W912PP21R0002 NC3 HAFB WRM Amendment 0005.pdf
PDF 10 MB Posted
- Solicitation number
- W912PP21R0002
About this file
This document provides details on a federal contract solicitation for construction services. The U.S. Army Corps of Engineers seeks proposals to design and construct a 69,945 square foot storage and shipping facility at Holloman Air Force Base in New Mexico for approximately $10-25 million. Interested offerors must register with beta.sam to access the solicitation and any amendments. The facility will include reinforced concrete, masonry walls, insulated metal walls, a standing seam metal roof, utilities, HVAC, fire protection, ventilation, large doors, pavements, an access road, office space, restrooms, a kitchen, site work and landscaping. In addition, six existing structures totaling around 20,000 square feet will be demolished and materials disposed of. The solicitation type is lowest price technically acceptable and will follow the unrestricted procurement process open to large and small businesses. The NAICS code is 236220 with a size standard of $39.5 million. Offers are due by March 2021 with a pre-proposal site tour scheduled for early that month.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912PP
Design Bid Build NC3 Support WRM Storage/Shipping Facility at Holloman Air Force Base, New Mexico.
1.This is Amendment No. 0005 to Solicitation No. W912PP21R0002. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
See Item 6
J
W912PP21R0002
1 2
04/14/2021
03/01/2021
W912PP21R0002
AMENDMENT No. 0005
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
TABLE OF CONTENTS, PAGES 2-4
(PAGES 4-6 OF SPECIFICATIONS
PACKAGE)
TABLE OF CONTENTS, PAGES 2-4
SUBMITTAL REGISTER, PAGES 32-82
(PAGES 196-246 OF SPECIFICATIONS
PACKAGE)
SUBMITTAL REGISTER, PAGES 32-83
AND 1 BLANK PAGE
04 20 00 UNIT MASONRY, PAGE 7
(PAGE 533 OF SPECIFICATIONS)
04 20 00 UNIT MASONRY, PAGE 7
07 21 13 BOARD AND BLOCK
INSULATION, ENTIRE SECTION
07 21 13 BOARD AND BLOCK
INSULATION, ENTIRE SECTION
N/A 07 95 00 EXPANSION CONTROL,
ENTIRE SECTION
3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:
Delete Page Insert Page
A-311 WALL SECTIONS, PAGE 115 OF
DRAWINGS PACKAGE
A-311.1 WALL SECTIONS
A-451 PLAN DETAILS, PAGE 121 OF
DRAWNGS PACKAGE
A-451.1 PLAN DETAILS
A-571 ROOF DETAILS, PAGE 128 OF
DRAWINGS PACKAGE
A-571.1 ROOF DETAILS
A-661 WINDOW DETAILS, PAGE 135 OF
DRAWINGS PACKAGE
A-661.1 WINDOW DETAILS
M-101.1 GROUND FLOOR - HVAC PLAN -
AREA A, PAGE 157 OF DRAWINGS PACKAGE
M-101.2 GROUND FLOOR - HVAC PLAN -
AREA A
W912PP21R0009
Page 2a of 2
M-106.1 GROUND FLOOR - HVAC PLAN -
BID OPTION 1, PAGE 162 OF DRAWINGS
PACKAGE
M-106.2 GROUND FLOOR - HVAC PLAN -
BID OPTION 1
M-721.1 MECHANICAL CONTROLS SCHEMATIC
– EXHAUST FAN, PAGE 176 OF DRAWINGS
PACKAGE
M-721.2 MECHANICAL CONTROLS SCHEMATIC
– EXHAUST FAN
N/A PLOT PLAN AND DETAILS
N/A UTILITY DETAILS
////////LAST ITEM////////
NC3 Support WRM Storage/Shipping Facility W912PP21R0002 HOLLOMAN AFB, NM AMENDMENT No. 0005
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 50 13 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 27 36 SPRAY FOAM AIR BARRIERS
07 42 13 METAL SOFFIT PANELS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 54 23 THERMOPLASTIC POLYOLEFIN (TPO) ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 31 00 ACCESS DOORS AND PANELS
08 34 19.10 20 ROLLING SERVICE DOORS
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
PROJECT TABLE OF CONTENTS Page 2
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
DI VI SI ON 12 - FURNI SHI NGS
12 21 00 WINDOW BLINDS
DI VI SI ON 13 - SPECI AL CONSTRUCTI ON
