W912PP23B0024 AFRCO FSU Bldg 1025 Renovation_Amendment 0002.pdf
PDF 728 KB Posted
- Attached to
- Building 1025 Section D Renovation, Kirtland Air Force Base, Bernalillo County, NM -- RFP and Amendments
- Solicitation number
- W912PP23B0024
About this file
This amendment to the solicitation provides revisions to the specifications and drawings for the Building 1025 Section D Renovation project at Kirtland Air Force Base in Bernalillo County, New Mexico. The Army Corps of Engineers Engineering District Albuquerque is seeking proposals to renovate the west end of Building 1025 for the Air Force Research Laboratory and Federal Strategic Utility Management Program. The amendment deletes and replaces pages in the specifications for static-control flooring and drawings showing the first floor plan and code analysis. It also adds plumbing fixture count information to the index sheet. Offerors must acknowledge receipt of the amendment by the specified date and time in order to be considered for award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912PP
AFRCO FSU Building 1025 Renovation at Kirtland Air Force Base, Bernalillo County, New Mexico
1.This is Amendment No. 0002 to Solicitation No. W912PP23B0024. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
See Item 6
J
W912PP23B0024
1 2
07/31/2023
07/12/2023
W912PP23B0024
AMENDMENT No. 0002
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
SECTION 09 62 38 - STATIC-CONTROL
FLOORING, ENTIRETY
SECTION 09 62 38 - STATIC-CONTROL
FLOORING, ENTIRETY
3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:
Delete Page Insert Page
G002 - INDEX SHEET AND CODE ANALYSIS G002.1 - INDEX SHEET AND CODE ANALYSIS
A-101 - FIRST FLOOR PLAN A-101.1- FIRST FLOOR PLAN
////////LAST ITEM////////
Building 1025 Renovation W912PP23B0024 Albuquerque, NM Amendment 0002
SECTION 09 62 38
STATIC-CONTROL FLOORING
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC)
AATCC 16 (2004; E 2008; E 2010) Colorfastness to Light
AATCC 107 (2013) Colorfastness to Water
AATCC 165 (2013) Colorfastness to Crocking: Textile Floor Coverings - Crockmeter Method
ASTM INTERNATIONAL (ASTM)
ASTM E648 (2019a) Standard Test Method for Critical Radiant Flux of Floor-Covering Systems Using a Radiant Heat Energy Source
ASTM F150 (2006; R 2013) Standard Test Method for Electrical Resistance of Conductive and Static Dissipative Resilient Flooring
ASTM F1700 (2020) Standard Specification for Solid Vinyl Floor Tile
ASTM F1861 (2021) Standard Specification for Resilient Wall Base
ASTM F1869 (2016a) Standard Test Method for Measuring Moisture Vapor Emission Rate of Concrete Subfloor Using Anhydrous Calcium Chloride
ASTM F2170 (2019a) Standard Test Method for Determining Relative Humidity in Concrete Floor Slabs Using in situ Probes
CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (CDPH)
CDPH SECTION 01350 (2010; Version 1.1) Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources using Environmental Chambers
CARPET AND RUG INSTITUTE (CRI)
CRI 104 (2015) Carpet Installation Standard for
SECTION 09 62 38 Page 1
Commercial Carpet
CRI 105 (2015) Carpet Installation Standard for Residential Carpet
CRI Green Label Plus (2017) Green Label Plus Quality Manual
ELECTROSTATIC DISCHARGE ASSOCIATION (ESD)
ESD S6.1 (2019) Standard for the Protection of Electrostatic Discharge Susceptible Items
– Grounding
GREEN SEAL (GS)
GS-36 (2013) Adhesives for Commercial Use
INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)
ISO 2551 (2020) Textile Floor Coverings and Textile Floor Coverings in Tile Form- Determination of Dimensional Changes Due to the Effects of Varied Water and Heat Conditions and Distortion Out of Plane
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 99 (2021; TIA 20-1) Health Care Facilities Code
RESILIENT FLOOR COVERING INSTITUTE (RFCI)
FLOORSCORE FLOORSCORE IAQ Certification
SCIENTIFIC CERTIFICATION SYSTEMS (SCS)
SCS SCS Global Services (SCS) Indoor Advantage
SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (SCAQMD)
SCAQMD Rule 1168 (2017) Adhesive and Sealant Applications
UNDERWRITERS LABORATORIES (UL)
UL 2818 (2013) GREENGUARD Certification Program For Chemical Emissions For Building Materials, Finishes And Furnishings
