IDIQ MATOC

RFP W912PQ-08-R-0009

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, PROPOSAL FORM

Date: MAY 3, 2008 PROJECT TITLE AND NO.: Repair Water Damaged Areas WKVB2008007 PROJECT DESCRIPTION: Work shall consist of removing and replacing water damaged gypsum board in noted rooms. Repair areas of drywall where the paint was damaged due to water in noted rooms. Prime all areas of new drywall and repaired areas. Paint all walls in noted rooms. Remove and replace, with new, all VCT and wall base in noted rooms. Remove the remaining damaged (water stained) ceiling tiles and install new tiles to include repairing the damaged grid system in noted rooms. Repair and install, in their entirety, break area cabinetry.

MAGNITUDE OF PROJECT: Between $25,000 and $100,000 PERFORMANCE PERIOD: 59 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will be conducted in conjunction with the MATOC pre-proposal meeting. See Section 00100 of the solicitation for details.

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $100,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

LIQUIDATED DAMAGES: ( X) YES or ( ) NO- reference Contract Clause 52.211-12.

CONSTRUCTION: (X ) YES or ( ) NO- reference Contract Clause 52.246-21, Warranty of Construction, is applicable to this task order.

WAGE DETERMINATION: Currently, General Decision Number NY080007 Modification No. NY7 dated 4/11/08 for Orange County and General Decision Number NY080013 Modification No. NY13 dated 3/21/08 for Suffolk County, is applicable to this task order. However, the current prevailing Wage Determination will be incorporated at time of award. Select the county in which performance of work will be performed.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

Item

Number

Description

Lump Sum Amount

Repair Water Damaged Areas WKVB2008007 $________________

SIGNATURE:

COMPANY NAME

Name and title of person authorized to sign Offer Date

EXHIBIT E – 1 - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED IN RESPONSE TO W912PQ-08-R-0009

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:__________________________________

B.1 Total Offer Price: $_________________

B.2 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)_________________________________________

B.3 Remainder is “Total amount of work to be performed under the Contract” = $__________________

B.4 “Work to be self-performed”: = $ _________________________________ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.5 % Self-performed Work = Line B.5 / B.4 X 100% = ________________________%