W912PP21R0002 NC3 HAFB WRM Amendment 0003.pdf
PDF 3 MB Posted
- Solicitation number
- W912PP21R0002
About this file
This solicitation requests proposals for the design and construction of an NC3 Support WRM storage and shipping facility at Holloman Air Force Base in New Mexico. The project involves construction of a nearly 70,000 square foot prefabricated insulated metal building with reinforced concrete foundation, masonry walls, standing seam metal roof, utilities, HVAC, fire protection, air ventilation and exhaust systems, large roll-up doors, office and restroom space, paved access road, and site improvements. Offerors must also demolish six existing structures totaling approximately 20,000 square feet and dispose of resulting materials. The solicitation is open to all businesses and will be awarded on a lowest price technically acceptable basis. The project value is estimated between $10-25 million and bonding is required. The Army Corps of Engineers is the contracting agency. The response due date is not provided but offerors must register on beta.sam to access solicitation documents and amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
W912PP
Design Bid Build NC3 Support WRM Storage/Shipping Facility at Holloman Air Force Base, New Mexico.
1.This is Amendment No. 0003 to Solicitation No. W912PP21R0002. The following revisions shall be incorporated into the specifications. All other provisions shall remain unchanged.
U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE
CORPS OF ENGINEERS
4101 JEFFERSON PLAZA, N.E.
ALBUQUERQUE, NEW MEXICO 87109-3435
See Item 6
J
W912PP21R0002
1 2
04/05/2021
03/01/2021
W912PP21R0002
AMENDMENT No. 0003
2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by STRIKETHROUGH for deletions and UNDERLINE for additions from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.
Delete Page Insert Page
00 21 00, PAGE 11 (PAGE 21 OF
SPECIFICATIONS PACKAGE)
00 21 00, PAGE 11
00 22 16, PAGES 15-31 (PAGES 25-41 OF
SPECIFICATIONS PACKAGE)
00 22 16, PAGES 15-31
00 45 00, PAGE 49 (PAGE 60 OF
SPECIFICATIONS PACKAGE)
00 45 00, PAGE 49
00 70 00, ENTIRE SECTION (PAGES
81-112 OF SPECIFICATION PACKAGE)
00 70 00, ENTIRE SECTION
04 20 00 UNIT MASONRY, PAGE 7
(PAGE 533 OF SPECIFICATIONS
PACKAGE)
04 20 00 UNIT MASONRY, PAGE 7
32 13 13.06 PORTLAND CEMENT
CONCRETE PAVEMENT FOR ROADS AND
SITE FACILITIES, PAGE 8 (PAGE
1630 OF SPECIFICATIONS PACKAGE)
32 13 13.06 PORTLAND CEMENT
CONCRETE PAVEMENT FOR ROADS AND
SITE FACILITIES, PAGE 8
3. DRAWING CHANGES: The following drawings have been revised and the sequence number changed to indicate such revision:
S-012 TYPICAL CONCRETE DETAILS 2
OF 2 (PAGE 67 OF DRAWINGS
PACKAGE)
S-012.1 TYPICAL CONCRETE DETAILS
M-101 GROUND FLOOR – HVAC PLAN –
AREA A (PAGE 157 OF DRAWINGS
PACKAGE)
M-101.1 GROUND FLOOR – HVAC
PLAN –AREA A
M-106 GROUND FLOOR – HVAC PLAN –
BID OPTION 1 (PAGE 162 OF
DRAWINGS PACKAGE)
M-106.1 GROUND FLOOR – HVAC
PLAN –BID OPTION 1
AMENDMENT No. 0003
Page 2a of 2
M-107 GROUND FLOOR – HVAC PLAN –
BID OPTION 2 (PAGE 163 OF
DRAWINGS PACKAGE)
M-107.1 GROUND FLOOR – HVAC
PLAN –BID OPTION 2
M-601 MECHANICAL SCHEDULES (PAGE
167 OF DRAWINGS PACKAGE)
M-601.1 MECHANICAL SCHEDULES
M-602 MECHANICAL SCHEDULES (PAGE
168 OF DRAWINGS PACKAGE)
M-602.1 MECHANICAL SCHEDULES
M-702 MECHANICAL CONTROLS
ARCHITECTURE (PAGE 170 OF
DRAWINGS PACKAGE)
M-702.1 MECHANICAL
CONTROLS ARCHITECTURE
M-703 MECHANICAL CONTROLS
SCHEMATIC AHU (PAGE 171 OF
DRAWINGS PACKAGE)
M-703.1 MECHANICAL
CONTROLS SCHEMATIC AHU
M-705 MECHANICAL CONTROLS SYSTEM
SCHEDULE (PAGE 173 OF DRAWINGS
PACKAGE)
M-705.1 MECHANICAL CONTROLS
SYSTEM SCHEDULE
M-721 MECHANICAL CONTROLS
SCHEMATIC – EXHAUST FAN (PAGE 176
OF DRAWINGS PACKAGE)
M-721.1 MECHANICAL
CONTROLS SCHEMATIC –
EXHAUST FAN
////////LAST ITEM////////
Amendment 0003
Section 00 21 00 - Instructions
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements
MAY 2014
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.215-7010 Requirements for Certified Cost or Pricing Data and Data
Other Than Certified Cost or Pricing Data
JUL 2019
252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.