1.2 SCHEDULING
Schedule static-control flooring work after any other work which would damage the finished surface of the flooring.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
SECTION 09 62 38 Page 2
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-03 Product Data
Static-Control Resilient Flooring ; G
Recycled content for Static-Dissipative Vinyl Tile ; S
Recycled content for Static-Control Carpet ; S
Accessories ; G
Adhesives ; G
Warranty
SD-04 Samples
Static-Control Resilient Flooring ; G
Static-Control Carpet ; G
Moldings ; G
Special Treatment Materials ; G
Accessories ; G
SD-06 Test Reports
Fire Resistance
Moisture, Alkalinity and Bond
Testing
SD-07 Certificates
Indoor Air Quality for Static-Dissipative Vinyl Tile ; S
Indoor Air Quality for Static-Control Carpet ; S
Qualifications of Applicator
SD-08 Manufacturer's Instructions
Static-Control Resilient Flooring ; G
Accessories ; G
SD-10 Operation and Maintenance Data
Static-Control Resilient Flooring ; G
Accessories ; G
SECTION 09 62 38 Page 3
1.3.1 Samples
1.3.1.1 Static-Control Resilient Flooring
Submit three samples of each indicated color and type of flooring, base, moldings, and accessories sized a minimum 2-1/2 by 4 inch .
1.3.1.2 Static-Control Carpet
Submit three "Production Quality" samples 18 by 18 inches of each carpet proposed for use, showing quality, pattern, and color specified.
1.3.1.3 Moldings
Submit three pieces of each type at least 12 inches long.
1.3.1.4 Special Treatment Materials
Submit three samples showing system and installation method.
1.3.1.5 Operations and Maintenance Data
a. Submit Data Package 1 in accordance with Section 01 78 23 OPERATION
AND MAINTENANCE DATA.
b. Submit three copies of manufacturer's maintenance instructions for each type of flooring material describing recommended type of cleaning equipment and materials, spotting and cleaning methods, and cleaning cycles.
1.4 CERTIFICATIONS
1.4.1 Indoor Air Quality Certifications
1.4.1.1 Floor Covering Materials
Provide Static-Dissipative Vinyl Tile and wall base products certified to meet indoor air quality requirements by FLOORSCORE, UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide Static-Control Carpet certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold, CRI Green Label Plus or provide certification or validation by other third-party program that products meet the requirements of this Section. Provide current product certification documentation from certification body.
1.4.1.2 Adhesives
Provide products certified to meet indoor air quality requirements by UL 2818 (Greenguard) Gold, SCS Global Services Indoor Advantage Gold or provide certification or validation by other third-party programs that products meet the requirements of this Section. Provide current product certification documentation from certification body.
1.5 EXTRA MATERIALS
Provide extra material from same dye lot for future maintenance. Provide a minimum of 10 percent of total square yards of each flooring and base
SECTION 09 62 38 Page 4 type, pattern, and color.
1.6 QUALITY ASSURANCE
The flooring manufacturer will approve the Qualifications of Applicator and certify that he/she has a minimum of 3 years of experience in the application of the materials to be used.
1.7 DELIVERY, STORAGE, AND HANDLING
Deliver materials to the building site in original unopened containers bearing the manufacturer's name, style name, pattern color name and number, size, production run, project identification, handling instructions and related information. Observe ventilation and safety procedures specified in the Safety Data Sheets (SDS). Do not store flooring near materials that may off-gas or emit harmful fumes, such as kerosene heaters, fresh paint, or adhesives.
1.7.1 Static-Control Resilient Flooring
Store materials in a clean, dry, secure, and well-ventilated area free from strong contaminant sources and residues with ambient air temperature range as recommended by the manufacturer but not less than 68 degrees F or more than 85 degrees F . Stack materials according to manufacturer's recommendations. Protect materials from the direct flow of heat from hot-air registers, radiators and other heating fixtures and appliances.
