L C
LCLC
L C
L C
LCLC
L C
L C
LCLC
L
C
L
C
LCLCLC
L C
L C
LCLCLC
L C
L C
LC
L C
L C
L C
L C
LCLC
L C
L C
LCLCLC
L C
L C
LCLC
L C
L C
LCLC
L C
L C
LCLC
L C
L C
L C
L C
LCLC
L C
L C
LCLCLC
L C
L C
LC
LC
L C
L C
LCLC
L C
L C
LCLC
L
C
L
C
L C
L C
LCLC
L C
L C
LCLC
L C
L C
LC
L
C
L
C
LCLC
L C
L
C
L
C
L C
L
C
LC
LC
LC LC LC
LC LC LC LC LC LC LC LC LC LC LC LC
LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L
C
L C
L C
L C
L C
LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC
LC LC LC LC LC LC
L
C
LC
LC LC LC LC LC LC
LCLCLCLCLCLC
L
C
L
C
LC
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
L C
L C
L C
L C
L
C
L
C
LC
L
C
L
C
L
C
L C
L C
LCLC
L
C
L
C
LCLCLC
L C
L C
LCLCLC
L C
L C
LCLC
L C
L C
L C
L C
LCLCLC
L C
L C
LC LC LC
LCLCLCLCLCLCLCLC
LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC LC
L
C
L
C
L
C
L
C
L
C
L
C
LC
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L C
L C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
LC LC LC LC LC LC
LC LC LC LC
LC
LCLCLCLCLCLCLCLC
L
C
L
C
L C
L C
L
C
L
C
LC
LC
L
C
LC
LC LC
L
C
LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC LC
L C
L C
LC LC
L
C
L
C
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC LC
L C
L C
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC
L C
L C
LC LC LC
L C
L C
L C
L C
L
C
L C
L C
L C
L C
L
C
L
C
L
C
L
C
L
C
LCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLCLC
L C
LCLCLC
LC
L C
L C
LC LC LC
L C
L C
LC
LC
L C
L C
LC LC
L C
L C
LC
L C
L C
LC
L C
L C
LC LC LC
L C
L C
LC LC LC
L C
L C
LC
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
L
C
LCLCLCLCLCLCLCLC
LCLCLCLCLCLCLCLC
L C
L C
L C
L
C
L
C
L
C
L
D
S
D
S
D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S
D
S
D
S
D
S
D
S D S D S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S
S D S D S D S D S D S D S D S D
S D S D
S D
S D
S D
S
D
S D S D
S D S D
S D
S D
S
D
S
D
S
D
S
D
S
D
S
D
S
D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S DS D S D S D S D S D S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D
S
D
S
D
S D
S D
S D
S D
S D
S D
S D
S
D
S D
S D S D S D S D
S D S D S D S D S D S D S D
S D S D S D S D S D S D S D S D
S D S D S D
S D S D
S D S D S D S D
S D S D S D
S D S D S D
S D
S D S D
S D S D
S D S D
S D S D
S D S D
S D S D S D
S D S D
S D S D
S D
S D
S D S D
S D
S
D
S
D
S
D
S
D
S
D
S D
S
D
S
D
S
D
S
D
S
D
S D
S D
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L C
L
C
LCLCLCLCLCLCLCLCLCLCLCLCLCLC
LC LC LC LC LC LC LC LC LC LC LC LC LC LC
L
C
INSTALL PAPI 5
CONCRETE HOUSE
KEEPING PAD
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text
U.S. HIGHWAY 31
AutoCAD SHX Text
EAST LOOP ROAD
AutoCAD SHX Text
HOOSIER BLVD
AutoCAD SHX Text
KITTYHAWK
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text FlYER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
HOOSIER
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
FORTRESS
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LIGHTNING
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
LANCER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LANCER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
THUNDERBOLT
AutoCAD SHX Text
THUNDERBOLT
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
CONSTELLATION
AutoCAD SHX Text
MATADOR
AutoCAD SHX Text
MUSTANG
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
RUNWAY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
HARRY FROEMAN
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
WARRIOR
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
KELLY
AutoCAD SHX Text
SKYTRAIN
AutoCAD SHX Text
STREET
AutoCAD SHX Text
WARTHOG
AutoCAD SHX Text
STREET
AutoCAD SHX Text
GRISSOM
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
HOOSIER
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
TANKER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
TANKER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
CHOCKS LANE
AutoCAD SHX Text
BOOM PLACE
AutoCAD SHX Text
BOXCAR STREET
AutoCAD SHX Text
DRAGONFLY
AutoCAD SHX Text
LANE
AutoCAD SHX Text
MUNITIONS DRIVE
AutoCAD SHX Text
BAKALAR LANE
AutoCAD SHX Text
ATTERBURY
AutoCAD SHX Text
WAY
AutoCAD SHX Text
SEXTANT LANE
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text P
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
GC-102
AutoCAD SHX Text
SCOPE OF WORK
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
NOTES
1. VEHICULAR MARKINGS: CONTRACTOR VEHICLES AND EQUIPMENT SHALL BE
MARKED WITH CHECKERED FLAGS OR LIGHTED WITH FLASHING BEACONS.
1.1. ALL CONSTRUCTION EQUIPMENT, SUCH AS BULLDOZERS, BACKHOES,
GRADERS, END LOADERS, PANS, OFF-ROAD ARTICULATED DUMP TRUCKS,
TRADITIONAL DUMP TRUCKS STATIONED ON-SITE, AND SIMILAR EQUIPMENT
SHALL BE MARKED WITH AN ORANGE/WHITE CHECKERED FLAG ATTACHED TO
THE HIGHEST POINT ON THE VEHICLE.
1.2. ALL OTHER CONSTRUCTION RELATED VEHICLES, SUCH AS SUPERVISOR'S
VEHICLES, EQUIPMENT AND MAINTENANCE SUPPORT VEHICLES (VANS,
PICK-UPS, ETC.), DUMP TRUCKS THAT TRANSPORT OFF-SITE AND ON-SITE, AND
SIMILAR EQUIPMENT SHALL BE LIGHTED WITH A YELLOW FLASHING BEACAN
THAT IS VISIBLE DURING BOTH LOW VISIBILITY AND DAYLIGHT CONDITIONS AND
MARKED WITH PERMANENT OR MAGNETIC PLACARDS IDENTIFYING THE
COMPANY NAME ON BOTH SIDES OF THE VEHICLE.
2. THE FLAGS SHALL BE 36 INCHES SQUARE HAVING A CHECKERED PATTERN OF
ORANGE AND WHITE SQUARES AT LEAST 12 INCHES PER SIDE.
C-5
NOT TO SCALE
TRUCK SIGNAL FLAG
GENERAL CONSTRUCTION NOTES:
THE GENERAL REQUIREMENTS PRESENTED IN THESE NOTES ARE SUPPLEMENTARY TO THOSE GIVEN IN THE
SPECIFICATION.
I. SPECIFIED CONTRACT TIMES
REFER TO THE SPECIFICATION FOR CONTRACT DURATION AND ASSOCIATED LIQUIDATED DAMAGES FOR FAILURE TO
COMPLETE WORK WITHIN THE SPECIFIED CONTRACT TIME.
II. SITE AVAILABILITY
THE CONTRACTOR IS REQUIRED TO STAY WITHIN THE WORK AREA LIMITS SHOWN IN THE PLANS AND UTILIZE THE
HAUL ROUTES SPECIFIED IN THE PLANS.
