Solicitation W912PQ-18-Q-9799 Questions and Answers 18 September 2018 Revision 1

Q1-Please clarify that there is an existing breathing air compressor.

A1- There is an existing breathing air compressor, newly installed. We have a Quincy model QGC-50 compressor, that with the installation of the, Hankison model CBA 95 package and associated plumbing we will be using for breathable air.

Q2- What is the brand and specifications of the tool air compressor and the breathing air compressor? (needed to plan for the servicing requirement with OEM parts).

A2- Quincy model QGC-50 compressor is installed and operational. The Breathing air equipment is a Hankison Model CBA95. This was installed by Scales Compressors , and we have used them for services in the past, and will use for parts and services.

Q3- Please clarify 2.14.2. Who supplies this, the vendor or the Government.?2.14.2 A total of two tool airdrops will be provided on each side of sanding booth. Each drop will have two each tool air connections.

A3- The airdrops and tool air point of use equipment is supplied by the vendor/ contractor.

None of this is contractor supplied. See 2.14.4. for specifications for the contractor supplied and installed equipment

Q4- Is the 3D exploded view required with the bid? Or after award? 2.11.13.3D exploded view assembly drawings and construction detail sheets.

A4- That data is to be provided after the awarded contract during the first meeting with the contractor. This will be provided by the contractor and approved by the government to finalize the design phase. This is described in para 2.11.1. at the end.