This federal contract opportunity document describes a solicitation for the Coolidge Dam Outlet Works Rehabilitation project located on the San Carlos Indian Reservation in Arizona. The project involves selective rehabilitation and modifications to the existing outlet towers and low level conduits at the dam, including the addition of new isolation valves, an upgrade to the existing regulating and guard gate operating equipment and control systems, and other miscellaneous improvements. Both above and underwater work will be required. The proposed procurement will be an unrestricted Lowest Price Technically Acceptable request for proposal with an anticipated contract value between $10-25 million. Offerors must register with SAM and submit proposals through beta.sam by June 5, 2020. The contract will be firm-fixed price awarded based on best value. The Army Corps of Engineers district office in Albuquerque is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DESCRIPTION FORM
Volume 1, Tab A, Section 1 Control No.: W912PP20R0004
Provide a completed form for each project for which experience is being submitted. Project experience submitted by the offeror as a subcontractor will not be evaluated.
1. OFFEROR’S NAME (Prime Contractor): _____________________________________
Project Name: _________________________________________________________
Project Location: _______________________________________________________
Client/Customer: _______________________________________________________
1. Contract Number: _________________________________________________ (For Indefinite Delivery type contracts, GSA contracts, and Blanket Purchase Agreements, include Delivery Order Numbers)
Contract Type (e.g. Fixed-Priced, Cost Reimbursement, etc.): _____________________
Awarded price/cost: __________________________
Final or projected final price/cost: _____________________________
Original delivery schedule (include dates of start and completion): __________________
Final or projected delivery schedule (include dates of start and completion):__________
Percent of Completion (if project is currently under construction) __________________
1. Client/Customer Point of Contact: ______________ Alternate POC______________
Address: _________________________ Address: _______________________
| Email: ___________________________ | Email: __________________________ |
| Fax: ____________________________ | Fax: ___________________________ |
Telephone: ________________________ Telephone: ______________________
1. Government Contracting Activity/Agency (if applicable): ______________________
Address: ____________________________________________________________ Contracting Officer: ____________________________________________________ Email: ______________________________ Fax: ________________________________ Telephone: ___________________________
Government Contract Administration Activity (if applicable:_______________________ Administrative Contracting Officer (ACO): ____________________________________ Contracting Officer Representative (COR): ___________________________________ Address: ______________________________________________________________ Email: _________________________________ Fax: ___________________________________ Telephone: ______________________________
(e) Description of project: (Provide a specific narrative explanation of the contract and objectives achieved. Detail how the effort is relevant to the requirement of this RFP):
1. If contract did not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence:
(g) List each time the delivery schedule was revised and provide an explanation of why the revision was necessary. Address all Requests for Deviation and Requests for Waiver with respect to causes and corrective actions: ____________________________________________________________________________
(h) Was the project terminated early or was Cure Notices or Show Cause Letters received on this contract? Yes ____ No____: If yes, explain nature of termination (default/convenience). Provide copy of any Cure Notices or Show Cause Letters received and describe any corrective action(s) implemented by the offeror or subcontractor: ____________________________________________________________________________
(i) Safety record (Use the number reported on OSHA Form No. 200 or equivalent):
Injuries with Lost Workdays __________ Injuries without Lost Workdays _________
Explain any injuries that occurred and corrective action(s) taken:_________________________
(j) List and explain any customer concerns or dissatisfaction. Explain how you responded: ____
(k) Small Business Subcontracting Effort (Complete for Offeror/Prime Contractor only):
Large Business Offerors Only:
What were the various small business percentage goals in the original contract and the actual percentage attained, if applicable (see FAR 52.219-9)?
| Goal (%)_ | Actual (%) | ||||||
| Small Business (SB): | ___50____ | _________ | |||||
| 8(a) Small Business: | _________ | _________ | |||||
| Woman Owned Small Business (WOSB): | _________ | _________ | |||||
| Historically Underutilized Business Zone (HUBZone): | _________ | _________ | |||||
| Veteran Owned Small Business (VOSB): | _________ | _________ | |||||
| Service Disabled Veteran Owned Small Business (SDVOSB): | _________ | _________ |
If goals were not met, explain:____________________________________________________
Large and Small Business Offerors: List types of work subcontracted to small businesses and percentage of contract (see FAR 52.219-8, Utilization of Small Business Concerns):
| Type of Work Subcontracted to SB | % of Contract |
| 1. ______________________________ | ____________ |
| 2. ______________________________ | ____________ |
| 3. ______________________________ | ____________ |
| 4. ______________________________ | ____________ |
| 5. ______________________________ | ____________ |
| 6. ______________________________ | ____________ |
(l) If applicable, provide data on all manufacturing warranty returns. Data shall delineate total number of warranty returns. Data shall delineate total number of warranty returns, number of Could Not Duplicate (CND), number of failures attributable to GFE component Failures, and number and nature of failures attributable to the offeror’s delivered product:________________