JAN 2018
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be DX rated order; X DO rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed Price contract resulting from this solicitation.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Section 00 22 16 - Supplementary Instructions to Proposers
SECTION 00 22 16
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS
FOR AWARD FOR DESIGN BID BUILD FY20 NC3 SUPPORT WAR RESERVE
MATERIAL (WRM) STORAGE/SHIPPING FACILITY, HOLLOMAN AIR FORCE
BASE, OTERO COUNTY, NEW MEXICO
A. PROPOSAL SUBMISSION
1. GENERAL REQUIREMENTS
1.1 The intent of this Request for Proposal (RFP) is to solicit proposals for the NC3 Support War Reserve Materiel (WRM) Storage/Shipping Facility, Holloman AFB, New Mexico. The Government reserves the right to award a contract without discussions in accordance with (IAW) FAR 52.215-1, therefore, the offeror’s initial proposal should contain the offeror’s best terms from a technical and cost/price standpoint. Offerors shall organize their proposals as described herein. Proposals may be determined non-responsive for failure to follow this format.
1.2 The proposal shall describe the capability of the Offeror to perform the requirements of the solicitation. The proposal should be specific and complete in every detail, and should be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the requirements. The proposal should be practical, legible, clear, and coherent.
1.3 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory.
Failure to submit and organize proposals as requested may adversely affect an offeror’s evaluation.
2. PROPOSAL SUBMISSION REQUIREMENTS
2.1 Each volume shall be submitted electronically. There are two electronic options: via email or using the DoD SAFE (formerly AMRDEC SAFE) if proposals are too large to send via email. When using SAFE, Offerors are required to request a drop off code from the contract specialist Robert McPherren, robert.j.mcpherren@usace.army.mil prior to the proposal due date and time. Bonds may be submitted electronically with the proposal., however, a hard copy of the bonds must be submitted to attn: Robert McPherren at 4101 Jefferson Plaza NE, Albuquerque, NM 87109.
2.2 Each paragraph shall be single spaced and be separated by at least one blank line.
A standard, 12-point minimum font size applies. Arial or New Times Roman fonts are required. Tables and illustrations may use a reduced font size no less than 10-point and may be produced in landscape mode. Sheet size shall be 8.5 x 11 inches, however if mailto:robert.j.mcpherren@usace.army.mil drawings, charts, or other graphics are submitted, sheets no larger than 11 x 17 inches shall be used. Each 11 x 17 page shall count as one (1) single page toward the page count.
2.3 The following volumes of material shall be submitted:
Volume/Title Electronic Copies Page limit
Volume 1: Technical Proposal One (1) 30*
Volume 2: Price Proposal One (1) N/A
Volume Tab Title Digital
Copies Hard Copy
Maximum Pages
Rating
I A Factor 1: Relevant Contractor Experience
1 0 20 Acceptable/Unacceptable
I B Factor 2: Management Approach
1 0 10 Acceptable/Unacceptable
I C Factor 3: Past Performance
1 0 N/A Acceptable/Unacceptable
2 Factor 4: Cost/Price 1 0 N/A Not Rated
2 A Solicitation, Offer and Award Documents, and Certifications / Representations
1 0 N/A Not Rated
2 B Proposal Schedule 1 0 N/A Not Rated
2 C Bid Guarantee (Bid Bond)
1 1 N/A Not Rated
2 D Financials and Financial Standing Questionnaire
1 0 N/A Not Rated
2 E Small Business Subcontracting Plan
1 0 N/A Acceptable/Unacceptable
2 F JV Agreement or Teaming Agreement (if applicable) and/or Corporate, Partnership, Joint Venture Certificate
1 0 N/A Not Rated
* Past Performance Questionnaires, Representations and Certifications, performance recognition documents, Small Business Participation Past Performance, and Small Business Participation Commitment Document are excluded from the page count. Title sheets, indices, a detailed work schedule, and tables of contents are EXCLUDED from the page limitation.