1.7.2 Static-Control Carpet
Remove materials from packaging and store them in a clean, dry, well ventilated area protected from damage, soiling, and moisture, and maintain at a temperature range as recommended by the manufacturer but not less than 60 degrees F or more than 90 degrees F for 2 days prior to installation.
1.8 ENVIRONMENTAL CONDITIONS
Provide temporary ventilation during work of this section.
1.8.1 Static-Control Resilient Flooring
Maintain areas in which resilient flooring is to be installed at a temperature range as recommended by the manufacturer but not less than 68 degrees F or more than 85 degrees F for 3 days before application, during application and 2 days after application, unless otherwise directed by the flooring manufacturer for the flooring being installed. Maintain a minimum temperature range as recommended by the manufacturer but not less than 55 degrees F thereafter for the duration of the contract. Provide adequate ventilation to remove moisture from area and to comply with regulations limiting concentrations of hazardous vapors.
1.8.2 Static-Control Carpet
Maintain areas in which carpeting is to be installed at a temperature range as recommended by the manufacturer but not less than 60 degrees F or more than 90 degrees F for 2 days before installation, during installation, and for 2 days after installation. Maintain a minimum temperature range as recommended by the manufacturer but not less than 55 degrees F thereafter for the duration of the contract. Do not permit traffic or movement of furniture or equipment in carpeted area for 24
SECTION 09 62 38 Page 5 hours after installation.
1.9 WARRANTY
1.9.1 Static-Control Resilient Flooring
Provide manufacturer's standard performance guarantees or warranties including a five year wear warranty and ten year conductivity warranty.
1.9.2 Static-Control Carpet
Provide manufacturer's standard performance guarantees or warranties including a minimum two years for material and workmanship and ten years for wear, static control, tuft bind and delamination.
PART 2 PRODUCTS
2.1 STATIC-CONTROL RESILIENT FLOORING
2.1.1 Static-Dissipative Resilient Flooring
2.1.1.1 Static-Dissipative Vinyl Tile
Static-dissipative vinyl tile must be a homogeneous vinyl product and conform to ASTM F1700. Provide electrical resistance from surface to surface and surface to ground between 1,000,000 ohms (1.0 x 10 to the 6th) and 1,000,000,000 ohms (1.0 x 10 to the 9th) when tested in accordance with ASTM F150. Tile must be 12 inches square and 1/8 inch thick.
Provide Static-Dissipative Vinyl Tile containing a minimum of 10 percent recycled content. Provide data identifying percentage of recycled content for Static-Dissipative Vinyl Tile .
Provide certification of indoor air quality for Static-Dissipative Vinyl Tile .
2.2 STATIC-CONTROL CARPET
Provide first quality carpet; free of visual blemishes, streaks, poorly dyed areas, fuzzing of pile yarn, spots or stains, and other physical and manufacturing defects. Provide carpet materials and treatments as reasonably non-allergenic and free of other recognized health hazards.
Provide a static control construction on all grade carpets which gives adequate durability and performance.
Provide Static Control Carpet containing a minimum of 40 percent recycled content. Provide data identifying percentage of recycled content for Static-Control Carpet .
Provide certification of indoor air quality for Static-Control Carpet .
2.2.1 Physical Characteristics
2.2.1.1 Carpet Construction
Tufted
SECTION 09 62 38 Page 6
2.2.1.2 Type
Modular tile 24 by 24 inch square with 0.15 percent growth/shrink rate in accordance with ISO 2551 .
2.2.1.3 Pile Type
Level-loop
2.2.1.4 Pile Fiber
Commercial 100 percent branded (federally registered trademark) nylon continuous filament
2.2.1.5 Conductive Fiber
Provide a continuous conductive fiber as recommended by the manufacturer in every tuft.
2.2.1.6 Dye Method
Solution dyed
2.2.1.7 Backing System
Provide conductive backing system of synthetic material as recommended by the carpet manufacturer.
