This document outlines a solicitation for groundwater monitoring and interim remedial operations, maintenance, and modification services at Kirtland Air Force Base in New Mexico. The solicitation seeks qualified sources to address groundwater contamination resulting from historical releases at the Bulk Fuels Facility. Services include operating and maintaining an existing groundwater treatment system, monitoring groundwater and other media, optimizing and modifying the treatment system and interim measures, evaluating remedial alternatives, and coordinating with stakeholders. The solicitation will be open to all small businesses and use a best value tradeoff evaluation. The number is W912PP20R0009 with proposals due June 1, 2020. The contract type will be firm fixed price for an initial two-year base period and three optional one-year periods. The primary federal agencies are the Department of the Army Corps of Engineers Albuquerque District and Kirtland Air Force Base.

View the file

Other files

File Type Posted
Amendment 0001 W912PP20R0009.pdf PDF
W912PP20R0009.pdf PDF
BidSheetBFF5yr_W912PP20R0009.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

Groundwater Monitoring and Interim Remedial Measures Operations Modifications, Bulk Fuels Facility, Kirtland Air Force Base, Bernalillo County, New Mexico

1. This is Amendment No. 0002 to Solicitation W912PP20R0009; 01 May 2020. The attached Performance Work Statement (PWS) shall replace the original PWS in the solicitation document.

US ARMY ENGINEER DISTRICT, ALBUQUERQUE CORPS

OF ENGINEERS

6200 JEFFERSON STREET NE

ALBUQUERQUE, NEW MEXICO 87109-3435

W912PP20R0009

05/19/2020

05/01/2020

2. Proposal receipt date is hereby changed from 01 June 2020 14:00 to 15 June 14:00 2020.

//////////////////////LAST ITEM//////////////////////////

Revised 09/07/17

PERFORMANCE WORK STATEMENT (PWS)

Groundwater Monitoring and Interim Remedial Measures Operations Modifications, Bulk Fuels Facility, Kirtland Air Force Base, Bernalillo County, New Mexico

Amendment 0002

PART 1

GENERAL INFORMATION

1.0 General: This is a non-personal services contract to provide environmental remediation services for Hazardous, Toxic, and Radioactive Waste (HTRW). The services are to address groundwater contamination associated with historical releases from the Bulk Fuels Facility (BFF) at Kirtland Air Force Base (KAFB). The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the primary Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform environmental remedial services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The Contractor shall perform to the standards in this contract.

1.2 Background: The KAFB BFF historical fuel releases are being investigated and remediated in accordance with New Mexico Environment Department (NMED) regulations. NMED regulates the BFF site under a Resource Conservation and Recovery Act (RCRA) permit. The BFF solid waste management units (SWMUs) ST-106 and SS-111 are being remediated via interim measures and through implementation of remedial investigations and pilot tests. Soil and vadose zone monitoring and remedial actions are being addressed under separate contracts. Services included in this PWS are to support remediation of the fuel contamination in the regional groundwater aquifer, coordination for KAFB, stakeholder and public meetings support.

1.3 Objectives: The primary objective of this contract is to fulfill KAFB requirement and regulator directives for addressing groundwater contamination resulting from historical releases of the BFF. In order to effectively address remedial objectives KAFB is required to coordinate multiple studies, operations, and interim measures and to make effective communication with stakeholders and regulators. As such numerous supporting tasks are included in this PWS. The tasks required to achieve the project objectives are the following:

Maintain and operate the existing BFF Groundwater Treatment System (GWTS) in accordance with regulatory permits and approved Operation Maintenance and Monitoring (OM&M) plans.

Monitor groundwater, drinking water, GWTS, soil vapor, and associated media to assess plume conditions, assess safety of drinking water supplies, and assess interim measures.

Optimize, improve, and modify the GWTS to most effectively contain groundwater contamination in order to ensure safety of public and KAFB water supply.

Optimize, improve, and modify groundwater interim measure in order to address regulatory requirements as needed to address environmental hazards, Evaluate remedial alternatives by implementing studies or pilot testing as required by the Government.

Coordinate with the Government and other contractors to provide the Government information necessary to perform planning and to brief stakeholders and regulators.

1.4 Scope: The Contractor shall execute environmental remedial services necessary to address groundwater contamination at KAFB SWMUs ST-106 and SS-111. The Contractor shall implement, monitor, and maintain interim measures in accordance with approved permits and Contractor plans. The Contractor shall perform optional remedial services, remedial construction, and environmental studies tasks at the Government’s discretion and based upon the current site condition and need. Optional services include:

planning and permitting, meetings and presentations, OM&M of existing interim measure infrastructure, design and construction for expansion, modification, and optimization of interim measures pilot test implementation environmental investigations, studies, and site monitoring, drinking water monitoring, interim measures system performance assessment, and preparation of documents.

1.5 Period of Performance: The period of performance shall be for one (1) base period of 24 months and three (3) 12 month option years. The Period of Performance (POP) reads as follows:

Base Period shall be for 24-months from date of contract award.

Option Year 1 shall be for 12 months from the end of the Base Period.

Option Year 2 shall be for 12 months from the end of Option Year 1.

Option Year 3 shall be for 12 months from the end of Option Year 1 award.

The period of performance for Optional Tasks not specified for Base or Option Year periods, if exercised, will be identified in a modification signed by the Contracting Officer.

1.6 General Information:

1.6.1 Place of Performance: The work to be performed under this contract will be performed at KAFB, in Albuquerque, New Mexico.

1.6.2 Type of Contract: USACE will award a firm fixed-price, performance based environmental remediation services contract.

1.6.3 Hours of Operation: The Contractor is responsible for conducting business between the hours of 08:00 a.m. to 5:00 p.m. Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Access to work sites outside of the core business hours may be facilitated as necessary without direct government oversight. For other than firm fixed price contracts, the Contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.6.4 Recognized Holidays: The following holidays are recognized as Federal holidays and Government offices will not be open.

New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day

1.6.5 Quality Control: The Contractor shall develop and maintain an effective Quality Control Program (QCP) to ensure services are performed in accordance with this PWS. Quality controls will be evaluated in the work plan deliverables as discussed in Section 5 of this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services.

1.6.6 Quality Assurance: USACE shall evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what USACE must do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum satisfactory performance thresholds.

1.6.7 Security Requirements: Contractor personnel performing work under this contract must be able to provide staff that can gain access to the federal facility and pass a background check prior to initiation of field activities, and must maintain the level of security required for the life of the contract.

Installation Access: The Contractor shall coordinate with the U.S. Army Corps of Engineers (USACE) point of contact and KAFB security in order to gain access to project work sites. The Contractor staff that require access to the federal facility will require proof of citizenship, a vehicle with current insurance and registration, and the ability to pass a background check.

1.6.7.1 Physical Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for Contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.

1.6.7.2 Antiterrorism and Operations Security: Per the guidelines mandated with the implementation of OPORD 2013-74: Integrating Antiterrorism and Operations Security (OPSEC) into the USACE Acquisition Process, the following OPSEC provisions apply to this requirement:

1.6.7.2.1 AT Level I Training: Not Applicable

1.6.7.2.2 Access and General Protection/Security Policy and Procedures: All Contractor and all associated sub-contractors’ employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The Contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

1.6.7.2.2.1 For Contractors Requiring Common Access Card (CAC) Not Applicable.

1.6.7.2.2.2 For Contractors who do not Require CAC, but Require Access to a DOD Facility or Installation: Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014- 05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at

OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.6.7.2.3 through 1.6.7.2.17. Other OPSEC Requirements: Not applicable.

1.6.7.3 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer.

1.6.7.3.1 In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.

1.6.7.3.2 The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.

1.6.7.4 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the Contractor’s Quality Control Plan.

1.6.8 Special Qualifications: Contractor personnel shall be proficient in the use of computers, word processing, data entry, computer aided design, geographic information system, and groundwater modeling proficiency capabilities. Contractor personnel shall be experienced in the use of the internet, in corresponding via email using Microsoft Office for all transmitted information, and in the use of Microsoft office products such as Word, Excel, PowerPoint, and Access. Data sharing between the Contractor and the Government shall be conducted on a Government approved application or secure website.

The Contractor shall have prior experience with design and operation of water treatment systems and maintain staff with appropriate qualifications through the life of the contract. The scope of this contract requires specialized experience with water treatment systems and there is no opportunity to develop the necessary skills to perform key operation and maintenance tasks without unacceptable downtime or deterioration of treatment system performance.

1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), and other Government (USACE, AFCEC, and U.S. Air Force) personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting officer will apprise the Contractor of how the USACE views the Contractor's performance and the Contractor will apprise the Government (USACE, AFCEC, and U.S. Air Force) of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government (USACE and AFCEC).

1.6.10 Contracting Officer’s Representative (COR): A COR may be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance;

maintain written and oral communications with the Contractor concerning technical aspects of the contract;

issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting contract.

1.6.11 Key Personnel: The follow personnel are considered key personnel by USACE:

Project Manager. The Project Manager shall have a minimum of five (5) years of experience managing complex environmental projects. The Project Manager shall have experience with remedial design and execution of projects managed under the RCRA corrective action process. Preferable experience includes management of remedial systems for fuel-contaminated groundwater sites. The Project Manager must not have been convicted of a crime involving fraudulent financial activities or tax infractions. The Project Manager must have sufficient technical experience to communicate proficiently with USACE engineers and scientists. This Project Manager will be the primary point of contact for the USACE.

Assistant Project Manager. The Assistant Project Manager shall have a minimum of five (5) years of experience managing environmental projects. The Assistant Project Manager shall have experience with remedial design and execution of projects managed under the RCRA corrective action process. The Assistant Project Manager must have sufficient technical experience to communicate proficiently with USACE engineers and scientists. To ensure 100% project coverage, the Assistant Project Manager shall be available as a back-up when Project Manager is not available. The Assistant Project Manager should be available for USACE coordination, meetings and site visits when the project manager is not available. The Assistant Project Manager must not have been convicted of a crime involving fraudulent financial activities or tax infractions. The Assistant Project Manager may be designated by the Project Manager to lead some tasks and activities and should be a fully engaged part of the Contractor personnel.

Treatment Plant Operator: The Treatment Plant Operator (Operator) shall have three (3) years of experience in operation of a water treatment or processing plant and five (5) years of experience performing design and operation of electrical controls and mechanical systems. The plant Operator shall have experience managing or performing maintenance of complex water treatment and management systems including a variety of system controls for minimizing biological growth, scale, and waste and for maintaining optimal pressures, flows, and contaminant mass capture. The Operator shall be able to perform or manage maintenance of conveyance, valves, controls, metering, chemical amendment, and water treatment system components. Experience with Supervisory Control and Data Acquisition (SCADA) system management software is preferable.

Subject Matter Expert: A Subject Matter Expert (SME) with expertise in groundwater geochemistry, petroleum remediation, and groundwater remedial design is a key personnel for maintaining and modifying the BFF GWTS. The SME must have a relevant technical education and professional certification such as Professional Engineer (PE) or Professional Geologist (PG) certification. The SME must have a minimum of five (5) years of experience in design, technical evaluation of groundwater data and system operational data, and optimization of remedial systems. The role of SME may be filled by one or more people.

Professional Engineer (PE): A New Mexico licensed PE with experience designing water conveyance, wells, and water systems is a key personnel for modifications to the BFF GWTS. The PE shall have experience with water treatment technology, state and federal design requirements for water conveyance, controls, valves, and monitoring systems. Changes to the GWTS may require development of component designs that must be approved by USACE in advance of construction. The PE must be able to produce designs for treatment system modifications that meet project specifications.

Modeler: One or more staff shall be provided to meet minimum modeling staff qualifications. The Modeler(s) shall have five (5) years of relevant experience designing, constructing, and assessing computer models for groundwater resources and environmental investigations. Experience with FEFLOW or similar finite element groundwater flow models for dynamic well fields is required. Experience with MODFLOW or similar finite difference regional or basin-scale groundwater flow models is required. Experience with 3-dimentional subsurface models such as the C Tech MVS/EVS model is required.

Chemist: The Senior Project Chemist shall have a minimum of five (5) years of experience as a senior scientist managing laboratory data quality for environmental and drinking water laboratory methods. The Chemist shall have expertise necessary for management of large and complex databases. The Chemist shall have experience assessing analytical laboratory certifications and quality control processes. The Chemist’s experience must demonstrate expertise with the Department of Defense Quality Systems Manual (QSM) for environmental laboratories and with the Safe Drinking Water Act and associated U.S. Environmental Protection Agency laboratory methods.

Regulatory Expert: An expert on environmental regulations with a minimum five (5) years of relevant experience with RCRA law, waste regulations, and New Mexico environmental regulations shall be provided as a regulatory expert. Experience with RCRA is required in order to comply with the KAFB RCRA permit and operations within the BFF SWMUs. Experience with hazardous waste characterization, management, and disposal is required to address investigation and remedial wastes associated with the BFF site. Experience with New Mexico environmental policy and regulations is required to maintain compliance with groundwater extraction and injection permits and with site specific groundwater resource protection requirements. More than one staff may be provided to fulfill this role.

Technical Editor: A Technical Editor with a minimum five (5) years of relevant experience with editing, formatting, and production of engineering and scientific documents. The Technical Editor shall review all document deliverables for conformance with the Kirtland Style Guide, for contact conformance with RCRA permit requirements, and for production of high quality complete and technically sound document deliverables. The Technical Editor shall be engaged in the project and be capable of maintaining consistent and appropriate tones and voice of documents that are consistent with Air Force policy and direction. The editor is a key staff that must be aware of the technical, regulatory, and U.S. Air Force policy specific for the project in order to ensure document deliverables are of sufficient quality to allow for USACE approval.

The Contractor shall provide qualifications in their proposal for the proposed key staff to the USACE for review and approval in advance of the project kick-off meeting. The resumes for Key Personnel shall be provided for KO review and approval before initiation of major project tasks.

1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by Contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.

1.6.13 Contractor Travel: Not Applicable. As a firm fixed-price task order, the Contractor is responsible for costs associated with travel necessary to support the PWS.

1.6.14 Other Direct Costs This contract is a firm-fixed price contract. Other direct costs, including travel and training shall be included within negotiated milestone payments.

1.6.15 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the Contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.

1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.6.17 Phase In/Phase Out Period: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the Contractor shall have personnel on board, during the 90 day phase in/ phase out periods. During the phase in period, the Contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.

1.6.18 Safety:

1.6.18.1 U.S. Army Corps of Engineers’ Safety and Health Requirements Manual, EM 385-

1-1 and OSHA Requirements: The Contractor will be required to comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 in effect on the date of the contract award. EM 385-1-1 and its changes are available at http://www.publications.usace.army.mil/USACE-publications/Engineer-Manuals/. The Contractor must also comply with Occupational Safety and Health Act (OSHA) standards. OSHA standards are subject to change. It is the Contractor's responsibility to maintain familiarity with current OSHA standards.

1.6.18.2 Zero Accident Program: The Albuquerque District, in its continual pursuit of excellence in safety and has established a goal of zero Contractor injuries. To attain this goal it will be necessary for the Contractor management personnel to communicate to the workers an expectation of zero injuries; that it is no longer acceptable to take chances; that shortcuts taken because of laziness or even while trying to do an efficient job are no longer welcomed; that praise for shortcuts or chance-taking will not exist. It is imperative that Contractor management clearly sets forth the expectation for zero injuries so that the workers can begin to believe that the company is truly serious about safety. From the standpoint of worker psychology, zero is the only supportable goal. In attaining zero-injury performance, there is no substitute for the concept of setting and communicating safety performance expectations to the workers.

1.6.19 Pricing and Payment: The Contractor may invoice for partial performance of a task (including partial performance of any unit-priced task, if applicable) when that task is being performed in compliance with all applicable contract requirements in a manner found acceptable by USACE, and the amount due for any such partial performance (for purposes of FAR § 32.906, Making Payments, and the clause at FAR § 52.232-1, Payments) shall be subject to approval by the COR -- based on the recommendation of the Contracting Officer (KO). The Contractor shall submit invoices by email to the COR for approval and payment from USACE by the 10th of each month. For purposes of determining whether an invoice has been properly submitted, the COR shall be responsible for determining whether any task has been completed or is being completed in compliance with all applicable contract requirements and what percentage of the task has actually been completed. However, the Contractor shall remain responsible for Quality Control (QC) and maintaining an inspection system, as specified in the contract.

Invoices shall include all the necessary information, including any and all supporting documentation, and will be based on the work completed for each specific task under this Project. The Contractor shall (concurrently) send a monthly progress report and invoices for approval by the COR in pdf format to:

TBD

USACE, Albuquerque

During the performance of this project, USACE shall make progress payments based on the invoices submitted for the work completed, and found to be acceptable by USACE. No modification of the contract shall occur without coordination and approval by the KO.

PART 2

DEFINITIONS & ACRONYMS

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government (USACE and AFCEC). The term used in this contract refers to the prime.

2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. NOTE: The only individual who can legally bind the Government.

2.1.3 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the Contracting Officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5 Deliverable: Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.8 Quality Assurance (QA): The Government procedures to verify that services being performed by the contractor are performed according to acceptable standards.

2.1.9 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10 Quality Control (QC): All necessary measures taken by the contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12 Work Day: The number of hours per day the contractor provides services in accordance with the contract.

2.1.12 Work Week: Monday through Friday, unless specified otherwise.

2.2 Acronyms:

AFCEC U.S. Air Force Civil Engineering Center AHA activity hazard analysis APP Accident Prevention Plan AR Army Regulation BFF Bulk Fuels Facility BMP Best Management Practice CAC Common Access Card CFR Code of Federal Regulations CMR Contractor Manpower Reporting COC contaminant of concern CONUS Continental United States (excludes Alaska and Hawaii) COPC contaminant of potential concern COR Contracting Officer Representative COTR Contracting Officer's Technical Representative DA Department of the Army DOD Department of Defense EDB ethylene dibromide (1,2-dibromomethane) EM Engineering Manual EPA U.S. Environmental Protection Agency FAA Federal Aviation Administration FAR Federal Acquisition Regulation FSP Field Sampling Plan FY fiscal year GWTS Groundwater Treatment System HTRW Hazardous, Toxic, and Radioactive Waste KAFB Kirtland Air Force Base LNAPL light non-aqueous petroleum liquid IAW in accordance with KO Contracting Officer NMED New Mexico Environment Department NMOSE New Mexico Office of the State Engineer NOI Notice of Intent NPDES National Pollution Discharge Elimination System O&M operation and maintenance OM&M operation, maintenance, and monitoring OCI Organizational Conflict of Interest OPSEC Operations Security OSHA Occupational Safety and Health Act PM project management or project manager PMP Project Management Plan POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QAPP Quality Assurance Project Plan QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RCRA Resource Conservation and Recovery Act SME subject matter expert SOP standard operating procedure SVOC semi-volatile organic compounds SWMU Solid Waste Management Unit

TPH total petroleum hydrocarbons UFP-QAPP Unified Federal Policy-Quality Assurance Project Plan USACE U.S. Army Corps of Engineers USGS U.S. Geologic Survey VOC volatile organic compounds

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3.0 Government Furnished Items and Services:

3.1 Services: The Government (USACE, KAFB, and AFCEC) will provide coordination for access to work site and for badging of field staff. The Government will facilitate coordination with other Contractors to exchange information and to organize field efforts. The Government shall also coordinate access to the Golf Course Main Pond for water discharge.

3.2 Facilities: The Government will provide the existing infrastructure associated with the Bulk Fuels Facility Groundwater Treatment Plant (GWTP). Contractor damage to KAFB infrastructure shall be repaired or replaced at no cost to the Government.

3.3 Utilities: The Government will provide electrical power to the GWTP. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities.

3.4 Equipment: The Government will provide equipment that is housed within the GWTP.

3.5 Materials: USACE will not provide materials.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4.0 Contractor Furnished Items and Responsibilities:

4.1 General: The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: Not applicable.

4.3 Materials: The Contractor shall provide all materials necessary to perform the scope of services included in this PWS.

4.4 Equipment: The Contractor shall provide all equipment necessary to perform the scope of services included in this PWS.

4.5 Government Safety Requirements: The Contractor shall submit their written Accident Prevention Program in accordance with EM 385-1-1 to the Contracting Officer’s Representative for evaluation and acceptance. The plan must be submitted and approved before any on-site work begins.

4.6 Contractor Manpower Reporting (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for USACE via a secure data collection site. The contractor is required to completely fill in all required data fields using the following web address www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at: dod.ecmra.support.desk@mail.mil.

Contractor User Guide is available at https://www.ecmra.mil/help/help.html.

PART 5

SPECIFIC TASKS

5.0 General Scope:

The Contractor shall implement, monitor, and modify the groundwater interim measures and pilot test systems for the Kirtland Air Force Base (KAFB) Bulk Fuels Facility (BFF). The scope of activities included in base and option tasks of this contract include the following:

Maintain and operate the existing BFF Groundwater Treatment System (GWTS) in accordance with regulatory permits and approved Operation Maintenance and Monitoring (OM&M) plans.

Monitor groundwater, drinking water, and GWTS, and soil vapor to assess plume conditions (including plume extent, mass, and volume, groundwater gradient, and groundwater geochemical conditions), assess safety of drinking water supplies, and assess overall effectiveness of groundwater interim measure.

Optimize, improve, and modify the GWTS to most effectively contain groundwater contamination in order to ensure safety of public and KAFB water supply.

Optimize, improve, and modify groundwater interim measures in order to address regulatory requirements as needed to address environmental hazards.

Coordinate with the Government (USACE, AFCEC, and U.S. Air Force) and other contractors to provide the Government information necessary to perform planning and to allow KAFB to brief stakeholders and regulators.

Prepare documents and permit applications associated with the above activities.

Optional tasks may be awarded at the discretion of the Contracting Officer (KO), based upon current the KAFB need, AFCEC availability of funds, and USACE assessment of Contractor successful performance to date. No minimum quantity for optional tasks is guaranteed or implied. See Attachment 1 (Technical Exhibit 1), Performance Summary Requirements.

The Contractor shall comply with regulatory requirements by adhering to all site permits in place during the initiation of this contract and enacted with Contractor participation during the course of period of performance as described further in this PWS. The Contractor shall address all regulatory comments in document submittals in accordance with state regulations 20 NMAC 4.2, which specifies document fees and review periods.

The Contractor shall be prepared to deliver regulatory submittals (Final Revision 1 and Final Revision 2 drafts) on an expedited schedule. NMED may set dates as short as 30 days for response to comments. The Contractor shall make all reasonable efforts to address regulatory comments in approved and disapproved documents at the deadlines defined by the NMED regulator letters. The Contractor shall also provide sufficient time for review of NMED response documents.

USACE reviews will include field inspections and technical review of all data deliverables and document deliverables. AFCEC and Air Force reviews will be performed on all document and data submittals.

Submittals that require regulatory approval shall be provided to KAFB with a minimum of 10 working days prior to submittal deadline and after achieving approval in the response to comments (RTC) tables. The Contractor shall coordinate with KAFB staff to provide the document for KAFB staffing signature, which requires Air Force legal and management approval and signature. All regulatory deliverables shall be provided with a staffing package that includes an electronic and hard copy as well as a transmittal letter on KAFB letterhead. The Air Force signed and approved regulatory deliverables shall be delivered by the Contractor to the regulator with verified delivery in the form of a NMED receipt stamp or certified mail delivery receipt.

5.1 BASE TASK 1.0: Project Management

The Contractor shall perform project management tasks necessary to maintain financial management, provide accurate and timely invoicing, and maintain the project schedule for the Base Period. The Contractor shall designate a qualified project manager (PM) in accordance with (IAW) Section 1.6.11 of this Performance Work Statement (PWS). The PM shall be the primary point of contact (POC) for the U.S.

Army Corps of Engineers (USACE). In order to assure USACE that project management will be performed effectively and IAW this PWS and with Federal Acquisitions Regulations (FAR), the Contractor shall deliver a Project Management Plan (PMP).

5.1.0A Base Task 1.0A: Project Management Plan (PMP) Deliverable, POP is 24 months from contract award The PMP shall be delivered in Draft within 30 days of contract award for review and approval by USACE. The PMP shall provide information necessary for USACE to accurately evaluate the Contractor management process. This document shall not include details of specific field or technical process, but instead provides the overarching management and quality process. The Draft PMP document shall include the following items at a minimum:

Quality Management Plan Organization chart with key personnel specified Roles and responsibilities for Contractor staff Integration, acquisition, and quality management plan for subcontractors Milestone payment schedule specifying proposed partial payment plan Onboarding or coordination plan Draft project schedule in Gantt Chart format

The Contractor shall develop and maintain an activity-based schedule that fully supports the technical approach and outlines activities and milestones defined at the appropriate detail level and logically sequenced to support and manage the completion of the performance objectives in this PWS. The schedule shall account for USACE, AFCEC, and Air Force review periods, as well KAFB legal and staffing for signature authority in order to meet project goals and regulatory deadlines. USACE shall require 3 weeks to review and comment on the PMP and may require a meeting to address comments on interim milestone payments and acceptance language of the initial project milestone schedule. The Contractor shall coordinate with KAFB for document delivery and review. USACE will assess document quality metrics in close consultation with Air Force Civil Engineering Center (AFCEC) and KAFB staff. USACE comments will be provided in a comment response table and responses accepted by USACE prior to finalization. The Final PMP shall be delivered within 90 days of contract award.

See Attachment 2 (Technical Exhibit 2), Deliverables Schedule. This document is not a regulatory submittal.

The Contractor shall maintain the PMP as a working document throughout the period of performance (POP) of the contract. The PMP shall be updated with significant changes in management procedures, changes in key personnel, changes in project schedule, and upon award of additional contract scope or options.

5.1.0B Base Task 1.0B: Kick-off or Post Award Meeting, POP is 24 months from contract award The Contractor shall attend a project kick-off meeting and site visit within 14 days of contract award to discuss task requirements and expectations. During the kick-off meeting, the Contractor shall provide and review a Draft Schedule for USACE review. The revised schedule shall be maintained within the PMP. The Contractor shall provide meeting minutes to attendees within one week of the Kick-Off Meeting.

5.1.0C Base Task 1.0C: Recurring Project Meetings, The Contractor shall coordinate and facilitate meetings for this project. The Contractor shall also be responsible for developing meeting agendas, documenting meeting content, and developing meeting minutes for review and approval by the entire project team. Agendas and meeting materials shall be distributed a minimum of 48 hours in advance of the meeting. Recurring meetings include the following:

Weekly status calls between the Federal Government Team (currently composed of KAFB, AFCEC, USACE, U.S. Geologic Survey [USGS], and Contractors) and shall be conducted 52 times per year.

Twelve (12) monthly community relations calls and four (4) supplemental meetings/calls between the Federal Team and the Contractor shall be conducted per year.

Recurring meetings shall be conducted as needed between USACE and the Contractor in order to inspect contractor work products up to 52 times per year.

See Attachment 1 (Technical Exhibit 1), Performance Summary Requirements.

5.1.0D Base Task 1.0D: Public Meetings and Public Events, The Contractor shall supply labor and materials to support three (3) public meetings, two (2) deep dive meetings, and three (3) public events per year. Public meetings and public events include meeting space rentals (including tables and chairs as needed), advertising by newspaper, power point presentations, eight (8) posters, graphics (up to 50 hardcopies consisting of up to 50 pages each), and technical support staff to coordinate and execute meeting set-up, poster sessions, and logistics. The Contractor PM and other key personnel shall participate in an in-person rehearsal for public meetings and two (2) planning meetings for each public meeting and shall have staff available for coordination. The SME shall prepare materials and be available to present detailed technical briefings and hold question and answer sessions with the public and stakeholders at deep dive meetings.

In addition to public meetings and events, the BFF team presents information at workshops and community events (i.e., boards, technical groups, neighborhood association meetings, etc.). The Contractor shall provide information materials such as graphics for those presentations/informational sheets for three (3) additional BFF events per year. The Contractor shall provide up to 25 hand-outs with up to 50 pages, up to six (6) oversized maps or posters, and up to 100 fliers for each event.

Tours of the BFF GWTS are conducted routinely by KAFB and USACE. The Contractor shall support these tours as required by the Government (USACE, AFCEC, and U.S. Air Force).