13 34 19 METAL BUILDING SYSTEMS
13 48 00 BRACING FOR MISCELLANEOUS EQUIPMENT
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBING, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 48.19 BRACING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 54 16.00 10 HEATING SYSTEM; GAS-FIRED HEATERS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
23 82 00.00 20 TERMINAL HEATING UNITS
DI VI SI ON 25 - I NTEGRATED AUTOMATI ON
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS HVAC
DIRECT DIGITAL CONTROLLER (DDC) ENERGY MANAGEMENT CONTROL
SYSTEM (EMCS) BUILDING LEVEL ONLY
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS FIRE
ALARM REPORTING SYSTEM/MASS NOTIFICATION SYSTEM BUILDING
LEVEL ONLY
DI VI SI ON 26 - ELECTRI CAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 BRACING FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 30 ELECTRIC METERS
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
PROJECT TABLE OF CONTENTS Page 3
DI VI SI ON 27 - COMMUNI CATI ONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DI VI SI ON 31 - EARTHWORK
31 00 00 EARTHWORK
31 31 16.13 CHEMICAL TERMITE CONTROL
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID
PAVEMENTS
32 11 23 AGGREGATE BASE COURSES
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
DI VI SI ON 33 - UTI LI TI ES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERAGE
33 51 15 NATURAL-GAS / LIQUID PETROLEUM GAS DISTRIBUTION
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 83 PAGES
NC3 Weapons Reserve Material Facility at HAFB
07 84 00 SD-02 Shop Drawings
2.1 GFirestopping System
SD-03 Product Data
2.2 GFirestopping Materials
SD-06 Test Reports
3.3 GInspection
SD-07 Certificates
1.5.2Inspector Qualifications
2.2Firestopping Materials
1.5.1 GInstaller Qualifications
07 92 00 SD-03 Product Data
2.1 GSealants
2.2 GPrimers
2.3 GBond Breakers
2.4 GBackstops
SD-06 Test Reports
3.1 GField Adhesion
SD-07 Certificates
2.1.1 SIndoor Air Quality For Interior
Sealants
2.1.4 SIndoor Air Quality For Interior
Acoustical Sealants
07 95 00 SD-01 Preconstruction Submittals
GQualification of Manufacturer
GQualification of Installation
Contractor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 83 PAGES
07 95 00 1.3.1 GSample Warranty
SD-02 Shop Drawings
GInstallation Drawings
SD-03 Product Data
GProduct Schedule
GFactory Color Finish
SD-04 Samples
2.5 GFinishes
SD-07 Certificates
1.3.2Expansion Joints
08 11 13 SD-02 Shop Drawings
2.1 GDoors
2.1 GDoors
2.1 SRecycled Content for Steel Door
Product
2.6 GFrames
2.6 GFrames
2.6 SRecycled Content for Steel Frame
Product
2.4Accessories
2.8Weatherstripping
SD-03 Product Data
2.1 GDoors
2.6 GFrames
2.4Accessories
2.8Weatherstripping
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 83 PAGES
08 14 00 SD-02 Shop Drawings
2.1 GDoors
SD-03 Product Data
2.1 GDoors
2.1.1.1 SRecycled Content for Door Cores
2.2 GAccessories
SD-04 Samples
2.3.5.1 GFactory Finish
SD-06 Test Reports
2.4 GCycle-Slam
2.4 GHinge Loading Resistance
SD-07 Certificates
1.3.1 SCertified Sustainably Harvested
Wood
SD-11 Closeout Submittals
1.5Warranty
08 31 00 SD-03 Product Data
1.3 GAccess Doors And Panels
1.3.1 GHardware
2.2.6 GAccessories
2.1 SRecycled Content
SD-04 Samples
2.5 GFinishes
08 34 19.10 20 SD-02 Shop Drawings
2.1 GRolling service doors
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 83 PAGES
08 34 19.10 20 2.1 GRolling service doors
2.3.2 GMotors
2.3.3 GControls
SD-08 Manufacturer’s Instructions
2.1Rolling service doors
SD-10 Operation and Maintenance
Data
2.1Rolling service doors
08 41 13 SD-01 Preconstruction Submittals
1.2.1 GSample Warranty