2.2.2 Static-Control Carpet Performance Requirements
2.2.2.1 Electrical Resistance
Provide electrical resistance from surface to surface and surface to ground between 251,000 ,000 ohms ( 2.5 1.0 x 10 to the 46th) and 1 ,0 00,000,000 ohms (1.0 x 10 to the 89th) ohms when tested in accordance with
NFPA 99 .
2.2.2.2 Tuft Bind
Provide tuft bind force required to pull a tuft or loop free from carpet backing with a minimum 10 pound average force for loop pile.
2.2.2.3 Colorfastness to Crocking
Comply dry and wet crocking with AATCC 165 and with a Class 4 minimum rating on the AATCC Color Transference Chart for all colors.
2.2.2.4 Colorfastness to Light
Comply colorfastness to light with AATCC 16, Test Option E "Water-Cooled Xenon-Arc Lamp, Continuous Light" and with a minimum 4 grey scale rating after 40 hours.
2.2.2.5 Colorfastness to Water
Comply colorfastness to water with AATCC 107 and with a minimum 4.0 gray scale rating and a minimum 4.0 transfer scale rating.
SECTION 09 62 38 Page 7
2.2.2.6 Delamination Strength
Provide delamination strength for tufted carpet with a secondary back of minimum 2.5 lbs/inch .
2.3 WALL BASE
2.3.1 Resilient Base
Resilient base must conform to ASTM F1861, Type TS (vulcanized thermoset rubber), Style A (straight - installed with carpet), and Style B (coved
- installed with resilient flooring). Provide 4 inch high and a minimum 1/8 inch thick wall base. Provide preformed corners in matching height, shape, and color.
2.4 ADHESIVES
Provide conductive adhesive as recommended by the manufacturer of the static-control flooring. Provide conductive adhesive for carpet tile that is also releasable as recommended by the manufacturer. Provide adhesive for wall base as recommended by the wall base manufacturer.
Provide non-aerosol adhesive products used on the interior of the building (defined as inside of the weatherproofing system) that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of SCAQMD Rule 1168 . Provide aerosol adhesives used on the interior of the building that meet either emissions requirements of CDPH SECTION 01350 (use the office or classroom requirements, regardless of space type) or VOC content requirements of GS-36. Provide certification or validation of indoor air quality for adhesives .
2.5 MOLDINGS
Provide heavy duty tapered moldings of vinyl and types as recommended by flooring manufacturer for both edges and transitions of flooring materials specified. Provide vertical lip on molding of maximum 1/4 inch . Provide bevel change in level between 1/4 and 1/2 inch with a slope no greater than 1:2. Provide color to match resilient base.
2.6 ACCESSORIES
Use accessories recommended by the manufacturer of the flooring.
2.7 ELECTRICAL GROUND CONNECTION
Provide an electrical ground connection that meets the requirements of ESD S6.1 . Connection between the static-control floor system and the external grounding system must be provided. Contact with the static-control floor system must be with conductive grounding strip and must have the greater of the following: a minimum contact area of 9 square inch or the dimensions recommended by the manufacturer. Provide the grounding conductor recommended by the manufacturer of the flooring.
Connect and install the grounding conductor as recommend by the flooring manufacturer.
2.8 MANUFACTURER'S COLOR, PATTERN AND TEXTURE
Provide color, pattern and texture as selected by contracting officer.
SECTION 09 62 38 Page 8
Provide flooring in any one continuous area or replacement of damaged flooring in continuous area from same production run with same shade and pattern.
2.9 FIRE RESISTANCE TESTING REQUIREMENTS
Provide a minimum average critical radiant flux of 0.22 watts per square centimeter for flooring in corridors and exits when tested in accordance with ASTM E648.
PART 3 EXECUTION
3.1 SURFACE PREPARATION
Before any work under this section is begun, defects such as rough or scaling concrete, low spots, high spots, and uneven surfaces must be corrected, and damaged portions of concrete slabs must be repaired in accordance with flooring manufacturer's recommended instructions. Floor must be in a level plane with a maximum variation of 1/8 inch every 10 feet , except where indicated as sloped. Repair cracks and irregularities and prepare the subfloor in accordance with flooring manufacturer's recommended instructions. Curing and sealing compounds should not be used on concrete surfaces to receive flooring unless they have been tested and approved by the flooring manufacturer. In addition, remove paint, varnish, oils, release agents, sealers, waxes, and adhesives, as required by the flooring product in accordance with manufacturer's printed installation instructions. If a curing compound is required, it must be coordinated for compatibility with the flooring adhesive.