NOTE 1: Pages that exceed the required page limitations will not be evaluated.
Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
NOTE 2: A RATING OF UNACCEPTABLE ON ANY FACTOR WILL RESULT IN AN
OVERALL RATING OF UNACCEPTABLE.
3. PROPOSAL FILES
3.1 Format. The submission shall be clearly indexed and logically assembled. Each volume shall be clearly identified and shall begin at the top of a page. All pages of each volume shall be appropriately numbered and identified by the complete company name, date and Request for Proposal (RFP) number in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1” Gutter – 0” From Edge – Header, Footer 0.5” Page Size, Width – 8.5” Page Size, Height – 11”
3.2 The following additional restrictions apply:
3.2.1 File Packaging. Files shall be in read-only, searchable format, using PDF files.
All price breakdown information to aide in the cost/price evaluation shall be submitted in Microsoft Office Excel.
3.2.2 Content Requirement. All information shall be confined to the appropriate file.
The offeror shall confine submissions to essential matters sufficient to define the proposal in a concise manner to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked.
3.2.3 Where the word “project” appears, it is understood to mean a project(s), contract(s), task order(s), or any other contract document provided for in the Federal Acquisition Regulation (FAR 2.101). Examples of projects submitted by the Prime Contractor may be projects performed for a State or Federal Government Agency, or for a commercial or private sector customer.
B. FACTORS AND EVALUATION APPROACH
VOLUME I, Tabs A-C – Technical. The volume shall be organized in accordance with the 2. PROPOSAL SUBMISSION REQUIREMENTS and include the following:
1. Factor 1: Relevant Contractor Experience
1.1 The offeror shall submit examples of recent construction projects which best illustrate the experience of the construction contractor on relevant projects of similar scope, type, complexity, and magnitude as defined below. A minimum of three (3) projects but not more than five (5) are to be submitted for the Prime Contractor.
Limit the information to Factor 1 to twenty (20) pages or less.
1.2 Where the word “recent” appears it is understood to mean construction type project for which construction is at least 70% complete (measured by performance period days) as of the RFP closing date, or a construction type project that has been completed within 7 years of the RFP closing date. Projects completed more than 7 years before the RFP closing date will not be considered for evaluation purposes.
1.3 Where the word “relevant” appears, it is understood to mean that project experience submitted is similar to the context of the solicitation in terms of scope, type, magnitude of effort and complexity as described and required in this RFP. For this RFP, “relevant” projects are defined as projects that are similar in terms of:
• Scope: Project includes: reinforced concrete foundation, masonry walls, metal prefabricated insulated construction that includes ANY/ALL of the following items: reinforced concrete foundation, masonry walls, standing seam metal roof, utilities, HVAC, fire detection/protection, pavements, access road, office space, site improvements, new construction in conjunction with demolition of existing structures with appropriate disposal of resulting materials. and all supporting work for a complete useable facility. The project also involves demolition of six existing structures with appropriate disposal of resulting materials.
• Type: Construction of large warehouse facility and associated features.
• Complexity: Working on military installation with the security requirements imposed on a construction outfit and the associated personnel. AND/OR working in an area with limited personnel and construction resources.
• Magnitude: Construction of facilities of 50-100,000 50,000 square-foot or above AND/OR construction of facilities facility with a value of $10-30 million or above.
1.4 Information is to be compiled on the Contract Description Forms provided at the end of Section 00 22 16 and will be used to evaluate relevant contractor experience.
Responses to this factor should take into account experience of the management team proposed for the contract, timeliness of performance, safety and health record, customer satisfaction and cost control. Projects submitted shall include challenges that were overcome and risks that were mitigated by use of quality management, risk evaluation and mitigation, and technical solutions.
1.5 Offerors are invited, but not required, to submit photographs of successful projects in conjunction with this section.
1.6 Each project example narrative should include the following information (provided on Contract Description Form):
1.6.1 Project and title location
1.6.2 Detailed scope of the project
1.6.3 Original contract award amount and final construction cost
1.6.4 Original contract finish date and actual finish date
1.6.5 Points of contact, as described below
1.6.6 Subcontractors utilized on the project and if they are proposed to be utilized for this project
1.6.7 Prime Contractor personnel on the project and if they are proposed to be utilized for this project
1.6.8 Narrative description of the project, as described below:
1.7 All project examples shall contain a Point of Contact (POC) as well as on alternate POC, to include the name, job title of the POC, address, telephone, and e-mail address. The POC and alternate shall be familiar with the construction performance of the proposer and be a representative of the owner/customer, not affiliated with the proposer. The POC and alternate shall be available to verify the experience cited.