3.6 GSample Warranty
1.2.1 GList of Product Installations
SD-02 Shop Drawings
3.3 GInstallation Drawings
2.2 GFabrication Drawings
SD-03 Product Data
1.2.1 GManufacturer's Catalog Data
2.2.3 GFinish
2.1.1.2 SRecycled Content of Aluminum
Material
SD-04 Samples
1.2.1 GFinish and Color Samples
SD-06 Test Reports
1.2.1 GCertified Test Reports
3.4.1 GCertified Test Reports
3.4.1Air Infiltration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 83 PAGES
08 41 13 SD-08 Manufacturer’s Instructions
3.3Manufacturer's Instructions
SD-11 Closeout Submittals
3.6Manufacturer's Product Warranty
08 51 13 SD-02 Shop Drawings
2.1 GWindows
1.6Fabrication Drawings
SD-03 Product Data
2.1 GWindows
2.2.2 GFasteners
1.7 GWindow Performance
2.3 GThermal-Barrier Windows
2.2.7 GAccessories
2.2.3Adhesives
1.7.4 GThermal Performance
1.7.4 SEnergy Star Label For Residential
Aluminum Window Products
SD-04 Samples
1.3.3.1Finish Sample
1.3.3.2Window Sample
SD-05 Design Data
2.1 GStructural Calculations for
Deflection
SD-06 Test Reports
2.1Minimum Condensation
Resistance Factor
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 83 PAGES
08 51 13 SD-10 Operation and Maintenance
Data
2.1 GWindows
08 60 45 SD-02 Shop Drawings
3.2 GShop Drawings
SD-03 Product Data
2.1 GTranslucent Panels
2.2.4 SRecycled Content for Aluminum
Framing Materials
1.7Warranty
SD-06 Test Reports
2.1Test Reports
SD-07 Certificates
2.4Systems
1.4Qualifications
08 71 00 SD-02 Shop Drawings
1.3 GManufacturer's Detail Drawings
1.3 GVerification of Existing Conditions
1.5 GHardware Schedule
2.3.6 GKeying System
SD-03 Product Data
2.3 GHardware Items
SD-08 Manufacturer’s Instructions
3.1Installation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 83 PAGES
08 71 00 1.5 GHardware Schedule
SD-11 Closeout Submittals
1.6.1Key Bitting
08 81 00 SD-03 Product Data
2.2Insulating Glass
1.3Glazing Accessories
2.3.3.1Sealants
2.3.4Joint Backer
SD-04 Samples
2.2Insulating Glass
2.1.2Laminated Glass
SD-08 Manufacturer’s Instructions
2.3Setting and Sealing Materials
3.2Glass Setting
SD-11 Closeout Submittals
1.7.1Insulated Glass Units
08 91 00 SD-02 Shop Drawings
1.4Wall louvers
1.5Wall louvers
SD-03 Product Data
2.2Metal Wall Louvers
SD-04 Samples
1.4 GWall louvers
1.5 GWall louvers
09 22 00 SD-03 Product Data
2.1 GMetal Support Systems
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 83 PAGES
09 22 00 2.1 SRecycled Content for Metal
Support Systems
09 29 00 SD-03 Product Data
2.1.4Cementitious Backer Units
2.1.2Water-Resistant Gypsum Backing
Board
2.1.3Glass Mat Covered or Reinforced
Gypsum Sheathing
2.1.8Accessories
2.1.1Gypsum Board
2.1.1 SRecycled Content for Gypsum
Board
2.1.5 SVOC Content of Joint Compound
SD-07 Certificates
2.1 GAsbestos Free Materials
2.1.1 SIndoor Air Quality for Gypsum
Board
SD-08 Manufacturer’s Instructions
2.1Safety Data Sheets
09 30 10 SD-02 Shop Drawings
3.2 GDetail Drawings
SD-03 Product Data
2.1.1 GPorcelain Tile
2.1.1 SRecycled Content for Porcelain
Tile
2.1.2 GGlazed Wall Tile
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 83 PAGES
09 30 10 2.1.2 SRecycled Content for Glazed Wall
Tile
2.4 GMortar, Grout, and Adhesive
SD-04 Samples
2.1 GTile
2.1 GAccessories
2.1 GTransition Strips
2.5 GTransition Strips
2.4.3 GGrout
SD-07 Certificates
2.4 SIndoor Air Quality for Adhesives
2.4.4 SIndoor Air Quality for Sealants
SD-08 Manufacturer’s Instructions
3.7Maintenance Instructions
SD-10 Operation and Maintenance
Data
3.2 GInstallation
09 51 00 SD-02 Shop Drawings
2.1 GApproved Detail Drawings
SD-03 Product Data
1.9 GAcoustical Ceiling Systems
SD-04 Samples
2.2 GAcoustical Units
