Questions_and_Answers_2.docx

DOCX document 12 KB Posted

Attached to
Oil Water Separator inspection/Cleaning
Solicitation number
W912PQ-18-Q-8008
Issued by

About this file

Question and Answers 2

View the file

Other files

File Type Posted
SF_30_AMD_0002.pdf PDF
Questions_and_Answers.docx DOCX document
SF_30_AMD.pdf PDF
Appendix_B_SPRP_Form_6.pdf PDF
Wage_Determination.docx DOCX document
Appendix_A_OWS_List.docx DOCX document
PWS_Format_for_OWS_Inspection_Services.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #2 28 June 2018

Q. Is it safe to assume that the OWS at S-21 Bldg 802 is smaller than the largest one at S1 Bldg 106?

A. Yes

Q. I was reviewing Appendix A and have a question about the Ancillary equipment. i.e. S-1 lists capacity of 6000 gal and then the Ancillary equipment’s lists 6000 gal WST. Does that indicate that S-1 has 12,000 gal of capacity that needs to be cleaned and inspected?

A. Yes

Q. Have any of the OWS/Traps tested for positive for Hazardous Materials?

A. The materials have not been analytically tested to determine if they meet the definition of hazardous material in 49 CFR 171.8. However, with process knowledge, the government does not expect the materials to be hazardous.

Q. Are there any analytical testing results available for review?

A. No

Q. We normally do not clean grease traps, if we win the contract will we be able to sub-contract that portion?

A. Yes