1.8 Narratives for each project should include a brief overview of the project and providing specifics as noted herein, discussing major features of the project and each project’s relevance and similarities to this project. The role and work assigned to any sub-contractors and/or personnel noted in the narrative shall be explained.
1.9 Indefinite-Delivery, Indefinite-Quantity (IDIQ) Contracts, where numerous Task
Orders are summed to meet the minimum construction dollar value identified herein, are not acceptable.
1.10 If proposing as a Joint Venture (JV), providing examples for each prime contractor in the JV within the five project examples is allowed. JV documentation shall be provided in Volume 2 of the offeror’s price proposal.
1.11 In the case of contractor teaming arrangements involving a prime contractor and subcontractor(s), where the prime contractor submits the proposal in response to this RFP, the prime contractor must have completed at least 2 of the 3 minimum total number of relevant projects submitted for Factor 1 for consideration in response to the experience requirements of the RFP. Teaming documentation shall be provided in Volume 2 of the offeror’s price proposal. If a teaming agreement or commitment is not provided, the projects of any team members outside of the Prime Contractor will not be considered.
2. EVALUATION CRITERIA
2.1 The Government will evaluate the extent of the offeror's experience on projects that are “recent” and “relevant” to the work to be done in the context of this solicitation.
Recency and relevancy is defined above. The evaluation will focus on the offeror’s experience in construction of facilities similar to this project. The contractor must submit at least three projects that are determined to be recent and relevant to this project as defined in Section 1.3 above in order to receive an Acceptable rating for this factor.
2.2 The Government preference is that project examples submitted be of completed projects (i.e. construction complete). Projects still under construction will be evaluated only if they are at least 70% complete as of the RFP closing date, though less favorably than completed projects.
2.3 The Offeror MUST, at a minimum, address the requirements listed above. Failure to address these requirements will result in an Unacceptable rating. The Government will evaluate the firm’s understanding of the requirements described in the RFP and associated documents and the capability to execute the project.
3. Factor 2: Management Approach
3.1 Provide information that describes the offeror’s organization and intended management approach to project management and execution. Limit the information to ten (10) pages. At a minimum, the narrative MUST address the key points listed below.
3.1.1 Discuss your management approach to successfully complete this construction project. 1) Identify and explain the roles and responsibilities of team members that will perform major or critical aspects of construction phases including lines of authority in decision making. Provide an organization chart identifying on-site and remote positions and staff, and provide any past local experience of each. 2) Discuss the role of your proposed subcontractors and their involvement in decision making regarding Requests for Information (RFIs), submittals, and modifications. Identify any experience with local sub-contractors and your approach to managing local workforce.
3.1.2 Describe your approach to manage the unique equipment storage and ventilation requirements of this facility.
3.1.3 Describe your understanding of constrained site access due to COVID-19 affecting the material shipping and construction and your mitigation process to meet the required construction completion schedule.
3.1.4 Describe your approach to the demolition of buildings and any potential hazardous waste disposal and recordkeeping at this particular location.
4. EVALUATION CRITERIA
4.1 The Offeror MUST, at a minimum, address the requirements listed above. Failure to address all requirements will result in an Unacceptable rating. The Government will evaluate the firm’s understanding of the requirements described in the Division 01 of the RFP in addition to any/all plans and specifications of the RFP and the capability to execute the project.
5. Factor 3 – Past Performance
5.1 Information provided on the Contract Description Forms provided under Factor 1:
Relevant Contractor Experience will be used to evaluate Past Performance.
5.2 Past Performance Questionnaire (PPQ).
5.2.1 For all contracts identified in Factor 1, a Past Performance Questionnaire must be completed and submitted. The Past Performance Questionnaire included in this solicitation (at the end of Section 00 22 16) is provided for the offeror or its team members to submit to the customer/client for each project the offeror includes in its proposal for the Past Performance factor. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to both the Government contracting activity and technical representative responsible for the past/current contract. The POCs shall be instructed to electronically complete Part II of the questionnaire. Ensure correct phone numbers and email addresses are provided for the customer/client point of contact.
5.2.2 Completed PPQs should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a customer/client for a project before the proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ which will provide contract and customer information for the respective project(s). Offerors should follow up with customers/clients to ensure timely submittal of questionnaires. The Government reserves the right to contact the customer/client for verification or additional information. If the customer requests, questionnaires may be submitted directly to the Contracting Office no later than the proposal due date via email. Robert McPherren, Contract Specialist, via email at robert.j.mcpherren@usace.army.mil.