2.2.1.1 GAcoustical Ceiling Tiles
SD-07 Certificates
2.2.1.1Indoor Air Quality
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 83 PAGES
09 65 00 SD-02 Shop Drawings
2.7 GResilient Flooring and
Accessories
SD-03 Product Data
2.7 GResilient Flooring and
Accessories
2.4Adhesives
2.1Vinyl Composition Tile
2.2Wall Base
SD-04 Samples
2.7 GResilient Flooring and
Accessories
SD-06 Test Reports
3.3 GMoisture, Alkalinity and Bond
Tests
SD-07 Certificates
2.1 SIndoor Air Quality for Vinyl
Composition Tile
2.2 SIndoor Air Quality for Wall Base
2.4 SIndoor Air Quality for Adhesives
SD-08 Manufacturer’s Instructions
3.2 GSurface Preparation
3.1 GInstallation
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 83 PAGES
09 65 00 2.7 GResilient Flooring and
Accessories
09 68 00 SD-02 Shop Drawings
3.4 GInstallation Drawings
SD-03 Product Data
2.1 GCarpet
2.2 GCarpet
2.1.1 SRecycled Content for Carpeting
2.2.1 SRecycled Content for Carpeting
2.5 GMoldings
2.4 SIndoor Air Quality for Non-Aerosol
Adhesives
2.4 SIndoor Air Quality for Concrete
Primer
SD-04 Samples
2.1 GCarpet
2.2 GCarpet
2.5 GMoldings
SD-06 Test Reports
3.2 GMoisture and Alkalinity Tests
SD-07 Certificates
2.1.1 SIndoor Air Quality for Carpet
2.1.2 SIndoor Air Quality for Carpet
2.2.1 SIndoor Air Quality for Carpet
2.2.2 SIndoor Air Quality for Carpet
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 83 PAGES
09 68 00 3.1Surface Preparation
SD-10 Operation and Maintenance
Data
3.5Cleaning and Protection
3.7.2Maintenance Service
SD-11 Closeout Submittals
1.6Warranty
09 90 00 SD-03 Product Data
2.1 GCoating
SD-04 Samples
1.7 GColor
SD-07 Certificates
1.4Applicator's Qualifications
1.5.1.2 GQualification Testing
2.1Indoor Air Quality for Paints and
Primers
SD-08 Manufacturer’s Instructions
3.5.2Mixing
1.8.2Manufacturer's Safety Data
Sheets
SD-10 Operation and Maintenance
Data
2.1 GCoatings
10 14 00.10 SD-02 Shop Drawings
3.1 GApproved Detail Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 83 PAGES
10 14 00.10 3.1Installation
1.2 GExterior Signage
1.2.1Wind Load Requirements
SD-04 Samples
1.2 GExterior Signage
SD-10 Operation and Maintenance
Data
3.1.2 GProtection and Cleaning
10 14 00.20 SD-02 Shop Drawings
1.4.2 GDetail Drawings
SD-03 Product Data
3.1 GInstallation
1.6 GWarranty
SD-04 Samples
1.4.1 GInterior Signage
1.3 GSoftware
SD-10 Operation and Maintenance
Data
3.1 GApproved Manufacturer's
Instructions
3.1.2 GProtection and Cleaning
10 21 13 SD-02 Shop Drawings
2.1Fabrication Drawings
3.2 GInstallation Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 83 PAGES
10 21 13 2.1Cleaning and Maintenance
Instructions
2.7Colors And Finishes
2.2.1Anchoring Devices and Fasteners
2.2.3Hardware and Fittings
2.2.2Brackets
2.2.4Door Hardware
2.3.1Toilet Enclosures
2.5Pilaster Shoes
2.2.3.2 GFinishes
2.3 SRecycled content for plastic, solid
polyethylene partitions and screens
SD-04 Samples
2.7 GColors and Finishes
10 26 00 SD-02 Shop Drawings
2.2 GCorner Guards
SD-03 Product Data
2.2 GCorner Guards
SD-04 Samples
2.4 GFinish
SD-06 Test Reports
2.2Corner Guards
SD-07 Certificates
2.2Corner Guards
10 28 13 SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 83 PAGES
10 28 13 2.1.2 GFinishes
2.2 GAccessory Items
2.1 SRecycled content for stainless
steel toilet accessories
SD-04 Samples
2.1.2 GFinishes
2.2Accessory Items
SD-07 Certificates
2.2Accessory Items
12 21 00 SD-02 Shop Drawings
3.2Installation
SD-03 Product Data
2.1 GWindow Blinds
SD-04 Samples
2.1 GWindow Blinds
SD-06 Test Reports
2.1Window Blinds
SD-07 Certificates
2.1 SIndoor Air Quality for window
blinds
