This is a site visit presentation document for the Philpott Dam Anchors & Stability Project scheduled for May 5, 2026, in the Wilmington District of the U.S. Army Corps of Engineers.

The project addresses alkali-silica reaction (ASR) damage to the concrete dam constructed in 1952 using aggregate susceptible to ASR. The dam, located on the Smith River, is 892 feet long with a 220-foot maximum height and a 120-foot spillway crest. Historical analysis reveals that 1969 spillway anchors are stressed at approximately 92 percent of gross ultimate tensile strength due to ASR on unbonded lift joints, with potential for eventual rupture. The upper portions of Monoliths 9 and 13 are expanding toward the spillway. The FY26 construction scope includes installing 12 new re-stressable spillway anchors with load sensors, installing inclinometers in Monoliths 9 and 13, and automating crack gauge and piezometer monitoring. The Government will execute this acquisition through a negotiated FAR Part 15 procurement using Request for Proposals (RFPs), awarding a firm-fixed-price contract to the responsible offeror whose proposal provides the best overall value. Evaluation criteria include Technical Approach, Key Personnel, Past Performance, and Small Business Participation Plan. Bidders must submit questions via ProjNet before close of business May 29, 2026, using Bidder Inquiry key 3359F6-8VVZJS. Primary points of contact include James Duke (Project Manager), Troy D. Small (Contracting Officer), and Jenifer Garland (Contract Specialist).

View the file

Other files

File Type Posted
A21 - Solicitation Amendment - W912PM26RA0040008 CCopy.pdf PDF
B9 - Enclosure 3 General Proposal Amendment 8.pdf PDF
A21 - Solicitation Amendment W912PM26RA0040008 SF 30.pdf PDF
Philpott Dam Div 01 Specifications - Clean_Rev 1.pdf PDF
Philpott Dam Div 01 Specifications with Revisions_Rev 1.pdf PDF
DBA_WD_Virginia_VA20260026_Mod._No._1_Rev._Date_05.18.26.pdf PDF
A21 - Solicitation Amendment - W912PM26RA0040007 Conformed Copy.pdf PDF
DBA_WD_Virginia_VA20260025_Mod._No._1_Rev._Date_05.18.26.pdf PDF
A21 - Solicitation Amendment W912PM26RA0040007 SF 30 Final.pdf PDF
B9 - Enclosure 3 General Proposal Updated.pdf PDF
A21 - Solicitation Amendment W912PM26RA0040006 SF 30.pdf PDF
A21 - Solicitation Amendment - W912PM26RA0040006 CCopy.pdf PDF
D2 - Solicitation Amendment W912PM26RA0040005 SF 30 Final.pdf PDF
D2 - Solicitation Amendment - W912PM26RA0040005 CCopy Final.pdf PDF
D2 - Solicitation Amendment W912PM26RA0040004 SF 30.pdf PDF
D2 - Solicitation Amendment - W912PM26RA0040004 Conformed Copy.pdf PDF
A21 - Solicitation Amendment W912PM26RA0040003 SF 30.pdf PDF
A21 - Solicitation Amendment W912PM26RA0040003 CCopy.pdf PDF
A21 - W912PM26RA004-AMDT0003-PACKAGE.pdf PDF
D2 - Solicitation Amendment W912PM26RA0040002 Amendment 2.pdf PDF
D2 - Solicitation Amendment W912PM26RA0040002 Conformed Copy.pdf PDF
A19 - DBA_WD_Virginia_VA20260026_Mod._No._1_Rev._Date_05.18.26.pdf PDF
A19 - DBA_WD_Virginia_VA20260025_Mod._No._1_Rev._Date_05.18.26.pdf PDF
A21 - W912PM-26-R-A004 Amendment 01.pdf PDF
Site Visit Sign-in Sheet.pdf PDF
CESAW-Philpott Dam Specifications RTA-W912PM26RA004_25Mar2026.pdf PDF
A19 - DBA_WD_Virginia_VA20260026_Mod._No._0_Rev._Date_01.02.26.pdf PDF
A21 - CESAW-Philpott Dam Specifications RTA-W912PM26RA004_25Mar2026.pdf PDF
A21 - Unlocked Drawings.pdf PDF
A19 - DBA_WD_Virginia_VA20260025_Mod._No._0_Rev._Date_01.02.26.pdf PDF
A21 - Locked Drawings.pdf PDF
A21 - Solicitation - W912PM26RA004 Phl Anchors Final.pdf PDF
B9 - Enclosure 3 General Proposal Submittsion and Tabbing Requirements.pdf PDF
B9 - Attachment 1 Proposal Data Sheet.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Philpott Dam: Anchors & Stability Project Site Visit

05 MAY 2026

Discussion Agenda

• Presentation – 0800-0915

• Project Orientation & History

• Proposed Project Overview

• Spillway Anchoring

• Instrumentation

• Post Presentation Tour – 0930-1200

• Safety Review

• Piezometers @ Powerhouse

• Anchors @ Top of the Dam

* Times are approximate, and may shorten or events occur earlier depending on progress

Wilmington District POCs

• James Duke, Project Manager

• James.H.Duke@usace.army.mil.

• Walt Haven, ETL

• Walter.T.Haven@usace.army.mil.

• Richard Beckwith, ProjNet Manager

• Richard.E.Beckwith@usace.army.mil.

• Scott Surratt, ProjNet Manager

• Scott.Surratt@usace.army.mil

• George Clark, AE Contract Management

• George.E.Clark@usace.army.mil.

• Troy D. Small, Contracting Officer

• Troy.D.Small@usace.army.mil.

• Jenifer Garland, Contract Specialist

• Jenifer.M.Garland@usace.army.mil.

Bidder Inquiry Process

• Submit questions via ProjNet before COB 29 MAY 2026.

• ProjNet website: https://www.projnet.org.

• Use the Bidder Inquiry key 3359F6-8VVZJS.

Project Location

District Boundary

Philpott Dam

SAW Office

Dam Characteristics

1015.33 Ō, NAVD88 Top of Dam EL.

892 Ō. Length of Dam

984.33 ft., NAVD88 Spillway Crest EL.

120 Ō. Spillway Crest Length

31 Ō Spillway Crest Width

220 ft. Maximum Height

Spillway

Tailrace Stilling Basin

Powerhouse

CUI

Spillway Cross-Section:

Sluice to Stilling Basin

Cross-Section:

Penstock to Powerhouse

Head Gate Bay

Gate & Penstock Flow to Turbine

Philpott Dam: Upstream, Right Side

Spillway Headgate Bay Area

Monolith 9 Monolith 8

Spillway

Monolith 13

Philpott Dam: Upstream, Left Side

General Historical Timeline

Construction Completed

Aggregate and concrete mixtures used with ASR susceptibility.

Crack observations and measurements begin

Spillway Anchor Installations

1980s 1993

Subsequent Crack Mapping

Efforts

PI No.2

Recommendation:

Spillway Remediation (Anchors)

Alkali-Aggregate Reaction (AAR)

• Alkali-Silica Reaction (ASR) Amorphous or microcrystalline silica aggregate (common in stream beds) Strained quartz-bearing aggregate Amphibolite aggregate

• Philpott Dam aggregate: locally sourced braided stream bars

Philpott Spillway Tendon Installation in 1969.

BUILDING STRONG®

1969 Spillway Repair

(IAW PI #2 (OCT 1968))

Philpott Spillway Tendon Installation in 1969.

BUILDING STRONG®

Philpott Dam – 1969 Spillway Repair

Spillway Anchors (1969)

General Historical Timeline (continued)

20092004 2010

ERDC (USACE)

Crack mapping completed for:

-Interior and DS face of the dam

-Headgate bay area

Other Specifics:

-Six cores drilled

-Pulse velocity testing

-Compressive strength

-Petrographic exam

Robin Charlwood, Ph.D.

Completed an independent technical review of concrete cracking at the dam.

Findings:

− ASR Cracking

− Potential anchor failure & spillway crest separation

− Headgate Bay cracking

Recommendations:

− Headgate Bay Structural Analysis

− Finite Element Analysis of Spillway

HDR

Crack mapping completed:

- Interior of the dam

- Headgate bay area

Also completed:

3D Finite ElementAnalysis of Spillway Monoliths

Structural Analysis of headgate bay area

Proposals/Cost estimates for recommended repairs

Recommended more thorough 3D Finite Element Analysis and bonding of lifts

SEAMAR

Crack mapping of US and DS faces of the dam, below the waterline to EL 835-ft NGVD29.

Army Dive Team Crack mapping completed for:

-Monoliths 8 and 9 from below water surface to invert of penstock intake, in each gate slot.

-Concrete entrances to each of three sluice gates.

NAP (USACE)

Crack mapping completed for:

-Complete DS face of the dam.

-US face of the dam to water surface.

MVK (USACE)

Investigated Face Drains in Monoliths 8 and 9 to determine where water is entering the drains.

Video inspected and pressure-jet cleaned all Joint Drains, and Foundation Drains.

Sufficient data gathered and investigations completed to pursue repair options.

$930k in FY15 Increment 4 Funds available for Headgate Bay Area Repair

General Historical Timeline (continued)

General Historical Timeline (continued)

Saw Cuts (TVA)

Vertical relief slots for M6-7 and M14-15

Headgate Bay Crack Mitigation (TVA)

Installation of six horizontal anchors through Monolith 8

Receipt of IIJA Funding

$3.3M for…

• Comprehensive Structural Analysis

• Geotechnical Investigation

• Spillway Anchor Installation

$400K for…

• Monoliths 1 and 2 Anchors

• Plans and Specs for Anchors

Report Findings and Outcomes

• ASR growth contributed to cracking but should slow in the future.

• 1969 Spillway anchors STRESSED ≈ 92% GROSS ULTIMATE TENSILE STRENGTH from ASR on unbonded/poorly prepared lift joints. Eventual anchor rupture is possible.

• Upper portions of M9 and M13 are expanding toward the spillway.

AE Design (Based on AE Recommendations from Stability Analysis)

Scope for FY26 Construction:

Install 12 spillway anchors with re-stressable anchors Install anchor load sensors.

Install inclinometers in M-9 and M-13.

Crack gauge and piezometer automation.

M-13

M-9

Spillway Anchors Concept

Instrumentation Concepts

Acquisition

• The Government is soliciting for Request for Proposals (RFPs) and will execute this acquisition through a negotiated procurement under FAR Part 15.

• The Government will evaluate the proposals in accordance with the following evaluation criteria: Technical Approach, Key Personnel, Past Performance, Small Business Participation Plan.

• The Government will award a firm-fixed-price contract to the responsible offeror whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, all factors considered.

Wilmington District POCs

• James Duke, Project Manager

• James.H.Duke@usace.army.mil.

• Walt Haven, ETL

• Walter.T.Haven@usace.army.mil.

• Richard Beckwith, ProjNet Manager

• Richard.E.Beckwith@usace.army.mil.

• Scott Surratt, ProjNet Manager

• Scott.Surratt@usace.army.mil

• George Clark, AE Contract Management

• George.E.Clark@usace.army.mil.

• Troy D. Small, Contracting Officer

• Troy.D.Small@usace.army.mil.

• Jenifer Garland, Contract Specialist

• Jenifer.M.Garland@usace.army.mil.

Bidder Inquiry Process

• Submit questions via ProjNet before COB 29 MAY 2026.

• ProjNet website: https://www.projnet.org.

• Use the Bidder Inquiry key 3359F6-8VVZJS.

Discussion & AHA Review