5.2.3 Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. i.e. offerors cannot reference PPQ’s from other projects by simply stating “refer to PPQ submitted for Project XX”. Complete PPQs must be submitted for this project. However, this does not preclude the Government from utilizing previously submitted PPQ information into the past performance evaluation.
5.2.4 Offerors may include performance recognition documents received within the last seven (7) years, from RFP closing date, such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition relative to the projects submitted for this factor. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
mailto:robert.j.mcpherren@usace.army.mil
5.2.5 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
5.2.6 Other types of past performance questionnaires, signed by a commercial customer or signed by a representative from another Federal or State agency, may be submitted as long as the information submitted has the same or similar information as that of the PPQ provided at the end of this section, documenting the quality of the offeror’s performance for the project submitted.
5.2.7 PPQs previously completed by the customer/client may be submitted in lieu of having the customer/client complete a new questionnaire for the contracts identified in the Contract Descriptions Form. Previously completed surveys will be evaluated only if: (1) they match the projects identified in Volume I Tab A and
(2) they are submitted according to the instructions listed above.
5.3 Small Business Participation Past Performance. All offerors shall submit information substantiating the offerors’ past performance in complying with FAR 52.219-8, Utilization of Small Business Concerns, maximizing opportunities for U.S.
small business subcontractors. Offerors may submit ISRs/SSRs as part of their past performance. Offerors shall also provide a statement indicating whether any negative information has been reported in the past seven years concerning the offerors’ past compliance with FAR 52.219-8 and FAR 52.219-9 (large businesses only). If any such negative information has been reported, the offeror may submit explanations or comments responding to such negative information. Offerors with no prior contracts containing FAR 52.219-8 and 52.219-9 (large businesses only) shall certify the same. In evaluating past performance, the Government reserves the right to review any ISRs/SSRs in the eSRS, not provided in the Offeror’s proposal.
5.4 If an offeror has been required to take corrective action for any substandard performance (overall rating below Satisfactory), the offeror should explain the circumstances and the corrective actions taken. If an offeror has experienced other performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc…, the offeror should provide an explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence.
6. EVALUATION CRITERIA
6.1 The Government will evaluate the Offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the contract. Information provided on the Contract Description Forms provided under Factor 1: Relevant Contractor Experience will be used to evaluate Past Performance.
6.1.1 The Government will focus its inquiries on the record of performance as it relates to all solicitation requirements, including cost, schedule, performance and management of subcontractors and compliance with FAR 52.219-8, Utilization of Small Business Concerns, and FAR 52.219-9, Small Business Subcontracting Plan. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process.
Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the offeror will be assigned an Acceptable rating. In making its assessment, the Government may use data provided by the offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor, and any other information relating to their current and past performance under Federal, State or Local government or commercial contracts.
6.1.2 The past performance factor considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract requirements.
6.1.2.1 RECENCY: The first aspect is to evaluate the recency of the offeror’s past performance. Recency is generally expressed as a time period during which past performance references are considered relevant and is critical to establishing the relevancy of past performance information. (Seven (7) years as of the RFP closing date.)
6.1.2.2 RELEVANCY: The second aspect is to determine how relevant a recent effort accomplished by the offeror is to the effort to be acquired through the source selection. Relevancy is not separately rated; however, the following criteria (see Table 2) will be used to establish what is relevant which shall include items such as similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.
Table 2 - Past Performance Relevancy Ratings
Rating Definition Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
6.1.2.3 QUALITY ASSESSMENT: This aspect assesses the overall quality of the offeror’s past performance. Documented results from Past Performance
Questionnaires, interviews, CPARS, and other sources form the support and basis for this assessment.
6.1.3 Past Performance Evaluation Ratings: Utilize the Performance Evaluation
Ratings (see Table 2 below) to select the most appropriate rating for each Offeror. Ensure the rationale for the conclusions reached are included.
7. VOLUME 2, Tabs A-F – Cost/Price. The volume shall be organized in accordance with the 2. PROPOSAL SUBMISSION REQUIREMENTS and include the following:
7.1 Electronic Copy. The Offeror shall provide a completed Proposal Schedule from Section 00 10 00 of the RFP. All price breakdown information to aide in the cost/price evaluation shall be submitted in Microsoft Office Excel.
7.2 Compliance. Failure to comply with the RFP requirements for Cost information may result in an adverse assessment of an offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes. Also, the Offeror shall ensure that the information submitted in this volume is consistent with and fully supports the amounts set forth in the SF1442 and continuation sheets.