SD-08 Manufacturer’s Instructions
2.1 GWindow Blinds
SD-10 Operation and Maintenance
Data
2.1 GWindow Blinds
13 34 19 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 83 PAGES
13 34 19 1.6.3 GManufacturer's Qualifications
SD-02 Shop Drawings
1.2.1.7 GDetail Drawings
1.6.1 GDetail Drawings
1.2.3 GErection Plan
SD-03 Product Data
1.6.1 GManufacturer's Catalog Data
SD-05 Design Data
1.6.1 GManufacturer's Descriptive and
Technical Literature
1.6.1 GManufacturer's Building Design
Analysis
SD-07 Certificates
1.6.1 GSystem Components
1.6.1 GQualification of Manufacturer
1.6.1 GQualification of Erector
SD-08 Manufacturer’s Instructions
1.6.2 GInstallation of Roof and Wall
panels
1.7 GShipping, Handling, and Storage
SD-11 Closeout Submittals
3.10.1 GManufacturer's Warranty
3.10.2 GContractor's Warranty for
Installation
13 48 00 SD-02 Shop Drawings
3.1 GBracing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 83 PAGES
13 48 00 3.4 GResilient Vibration Isolation
Devices
2.1 GEquipment Requirements
SD-03 Product Data
3.1 GBracing
2.1 GEquipment Requirements
3.3 GAnchor Bolts
2.1.2 GVibration Isolators
SD-05 Design Data
1.2.3 GDesign Calculations
SD-06 Test Reports
3.3 GAnchor Bolts
21 13 13.00 10 SD-02 Shop Drawings
1.4.4 G AEShop Drawings
3.9 G AEAs-Built Drawings
SD-03 Product Data
1.4.1 G AEFire Protection Related
Submittals
2.3 G AEMaterials and Equipment
1.6 G AESpare Parts
3.8 G AEPreliminary Tests
3.9 G AEFinal Acceptance Test
3.10 G AEOnsite Training
1.4.1 G AEFire Protection Specialist
1.4.3 G AESprinkler System Installer
SD-05 Design Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 83 PAGES
21 13 13.00 10 1.4.4 G AESway Bracing
1.2.1.3 G AEHydraulic Calculations
SD-06 Test Reports
3.8 G AEPreliminary Test Report
3.9 G AEFinal Acceptance Test Report
SD-07 Certificates
3.3 G AEInspection by Fire Protection
Specialist
SD-10 Operation and Maintenance
Data
3.10 G AEOperating and Maintenance
Manuals
21 30 00 SD-01 Preconstruction Submittals
1.3Fire Pump Installation Related
Submittals
1.7.1 G AEFire Protection Specialist
SD-02 Shop Drawings
3.3.1 G AEInstallation Drawings
3.9.2 G AEAs-Built Drawings
3.3.2 G AEPiping Layout
3.3.2 G AEPump Room
SD-03 Product Data
2.1 G AECatalog Data
1.6 G AESpare Parts
3.7.2 G AEPreliminary Tests
3.7 G AEField Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 83 PAGES
21 30 00 1.7.7 G AEManufacturer's Representative
3.9.1 G AEField Training
3.7.3Final Acceptance Test
SD-06 Test Reports
3.7.2Preliminary Tests
3.7.3 G AEFinal Acceptance Test
SD-07 Certificates
1.7.1Fire Protection Specialist
1.7.3 G AEQualifications of Welders
1.7.4 G AEQualifications of Installer
1.7.5 G AEPreliminary Test Certification
1.7.6 G AEFinal Test Certification
SD-10 Operation and Maintenance
Data
3.9.1 G AEOperating and Maintenance
Instructions
2.13 G AEFlow Meter
22 00 00 SD-02 Shop Drawings
3.8.1 GPlumbing System
SD-03 Product Data
2.1 SRecycled Content for Cast Iron
Pipe
2.4 GFixtures
2.4.1Flush Valve Water Closets
2.4.1 SWaterSense Label for Flush
Valve Water Closet
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 83 PAGES
22 00 00 2.4.2 GFlush Valve Urinals
2.4.2 SWaterSense Label for Urinal
2.4.4 GCountertop Lavatories
2.4.4 SWaterSense Label for Lavatory
Faucet
2.4.5 GSinks
2.4.6 GElectric Water Coolers
2.4.6 SEnergy Star Label for Electric
Water Cooler
2.4.7 GPlastic Shower Stalls
2.6.2 SWaterSense Label for
Showerhead
2.8 GWater Heaters
2.8.1.1 SEnergy Star Label for Gas
Storage Water Heater
2.9 GPumps
3.8.1.1 GBackflow Prevention Assemblies
2.6.2 GShower Faucets
1.5.1Welding
3.8.1Plumbing System
SD-06 Test Reports
3.8Tests, Flushing and Disinfection
3.8.1.1 GTest of Backflow Prevention
Assemblies
SD-07 Certificates
1.3Materials and Equipment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 83 PAGES
22 00 00 2.1.1Bolts
SD-10 Operation and Maintenance
Data
3.8.1 GPlumbing System
23 00 00 SD-02 Shop Drawings
1.4.4 GDetail Drawings
SD-03 Product Data
2.9.1.1 GInsulated Nonmetallic Flexible
Duct Runouts
2.9.1.1Duct Connectors
2.9.2 GDuct Access Doors
2.9.3 GManual Balancing Dampers
2.9.5.1 GDiffusers
2.9.5.2 GRegisters and Grilles
2.10.1.1 GIn-Line Centrifugal Fans
2.10.1.2 GPanel Type Power Wall
Ventilators
1.4.5Test Procedures
2.9.1 SIndoor Air Quality for Duct
Sealants
SD-06 Test Reports
3.12 GPerformance Tests
3.10 GDamper Acceptance Test
SD-07 Certificates
1.4.4Bolts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 83 PAGES
23 00 00 1.4.3Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
3.2Manufacturer's Installation
Instructions
3.14.2Operation and Maintenance
Training
SD-10 Operation and Maintenance
Data
3.14.1 GOperation and Maintenance
Manuals
2.9.3 GManual Balancing Dampers
2.10.1.1 GIn-Line Centrifugal Fans
2.10.1.2 GPanel Type Power Wall
Ventilators
SD-11 Closeout Submittals
3.13 SIndoor Air Quality During
Construction
23 05 48.19 SD-02 Shop Drawings
3.1Coupling and Bracing
3.3Flexible Couplings or Joints
2.2Equipment Restraint
1.2.4 GContractor Designed Bracing
SD-03 Product Data
3.1 GCoupling and Bracing
3.3 GFlexible Couplings Or Joints
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 83 PAGES
23 05 48.19 2.2 GEquipment Restraint
1.2.4 GContractor Designed Bracing
3.9Anchor Bolts
2.2.2Vibration Isolators
SD-05 Design Data
1.2.4Design Calculations
SD-06 Test Reports
3.9 GAnchor Bolts
23 05 93 SD-01 Preconstruction Submittals
1.5.3.1 GTAB Firm
1.2 GTAB Team Assistants
1.2 GTAB Team Engineer
1.5.3.2 GTAB Specialist
1.2 GTAB Team Field Leader
SD-02 Shop Drawings
1.3.2 GTAB Schematic Drawings and
Report Forms
SD-03 Product Data
1.3 GEquipment and Performance
Data
1.5.3.4 GTAB Related HVAC Submittals
1.5.2 GTAB Procedures
1.5.2 GCalibration
1.3.2 GSystems Readiness Check
1.5.4 GTAB Execution
1.5.4.3 GTAB Verification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 83 PAGES
23 05 93 SD-06 Test Reports
3.3.5 GCompleted Pre-Final DALT
Report
3.3.8 GCertified Final DALT Report
1.6.1.1 GTAB Design Review Report
1.5.5.2 GTAB Report for Season 1
1.5.5.2 GTAB Report for Season 2
SD-07 Certificates
1.5.1 GIndependent TAB Agency and
Personnel Qualifications
1.6.1 GDALT and TAB Submittal and
Work Schedule
1.6.1.3 GTAB Pre-Field Engineering
Report
1.5.3.1 GTAB Firm
1.3.2 GDesign Review Report
1.6.1.2 GPre-field DALT Preliminary
Notification
1.6.1 GAdvanced Notice for Season 1
TAB Field Work
1.6.1 GPrerequisite HVAC Work Check
Out List For Season 1
1.6.1 GAdvanced Notice for Season 2
TAB Field Work
1.6.1 GPrerequisite HVAC Work Check
Out List For Season 2
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 83 PAGES
23 07 00 SD-02 Shop Drawings
2.3Pipe Insulation Systems
3.2Pipe Insulation Systems
3.3Duct Insulation Systems
3.4Equipment Insulation Systems
2.3.1 SRecycled content for insulation
materials
SD-03 Product Data
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
SD-04 Samples
2.2.1.2 GThermal Insulation
3.1.1 GDisplay Samples
SD-07 Certificates
2.2.1 SIndoor air quality for adhesives
SD-08 Manufacturer’s Instructions
2.3 GPipe Insulation Systems
3.2 GPipe Insulation Systems
3.3 GDuct Insulation Systems
3.4 GEquipment Insulation Systems
23 09 00 SD-02 Shop Drawings
3.2 GDDC Contractor Design Drawings
3.2 GDraft As-Built Drawings
3.2 GFinal As-Built Drawings
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 83 PAGES
23 09 00 1.8.1 GProgramming Software
1.8.2 GController Application Programs
1.8.1 GConfiguration Software
2.2 GManufacturer's Product Data
2.2.1 GXIF files
3.4.3 GDraft LNS Database
3.6 GFinal LNS Database
1.8.3 GLNS Plug-ins
1.8.5 GNiagara Framework Supervisory
Gateway Backups
1.8.6 GNiagara Framework Engineering
Tool
1.8.4 GNiagara Framework Wizards
1.7 GComputer Software
SD-06 Test Reports
3.4.2 GStart-Up Testing Report
3.5.1 GPVT Procedures
3.5.3 GPVT Report
1.9.1 GPre-Construction Quality Control
(QC) Checklist
1.9.2 GPost-Construction Quality Control
(QC) Checklist
SD-10 Operation and Maintenance
Data
3.7 GOperation and Maintenance
(O&M) Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 83 PAGES
23 09 00 3.9.1 GTraining Documentation
SD-11 Closeout Submittals
2.5 GEnclosure Keys
3.1.6.1 GPassword Summary Report
1.9.3 GCloseout Quality Control (QC)
Checklist
23 11 25 SD-02 Shop Drawings
1.5.3 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
SD-03 Product Data
1.6.1 GPipe and Fittings
1.5.3 GGas Equipment Connectors
1.5.3 GGas Piping System
2.2 GGas Piping System
3.3 GGas Piping System
2.1 GPipe Coating Materials
2.6 GPressure Regulators
2.4 GRisers
2.2.9 GTransition Fittings
2.3 GValves
2.2.5 GWarning and Identification Tape
SD-06 Test Reports
3.19 GTesting
3.19.1 GPressure Tests
3.19.2 GTest with Gas
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 83 PAGES
23 11 25 SD-07 Certificates
1.5.1 GWelders Procedures and
Qualifications
1.5.1 GAssigned Number, Letter, or
Symbol
SD-08 Manufacturer’s Instructions
1.5.2 GPE Pipe and Fittings
2.1 GPipe Coating Materials
SD-10 Operation and Maintenance
Data
1.3.1 GGas Facility System and
Equipment Operation
1.3.2 GGas Facility System Maintenance
1.3.3 GGas Facility Equipment
Maintenance
23 54 16.00 10 SD-02 Shop Drawings
1.3Detail Drawings
3.2Installation
SD-03 Product Data
2.3.1 GMake-Up Air Units
1.5Spare Parts
SD-06 Test Reports
3.4Testing, Adjusting, and Balancing
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 83 PAGES
23 54 16.00 10 3.3Operation and Maintenance
Instructions
23 81 00.00 20 SD-02 Shop Drawings
2.4.2Field-Assembled Refrigerant
Piping
1.4.2Control System Wiring Diagrams
SD-03 Product Data
2.1Air Conditioners
2.1.1 SEnergy Star Label for
Split-System Type Air Conditioners
2.2Filters
2.1.6Thermostats
2.4.1Refrigerant
3.2.3Refrigerant
2.4Refrigerant Piping and
Accessories
SD-06 Test Reports
2.6.1Salt-Spray Tests
3.7.3Start-Up and Initial Operational
Tests
SD-07 Certificates
1.4.6Ozone Depleting Substances
Technician Certification
SD-08 Manufacturer’s Instructions
2.1Air Conditioners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 61 OF 83 PAGES
23 81 00.00 20 2.4Refrigerant Piping and
Accessories
SD-10 Operation and Maintenance
Data
2.1Air Conditioners
2.2Filters
2.1.6Thermostats
SD-11 Closeout Submittals
1.4.4Posted Operating Instructions
23 82 00.00 20 SD-03 Product Data
2.1Unit Heaters
2.2Infrared Heaters
SD-10 Operation and Maintenance
Data
2.1Unit Heaters
2.2Infrared Heaters
25 05 11.01 SD-01 Preconstruction Submittals
1.10.1.4 GContractor Computer
Cybersecurity Compliance
Statements
1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
1.7.1 GQualifications
SD-02 Shop Drawings
3.1.3.1 GUser Interface Banner Schedule
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 62 OF 83 PAGES
25 05 11.01 1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
1.8.2 GControl System Inventory Report
1.8.6 GProposed Security Technical
Implementation Guides
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.5.2.2.4 GPassword Summary Report
1.8.3 GSoftware Recovery and
Reconstitution Images
3.2.2.1 GDevice Audit Record Upload
Software
3.10.1 GCompleted Security Technical
Implementation Guides Checklist
3.10.2 GCompleted NESSUS/ACAS
Scans
25 05 11.02 SD-01 Preconstruction Submittals
1.5.1 GWireless Communication
Request
1.10.1.4 GContractor Computer
Cybersecurity Compliance
Statements
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 63 OF 83 PAGES
25 05 11.02 1.10.6 GContractor Temporary Network
Cybersecurity Compliance
Statements
GCybersecurity Subject Matter
Expert Qualifications
SD-02 Shop Drawings
3.1.3.1 GUser Interface Banner Schedule
1.8.1 GNetwork Communication Report
1.8.4 GCybersecurity Riser Diagram
1.8.2 GControl System Inventory Report
1.8.6 GProposed Security Technical
Implementation Guides
SD-03 Product Data
1.8.5 GControl System Cybersecurity
Documentation
SD-06 Test Reports
1.5.1 GWireless Communication Test
Report
SD-07 Certificates
1.9 GSoftware Licenses
SD-11 Closeout Submittals
3.5.2.2.3 GPassword Summary Report
1.8.3 GSoftware Recovery And
Reconstitution Images
3.9.1 GCompleted Security Technical
Implementation Guides Checklist
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 64 OF 83 PAGES
25 05 11.02 3.9.2 GCompleted NESSUS/ACAS
Scans
26 05 48.00 10 SD-02 Shop Drawings
3.2Lighting Fixtures in Buildings
1.3Equipment Requirements
SD-03 Product Data
3.2 GLighting Fixtures in Buildings
1.3 GEquipment Requirements
1.2.4 GContractor Designed Bracing
26 08 00 SD-06 Test Reports
3.1 GAcceptance tests and inspections
SD-07 Certificates
1.4.1 GQualifications
1.4.3 GAcceptance test and inspections
procedure
26 12 19.10 SD-02 Shop Drawings
1.5.1 GPad-mounted Transformer
Drawings
SD-03 Product Data
2.2 GPad-mounted Transformers
SD-06 Test Reports
3.7.1 GAcceptance Checks and Tests
SD-07 Certificates
2.2.2.1 GTransformer Efficiencies
SD-09 Manufacturer’s Field
Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 65 OF 83 PAGES
26 12 19.10 2.8.1 GTransformer Test Schedule
2.8.2 GDesign Tests
2.8.3 GRoutine and Other Tests
SD-10 Operation and Maintenance
Data
1.6.1 GTransformer(s)
26 20 00 SD-02 Shop Drawings
2.12 GPanelboards
2.14 GTransformers
2.3 GCable trays
2.26 GWireways
SD-03 Product Data
2.11 GReceptacles
2.12.3 GCircuit breakers
2.9 GSwitches
2.14 GTransformers
2.13 GEnclosed circuit breakers
2.16 GMotor controllers
2.16 GCombination motor controller
2.17 GManual motor starters
GMetering
GMeter base only
2.20.1 GCATV outlets
2.21.3 GGrounding Busbar
2.27 GSurge protective devices
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 66 OF 83 PAGES
26 20 00 3.5.2 G600-volt wiring test
3.5.5 GGrounding system test
3.5.3 GTransformer tests
3.5.4 GGround-fault receptacle test
SD-07 Certificates
2.10 GFuses
SD-09 Manufacturer’s Field
Reports
2.29.1 GTransformer factory tests
SD-10 Operation and Maintenance
Data
1.5.1 GElectrical Systems
26 27 13.10 30 SD-03 Product Data
2.1 GPower Meters
2.1.3 GCurrent
2.1.2 GPotential Transformer
2.2.2 GCommunications Module
1.6.1 GProtocol Modules
1.6.2 GData Recorder
1.6.2 GModem
SD-06 Test Reports
3.3.1 GAcceptance Checks and Tests
SD-10 Operation and Maintenance
Data
2.1 GPower Meters
2.2.2 GCommunications Module
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 67 OF 83 PAGES
26 27 13.10 30 1.6.1 GProtocol Modules
1.6.2 GData Recorder
1.6.2 GModem
SD-11 Closeout Submittals
3.3.2 GSystem Function Verification
26 29 23 SD-02 Shop Drawings
1.5.1 GSchematic Diagrams
1.5.2 GInterconnecting Diagrams
1.5.3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .