This document is an amendment to a solicitation for the placement and leasing of modular facilities to support approximately 450 personnel at Scott AFB, Illinois. The U.S. Army Corps of Engineers Louisville District is seeking bids for the placement of modular facilities with a period of performance of 300 calendar days from notice to proceed. The modular facility leasing period is one base year plus four option years. The amendment revises the bid schedule to include additional notes addressing performance and payment bonds requirements. Bidders must provide prices for all contract line items and options in the schedule. The statutory limit for allied support costs is $1.8 million.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20B0007 for the placement and leasing of modular facilities to support approximately 450 personnel at Scott AFB, IL is hereby amended as follow s:
1. The bid schedule has been revised to include an additional "Note" addressing Performance and Payment Bonds.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912QR20B0007
X 9B. DATED (SEE ITEM 11)
19-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Feb-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20B0007-0005
W912QR20B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
BID SCHEDULE
BID SCHEDULE
BIDDERS'S NAME:
CONTRACT LINE ITEM
SCHEDULE
CLIN Description Unit Unit
Amount BASE PROPOSAL
All work, labor, materials, and equipment required to provide Allied Support Costs excluding work included in CLIN’s 0002 through 0004.
Allied Support Costs include, but is not limited to, foundations; concrete mounting slabs; site preparation; utility connections; stairways;
porches or breezeways between units; extra wall covering and paneling; ceramic works; lighting;
and other interior and exterior finishes and features not included in the original facility package or unit.
Provide coordination and integration of all work in CLIN’s 0002 through 0004.
LS
0002 All work, labor, materials, and equipment required to construct/erect/install the modular units including communications and security systems.
LS
0003 All work, labor, materials, and equipment required to provide new Fixtures, Furnishings and
Equipment, for the facility.
LS
0004 All work, labor, materials, and equipment required to remove the modular units from Scott AFB and restore the site per the design documents.
LS
0005 All work, labor, materials, and equipment required to provide two months lease and operations and management of modular facility to the Government.
LS
TOTAL BASE
0006 BID OPTION 1
All work, labor, materials, and equipment required to provide one-year (Year 2) lease and operations and management of modular facility to the
Government.
LS
0007 BID OPTION 2
All work, labor, materials, and equipment required to provide one-year (Year 3) lease and operations and management of modular facility to the
Government.
LS
0008 BID OPTION 3
All work, labor, materials, and equipment required to provide one-year (Year 4) lease and operations and management of modular facility to the
Government.
LS
0009 BID OPTION 4
All work, labor, materials, and equipment required to provide one-year (Year 5) lease and operations and management of modular facility to the
Government.
LS
TOTAL BID COSTS (ALL CLINs)
NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE
NOTE NO. 1. To better facilitate the receipt and bidder process, all modifications to bids are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. Option years for the lease of modular facilities, in accordance with
FAR Clause 52.217-9, will be exercised within thirty (30) calendar days of the current year expiring. A notice of intent will be issued at least sixty (60) calendar days prior to current year expiring. This includes CLINS 0006 – 0009.
NOTE NO. 4. The statutory limit for CLIN 0001 (All work, labor, materials, and equipment required to provide Allied Support Costs excluding work included in CLIN’s 0002 through 0004) is $1.8M. Award will not be made to a bidder that submits a bid for more than $1.8M for CLIN 0001.
NOTE NO. 5. The period of performance for CLIN 0001 – 0003 is 300 calendar days from Notice to Proceed. The period of performance for CLIN 0004 is 90 calendar days from the expiration of the final lease period.
NOTE NO. 6. Performance and Payment Bonds shall be provided for the total dollar value of CLINs 0001-0003. The Performance and Payment Bonds shall be good for the period of performance of CLINs 0001-0003 PLUS the one year construction warranty period upon construction completion.
(End of Summary of Changes)