7.3 General Instructions. In accordance with Federal Acquisition Regulation (FAR)
15.402 and 15.403-1, certified cost or pricing data are not required based on the fact that adequate competition is expected for this procurement. Information other than certified cost or pricing data may be provided in contractor format providing that sufficient information is made available. Information submitted shall be prepared following the instruction in FAR 15.403-5. If after receipt of proposals the Contracting Officer determines that there is insufficient information available to determine price reasonableness and none of the exceptions at FAR 15.403-1 apply, the Offeror may be required to submit cost or pricing data. Additionally, in the event that adequate competition is not obtained, the Contracting Officer may incorporate FAR 52.215-20 entitled, “Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data,” into the solicitation and request a Certificate of Current Cost or Pricing Data. There are no page limitations for this volume. Proposal information included in this volume which is not directly related to Cost will be disregarded.
7.4 Proposal Cover Sheet. Offerors shall include a proposal cover sheet in Volume 2 as required by FAR 52.215-1(c)(2). This provision, entitled “Instructions to Offerors – Competitive Acquisition,” is included in full text in Section 00 21 16 of the RFP. The proposal cover sheet must provide the following information:
7.4.1 Solicitation Number
7.4.2 Name, address, telephone, and electronic email address
7.4.3 DUNS, CAGE, and Tax Identification numbers of the Offeror
7.4.4 Statement specifying the extent of the agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item as reflected in the price schedule attached to the SF1442. (Note: failure to agree with all terms, conditions, and provisions in the solicitation may result in the Offeror’s proposal being rejected as non-responsive).
7.4.5 Name, title, telephone, and electronic email address of person(s) authorized to negotiate on the Offeror’s behalf with the Government in connection with this
RFP.
7.4.6 Name, title, telephone, and electronic email address of alternative point of contact (other than those listed in v. and vi. above) authorized to receive electronic correspondence regarding this RFP.
7.4.7 Acknowledgement that your company’s data at the System for Award Management website is current per FAR 52.204-7, System for Award Management. This clause is included in Section 00 70 00 of this RFP.
7.5 Following the proposal cover sheet, Volume 2 should be organized into the following tabbed sections:
7.5.1 Standard Form, Solicitation, Offer and Acknowledgement of Amendments (SF1442). If hard copies are submitted, these documents should be secured within some form of document protector and not “hole punched”. The SF1442 shall be completed by the Offeror and duly executed with an original signature by an official authorized to bind the company in accordance with instruction at FAR
4.102. Include with the Offeror’s name and address in Block 14 of the SF1442, your company’s DUNS, CAGE, and Tax Identification numbers. Offerors shall acknowledge all amendments to the solicitation in block 19. If the Offeror fails to acknowledge all amendments, the proposal (Volumes I and II) will be considered non-responsive and shall not be evaluated further.
7.5.2 Certifications/Representations and other Statements of Offerors. This tab shall contain Section 00 45 00 of this solicitation, including the Representation & Certifications cover page completed by the Offeror (to include provision 52.204- 26 Covered Telecommunications Equipment or Services). Complete all provisions and fill in all applicable areas. In addition, Offerors shall include in this tab their completed electronic Representations and Certifications from the SAM.gov website. Since FAR 52.204-7 System for Award Management is applicable to this solicitation, the offeror in accordance with FAR 52.204-8 (d) is required to complete the annual representations and certifications electronically via the SAM Web site accessed through https://www.sam.gov. After reviewing the SAM database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified by the offeror under this provision.
7.5.3 Proposal Schedule. Your proposed price for this project shall be in the form of the Proposal Schedule provided in the solicitation. Offerors may not modify the proposal schedule wording or format. As this is a firm, fixed price contract, price proposals will not be considered which provide for subsequent increases in price. No qualified price proposal of any type will be accepted, therefore, all offers containing such qualifications will be considered unacceptable. If the Offeror does not comply with all requirements of the proposal forms, the proposal may be considered unacceptable and eliminated from consideration.
7.5.4 Bid Guarantee/Bond (SF24). This tab shall contain an executed bid bond for either 20% or $3 Million, whichever is less. The hard copy documents that will be mailed in should be secured within some form of document protector and not “hole-punched.” Failure to furnish a bid bond in proper form and amount in your Price Proposal may result in the offeror’s proposal being rejected from further consideration.
7.5.5 Financials and Financial Standing Questionnaire. Offerors shall provide their latest balance sheet and income statement, including names of banks or other financial institutions with which your firm conducts business. If the financial statements are more than 60 days old, a certificate should be attached stating that the financial condition is substantially the same, or if not the same, state the changes that have taken place. The financial statements will be treated as confidential. The Financial Standing Questionnaire provided at the end of this section of the RFP is required to be submitted under this section.