III. MAINTENANCE OF TRAFFIC AND ACCESS TO FACILITIES
THE CONTRACTOR SHALL CONDUCT THEIR WORK SUCH THAT THE SAFETY OF AIRPORT TRAFFIC OPERATIONS IS
MAINTAINED AT ALL TIMES. THE CONTRACTOR IS ADVISED, AND SHALL ACCEPT THIS AS AN IMPORTANT ELEMENT OF
THE WORK. THE MAINTENANCE OF SAFE AND EFFICIENT ACCESS TO THE AIRFIELD OPERATIONAL AREAS VIA THE
TAXIWAY/TAXILANE AND APRON SYSTEMS IS AN INTEGRAL PART OF THE WORK. ALL CONTRACTOR TRAFFIC SHALL
CONFORM TO THE REQUIREMENTS AS NOTED IN THE SPECIFICATION AND THE CONTRACT DOCUMENTS
THE PLAN CONTAINS ONLY GENERAL INFORMATION REGARDING CONTRACTOR TRAFFIC CONTROL SAFETY
MEASURES AND DEVICES NECESSARY FOR CONTROLLING TRAFFIC OPERATIONS TO AND THROUGH THE
CONSTRUCTION SITE. THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE MAINTENANCE OF
TRAFFIC AND WORK SCHEMES PRESENTED HEREIN. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR
ESTABLISHING, IMPLEMENTING, AND MAINTAINING SAFE AND EFFECTIVE TRAFFIC CONTROL PROCEDURES AT ALL
TIMES.
A. IT IS A REQUIREMENT OF THIS CONTRACT THAT CONTINUOUS ACCESS BE MAINTAINED TO ALL FACILITIES NOTED FOR
THE DURATION OF THE PROJECT OR AS INDICATED HEREIN.
B. ACCESS MUST BE MAINTAINED TO THE FOLLOWING FACILITIES AT ALL TIMES:
1. ALL AIR RESERVE BASE FACILITIES, INCLUDING THE RESTRICTED AREAS
2. ALL ACCESS AND SERVICE ROADS
3. ALL TENANT BUILDINGS AND HANGARS
4. THE RUNWAY, TAXIWAYS AND APRONS.
5. ATCT
6. NAVIGATIONAL FACILITIES
7. FIRE STATION (ARFF)
D. THE CONTRACTOR WILL NOT BE ALLOWED TO PARK CONSTRUCTION VEHICLES OR EQUIPMENT OUTSIDE OF THE
CONTRACTOR'S WORK AREA LIMITS OR STAGING AREA AT ANY TIME. EMPLOYEES FOR THE CONTRACTOR MAY ONLY
PARK WITHIN THE CONTRACTOR'S DESIGNATED AREA AT THE BUILDING 600 PARKING LOT. THE CONTRACTOR SHALL
NOTIFY THE OFFICE OF AIRFIELD MANAGEMENT ON THE NUMBER OF PARKING SPACES THEY WILL REQUIRE DURING
THE PROJECT PRIOR TO MOBILIZATION.
E. THE CONTRACTOR SHALL PROVIDE AND ACCOMMODATE CONTINUOUS INGRESS/EGRESS FOR ALL AIRCRAFT AND
SERVICE EQUIPMENT THROUGHOUT THE COURSE OF THIS PROJECT.
IV. CONSTRUCTION SAFETY ADJACENT TO OR WITHIN THE AIRPORT OPERATIONS AREA
(AOA), TAXIWAY, TAXILANE, AND RUNWAY OBJECT FREE AREAS
A. THE CONTRACTOR IS ADVISED THAT THE RUNWAY AND TAXIWAYS, INCLUDING PORTIONS OF T/W "F" AND
NORTH-SOUTH RUNWAY WILL BE OPERATIONAL AND ACTIVE DURING THIS PROJECT UNLESS OTHERWISE STATED IN
THE NOTES. THE CONTRACTOR'S PERSONNEL MUST STAY WITHIN THE WORK AREAS AS DEFINED IN THE PLANS.
UNESCORTED OR UNAUTHORIZED INCURSIONS INTO THE AOA OR MOVEMENT AREAS (OPEN TAXIWAYS/RUNWAYS)
ARE SUBJECT TO LOCAL AND FEDERAL PROSECUTION AND PENALTIES. A FEDERAL FINE MAY APPLY FOR EACH
INCURSION. THE CONTRACTOR SHALL MAINTAIN RADIO COMMUNICATION WITH THE ATCT AND THE OFFICE OF
AIRFIELD MANAGEMENT AT ALL TIMES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE RADIOS TO
BE USED ON THE PROJECT.
B. THE CONTRACTOR SHALL BECOME FAMILIAR WITH ALL REQUIREMENTS OF THE AIRPORT AND AFI13-213. THEY SHALL
COOPERATE AS WELL AS COORDINATE WITH OTHER CONTRACTORS TO ENSURE A SAFE CONSTRUCTION SITE AND
TIMELY EXECUTION OF WORK. CONSTRUCTION ACTIVITY SHALL BE SCHEDULED TO BE COMPATIBLE WITH THE
AIRPORT AND AIRCRAFT OPERATIONS. THE CONTRACTOR IS ADVISED THAT SECURITY RULES AND REGULATIONS
ARE SUBJECT TO CHANGE AT ANY TIME. THE CONTRACTOR SHALL IMMEDIATELY COMPLY WITH THE CHANGES AS
DIRECTED BY THE OFFICE OF AIRFIELD MANAGEMENT.
C. THE MAXIMUM HEIGHT FOR CONSTRUCTION EQUIPMENT IS STATED IN THE NOTES.
D. THE CONTRACTOR IS NOT PERMITTED TO PILE EXCAVATED MATERIALS OR STOCKPILE MATERIALS WITHIN CLOSE
PROXIMITY OF NAVAIDS, CLEAR ZONES, OR WITHIN CLOSE PROXIMITY OF RUNWAY, TAXIWAYS OR ON APRON AREAS
DURING THE COURSE OF THIS PROJECT BECAUSE OF THE POTENTIAL FOR FOREIGN OBJECT DAMAGE (FOD) AND
OBSTRUCTION HAZARDS. THE LOCATION AND METHOD OF STOCKPILED MATERIALS SHALL BE APPROVED BY THE
OFFICE OF AIRFIELD MANAGEMENT PRIOR TO CONSTRUCTION.
E. STOCKPILED MATERIAL WILL NOT BE ALLOWED WITHIN 250’ OF RUNWAY CENTERLINE AND 200’ OF TAXIWAY.
STOCKPILES ALLOWED OUTSIDE THESE LIMITS WILL NOT EXCEED 3’ IN HEIGHT DURING DAYTIME CONSTRUCTION
AND WILL NEED TO BE MOVED TO THE LAY DOWN AREA AT THE END OF THE DAY.
V. AIRFIELD AND ATCT FACILITIES
IT IS IMPERATIVE TO THE OPERATION OF THE AIRPORT THAT ALL AIRPORT ATCT FACILITIES REMAIN IN SERVICE AND
UNAFFECTED BY THE CONTRACTOR'S WORK. FURTHERMORE, ACCESS TO THESE FACILITIES SHALL BE MAINTAINED
AND REMAIN OPEN THROUGHOUT THE PROJECT. SPECIFIC REQUIREMENTS ARE GIVEN IN THESE PLANS AND
SPECIFICATIONS TO THAT EFFECT AND INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING:
A. THE CONTRACTOR MUST COORDINATE WITH THE OFFICE OF AIRFIELD MANAGEMENT AND THE ATCT. THEY SHALL
MAINTAIN POWER TO ALL AIRFIELD FACILITIES DURING THIS PROJECT. THESE INCLUDE RUNWAY AND TAXIWAY EDGE
AND CENTERLINE LIGHTS, AND AIRPORT GUIDANCE SIGNS. ANY UNPLANNED INTERRUPTION OF THESE FACILITIES
SHALL BE IMMEDIATELY REPAIRED BY THE CONTRACTOR.
B. POWER AND COMMUNICATION SHALL REMAIN CONTINUOUS FOR ALL NAVIGATIONAL FACILITIES.
VI. AIRPORT SECURITY
A. PERSONNEL WORKING WITHIN THE AOA MUST BE PROPERLY IDENTIFIED WITH A SECURITY ID BADGE ISSUED BY
GRISSOM ARB.
B. NO CONTRACTOR PERSONNEL OR VEHICLES SHALL VENTURE BEYOND THE WORK AREA LIMITS, THE STAGING AREA, OR THE HAUL ROUTE AS SHOWN IN THE PLANS. IF UNSURE ABOUT ACCESS OR CLEARANCE CONTACT THE OFFICE
OF AIRFIELD MANAGEMENT.
C. ALL CONTRACTOR PERSONNEL DRIVING WITHIN THE AOA ARE REQUIRED TO PARTICIPATE IN THE AIRPORT
SPONSORED DRIVING CLASS.
D. AIRPORT SECURITY REQUIREMENTS ARE SUBJECT TO CHANGE. THE CONTRACTOR SHALL IMMEDIATELY ABIDE BY
ALL CHANGES IN SECURITY.
VII. DUST AND SMOKE CONTROL
THE CONTRACTOR SHALL PAY PARTICULAR ATTENTION TO THE DUST AND SMOKE CONTROL REQUIREMENTS OF THIS
CONTRACT. THE OPERATIONS OF THE RUNWAY, TAXIWAYS, APRONS, AND ASSOCIATED NAVIGATIONAL AIDS ARE
ESPECIALLY SENSITIVE TO DUST AND SMOKE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST AND SMOKE
CONTROL BY APPROVED METHODS WITHIN THE WORK AREA LIMITS, THE STAGING AREA, THE HAUL ROUTES, AND
ALONG ANY ROADWAYS USED BY THEIR EQUIPMENT AND VEHICLES.
VIII. CONTROL OF MUD AND CONSTRUCTION DEBRIS
THE CONTRACTOR SHALL CONTROL AT ALL TIMES MUD AND OTHER CONSTRUCTION DEBRIS ON AIRPORT RUNWAY, TAXIWAYS AND APRONS; AS WELL AS ALL ROADS, DRIVEWAYS AND HAUL ROUTES. IMMEDIATE SWEEPING OR
FLUSHING SHALL BE UNDERTAKEN BY THE CONTRACTOR SHOULD SUCH ACTION BE NECESSARY TO KEEP PAVEMENT
SURFACES CLEAN OF MUD & DEBRIS. THE CONTRACTOR SHALL HAVE PERSONNEL AND EQUIPMENT DEDICATED
SOLELY TO THE TASK OF DIRT, MUD, AND DEBRIS CONTROL FOR THE DURATION OF THE PROJECT.
METAL BRISTLE SWEEPERS ARE NOT ALLOWED TO OPERATE ON AIRFIELD SURFACES.
CONTRACTOR WILL BE RESPONSIBLE FOR ALL GROUNDSKEEPING IN THEIR AREAS (GRASS AT 7” TO 14”)
IX. NON-WORK PERIOD REQUIREMENTS
A. NAMES AND PHONE NUMBERS OF CONTRACTOR EMERGENCY RESPONSE PERSONNEL, INCLUDING THE PERSON
RESPONSIBLE TO CLEAN THE PAVEMENTS, SHALL BE PROVIDED TO THE OFFICE OF AIRFIELD MANAGEMENT AT THE
PRE-CONSTRUCTION MEETING.
B. MATERIALS AND EQUIPMENT SHALL BE STORED WITHIN THE APPROVED STAGING AREA.
X. STAGING AREA LIMITS AREAS - GENERAL REQUIREMENTS
THE ACTUAL LIMITS AND EXACT LOCATION OF THE CONTRACTOR'S STAGING AREA IS SHOWN IN THE PLANS. THE
FOLLOWING REQUIREMENTS WILL APPLY HOWEVER:
A. ONCE THE WORK AREA BECOMES AVAILABLE, THE CONTRACTOR WILL ESTABLISH THE LIMITS OF THE STAGING AREA
AND OCCUPY THE AREA.
B. THE CONTRACTOR SHALL ESTABLISH EMPLOYEE PARKING IN THE BUILDING 600 PARKING AREA AS DIRECTED BY THE
OFFICE OF AIRFIELD MANAGEMENT. NO CONTRACTOR EMPLOYEE POVs SHALL BE ALLOWED TO PARK ON ANY
GRISSOM ARB ROADWAYS OR WITHIN THE AOA DURING THE CONSTRUCTION OF THE PROJECT.
C. THE CONTRACTOR MAY DO SOME GRADING AND DRAINAGE WORK TO ADAPT THE STAGING AREA LIMITS TO MEET
SPECIFIC NEEDS. CONSTRUCTION ENTRANCES ARE MANDATORY. THE CONTRACTOR SHALL MAINTAIN THE STAGING
AREA THROUGHOUT THE CONTRACT TIME. UPON COMPLETION OF THE WORK, THE STAGING AREA WILL BE
DRESSED, SEEDED, AND RESTORED TO THE OFFICE OF AIRFIELD MANAGEMENT'S SATISFACTION.
D. THE CONTRACTOR'S ACCESS/EGRESS TO THE STAGING AREA IS SHOWN IN THE PLANS.
E. THE CONSTRUCTION FIELD OFFICES FOR THE CONTRACTOR WILL BE LOCATED WITHIN THE STAGING AREA. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR ESTABLISHING ACCOUNTS FOR VARIOUS UTILITIES SUCH AS
TELEPHONE, POWER, WATER, AND SEWER, IF NEEDED. THE COST OF ALL FEES AND THE MONTHLY PAYMENT OF
ALL UTILITY BILLS FOR ALL FIELD OFFICES SHALL BE THE CONTRACTOR'S RESPONSIBILITY.
F. THE CONTRACTOR SHALL MAKE ANY AND ALL EFFORTS NECESSARY TO PROTECT THE PAVEMENT, CURB & GUTTER, UTILITIES, ETC. IN AND ADJACENT TO THE STAGING AREA.
G. ANY DAMAGE TO EXISTING PAVEMENTS, CURB & GUTTER, UTILITIES, ETC., SHALL BE REPAIRED WHEN DIRECTED BY
THE OFFICE OF AIRFIELD MANAGEMENT.
XI. DISPOSAL AREA
ALL WASTE MATERIALS SHALL BE DISPOSED OFF AIRFIELD PROPERTY UNLESS SPECIFICALLY ALLOWED BY THE
PLANS OR SPECIFICATIONS.
XII. SECURING THE CONSTRUCTION AREA
A. THE CONTRACTOR SHALL, AT ALL TIMES, PREVENT PUBLIC INGRESS AND EGRESS THROUGH THE AIRFIELD ACCESS
GATES INTO A CONSTRUCTION AREA, STAGING AREA OR AOA AREA.
B. THE CONTRACTOR SHALL HAVE SUPERVISORS ON SITE AT ALL TIMES THAT WORK IS UNDERWAY TO SECURE AND
MANAGE THE CONSTRUCTION AREA. SUPERVISORS WILL COMMUNICATE WITH THE OFFICE OF AIRFIELD
MANAGEMENT AS NECESSARY.
C. CONTRACTOR VEHICLES AND EQUIPMENT MUST AT ALL TIMES GIVE WAY TO AIRCRAFT OPERATIONS, SUPPORT
VEHICLES, AND TENANTS OF THE AIRPORT.
XIII. UNDERGROUND UTILITIES
A. UTILITIES- CONTRACTOR WILL BE RESPONSIBLE FOR PROVIDING PRIOR NOTIFICATION OF HIS CONSTRUCTION
ACTIVITY TO ALL UTILITY COMPANIES WHO MIGHT BE AFFECTED. THE CONTRACTOR SHALL MAKE THE NECESSARY
ARRANGEMENTS FOR UTILITY LINE STAKING AT LEAST 48 HOURS IN ADVANCE OF STARTING WORK.
B. CONTRACTOR SHALL HAND EXCAVATE IN THE AREAS WHERE CABLES, CONDUITS AND/OR PIPES CROSS THE
CONSTRUCTION TO ASCERTAIN THEIR VERTICAL ELEVATION PRIOR TO EXCAVATION.
XVI. WORKING HOURS
A. ALL WORK WITHIN 250' OF RUNWAY CENTERLINE SHALL BE ACCOMPLISHED BETWEEN THE HOURS OF 11 P.M. AND 7
A.M. ALL WORK AREAS MUST BE CLEANED UP AND LIGHTING SHALL BE OPERATIONAL AT THE BEGINNING OF
MORNING OPERATIONS.
B. WORK WILL BE ALLOWED ALL 7 DAYS.
21 3
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
2 3
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text 07/31/2020
AutoCAD SHX Text
GC-501
HAUL ROUTE AND STAGING AREA NOTES & DETAILS
SYMBOL
CIVIL SYMBOL LEGEND
DESCRIPTION
PROPOSED STORM DRAIN
EXISTING STORM
STAGING AND LAYDOWN AREA
CONSTRUCTION ENTRANCE
FILTER SOCK
INLET PROTECTION
NOTE:
SEE E-SERIES SHEETS FOR MORE ELECTRICAL
SYMBOLS AND NOTES
SD
CONNECT TO EXISTING PIPE OR STRUCTURE
CLEANOUT
CO
EXISTING CATCH BASIN
EXISTING STORM MANHOLE
DRYPIT
PROPERTY EDGE
PL
LIMIT OF CONSTRUCTION
A-4
CG503
A-1
CG503
C-4
CG502
A-2
CG504
A-4
CG502
A-3
CG502
EXISTING JUNCTION BOX
SYMBOL
ELECTRICAL SYMBOL LEGEND
DESCRIPTION
EXISTING LED TAXIWAY EDGE LIGHT
EXISTING SIGN (RDR, RUNWAY HOLD, OR TAXIWAY)
P
EXISTING PULL CAN PLAZA
EXISTING RUNWAY EDGE LIGHT.
XXX
NEW PULL CAN PLAZA, SEE DETAILS
# = NUMBER OF CANS
XXX = PULL CAN PLAZA IDENTIFICATION NUMBER
EXISTING MANHOLE
WINDCONE
NEW WIND CONE ON NEW FOUNDATION, CENTER OF DOT
REPRESENTS SITING POINT ON LAYOUT SHEETS.
L-830, 200W, 6.6 AMP ISOLATION TRANSFORMER WITH PVC STAND.
SECONDARY CABLES FROM L-830 TRANSFORMER TO EXISTING
RUNWAY EDGE LIGHT. INSTALL L-823 CABLE IN EXISTING CONDUIT.
EXISTING RUNWAY THRESHOLD LIGHT
RUNWAY SAFETY AREA
TAXIWAY SAFETY AREA
RUNWAY OBJECT FREE AREA
TAXIWAY OBJECT FREE AREA
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
S Dx
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text C-100
AutoCAD SHX Text
CIVIL LEGEND
AutoCAD SHX Text
RSA
AutoCAD SHX Text
TSA
AutoCAD SHX Text
ROFA
AutoCAD SHX Text
TOFA
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
CG-218 CG-219
CG-111
CG-126
CG-227 CG-228
C
G
CG-118 CG-119
CG-103CG-102
CG-125CG-224CG-223CG-221CG-220 CG-222
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text
U.S. HIGHWAY 31
AutoCAD SHX Text
U.S. HIGHWAY 31
AutoCAD SHX Text
EAST LOOP ROAD
AutoCAD SHX Text
EAST LOOP ROAD
AutoCAD SHX Text
HOOSIER
AutoCAD SHX Text
HOOSIER BLVD
AutoCAD SHX Text
KITTYHAWK
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
KOKOMO
AutoCAD SHX Text
COURT
AutoCAD SHX Text
BUNKER HILL
AutoCAD SHX Text
LOGANSPORT
AutoCAD SHX Text
LANE
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
LANE
AutoCAD SHX Text
PERU
AutoCAD SHX Text
PLACE
AutoCAD SHX Text
WALTON LANE
AutoCAD SHX Text
LIBERATOR
AutoCAD SHX Text
STREET
AutoCAD SHX Text FlYER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
HOOSIER
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
FORTRESS
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LIGHTNING
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
LANCER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LANCER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
THUNDERBOLT
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
THUNDERBOLT
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
CONSTELLATION
AutoCAD SHX Text
MATADOR
AutoCAD SHX Text
MUSTANG
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
RUNWAY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
HARRY FROEMAN
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
WARRIOR
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
ORLANDO
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
NORTON
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
CHANUTE AVENUE
AutoCAD SHX Text
CANNON CIRCLE
AutoCAD SHX Text
CAPEHART
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
PATRICK
AutoCAD SHX Text
STREET
AutoCAD SHX Text
RANDOLPH
AutoCAD SHX Text
STREET
AutoCAD SHX Text
LOWRY
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
KELLY
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
SKYTRAIN
AutoCAD SHX Text
STREET
AutoCAD SHX Text
WARTHOG
AutoCAD SHX Text
STREET
AutoCAD SHX Text
GRISSOM
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
HOOSIER
AutoCAD SHX Text
BLVD
AutoCAD SHX Text
STREET
AutoCAD SHX Text
STREET
AutoCAD SHX Text
TANKER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
TANKER
AutoCAD SHX Text
STREET
AutoCAD SHX Text
CHOCKS LANE
AutoCAD SHX Text
BOOM PLACE
AutoCAD SHX Text
BOXCAR STREET
AutoCAD SHX Text
DRAGONFLY
AutoCAD SHX Text
LANE
AutoCAD SHX Text
MUNITIONS DRIVE
AutoCAD SHX Text
LEATHERNECK
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
BAKALAR LANE
AutoCAD SHX Text
ATTERBURY
AutoCAD SHX Text
WAY
AutoCAD SHX Text
SEXTANT LANE
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
INST
AutoCAD SHX Text
CG-100
AutoCAD SHX Text
STORM DRAIN & EROSION CONTROL PLAN KEY MAP
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
S
D x
I
N
S
T
A
M
O
N
N
E
C
T
O
X
T
A
X
I
W
E
X
S
T
M
S
T
R
E
X
S
R
E
X
S
R
E
X
E
X
CONSTRUCTION
LIMITS
0 25 50 100
GRAPHIC SCALE (FEET)
MATCH LINE CG- 111
21 3 4
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
NOTE:
1. LOCATE ALL ELECTRIC CABLES IN PATH OF
STORM DRAIN BEFORE TRENCHING.
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text
SEXTANT LANE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CG-102
AutoCAD SHX Text
STORM DRAIN PLAN
AutoCAD SHX Text By
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Date:
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Code:
AutoCAD SHX Text Designed by:
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text Project Manager
AutoCAD SHX Text Description
AutoCAD SHX Text Revisions
AutoCAD SHX Text
JULY 31, 2020
AutoCAD SHX Text
AS SHOWN
AutoCAD SHX Text Sheryll Impellizzeri
AutoCAD SHX Text US Army Corps of Engineers Louisville District
AutoCAD SHX Text
AIRFIELD LIGHTING IMPROVEMENTS-PHASE A GRISSOM ARB, IN
AutoCAD SHX Text
SHEET REFERENCE NUMBER:
AutoCAD SHX Text R.Suhail
AutoCAD SHX Text
GRISSOM AIR RESERVE BASE,
AutoCAD SHX Text 434th BASE CIVIL ENGINEERS
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text Project Engineer/Architect
AutoCAD SHX Text Daniel McNatt
AutoCAD SHX Text xxx
AutoCAD SHX Text H.Suhail
AutoCAD SHX Text E.Suhail
AutoCAD SHX Text Project No. CTGB 15-2012A P2 No. 472105
AutoCAD SHX Text
THIS DOCUMENT IS A CERTIFIED FINAL DESIGN SUBMITTAL
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
EHTESHAM
AutoCAD SHX Text 58956
AutoCAD SHX Text
SUHAIL
AutoCAD SHX Text M.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text H
AutoCAD SHX Text D
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
S
D
S
D
S
D
S
D
S
D x
S D x
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
P
L
INSTALL 15'-4"
STM @ 1%
FROM PULL
CAN TO DRY PIT
INSTALL 15'-4"
STM @ 1%
FROM PULL
CAN TO DRY PIT
CONSTRUCTION
LIMITS
0 25 50 100
GRAPHIC SCALE (FEET)
21 3 4
B
21 3 4 5
21 3 4 5
A
C
D
B
A
C
D
NOTE:
1. LOCATE ALL ELECTRIC CABLES IN PATH OF
STORM DRAIN BEFORE TRENCHING.
W
2Q R
B0
4_
Pl an s-
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text W
AutoCAD SHX Text S
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .