W912QR10R0014_Specs_Vol2-0002.pdf
PDF 15 MB Posted
- Solicitation number
- W912QR19R0014
About this file
This document provides details for a Multiple Award Task Order Contract (MATOC) solicitation for roofing and building envelope repair and replacement services. The U.S. Army Corps of Engineers Louisville District intends to award up to ten IDIQ MATOCs to support the National Roofing Program, Army IMCOM, Air Force, and Air Force Reserves nationwide. The total value is $95 million over a five-year ordering period. Task order magnitudes will range from $100,000 to $2,000,000. This is a 100% small business set-aside with a NAICS code of 238160. The anticipated solicitation release date is September 16, 2019 on FBO.gov. Proposals will be evaluated using best value tradeoff. Discussions are not planned but may be held for Phase II. The point of contact is Emily Moore.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912QR19R0014-0003.pdf | ||
| W912QR10R0014_Specs_Vol1-0002.pdf | ||
| W912QR19R0014 AMDT 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Roofing Program (NRP) FY20 MATOC Volume 2 Corrected Final
NRP FY20 DB MATOC
Corrected Final
472474
January 2020
Am en dm en t 0
W912QR10R0014_Specs_Vol2-0002
NRP FY20 DB MATOC 472474
Corrected Final January 2020
VOLUME 2 Seed Projects
Seed Project 1 AS001
00 80 50.00 06 Seed Project 1 AS001 SPECIAL PROVISIONS 01 11 50.00 06 Seed Project 1 AS001 SUMMARY OF WORK
Attachment A Photos of Existing Conditions Attachment B Existing Conditions Attachment C Site Location
Seed Project 2 CA150
00 80 50.00 06 Seed Project 2 CA150 SPECIAL PROVISIONS 01 11 50.00 06 Seed Project 2 CA150 SUMMARY OF WORK
Attachment A Photos of Existing Conditions Attachment B Existing Conditions Attachment C Site Location
Seed Project 3 FL125
00 80 50.00 06 Seed Project 3 FL125 SPECIAL PROVISIONS 01 11 50.00 06 Seed Project 3 FL125 SUMMARY OF WORK
Attachment A Photos of Existing Conditions Attachment B Existing Conditions Attachment C Site Location
Seed Project 4 IL079
00 80 50.00 06 Seed Project 4 IL079 SPECIAL PROVISIONS 01 11 50.00 06 Seed Project 4 IL079 SUMMARY OF WORK
Attachment A Photos of Existing Conditions Attachment B Existing Conditions Attachment C Site Location
Seed Project 5 WV026
00 80 50.00 06 Seed Project 5 WV026 SPECIAL PROVISIONS 01 11 50.00 06 Seed Project 5 WV026 SUMMARY OF WORK
Attachment A Photos of Existing Conditions Attachment B Existing Conditions Attachment C Site Location
Am en dm en t 0
Corrected Final
NRP FY20 DB MATOC
Corrected Final
472474
January 2020
Seed Project 1
AS001
2508 Airport Rd, Tafuna, American Samoa Single Ply Overlay of Standing Seam Metal Roof
Am en dm en t 0
NRP FY20 MATOC Project 1 Tafuna, American Samoa AS001 January 2020 472474
SECTION 00 80 50.00 06 Page 1
CORRECTED FINAL
SECTION
00 80 50.00 06
SPECIAL PROVISIONS FOR TASK ORDERS
08/19
PART 1 GENERAL
1.1 NOT USED
1.2 NOT USED
1.3 NOT USED
1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. ER 415-1-15
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the "Default (Fixed-Price Construction)" as discussed in Section 00 70 00 of the base contract and Section 00 70 50 of this task order. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
AS001 6 5 6 7 9 7 9 11 8 9 8 6
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work
Am en dm en t 0
472474
SECTION 00 80 50.00 06 Page 2
CORRECTED FINAL
days, and issue a modification in accordance with the "Default (Fixed-Price Construction)" in section 00 70 00 of the base contract, Volume 1 .
1.5 WAGE RATES
The decision of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, is attached to this solicitation. The payment for all classes of laborers and mechanics actually employed to perform work under the contract will be specified in the following contract provisions: "Contract Work Hours and Safety Standards -- Overtime Compensation"; "Construction Wage Rate Requirements"; and, "Compliance with Copeland Act Requirements" in Section 00 70 00 of the base contract.
The Davis-Bacon Act is not applicable to contract work performed in American Samoa, and the Service Contract Act has been held not to apply to construction contracts. In accordance with the Permits and Responsibilities clause of the base contract, FAR 52.236-7, the Contractor shall be responsible for complying with any local labor laws, codes, and regulations that apply to the work performed under this task order. The Contractor is advised to consult with the Commonwealth's Department of Labor for the purpose of reviewing applicable local labor laws which may contain specific rules for computing overtime and the amount of overtime pay laborers and mechanics must be paid. Any such applicable local labor law imposing stricter overtime rules than those contained in the Contract Work Hours and Safety Standards Act -- Overtime Compensation clause of this contract (i.e., provides greater benefits to laborers and mechanics) may apply in lieu of the rules contained in that clause.
The work to be performed is located in the Territory of American Samoa, Tuaautu County.
1.6 Not Used
1.7 Not Used
1.8 Not Used
1.9 NOT USED
1.10 NOT USED
1.11 NOT USED 0
1.12 NOT USED
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 DESIGN CONFERENCES
Due to the remote location of the facility all design conferences will be at the Contractor’s or DORs office. The contractor shall be responsible for a
Am en dm en t 0
472474
SECTION 00 80 50.00 06 Page 3
CORRECTED FINAL
meeting room with size to accommodate all contractor and six (6) government personnel.
1.17 NOT USED
1.18 NOT USED
1.19 NOT USED
1.20 NOT USED
1.21 NOT USED
1.22 NOT USED
1.23 NOT USED
1.24 NOT USED
1.25 NOT USED
1.26 NOT USED
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
Am en dm en t 0
Line
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Labor, Equipment and Material Reports 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Daily Equipment Report 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding, Competent Person and Crew Qualifications and Training 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding Erection Plan 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Fingerprints of all persons employed or to be employed 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Local Agency Check 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Training Report 1.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Construction Plan 3.3.1 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Contractor’s Safety Program 3.4.5.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Demolition Plan 4.2 GA
01 32 01.00 06 Vol 1 SD-01 Preconstruction Submittal Task Order Schedule 3.4 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Accident Prevention Plan 1.8 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Activity Hazard Analysis (AHA) 1.9 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Site Safety & Health Office Qualifications (SSHO) 1.6 & Vol 2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Design Quality Control Plan 3.2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Construction Quality Control Plan 3.3 GA
01 50 00 Vol 1 SD-01 Preconstruction Submittal Construction Site Plan 1.4 GA
01 50 00 Vol 1 and 01 57 20.00 06 Vol 1 SD-02 Preconstruction Submittal Dust Control Plan 3.4.4 and
4.2.11 GA
01 57 20.00 06 Vol 1 SD-01 Preconstruction Submittal Environmental Protection Plan 1.7 GA
01 74 19 Vol 1 SD-01 Preconstruction Submittal Waste Management Plan 1.6 GA
00 80 50.00 06 Vol 2 SD-01 Preconstruction Submittal Storm Water Pollution Prevention Plan 1.7 GA
00 80 50.00 06 Vol 2 SD-02 Shop Drawings Mechanical/Electrical Room Layout 1.9 GA
00 80 00.00 06 Vol 1 SD-04 Samples Equipment Warranty Identification Tags 1.13(f) GA
00 80 50.00 06 Vol 2 SD-05 Design Data Soil Certification 1.24 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Equipment-in-Place List 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Maintenance and Parts Data 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Progress Photographs 1.20 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Warranties 1.13 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Insurance 1.4 GA
SB MATOC CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: NRP FY20 MATOC
SUBMITTAL REGISTER
JOB NAME: Seed Project 1 LOCATION: AS001 Tafuna, American Samoa
CONTRACT NO:
CONTRACTOR:
Am en dm en t 0
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
SB MATOC CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION APPROVING AUTHORITY
TITLE: NRP FY20 MATOC
SUBMITTAL REGISTER
JOB NAME: Seed Project 1 LOCATION: AS001 Tafuna, American Samoa
CONTRACT NO:
CONTRACTOR:
00 80 00.00 06 Vol 1 SD-07 Certificates Sales and Use Tax 1.1 GA
1 80 00.00 06 Vol 1 SD-08 Certificates Certificates of Compliance 1.33 GA
00 80 50.00 06 Vol 2 SD-07 Certificates No Asbestos - Containing Material (ACM) Certification 1.21 GA
00 80 50.00 06 Vol 2 SD-07 Certificates Monthly AT Training Roster 4.1.8 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Preliminary (Working) As-Built Drawings 1.7.4 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Warranty Management Plan 1.13(b) GA
00 80 50.00 06 Vol 2 SD-11 Closeout Submittals Final As-Built Drawings 1.9 GA
01 74 19 Vol 1 SD-11 Closeout Submittals Records, Waste Generated/Diverted 1.7 GA
1 80 00.00 06 Vol 1 SD-12 Closeout Submittals Final Borrow Pit/Spoil Area Contour Map 1.7.3(h) or
1.8.4 GA
Am en dm en t 0
FY20 NRP Project 1 P2 472474 AS001, Tafuna, American Samoa December 2019
SECTION 01 11 50.00 06
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1.0 PROJECT INFORMATION
1.1 GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at AS001 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test and survey results, building code (including fire protection, life safety, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
1.2 SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to install a single ply overlay system of the metal roofs for the Warehouse, AAFES, and VA buildings at AS001.
Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable and sustainable space.
Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.]
All demolition required to construct the project is included as part of the work of this Contract.
1.3 SITE LOCATION
This project is located at 2508 Airport Rd, Tafuna, AS.
1.4 EXISTING SITE UTILITIES
1.4.1 The contractor shall verify the capacity of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.
Am en dm en t 0
SECTION 01 11 50.00 06
1.5 BID OPTIONS
NOT USED
1.6 ATTACHMENTS
Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
a. ATTACHMENT A: Photos of Existing Conditions
b. ATTACHMENT B: Existing Conditions
c. ATTACHMENT C: Site Location
1.7 Not Used
1.8 Not Used
1.9 NOT USED
1.10 NOT USED
1.11 NOT USED
1.12 NOT USED
1.13 NOT USED
2.0 DESIGN REQUIREMENTS
2.1 GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
2.2 DESIGN
2.2.1 The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.
Am en dm en t 0
SECTION 01 11 50.00 06
2.2.2 Design Milestone Schedule
Notice to Proceed (NTP) Day 0 Charette Report (FIO no review) NTP + 60 Days Interim Submittal (FIO no review) NTP + 90 Days Draft Final NTP + 120 days Corrected Final/Issue for Construction Submittal NTP + 150 days
2.3 REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4 NOT USED
2.5 NOT USED
2.6 Not Used
2.7 NOT USED
2.8 NOT USED
2.9 NOT USEDS
2.10 NOT USED
2.11 Not Used
2.12
2.13 GOVERNMENT FURNISHED MATERIALS
2.12.1 GFM Handover
The GFM has been provided as part of the Solicitation package.
2.12.2 GFM File Formats
GFM are provided only in PDF format.
2.14 DESIGN SUBMITTAL DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addresses
U.S. Army Corps of Engineers Timothy M. McClellan, P.E., RRC Timothy.m.mcclellan@usace.army.mil LRL-ED-MA Room 872C 600 Doctor Martin Luther King Junior Place Louisville, KY 40202
U.S. Army Corps of Engineers
Am en dm en t 0
Carl Lindsay II, CMIT Carl.L.Lindsay@usace.army.mil
LRL-CD
600 Doctor Martin Luther King Junior Place Louisville, KY 40202
U.S. Army Corps of Engineers Jeffrey E. Bayers, P.E., P.M.P.
Jeffrey.e.bayers@usace.army.mil
LRL-PM-R
600 Doctor Martin Luther King Junior Place Louisville, KY 40202
Albert F. Cherry USARC-ARIMD Engineering Branch Program Manager: BUILDER, NRP, & FRP Phone: 910-570-8961 Email: albert.f.cherry.civ@mail.mil
3.0 GENERAL CONSTRUCTION REQUIREMENTS
3.1 SUMMARY
3.1.1 The requirements include:
a. Construction considerations and use of the premises.
b. Protection of personnel and Government property.
c. Construction facilities and job site standards.
d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
3.2 GENERAL INFORMATION
3.2.1 NOT USED
3.2.2 NOT USED
3.2.3 Coordinate all construction activities with:
a. Contracting Officer’s Representative
b. Building Occupants
3.2.4 Not Used
3.2.5 Not Used.
3.2.6 Not Used
3.2.7 Not Used
3.2.8 Not Used.
3.2.9 Project and Safety Signs. See 01 50 00, Paragraph 2.1.2.
3.3 DOCUMENTATION
3.3.1 Not Used
Am en dm en t 0
W912QR10R0014_Specs_Vol2-0002 mailto:Carl.L.Lindsay@usace.army.mil mailto:Jeffrey.e.bayers@usace.army.mil
3.3.2 Not Used
3.4 Not Used
3.5 Not Used
3.6 Not Used
4.0 Not Used
5.0 Not Used
6.0 EXTERIOR EQUIPMENT Document any exterior equipment to be replaced
6.1 Roof mounted solar panels are present on the VA building. All solar panels are to remain. Contractor shall remove, store, and reinstall solar panels. Contractor shall be responsible for replacing any solar panels that are damaged during removal, storage and reinstallation. Any required modifications to the solar panel system to accommodate the roof overlay system shall be the responsibility of the contractor. Contractor shall utilize a solar panel installation contractor to perform the removal and reinstallation of the solar panels.
7.0 Not Used
8.0 Not Used
9.0 STRUCTURAL
The existing structural support system shall be modified by the Contractor as required to accommodate the functional and space requirements in this Task Order RFP. This may require the removal of existing walls or columns and upgrading of the remaining structural elements and further bracing requirements necessitated to ensure structural integrity.
For the warehouse, the contractor shall cover or replace existing translucent panels shown in Attachment B, with metal roofing panels to match existing metal panels.
10.0 NOT USED
11.0 NOT USED
12.0 NOT USED
13.0 Not Used
14. Roof System
14.1 VA – Contractor to install PVC overlay system. Contractor to mechanically fasten insulation/cover board to structural system below roof deck. Contractor to utilize PVC SSMR simulated ribs on PVC overlay system spaced at a maximum of 15 inches on center. PVC system to be fully adhered to cover board/insulation.
14.2 AAFES - Contractor to install PVC overlay system. Contractor to mechanically fasten insulation/cover board to structural system below roof and batt insulation. Contractor to utilize PVC SSMR simulated ribs on PVC overlay
Am en dm en t 0 system spaced at a maximum of 15 inches on center. PVC system to be fully adhered to cover board/insulation.
14.3 Warehouse - Contractor to install PVC overlay system. Contractor to mechanically fasten insulation/cover board to structural system below roof. PVC system to be fully adhered to cover board/insulation.
--End of Section --
Am en dm en t 0
Attachment A: Photos of Existing Conditions
Photographs are provided as typical conditions and may not be all encompassing.
FY20 NRP MATOC
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Warehouse exterior view
Warehouse interior
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
AAFES Rib profile
AAFES interior
FY20 NRP MATOC
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
VA Exterior
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
FY20 NRP MATOC
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
VA Exterior Solar Panels
VA Exterior Solar Panels
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
VA Interior
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Seed Project 1 AS001 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Attachment B: Existing Conditions
VA Building is an Architectural Standing Seam over a metal deck with 4:12 slope in the structure.
Assume 4 inch polyiso insulation.
AAFES Building is a Structural Standing Seam with batt insulation 1:12 slope in the structure. Purlins 60” spacing
Warehouse is a R-panel mounted directly to purlins spaced 24”. 2:12 slope in the structure No insulation
FY20 NRP MATOC
Seed Project 1 AS001 01 11 50 00.00 06 Attachment B
January 2020 Corrected Final
Am en dm en t 0
A S
90'
90'
125'
40'
85'
VA BUILDING
5. ANTENNA MAST
4. 4" ROUND VENT
3. 8" RND VENT STACK
2. 30"x30" GOOSE NECK
1. 24x36 PENETRATION
KEY:
3 4
T
A N
D A
R D
E
S
IG
N
M
N U
L
N G
A
IN
IN
P
O G
R w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
R e v
C k d b y u b m it t e d b
F il e n a m e lo t d a t t s c a le s ig n f il e n o r a w in g c o d
Sheet reference number:
D e s c r ip t io n D a t e
A p p r o v e d
R e v of Engineers
US Army Corps
E R
IC
M O
A
Am en dm en t 0
63'
30'
122'
215'
SKYLIGHTSSKYLIGHTS
EXHAUST FANS
24"x24"
EXHAUST FANS
24"x24"
AAFES
WAREHOUSE
A N
D A
S
IG
N U
N
A
IN
IN
O G
R w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
R e v
C k d b u b m it t e d b
F il e n a m t d a t t s c a le s ig n f il e n o r a w in g c o d
Sheet reference number:
D e s c r ip t io n D a t e
A p p r o v e d
R e v of Engineers
US Army Corps
E R
IC
M O
A
Am en dm en t 0
Attachment C: Site Location
FY20 NRP MATOC Seed Project 1 AS001 01 11 50 00.00 06 Attachment C
Corrected Final January 2020
Am en dm en t 0
AS001 Site Location Tufana, American Samoa
Legen d AS001
Tafuna High School
The American Samoa
CBOC
ft
NN
© 2018 Google
Image © 2018 CNES / Airbus
©© 22001188 GGooooggllee
IImmaaggee ©© 22001188 CCNNEESS // AAiirrbbuuss
FY20 NRP MATOC Seed Project 1 01 11 50 00.00 06 Attachment C Corrected Final January 2020
Am en dm en t 0
AMERICAN SAMOA
AS001
VA
FY20 NRP MATOC
Seed Project 1 01 11 50 00.00 06 Attachment C
Corrected Final January 2020
Am en dm en t 0
Corrected Final
NRP FY20 DB MATOC
Corrected Final
472474
January 2020
Seed Project 2
CA150
1481 Railroad Ave, Vallejo, CA Replace Ballasted Built-up Roof with PVC Single Ply
Am en dm en t 0
NRP FY20 Seed Project 2 P2 472474 Vallejo, California, CA150 January 2020
SECTION 00 80 50.00 06 Page 1
CORRECTED FINAL
SECTION
00 80 50.00 06
SPECIAL PROVISIONS FOR TASK ORDERS
PART 1 GENERAL
1.1 NOT USED
1.2 NOT USED
1.3 NOT USED
1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. ER 415-1-15
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the "Default (Fixed-Price Construction)" as discussed in Section 00 70 00 of the base contract and Section 00 70 50 of this task order. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
CA150 21 19 17 7 1 0 0 0 1 1 8 19
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.
The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work days, and issue a modification in accordance with the "Default (Fixed-Price Construction)" in section 00 70 00 of the base contract, Volume 1 .
Am en dm en t 0
SECTION 00 80 50.00 06 Page 2
CORRECTED FINAL
1.5 WAGE RATES
The decision of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, is attached to this solicitation. The payment for all classes of laborers and mechanics actually employed to perform work under the contract will be specified in the following contract provisions: "Contract Work Hours and Safety Standards -- Overtime Compensation"; "Construction Wage Rate Requirements"; and, "Compliance with Copeland Act Requirements" in Section 00 70 00 of the base contract.
Wage decision included is: CA20190007 Building
The work to be performed is located in the State of California, Solano County.
1.6 Not Used
1.7 Not Used
1.8 Not Used
1.9 NOT USED
1.10 NOT USED
1.11 NOT USED
1.12 NOT USED
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 NOT USED
1.17 NOT USED
1.18 NOT USED
1.19 NOT USED
1.20 NOT USED
1.21 NOT USED
1.22 NOT USED
1.23 NOT USED
1.24 NOT USED
1.25 NOT USED
1.26 NOT USED
Am en dm en t 0
SECTION 00 80 50.00 06 Page 3
CORRECTED FINAL
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED Am en dm en t 0
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Labor, Equipment and Material Reports 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Daily Equipment Report 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding, Competent Person and Crew Qualifications and Training 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding Erection Plan 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Fingerprints of all persons employed or to be employed 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Local Agency Check 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Training Report 1.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Construction Plan 3.3.1 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Contractor’s Safety Program 3.4.5.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Demolition Plan 4.2 GA
01 32 01.00 06 Vol 1 SD-01 Preconstruction Submittal Task Order Schedule 3.4 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Accident Prevention Plan 1.8 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Activity Hazard Analysis (AHA) 1.9 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Site Safety & Health Office Qualifications (SSHO) 1.6 & Vol 2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Design Quality Control Plan 3.2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Construction Quality Control Plan 3.3 GA
01 50 00 Vol 1 SD-01 Preconstruction Submittal Construction Site Plan 1.4 GA
01 50 00 Vol 1 and 01 57 20.00 06 Vol 1 SD-02 Preconstruction Submittal Dust Control Plan 3.4.4 and
4.2.11 GA
01 57 20.00 06 Vol 1 SD-01 Preconstruction Submittal Environmental Protection Plan 1.7 GA
01 74 19 Vol 1 SD-01 Preconstruction Submittal Waste Management Plan 1.6 GA
00 80 50.00 06 Vol 2 SD-01 Preconstruction Submittal Storm Water Pollution Prevention Plan 1.7 GA
00 80 50.00 06 Vol 2 SD-02 Shop Drawings Mechanical/Electrical Room Layout 1.9 GA
00 80 00.00 06 Vol 1 SD-04 Samples Equipment Warranty Identification Tags 1.13(f) GA
00 80 50.00 06 Vol 2 SD-05 Design Data Soil Certification 1.24 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Equipment-in-Place List 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Maintenance and Parts Data 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Progress Photographs 1.20 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Warranties 1.13 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Insurance 1.4 GA
SB MATOC
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
TITLE: NRP FY20 MATOC
SUBMITTAL REGISTER
JOB NAME: Seed Project 2 LOCATION: CA150 Vallejo, CA
CONTRACT NO:
CONTRACTOR:
Am en dm en t 0
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
SB MATOC
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
TITLE: NRP FY20 MATOC
SUBMITTAL REGISTER
JOB NAME: Seed Project 2 LOCATION: CA150 Vallejo, CA
CONTRACT NO:
CONTRACTOR:
00 80 00.00 06 Vol 1 SD-07 Certificates Sales and Use Tax 1.1 GA
1 80 00.00 06 Vol 1 SD-08 Certificates Certificates of Compliance 1.33 GA
00 80 50.00 06 Vol 2 SD-07 Certificates No Asbestos - Containing Material (ACM) Certification 1.21 GA
00 80 50.00 06 Vol 2 SD-07 Certificates Monthly AT Training Roster 4.1.8 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Preliminary (Working) As-Built Drawings 1.7.4 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Warranty Management Plan 1.13(b) GA
00 80 50.00 06 Vol 2 SD-11 Closeout Submittals Final As-Built Drawings 1.9 GA
01 74 19 Vol 1 SD-11 Closeout Submittals Records, Waste Generated/Diverted 1.7 GA
1 80 00.00 06 Vol 1 SD-12 Closeout Submittals Final Borrow Pit/Spoil Area Contour Map 1.7.3(h) or
1.8.4 GA
Am en dm en t 0
FY20 NRP Seed Project 21 P2 472474 Vallejo, California CA150 December 2019
SECTION 01 11 50.00 06
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1.0 PROJECT INFORMATION
1.1 GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis, sampling, testing and verification of existing field conditions as required for design and construction of the Roof Replacement Project at CA150 to result in a complete and useable Facility. Contractor shall provide complete design analysis incorporating all engineering computations, analysis, test and survey results, building code (including fire protection, environmental and accessibility) review as it pertains/affects/relates to this project, equipment and material data and documentation of existing conditions.
1.2 SCOPE OF WORK
Unless specifically noted otherwise in this Specification Section or in the base MATOC contract Volume 1 of 2 itself, all requirements of the base MATOC contract Volume 1 of 2 shall apply to this Task Order. The work includes design and construction to replace the roofing systems on Building 1296 at CA150 with a PVC membrane roofing system.
Design/Build: Design and construction shall comply with the requirements contained in this Task Order Request for Proposal (RFP). The design and technical criteria contained and cited in this RFP and the Unified Facilities Guide Specifications (UFGS) establish minimum standards for design and construction quality. The Designers of Record shall use the Unified Facilities Guide Specifications (UFGS) and the requirements contained in this RFP to fully develop the technical specifications and construction drawings. The objective of this solicitation is to obtain an energy efficient, durable, maintainable and sustainable space.
Design/Build: The illustrations and exhibits included in this RFP illustrate the conceptual design of the project and are provided to define the scope of work and budget. The concepts provided shall be further developed by the Design/Build Contractor to comply with the customer’s functional needs.
All demolition required to construct the project is included as part of the work of this Contract.
1.3 SITE LOCATION
This project is located at 1481 Railroad Ave, Vallejo, CA.
1.4 EXISTING SITE UTILITIES
1.4.1 The contractor shall verify the location and capacity of all utilities serving the building. Upgrading the existing utilities, (unless noted otherwise) outside the limits of construction, is not a part of this project.
1.5 BID OPTIONS
Am en dm en t 0
SECTION 01 11 50.00 06
NOT USED
1.6 ATTACHMENTS
Design/Build: Information provided in the Attachments is intended to guide the completion of the design by establishing existing conditions, and the desired character, appearance, and function of the new construction. The following Attachments are included and shall be used and strictly adhered-to in completing the design and construction of the project.
a. ATTACHMENT A: Photos of Existing Conditions
b. ATTACHMENT B: Existing Conditions
c. ATTACHMENT C: Site Location
1.7 Not Used
1.8 Not Used
1.9 NOT USED
1.10 NOT USED
1.11 NOT USED
1.12 NOT USED
1.13 Not Used
2.0 DESIGN REQUIREMENTS
2.1 GENERAL
The Contractor shall prepare complete construction documents for all work designed as required by the RFP. The construction documents to be prepared shall include, but are not limited to, construction drawings, specifications, submittals, and design analysis as required in Section 01 33 16.00 10 DESIGN DATA (DESIGN AFTER AWARD), Volume 1. Materials and equipment shall be limited to those specified except that where no specific material and equipment is specified or no basis of design is identified, the Contractor shall use materials and equipment accepted within the construction industry and in compliance with Design Criteria.
2.2 DESIGN
2.2.1 The Contractor shall prepare a 100% design for the project in accordance with the RFP using industry standard materials and efficient practices. The design of the materials selected shall be high quality, durable and easily maintained. The Contractor shall be responsible for the professional quality, code compliance, technical accuracy, and coordination of all designs, drawings, specifications, and other documents or publications upon which the design and construction are based. It shall be the responsibility of the Design/ Build Contractor to verify the accuracy of the documents provided.
2.2.2 Design Milestone Schedule
Am en dm en t 0
SECTION 01 11 50.00 06
Notice to Proceed (NTP) Day 0 Charette Report (FIO no review) NTP + 45 Days Interim Submittal (FIO no review) NTP + 75 Days Draft Final NTP + 105 days Corrected Final/Issue for Construction Submittal NTP + 150 days
2.3 REQUEST FOR PROPOSAL (RFP) INTENT
The intent of this RFP section is to describe the requirements for appearance, function, materials, and types of construction in sufficient detail to enable engineering and design to be completed by the Contractor.
2.4 NOT USED
2.5 NOT USED
2.6 Not Used
2.7 NOT USED
2.8 NOT USED
2.9 NOT USEDS
2.10 NOT USED
2.11 Not Used
2.12 GOVERNMENT FURNISHED MATERIALS
2.12.1 GFM Handover
The GFM has been provided as part of the Solicitation package.
2.12.2 GFM File Formats
GFM are provided only in PDF format.
2.13 DESIGN SUBMITTAL DISTRIBUTION MATRIX
Submittal Reviewers & Mailing Addresses
U.S. Army Corps of Engineers Timothy M. McClellan, P.E., RRC Timothy.m.mcclellan@usace.army.mil LRL-ED-MA Room 872C 600 Doctor Martin Luther King Junior Place Louisville, KY 40202
U.S. Army Corps of Engineers Carl Lindsay II, CMIT Carl.L.Lindsay@usace.army.mil
LRL-CD
Am en dm en t 0
SECTION 01 11 50.00 06
600 Doctor Martin Luther King Junior Place Louisville, KY 40202
U.S. Army Corps of Engineers Jeffrey E. Bayers, P.E., P.M.P.
Jeffrey.e.bayers@usace.army.mil
LRL-PM-R
600 Doctor Martin Luther King Junior Place Louisville, KY 40202
Albert F. Cherry USARC-ARIMD Engineering Branch Program Manager: BUILDER, NRP, & FRP Phone: 910-570-8961 Email: albert.f.cherry.civ@mail.mil
3.0 GENERAL CONSTRUCTION REQUIREMENTS
3.1 SUMMARY
3.1.1 The requirements include:
a. Construction considerations and use of the premises.
b. Protection of personnel and Government property.
c. Construction facilities and job site standards.
d. The requirements of this section apply to the entire project including all amendments or modifications that may be issued to modify the contract documents.
3.2 GENERAL INFORMATION
3.2.1 NOT USED
3.2.2 NOT USED
3.2.3 Coordinate all construction activities with:
a. Contracting Officer’s Representative
b. Building Occupants
3.2.4 Not Used
3.2.5 Not Used.
3.2.6 Not Used
3.2.7 Not Used
3.2.8 Not Used.
3.2.9 Project and Safety Signs. See 01 50 00, Paragraph 2.1.2.
3.3 Not Used
3.4 Not Used
3.5 Not Used
Am en dm en t 0
SECTION 01 11 50.00 06
3.6 Not Used
4.0 Not Used
5.0 Not Used
6.0 Not Used
7.0 Not Used
8.0 Not Used
9.0 Not Used
10.0 Not Used
11.0 Not Used
12.0 Not Used
13.0 Not Used
14. Roof System
14.1 Contractor to replace existing roof system with PVC roof system.
--End of Section --
Am en dm en t 0
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Overview of roof
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Typical expansion joint
Typical HVAC equipment
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Typical HVAC equipment. Replace all curbs and supports for rooftop equipment.
Roof access hatch. Add supports for all plumbing and electrical conduit where missing.
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Overview of roof and typical HVAC equipment. Replace all curbs and supports for rooftop equipment.
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Corner
Over view of lower roof section
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Typical upper roof section
Damaged expansion joint
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Repair to expansion joint
Overview of lower roof section
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Overview of lower roof section. Electric line to remain. Replace all electrical and plumbing supports.
Debris on roof to be removed by contractor
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Flashing with covered weeps.
Typical coping cap. Replace all electrical and plumbing supports
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Typical coping cap. Replace all electrical and plumbing supports
Typical Corner and Electrical Conduit.
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
Install new electrical and plumbing supports where they are missing
Seed Project 2 CA150 01 11 50 00.00 06 Attachment A
Corrected Final January 2020
Am en dm en t 0
A majority of the roofs are gravel surfaced built-up roofs placed over insulation on existing metal decks.
Roof slope of 1/4 per 12 is built into the structure.
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment B
Corrected Final January 2020
Am en dm en t 0
ROOF DRAINS
OVERFLOW DRAIN
MECH
UNITMECH
UNIT
MECH
UNIT
EF
EF
ROOF
HATCH
150' - 0"
115' - 0"
0'
- 0
50' - 0"
0"
115' - 0"
0"
130' - 0"
0"
60' - 0"
EXPANSION JOINT
EXPANSION JOINT
US Army Corps of Engineers ®
FY20 NRP MATOC
Seed Project 2 CA150 01 11 50 00.00 06 Attachment B
Corrected Final January 2020
Am en dm en t 0
Seed Project 2 CA150 01 11 50 00.00 06 Attachment C
Corrected Final January 2020
Am en dm en t 0
CA150 Site Location 1481 Railroad Ave Vallejo, CA
1 mi
N
N © 2018 Google
© 2018 Google
© 2018 Google
FY20 NRP MATOC Seed Project 2 CA150 01 11 50 00.00 06 Attachment C Corrected Final January 2020
Am en dm en t 0
CA150 Building 1296 1481 Railroad Ave Vallejo, CA
100 ft
N
N © 2018 Google
© 2018 Google
© 2018 Google
FY20 NRP MATOC Seed Project 2 CA150 01 11 50 00.00 06 Attachment C Corrected Final January 2020
Am en dm en t 0
Corrected Final
NRP FY20 DB MATOC
Corrected Final
472474
January 2020
Seed Project 3
FL125
3000 8th Street, Orlando, FL Replace Mod Bit roof with Mod Bit Roof
Am en dm en t 0
NRP FY20 MATOC Seed Project 3 472474 Orlando, FL FL125 January 2020
SECTION 00 80 50.00 06 Page 1
CORRECTED FINAL
SECTION
00 80 50.00 06
SPECIAL PROVISIONS FOR TASK ORDERS
08/19
PART 1 GENERAL
1.1 NOT USED
1.2 NOT USED
1.3 NOT USED
1.4 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER. ER 415-1-15
This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the "Default (Fixed-Price Construction)" as discussed in Section 00 70 00 of the base contract and Section 00 70 50 of this task order. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:
The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.
The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.
The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in weather dependent activities.
MONTHLY ANTICIPATED ADVERSE WEATHER DELAY
WORK DAYS BASED ON (5) DAY WORK WEEK
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
FL125 18 21 19 11 4 7 10 9 5 4 14 19
Upon acknowledgment of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day. The number of actual adverse weather delay days shall include days impacted by actual adverse weather (even if adverse weather occurred in previous month), be calculated chronologically from the first to the last day of each month, and be recorded as full days. If the number of actual adverse weather delay days exceeds the number of days anticipated listed above, the Contracting Officer will convert any qualifying delays to calendar days, giving full consideration for equivalent fair weather work
Am en dm en t 0
SECTION 00 80 50.00 06 Page 2
CORRECTED FINAL
days, and issue a modification in accordance with the "Default (Fixed-Price Construction)" in section 00 70 00 of the base contract, Volume 1 .
1.5 WAGE RATES
The decision of the Secretary of Labor, covering rates of wages, including fringe benefits to be paid laborers and mechanics performing work under this contract, is attached to this solicitation. The payment for all classes of laborers and mechanics actually employed to perform work under the contract will be specified in the following contract provisions: "Contract Work Hours and Safety Standards -- Overtime Compensation"; "Construction Wage Rate Requirements"; and, "Compliance with Copeland Act Requirements" in Section 00 70 00 of the base contract.
Wage decision included is FL20190218 Building
The work to be performed is located in the State of Florida, Orange County
1.6 Not Used
1.7 Not Used
1.8 Not Used
1.9 NOT USED
1.10 NOT USED
1.11 NOT USED
1.12 NOT USED
1.13 NOT USED
1.14 NOT USED
1.15 NOT USED
1.16 NOT USED
1.17 NOT USED
1.18 NOT USED
1.19 NOT USED
1.20 NOT USED
1.21 NOT USED
1.22 NOT USED
1.23 NOT USED
1.24 NOT USED
Am en dm en t 0
SECTION 00 80 50.00 06 Page 3
CORRECTED FINAL
1.25 NOT USED
1.26 NOT USED
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
Am en dm en t 0
NRP FY20 MATOC
Seed Project 3 FL125 Orlando, FL
Line
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Labor, Equipment and Material Reports 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Daily Equipment Report 1.19 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding, Competent Person and Crew Qualifications and Training 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Scaffolding Erection Plan 1.21 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Fingerprints of all persons employed or to be employed 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Local Agency Check 1.12 GA
00 80 00.00 06 Vol 1 SD-01 Preconstruction Submittal Training Report 1.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Construction Plan 3.3.1 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Contractor’s Safety Program 3.4.5.3 GA
01 20 00.00 06 Vol 2 SD-01 Preconstruction Submittal Demolition Plan 4.2 GA
01 32 01.00 06 Vol 1 SD-01 Preconstruction Submittal Task Order Schedule 3.4 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Accident Prevention Plan 1.8 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Activity Hazard Analysis (AHA) 1.9 GA
01 35 26.00 06 Vol 1 SD-01 Preconstruction Submittal Site Safety & Health Office Qualifications (SSHO) 1.6 & Vol 2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Design Quality Control Plan 3.2 GA
01 45 04.10 06 Vol 1 SD-01 Preconstruction Submittal Construction Quality Control Plan 3.3 GA
01 50 00 Vol 1 SD-01 Preconstruction Submittal Construction Site Plan 1.4 GA
01 50 00 Vol 1 and 01 57 20.00 06 Vol 1 SD-02 Preconstruction Submittal Dust Control Plan 3.4.4 and
4.2.11 GA
01 57 20.00 06 Vol 1 SD-01 Preconstruction Submittal Environmental Protection Plan 1.7 GA
01 74 19 Vol 1 SD-01 Preconstruction Submittal Waste Management Plan 1.6 GA
00 80 50.00 06 Vol 2 SD-01 Preconstruction Submittal Storm Water Pollution Prevention Plan 1.7 GA
00 80 50.00 06 Vol 2 SD-02 Shop Drawings Mechanical/Electrical Room Layout 1.9 GA
00 80 00.00 06 Vol 1 SD-04 Samples Equipment Warranty Identification Tags 1.13(f) GA
00 80 50.00 06 Vol 2 SD-05 Design Data Soil Certification 1.24 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Equipment-in-Place List 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Maintenance and Parts Data 1.9 GA
00 80 00.00 06 Vol 1 SD-05 Design Data Progress Photographs 1.20 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Warranties 1.13 GA
00 80 00.00 06 Vol 1 SD-07 Certificates Insurance 1.4 GA
SB MATOC
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
Am en dm en t 0
Seed Project 3 FL125 Orlando, FL
Line
Act-ivity
Trans-mittal # Specification Section SD # SD Description Item Submitted
Paragraph
Classi-fication:
GA for
GOVT or A/E Revwr Submit
Approval Needed
By
Material Needed
By Action Code
Date Of Action
Date FWD to APPR /
Auth - Date RCD
From
CONTR
Date FWD To
Other Revwr
Date
RCD
From Other Revwr
Action Code
Date Of Action
Mailed To
CONTR/
Date RCD From
APPR
Authority Remarks
SB MATOC
CONTRACTOR SCHEDULE
DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
TITLE:
SUBMITTAL REGISTER
JOB NAME:
LOCATION:
CONTRACT NO:
CONTRACTOR:
00 80 00.00 06 Vol 1 SD-07 Certificates Sales and Use Tax 1.1 GA
1 80 00.00 06 Vol 1 SD-08 Certificates Certificates of Compliance 1.33 GA
00 80 50.00 06 Vol 2 SD-07 Certificates No Asbestos - Containing Material (ACM) Certification 1.21 GA
00 80 50.00 06 Vol 2 SD-07 Certificates Monthly AT Training Roster 4.1.8 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Preliminary (Working) As-Built Drawings 1.7.4 GA
00 80 00.00 06 Vol 1 SD-11 Closeout Submittals Warranty Management Plan 1.13(b) GA
00 80 50.00 06 Vol 2 SD-11 Closeout Submittals Final As-Built Drawings 1.9 GA
01 74 19 Vol 1 SD-11 Closeout Submittals Records, Waste Generated/Diverted 1.7 GA
1 80 00.00 06 Vol 1 SD-12 Closeout Submittals Final Borrow Pit/Spoil Area Contour Map 1.7.3(h) or
1.8.4 GA
Am en dm en t 0
FY20 NRP MATOC Seed Project 3 P2 472474 Orlando, FL FL125 December 2019
SECTION 01 11 50.00 06
SECTION
01 11 50.00 06
Task Order SCOPE OF WORK
1.0 PROJECT INFORMATION
1.1 GENERAL
Design/Build: The Contractor shall provide all labor, equipment, supplies, and consultant services and all site investigations, surveys, analysis,…