7.5.6 Small Business Subcontracting Plan. Only large business Offerors are required to submit a subcontracting plan. The plan shall be prepared in accordance with FAR 52.219-9 (DEV), DFARS 252.219-7003, and AFARS Appendix DD. The Offeror shall take into consideration when preparing the required subcontracting plan, that only those subcontracts which are awarded directly by the prime contractor to small and small disadvantaged firms can be included in the plan.
Subcontracts to be awarded by a large business subcontractor are subject to the flow-down provisions of the clause and shall be reported by that subcontractor electronically via eSRS (https://www.esrs.gov). Failure to submit an acceptable subcontracting plan shall make the Offeror ineligible for the award of the contract.
The format for the subcontracting plan and subcontracting goals applicable to this solicitation are provided at the end of section 002216. Subcontracting plans will be evaluated on an ACCEPTABLE/UNACCEPTABLE basis. The Subcontracting Plan must adequately respond to each of the required elements of FAR 52.219-9(d) paragraphs (1) through (15).
7.5.7 JV Agreement and/or Corporate, Partnership, Joint Venture Certificate. If applicable, the offeror shall provide a copy of the firm’s JV Agreement. The offeror shall provide a completed copy of the Corporate Partnership, Joint Venture Certificate provided in the RFP.
7.5.8 Teaming Agreement. If utilizing a Teaming Arrangement, as part of your proposal, the offeror must provide a contractor team agreement signed by all parties, identifying the legal name(s) of all entities and describing the nature of each entity’s relationship (teaming/partnering, joint venture, mentor/protégé, etc…)
8. Factor 4: Cost/Price Factor. Adjectival ratings shall not be used for offerors’
Cost/Price proposals. The Government will fully evaluate and, if necessary, negotiate all priced Contract Line Item Numbers (CLINs) for award. For award purposes, the total proposed price for all CLINs will be added together into a total sum (contract value). The evaluation of all option CLINs will not obligate the Government to exercise any option.
8.1 The Offeror’s Cost/Price proposal will be evaluated as follows.
8.1.1 FFP Evaluation. For a price to be fair and reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. The Offeror’s proposed fixed-price CLINs may be evaluated, using one or more of the techniques described in FAR 15.404-1 in order to determine if they are fair and reasonable.
8.1.2 Overall Cost/ Price Proposal Evaluation: The overall Cost/Price proposal will be evaluated for the following:
8.1.2.1 Compliance: The Cost/Price proposal submitted by the Offeror will be evaluated for compliance based upon the submission requirements contained in this Section 00 22 16, Volume 2-- Cost/Price instructions.
8.1.2.2 Errors: The Offeror’s Cost/Price proposal will be reviewed for errors. The Offeror may be given an opportunity to clarify certain aspects of their proposal at the sole discretion of the Contracting Officer.
8.1.2.3 Total Evaluated Price: The Total Evaluated Price consists of summing the
Offeror’s proposed fixed-price CLIN prices for the base bid and any/all optional CLINs.
9. BASIS FOR AWARD
9.1 Proposals must meet the criteria stated in the RFP in order to be eligible for award, to include responsiveness, technical acceptability, and responsibility.
9.2 The Government intends to award without discussions based on the initial proposals received, therefore, the proposals shall contain the Offeror’s best terms from a cost and technical standpoint. However, the Government reserves the right to conduct discussions in accordance with FAR 52.215-1, if the discussions are deemed necessary at the Government’s discretion. The Government reserves the right to address any pertinent issues in the proposals.
9.3 The award will be made to the lowest priced technically acceptable proposal.
Proposals will be evaluated for technical acceptability (including past performance), but will not be ranked using the non-price Factors (and Subfactors). In order for an Offeror to be considered for award, the proposal must receive an “Acceptable” rating in every non-price Factor. A proposal receiving a rating of “Unacceptable” in any non-price Factor will not be eligible for award. Additionally, any other than small business offeror must have an acceptable Small Business Subcontracting Plan to receive an award in accordance with Federal Acquisition Regulation (FAR) 19.702(a).
10. EVALUATION
10.1 Each member of the Source Selection Evaluation Board (SSEB) will independently consider all information provided in the technical proposal (non-priced factors). Once these individual analyses are completed, the team will meet and determine a rating for each of the evaluation Factors by consensus decision. The evaluation team will document their decision to support the rating for each Factor.
10.2 The Past Performance Factor considers each Offeror’s demonstrated record of performance as explained in more detail above in Factor 3. There are three aspects to the past performance evaluation: recency (within 7 years from RFP closing date) relevancy (similar scope, type magnitude) and quality (including general trends in Contractor performance and source of information).
10.3 Past Performance information will be reviewed to determine the quality of the
Offeror’s performance, general trends, and usefulness of the information and incorporate these into the evaluation rating.
10.4 The Government will evaluate the offeror’s probability of meeting the minimum past performance solicitation requirements and prior compliance with FAR 52.219-8 Utilization of Small Business Concerns and FAR 52.219-9 Small Business
Subcontracting Plan (if applicable). The Government will utilize the rating descriptions outlined below (see Table 2) to evaluate Past Performance.
10.5 Documentation and comments are required for all ratings. This consensus rating will be provided to the Source Selection Authority who, independently exercising prudent business judgment, will select the most qualified Contractor.
11. DEFINITIONS:
11.1 Rating. The adjective descriptor assigned by the evaluators to the non-Cost/Price
Factors. It represents their conclusions as to the contractor’s ability to meet the minimum standards of acceptability.
12. Technical Rating
12.1 In accordance with the Army Source Selection Supplement (AS3), Appendix A, the Army methodology for evaluating Technical Factors is to assign a rating of Acceptable or Unacceptable to each factor (see Table 1 below). Proposals are evaluated for acceptability, but not ranked using the non-cost/price factors. The Government will assess whether the offeror’s proposal will satisfy the Government’s minimum requirements.
Table 1: Technical Ratings
TECHNICAL ACCEPTABLE/UNACCEPTABLE RATINGS
Rating Definition Acceptable Proposal meets the requirements of the solicitation.
Unacceptable Proposal does not meet the requirements of the solicitation.
12.2 The adjectival ratings below will be used to rate non-priced Factor 3, Past
Performance.
Table 2: Past Performance Evaluation Ratings
Rating Definition Acceptable Based on the offeror’s performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.
Unacceptable Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
13. DISCUSSIONS
13.1 GENERAL INFORMATION. In accordance with FAR 15.306(d), discussion sessions with each offeror may be held. Should discussions take place, all offerors in the competitive range will be notified and allowed to submit Final Proposal Revisions if discussions require such revisions.
13.2 DISCUSSION SCHEDULING. If discussions are conducted, the Contracting Officer will schedule the discussion sessions, and each offeror will be notified. The Contracting Officer will provide additional instructions with the notification.
END OF SECTION
SUBCONTRACTING PLAN INFORMATION FOR VOLUME 2, TAB E
UNRESTRICTED ACQUISITIONS ONLY
Contractor shall provide detailed explanations/documentation supporting the proposed subcontracting goals. All proposed socioeconomic goals shall be substantiated with the Offeror’s supported market research. Proposing only the minimum Department of Defense Office of Small Business Programs statutory goals, without providing substantiated market research may result in an Unacceptable rating. Please note that in accordance with DFARS 219.705-4 the minimum subcontracting requirement to Small Disadvantaged Businesses is 5.0%.
1. SUBMIT YOUR PLAN IN THE ATTACHED FORMAT
2. Subcontracting Plans will be evaluated in accordance with FAR Clause 52.219-9 and AFARS Appendix DD.
3. If you have identified specific small businesses by name in the technical part of your proposal as businesses you intend to utilize on this contract, you must also list them in your subcontracting plan.
* An Indian tribe or tribally owned corporation does not have to qualify as a small business concern to be counted toward the Small Disadvantaged Business goal.
52.209-13 Violation of Arms Control Treaties or Agreements --
Certification.
JUL 2020
52.223-4 Recovered Material Certification MAY 2008 52.229-11 Tax on Certain Foreign Procurements--Notice and
Representation
JUN 2020
52.236-28 Preparation of Proposals--Construction OCT 1997 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.225-7973 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems - Representation (DEVIATION 2020- O0015)
MAY 2020
252.225-7974 (Dev) Representation Regarding Business Operations with the Maduro Regime (DEVIATION 2020-O0005)
FEB 2020
252.244-7001 Contractor Purchasing System Administration MAY 2014
52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)
(a) Definition. Women-owned business concern, as used in this provision, means a concern that is at least 51 percent owned by one or more women; or in the case of any publicly owned business, at least 51 percent of its stock is owned by one or more women; and whose management and daily business operations are controlled by one or more women.
(b) Representation. [Complete only if the offeror is a women-owned business concern and has not represented itself as a small business concern in paragraph (c)(1) of FAR 52.219-1, Small Business Program Representations, of this solicitation.] The offeror represents that it ( ___ ) is a women-owned business concern.
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)
(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $39,500,000.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .