This is a Questions and Responses document for the Removal of Topsail Beach Pier solicitation (W912PM26QA023) issued by the Department of the Army Corps of Engineers Engineering District Wilmington. The document contains six substantive Q&A entries addressing contractor inquiries submitted prior to the March 13, 2026, 2:00 PM ET question deadline. Key responses clarify that ASCII data from underwater multibeam images has been posted to SAM.GOV; equipment laydown area requests should be directed to Town Manager Christina Prince Burke (910-328-5841); horizontal pilings buried in sand within the designated removal area must be removed per USACE guidance; a post-multibeam survey is required to verify all piling removals rather than landfill proof of disposal; and the NAICS code for this project is fixed at 238910 and cannot be adjusted to 237990 as requested by one offeror.

The solicitation is a lowest-priced, technically-acceptable award with specific submission requirements including SAM registration verification, minimum two prior relevant contracts completed within five years, a technical proposal explaining SOW execution, and valid North Carolina Marine or Building contractors licensing. All quotes are due by 2:00 PM ET on the deadline date, and submissions must be sent via email to Diana D. Curl and Rosalind M. Shoemaker at USACE.Army.mil. The work involves removal of pier pilings from Topsail Beach, North Carolina, with multibeam survey verification of complete removal within designated areas.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question's and Responses
16-Mar-26
Solicitation Number: W912PM26QA023
Removal of Topsail Beach Pier
Question #QuestionResponse
1Can we provide an ASCII data from the underwater multibeam images that are in the SOW.ASCII File posted to SAM.GOV.
2Are there any restrictions with heavy equipment being on the beach at the project.That would be Christina Prince Burke Town Manager Phone: 910-328-5841, www.topsailbeachnc.gov
3Who is the contact for the Town to request a Lay down area for equipment during the project.That would be Christina Prince Burke Town Manager Phone: 910-328-5841, www.topsailbeachnc.gov
4We flew a drone over the area but could not see any pilings laying horzantally on the seafloor. From the survey it looks like maybe some thing down there. If the pilings are buried in the sand what is the USACOE guidance?If the Horizontal pilings are within the designated removal area (BOX) in the SOW and can be removed than the USACE requests them to be removed
5Is a proof of disposal at landfill required?From the SOW**After Contractor has removed all Pilings, the contractor shall provide a post Multibeam Survey to verify removals within Designated removal area (Figure 1)**
6We are interested in the project and wanted to inquire if the NAICS code could be adjusted to 237990 for this project?The NAICS Code chosen for this project is 238910. This is the NAICS Code that we are using.
7
8
9
10
11
12
13
14