3.2 MOISTURE, ALKALINITY AND BOND TESTS
Determine the suitability of the concrete subfloor for receiving the flooring with regard to moisture content and pH level by moisture and alkalinity tests. Conduct moisture testing in accordance with ASTM F1869 or ASTM F2170, unless otherwise recommended by the flooring manufacturer.
Conduct alkalinity testing as recommended by the flooring manufacturer.
Determine the compatibility of the flooring adhesives to the concrete floors by a bond test in accordance with the flooring manufacturer's recommendations.
3.3 GENERAL INSTALLATION
Do not install building construction materials that show visual evidence of biological growth.
3.4 INSTALLATION OF STATIC-CONTROL RESILIENT TILE FLOORING
Install static-control resilient flooring, ground connections and accessories in accordance with the approved manufacturer's installation instructions. Tile lines and joints must be kept square, symmetrical, tight, and even. Tile at the perimeter of the area to be finished may vary as necessary to maintain full-size tiles in the field, but no perimeter tile may be less than one-half the field tile size, except where irregular shaped rooms make it impossible. Tile must be cut, fitted, and scribed to walls, partitions, and projections after field flooring has been applied. Install grounding strips in accordance with manufacturer's installation instructions. Protect edges of flooring material meeting hard surface flooring with molding and install in accordance with the molding manufacturer's printed instructions.
SECTION 09 62 38 Page 9
3.5 INSTALLATION OF STATIC-CONTROL CARPET
Install static-control carpet, ground connections and accessories in accordance with the approved manufacturer's installation instructions and CRI 104 / CRI 105 . Protect edges of carpet meeting hard surface flooring with molding and install in accordance with the molding manufacturer's printed instructions. Follow ventilation, personal protection, and other safety precautions recommended by the adhesive manufacturer. Continue ventilation during installation and for at least 72 hours following installation. Install modular tiles with release adhesive and join together snugly. Lay tiles in the same direction with accessibility to the subfloor where required. Install grounding strips in accordance with manufacturer's installation instructions.
3.6 INSTALLATION OF WALL BASE
3.6.1 Resilient Base
Install wall base in accordance with manufacturer's printed installation instructions. Prepare and apply adhesives in accordance with manufacturer's printed directions. Tighten base joints and make even with adjacent resilient flooring. Fill voids along the top edge of base at masonry walls with caulk. Roll entire vertical surface of base with hand roller, and press toe of base with a straight piece of wood to ensure proper alignment. Avoid excess adhesive in corners.
3.7 CLEANING AND PROTECTION
The flooring must be cleaned in accordance with the manufacturer's recommendations. Flooring must be protected by a covering of heavy-duty building paper before foot traffic is permitted. Lap and secure edges of kraft paper protection to provide a continuous cover. Boardwalks must be placed over flooring in areas where subsequent building operations might damage the floor. Remove and replace flooring that becomes loose, broken, or curled prior to acceptance, or flooring that does not conform to resistance requirements of ASTM F150.
3.8 TESTING
Test the flooring in accordance with and conform to the requirements of
ESD S6.1 .
-- End of Section --
SECTION 09 62 38 Page 10
TRAVEL DISTANCE = 82'
TRAVEL DISTANCE = 105'
ADJACENT PORTION OF
FACILITY (NO CHANGES
TO LIFE SAFETY)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
AM
AD
D
ED
P
LU
M
BI
N
G F
IX
TU
R E
C O
U N
T
IN
FO
R
M
AT
IO
N
7/
/2
R . D
O U
R
TE
N . T
AY
LO
R
C . B
O W
EN
B.
Q
U
IR
IC
I
IN
D
EX
S
H
EE
T
AN
D C
O D
E
AN
AL
YS
IS
G002.1
K:
\K
AF
B\
KA
\P R
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 1_
G
EN
\K T8
6G
2_
AM
1.
D
W G
:1
5:
A M
/2
8/
AE
C _B
&W .S
TB
L4
ED
TJ
EM
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N
EW
M
EX
IC
O
W
2P P-
-X
-X
XX
X
JU
N
E
AN
SI
D
W
2P L2
3B
KI
R
TL
AN
D A
IR
F
O R
C E
BA
SE
BE
R
N
AL
IL
LO
C O
U N
TY
, N
M
BU
IL
D
IN
G
R
EN
O
VA
TE
W
ES
T
EN
D
AF
R
C O
FS
U
PN
M
H M
V1
R
TA
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
GENERAL
G-001 COVER SHEET
G-002 INDEX SHEET AND CODE ANALYSIS
G-003 PROJECT LOCATION MAP, VICINITY MAP, AND CONTRACTOR HAUL ROUTE
G-004 FLOW TEST HYDRANT LOCATIONS
CIVIL
CD101 DEMOLITION PLAN
CS101 SITE PLAN
C501 CHAIN LINK FENCE DETAILS
C502 DELIVERY GATE DETAILS
STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 SECTION AND PLAN DETAILS
S-003 TYPICAL FOUNDATION DETAILS
ARCHITECTURAL
AD101 FIRST FLOOR DEMO PLAN
A-101 FIRST FLOOR PLAN
A-102 REFLECTED CEILING PLAN
A-301 BUILDING AND WALL SECTION
A-601 ROOM FINISH AND DOOR SCHEDULES, DOOR AND FRAME TYPES
FIRE PROTECTION
FX101 FIRE PROTECTION PLAN
FA101 FIRE ALARM PLAN
PLUMBING
P-001 PLUMBING NOTES AND SYMBOLS
PD101 PLUMBING DEMOLITION PLAN
P-101 PLUMBING PLAN
P-501 PLUMBING DETAILS I
P-502 PLUMBING DETAILS II
P-503 PLUMBING RISERS
P-601 PLUMBING SCHEDULE
MECHANICAL
M-001 MECHANICAL LEGENDS
MD101 MECHANICAL DEMOLITION PLAN
M-101 MECHANICAL FLOOR PLAN
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL EQUIPMENT SCHEDULE
M-700 MECHANICAL CONTROLS LEGEND
M-701 MECHANICAL CONTROLS SEQUENCES
M-702 MECHANICAL CONTROLS SCHEDULE
M-703 CONTROLS POINTS SCHEDULE
ELECTRICAL
E-001 LEGEND AND ABBREVIATIONS
E-002 TYPICAL MOUNTING HEIGHTS
ES101 ELECTRICAL SITE PLAN
ED101 ELECTRICAL DEMOLITION PLAN
EL101 LIGHTING PLAN
EL501 LIGHTING CONTROL DETAIL
EP101 ELECTRICAL POWER PLAN
EP102 MECHANICAL POWER PLAN
EP501 ELECTRICAL EQUIPMENT SCHEDULE
EP601 ONE-LINE DIAGRAM
EP602 PANEL SCHEDULES
EP603 BUSWAY SCHEDULES
ET101 TELECOMMUNICATIONS PLAN
ET501 TELECOMMUNICATIONS DETAILS
ET502 TELECOMMUNICATIONS DETAILS II
EY101 SPECIAL SYSTEMS PLAN
EY501 ACCESS CONTROL SYSTEM DIAGRAM
INDEX OF DRAWINGS
1 LIFE SAFETY FLOOR PLAN
SCALE: 1/8" = 1'-0"
FIRE EXTINGUISHERS PER NFPA 10
EXIT
EGRESS PATH
1-HOUR RATED PARTITION
2-HOUR RATED PARTITION
(EXISTING TO REMAIN)
SECURE AREA BOUNDARY
CODE ANALYSIS:
APPLICABLE LIFE SAFETY CODES:
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES, WITH CHANGE 6, 6-MAY-2021
IBC, 2021 EDITION
NFPA 101- LIFE SAFETY CODE, 2021 EDITION
NFPA 10- PORTABLE FIRE EXTINGUISHERS, 2022 EDITION
FACILITY IS CURRENTLY 75% SPRINKLERED. RENOVATION WILL RESULT IN FULLY SPRINKLERED FACILITY.
IBC
CLASSIFICATIONS
OCCUPANCY CLASSIFICATION GROUP B 304.1
IBC CONSTRUCTION TYPE II-B (EXISTING) NFPA EQUIVALENT IS TYPE II (000)
ALLOWABLE HEIGHT: EXISTING N/A ACTUAL HEIGHT: EXISTING N/A TABLE 504.3
ALLOWABLE NUMBER OF STORIES: 4 STORIES: ACTUAL = 1 TABLE 504.4
ALLOWABLE AREA: 92,000 + (23000*0.75) = 109,250 SF; ACTUAL IS 24,000 TABLE 506.2
FIRE RATED SEPARATIONS: MECH & ELEC ROOMS ARE SEPARATED BY 1HR CONSTRUCTION
CONSTRUCTION:
EXTERIOR BEARING WALLS NON-COMBUSTIBLE TABLE 601
INTERIOR BEARING WALLS NON-COMBUSTIBLE TABLE 601
STRUCTURAL FRAME NON-COMBUSTIBLE TABLE 601
FLOOR CONSTRUCTION NON-COMBUSTIBLE TABLE 601
EXTERIOR DOORS/WINDOWS FIRE SEPARATION > 30FT NO PROTECTION REQUIRED
ROOF COVERING MIN CLASS C REQUIRED: EXISTING ROOF COVERING PROVIDED CLASS A (EXISTING/ ASSUMED) TABLE 1505.1
NFPA 101
OCCUPANCY CLASSIFICATION EXISTING BUSINESS CHAPTER 39
HAZARD OF CONTENTS ORDINARY HAZARD CONTENTS PER 6.2.2
OCCUPANT LOAD B: 4800 SF/ 100 SF = 48
CAPACITY OF MEANS OF EGRESS 48 PN X 0.2 INCHES/PN = 9.6 INCHES 7.3.3.1
DEAD END CORRIDORS 50FT (OK) 39.2.5.2
COMMON PATH OF TRAVEL 100FT (OK) 39.2.5.3.1
MAX TRAVEL DISTANCE TO EXITS 300FT (OK) 39.2.6.3
PROTECTION:
BOILER ROOM 1HR PROVIDED
INTERIOR WALL AND CEILING FINISHES CLASS A OR B
INTERIOR FLOOR FINISHES CLASS I OR II
PORTABLE FIRE EXTINGUISHERS NFPA 10 (75FT) (OK)
PLUMBING FIXTURE COUNT ANALYSIS:
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
A
B
C
D
E
F
G
H
J
K
L
M
N
P
SU
BM
IT
TE
D B
Y:
C H
EC
KE
D B
Y:
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
IS
SU
E D
AT
E:
SI
ZE
M
AR
K
D
ES
C R
IP
TI
O N
D
AT
E
SHEET ID
U
SA
C E
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
J
EF
FE
R
SO
N P
LA
ZA
N E
AL
BU
Q U
ER
Q
U E, N M
AL
BU
Q U
ER
Q
U E
D
IS
TR
IC
T
W
2P P2
2X
XX
X
JU
N
E
AN
SI
D
W
2P P2
3B
KI
R
TL
AN
D A
IR
FO
R C
E
BA
SE
BE
R N
AL
IL
LO
C
O U
N
TY
, N M
BU
IL
D
IN
G
R
EN
O
VA
TE
W
ES
T
EN
D
-A
FR
C O
-F
SU
PN
M H
M V1
R
TA
S
ET
N
O T
FO
R
C O
N
ST
R U
C
TI
O N
K:
\K
AF
B\
KA
\P R
O
JE
C
TD
AT
A\
C
AD
_B
IM
\0 8_
AR
C
H \K
A8 6A
-1
_A M
1.
D
W G
:2
2:
A M
/2
8/
L4
ED
TJ
EM
US Army Corps of Engineers
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
AM
D
ET
AI
LE
D S
TO
O
P
AT
B O
TT
O
M O
F
ST
EE
L
ST
AI
R 7/
/2
B.
C
O N
N
ER
M .S
AN
C
H
EZ
J.
M
AR
SH
AL
L
FI
R
ST
F
LO
O
R P
LA
N
A-101.1
KEYED NOTES:
1. SINGLE BOWL SINK WITH MANUAL FAUCET
2. EMERGENCY EYE WASH
3. NEW DOOR IN EXISTING RATED WALL
4. CLASSIFIED AREA (CONSTRUCT PER ICD/ICS 705)
5. UNCLASSIFIED AREA
6. NEW STEEL STAIRS WITH METAL RAILINGS
7. ISO 14644-1 CLASS 8
8. ELECTROSTATIC DISCHARGE (ESD) CARPETING
9. STC-50 RATED EXIT ONLY DOOR ASSEMBLY
10. EXISTING 2-HR RATED WALL
11. 8'-0"W X 8'-0"H (MIN) AIRTIGHT DOOR AND SEAL. POSITION DOOR AS
CLOSE TO EXISTING END WALL COLUMN AS STANDARD CONSTRUCTION
PRACTICE ALLOWS.
12. ELECTROSTATIC DISCHARGE (ESD) RESILIENT FLOORING
13. SEALED CONCRETE FLOOR
14. PATCH AND REPAIR ALL METAL SIDING PANELING TO MATCH EXISTING IN
COLOR, MATERIAL AND PERFORMANCE. SEE DETAIL 2/A-301
15. COLUMN FUR-OUT
16. EXISTING CMU WALL AND VEHICLE GATE, SEE CIVIL
17. AIR CURTAIN, SEE MECHANICAL
18. CHAIN LINK ACCESS GATE OPENING. SEE CIVIL
19. NOT USED
20. NEW EXTERIOR DOOR AND FRAME IN EXISTING OPENING
21. NOT USED
22. NEW WROUGHT IRON FENCING TO MATCH EXISTING IN HEIGHT, COLOR,
AND PERFORMANCE, SEE CIVIL
23. NEW WROUGHT IRON EXIT ONLY GATE TO MATCH EXISTING IN HEIGHT,
COLOR, AND PERFORMANCE, SEE CIVIL
24. MECHANICAL FUR-OUT. SEE MECHANICAL FOR DUCT SIZES AND
LOCATION.
GENERAL NOTES
A. WHERE NEW PLUMBING FIXTURES ARE NOTED BELOW, SAW CUT SLAB AS
NECESSARY TO THE TIE INTO EXISTING SANITARY SEWER DRAIN LINES
WHERE EXISTING RESTROOMS WERE DEMOLISHED.
B. THE REMAINDER OF THIS FACILITY WILL REMAIN OPERATIONAL DURING
CONSTRUCTION. MAINTAIN THE INTEGRITY OF THE FIRE-RATED WALL
SEPARATING THE RENOVATION AREA FROM THE AREA TO THE EAST
(SECTION A) THROUGHOUT CONSTRUCTION. DO NOT MAKE ANY
PENETRATIONS THROUGH THIS WALL UNTIL ALL OTHER RENOVATION
WORK HAS BEEN COMPLETED. SCHEDULE ALL WORK SO THAT THE LAST
WORK ITEMS ARE CUTTING THE OPENING FOR THE NEW DOOR,
INSTALLING THE DOOR, MAKING CONDUIT PENETRATIONS, AND
COMPLETING MINOR FINISH WORK. IDENTIFY THE DATE FOR THIS FINAL
TIE-IN WORK ON THE PROJECT SCHEDULE, COORDINATE IT WITH THE
CONTRACTING OFFICER, AND UPDATE IT AS NECESSARY THROUGHOUT
THE PROJECT.
1 2
1 FIRST FLOOR PLAN
SCALE: 3/16"=1'-0"
NORTH
PLAN
0 8'4' 16'
14 14
14 14
15 15 15
22 22
12 8
6 6
5 135 13
4 7
1 2
14 20
3 24
| SF30 |
| AMEND |
| 09 62 38 |
| DRAWINGS |
File details come from the government source that posted it. Updated .