This document is Amendment 2 to Solicitation W912PM24B0006 for FY 25 AIWW Maintenance Dredging. The U.S. Army Corps of Engineers, Wilmington District requires a contract to perform maintenance dredging of the Atlantic Intracoastal Waterway (AIWW) channel between Wilmington and Ocean Isle Beach, North Carolina. The work includes removal of shoaled material from AIWW channels with dredging depths of 8-12 feet plus 2 feet of allowable overdepth. Dredged material will be placed on approved ocean beaches and placement islands. The solicitation is a 100% Small Business set-aside with a Firm Fixed Price contract valued between $10,000,000 and $25,000,000. The NAICS code is 237990 - Dredging and Surface Cleanup Activities with a size standard of $37,000,000. No environmental dredging windows apply for most AIWW channels, though there is a November 1 - April 30 window for Core Creek Channels. The solicitation will be issued electronically on or about July 22, 2024 with a bid opening date to be specified.
View the file
Other files for this federal contract opportunity
Show all 32
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See the Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912PM24B0006
X 9B. DATED (SEE ITEM 11)
22-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Aug-2024
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM24B0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 00 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SUMMARY OF CHANGES
(End of Summary of Changes)
Solicitation # W912PM24B0006 Date: 05 AUGUST 2024 Project Title – ATLANTIC INTRACOASTAL WATERWAY MAINTENANCE DREDGING FY25
CONTRACT NORTH CAROLINA
Amendment No. 0002
TECHNICAL SUMMARY OF CHANGES
1. CHANGES TO SPECIFICATIONS. Attached hereto are [new, revised and deleted] sections to the specifications. Revision mark “***AMENDMENT 0002***” is shown on each revised page.
A. REVISE SECTION.
Section 31 01 00 – DIKE EMBANKMENT o ADD SENTENCE – 1.8 SURVEYS
Interim and post construction surveys of each diked placement area shall be performed in accordance with Section 02 21 00 CONSTRUCTION SURVEYS. Surveys shall include the diked embankment and interior of placement area. The Contractor shall submit the pre construction survey data to the Contracting Officer or his/her designated representative a minimum of 7 days prior to commencement of earth moving operations. The Contractor shall submit the post construction survey data to the Contracting Officer or his/her designated representative upon completion of work.
Section 35 20 23 – DREDGING o DELETED – 3.5.12 – Dredge Certification
This contract requires the use of the Dredging Quality Management Program for pipeline hydraulic dredge. Prior to submitting bid, see Section 35 20 23.33 NATIONAL
DREDGING QUALITY MANAGEMENT PROGRAM
PIPELINE HYDRAULIC DREDGE.
Section 35 20 23.33 – NATIONAL DREDGING QUALITY MANAGEMENT
PROGRAM – PIPELINE HYDRAULIC DREDGE
o DELETED – Specification section in entirety.
2. CHANGES TO DRAWINGS.
A. REVISED DRAWINGS (ISSUED)
CN106 – North Topsail Beach Placement o Revised construction berm width in “Transition Detail” and “Typical Beach
Placement Section” from 250’ to 100’ CN114- Ocean Isle Beach Placement o Revised callout of second beach placement area to say “Approximate Continuation Point for Beach Placement” in order to provide clarification.
Solicitation # W912PM24B0006 Date: 05 AUGUST 2024 Project Title – ATLANTIC INTRACOASTAL WATERWAY MAINTENANCE DREDGING FY25
CONTRACT NORTH CAROLINA
Amendment No. 0002
B. NEW DRAWINGS (ISSUED)
R-1 – Disposal Areas 22 and 23 Typical Sections and Details o Provides reference for DA23 Typical Dike Embankment Section.
…end of summary…
Solicitation No. W912PM24B0006 Contract No. W912PM24XXXXX
ATLANTIC INTRACOASTAL
WATERWAY
MAINTENANCE DREDGING
FY25 CONTRACT
NORTH CAROLINA
AMENDMENT 0002
SPECIFICATIONS
05-AUGUST-2024
FY25 ATLANTIC INTERCOASTAL WATERWAY MAINTENANCE DREDGING AIWWFY25
AMDT0002 W912PM24B0006
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 32 01.00 10 08/23 PROJECT PROGRESS SCHEDULE
01 33 00 08/18, CHG 4: 02/21 SUBMITTAL PROCEDURES
01 35 26 05/24 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 02/19, CHG 1: 08/23 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 11/16, CHG 2: 11/21 QUALITY CONTROL
01 45 00.15 10 11/16, CHG 2: 08/19 RESIDENT MANAGEMENT SYSTEM CONTRACTOR
MODE (RMS CM)
01 50 00 11/20, CHG 2: 08/22 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 08/22 TEMPORARY ENVIRONMENTAL CONTROLS
DIVISION 02 - EXISTING CONDITIONS
02 21 00 09/22 CONSTRUCTION SURVEYS
02 41 00 03/19 DEMOLITION
DIVISION 03 - CONCRETE
03 31 29 02/19 MARINE CONCRETE
DIVISION 05 - METALS
05 05 23.16 08/18 STRUCTURAL WELDING
05 12 00 08/18, CHG 2: 05/21 STRUCTURAL STEEL
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16 ROUGH CARPENTRY
DIVISION 31 - EARTHWORK
31 01 00 04/19 DIKE EMBANKMENT
31 11 00.10 03/19 CLEARING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 10/06 SEEDING
DIVISION 33 - UTILITIES
33 40 02 03/19 SPILLWAY SYSTEM
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 23 08/20
35 20 23.33 02/22
DREDGING
NATIONAL DREDGE QUALITY MANAGEMENT PROGRAM -
PIPELINE HYDRAULIC DREDGE
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS
***AMDT0002***
k7ecpreb Cross-Out
FY25 ATLANTI C I NTERCOASTAL WATERWAY MAI NTENANCE DREDGI NG AI WWFY25
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 01. 00 10
PROJECT PROGRESS SCHEDULE
08/ 23
PART 1 GENERAL
1. 1 REFERENCES
1. 2 SUBMI TTALS
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
PART 2 PRODUCTS
2. 1 SOFTWARE
2. 1. 1 Gover nment Def aul t Sof t war e
2. 1. 2 Cont r act or Sof t war e
2. 1. 2. 1 Pr i maver a
2. 1. 2. 2 Ot her Than Pr i maver a
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
3. 1. 1 Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO)
3. 2 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 2. 1 Level of Det ai l Requi r ed
3. 2. 2 Act i v i t y Dur at i ons
3. 2. 3 Pr ocur ement Act i v i t i es
3. 2. 4 Mandat or y Act i v i t i es
3. 2. 5 Gover nment Act i v i t i es
3. 2. 6 St andar d Act i v i t y Codi ng Di ct i onar y
3. 2. 6. 1 Wor ker s Per Day ( WRKP)
3. 2. 6. 2 Ar ea of Wor k Codi ng ( AREA)
3. 2. 6. 3 Modi f i cat i on Number ( MODF)
3. 2. 6. 4 Bi d I t em Codi ng ( BI DI )
3. 2. 7 Cont r act Mi l est ones and Const r ai nt s
3. 2. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
3. 2. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
3. 2. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
3. 2. 7. 3. 1 St ar t Phase
3. 2. 7. 3. 2 End Phase
3. 2. 8 Adver se Weat her
3. 2. 9 Cal endar s
3. 2. 10 Open Ended Logi c
3. 2. 11 Def aul t Pr ogr ess Dat a Di sal l owed
3. 2. 12 Out - of - Sequence Pr ogr ess
3. 2. 13 Added and Del et ed Act i v i t i es
3. 2. 14 Or i gi nal Dur at i ons
3. 2. 15 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
3. 2. 16 Ret ai ned Logi c
3. 2. 17 Per cent Compl et e
3. 2. 18 Remai ni ng Dur at i on
SECTI ON 01 32 01. 00 10 Page 1
3. 2. 19 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
3. 3 PROJECT SCHEDULE SUBMI SSI ONS
3. 3. 1 I ni t i al Pr oj ect Schedul e Submi ssi on
3. 3. 2 Per i odi c Schedul e Updat es
3. 4 SUBMI SSI ON REQUI REMENTS
3. 4. 1 El ect r oni c Schedul i ng Dat a
3. 4. 2 Net wor k Di agr am
3. 4. 2. 1 Cont i nuous Fl ow
3. 4. 2. 2 Pr oj ect Mi l est one Dat es
3. 4. 2. 3 Cr i t i cal Pat h
3. 4. 2. 4 Gr oupi ng and Sor t i ng
3. 5 WEEKLY PROGRESS MEETI NGS
3. 6 REQUESTS FOR TI ME EXTENSI ONS
3. 6. 1 Just i f i cat i on of Del ay
3. 6. 2 Ti me Ext ensi ons f or Unusual l y Sever e Weat her
3. 6. 3 Changes That Do Not Cause Del ay
3. 6. 4 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)
3. 6. 5 Fr agment ar y Net wor k ( Fr agment )
3. 6. 6 Ti me Ext ensi on
3. 6. 7 I mpact t o Ear l y Compl et i on Schedul e
3. 7 FAI LURE TO ACHI EVE PROGRESS
3. 7. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess
3. 7. 2 Fai l ur e t o Per f or m
3. 7. 3 Recover y Schedul e
3. 8 OWNERSHI P OF FLOAT
3. 9 TRANSFER OF SCHEDULE DATA I NTO RESI DENT MANAGEMENT SYSTEM
3. 10 PRI MAVERA P6 MANDATORY REQUI REMENTS
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 32 01. 00 10 Page 2
SECTI ON 01 32 01. 00 10
PROJECT PROGRESS SCHEDULE
08/ 23
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AACE I NTERNATI ONAL ( AACE)
AACE 29R- 03 ( 2011) For ensi c Schedul e Anal ysi s
AACE 52R- 06 ( 2006) Ti me I mpact Anal ysi s - As Appl i ed i n Const r uct i on
AACE 84R- 13 ( 2015) Pl anni ng and Account i ng f or Adver se Weat her
AMERI CAN SOCI ETY OF CI VI L ENGI NEERS ( ASCE)
ASCE 67- 17 ( 2017) Schedul e Del ay Anal ysi s
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
ER 1- 1- 11 ( 2017) Admi ni st r at i on - - Pr oj ect Schedul es
1. 2 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00
SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Pr oj ect Schedul er Qual i f i cat i ons;
I ni t i al Pr oj ect Schedul e; G
Per i odi c Schedul e Updat e; G
1. 3 PROJECT SCHEDULER QUALI FI CATI ONS
The cont r act or shal l desi gnat e an aut hor i zed r epr esent at i ve t o be r esponsi bl e f or t he pr epar at i on of t he schedul e and al l r equi r ed updat i ng and pr oduct i on of r epor t s. The Desi gnat ed Pr oj ect Schedul er must have pr epar ed and mai nt ai ned at l east t hr ee pr evi ous const r uct i on schedul es f or pr oj ect s of s i mi l ar s i ze and compl exi t y t o t hi s cont r act , usi ng Pr i maver a P6. . Repr esent at i ve must have a compr ehensi ve knowl edge of CPM schedul i ng pr i nci pl es and appl i cat i on.
SECTI ON 01 32 01. 00 10 Page 3
PART 2 PRODUCTS
2. 1 SOFTWARE
The schedul i ng sof t war e ut i l i zed t o pr oduce and updat e t he schedul es r equi r ed her ei n must be capabl e of meet i ng al l r equi r ement s of t hi s speci f i cat i on.
2. 1. 1 Gover nment Def aul t Sof t war e
The Gover nment uses Pr i maver a P6. Ensur e expor t ed schedul e f i l es ar e compat i bl e wi t h t he ver si on of P6 and/ or Mi cr osof t Pr oj ect Pr of essi onal 2016 ( or l at er ) used by t he Gover nment .
2. 1. 2 Cont r act or Sof t war e
Schedul i ng sof t war e used by t he cont r act or must be commer ci al l y avai l abl e f r om t he sof t war e vendor f or pur chase wi t h vendor sof t war e suppor t agr eement s avai l abl e. The sof t war e r out i ne used t o cr eat e t he r equi r ed SDEF f i l e must be cr eat ed and suppor t ed by t he sof t war e manuf act ur er .
2. 1. 2. 1 Pr i maver a
I f Pr i maver a P6 i s sel ect ed f or use, pr ovi de t he " xer " expor t f i l e i n a ver si on of P6 i mpor t abl e by t he Gover nment syst em. Ver i f y at t he SEKO meet i ng whi ch ver si on of P6 i s i n use by t he Gover nment . Expor t t he schedul e i n a ver si on of P6 no newer t han t hat used by t he Gover nment .
2. 1. 2. 2 Ot her Than Pr i maver a
I f t he Cont r act or chooses sof t war e ot her t han Pr i maver a P6 or Mi cr osof t Pr oj ect Pr of essi onal 2016, t hat i s compl i ant wi t h t hi s speci f i cat i on, t he cont r act or must r equest per mi ssi on f r om t he Gover nment t o use t he sof t war e pr i or t o submi ssi on of associ at ed submi t t al s.
PART 3 EXECUTI ON
3. 1 GENERAL REQUI REMENTS
Pur suant t o t he Cont r act Cl ause FAR 52. 236- 15, SCHEDULES FOR CONSTRUCTI ON CONTRACTS, a pr oj ect schedul e as descr i bed i n t hi s par agr aph PROGRESS SCHEDULE shal l be pr epar ed and submi t t ed. The Cont r act or shal l pr ovi de t he pr oj ect schedul e i n t he Pr ecedence Di agr am Met hod ( PDM) usi ng t he St andar d Dat a Exchange For mat ( SDEF) . The pr oj ect schedul e shal l be used t o measur e pr ogr ess of t he wor k, t o eval uat e pot ent i al t i me ext ensi ons and t o pr ovi de a basi s f or al l pr ogr ess payment s. I t shal l be i n suf f i c i ent det ai l t o pr oper l y moni t or and manage t he wor k and as a mi ni mum shal l i ncl ude t he f ol l owi ng:
a. t he wor k shal l be di v i ded i nt o act i v i t i es by accept ance sect i on and phase of wor k ( e. g. pr econst r uct i on st r uct ur e and pr oper t y condi t i on sur veys, bl ast i ng, dr edgi ng)
b. separ at e act i v i t i es shal l r ef l ect each mobi l i zat i on and demobi l i zat i on of each maj or pl ant
c. act i v i t i es shal l be i dent i f i ed by associ at ed bi d i t em
d. al l r equi r ed and pr oposed submi ssi ons shal l be i ncl uded i n t he
SECTI ON 01 32 01. 00 10 Page 4 pr ogr ess schedul e
e. Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess shal l be shown ( e. g. Gover nment sur veys, navi gat i on ai d r el ocat i ons, et c. )
The schedul e shal l ext end f r om NTP t o t he est abl i shed cont r act compl et i on dat e.
The i ni t i al pr ogr ess schedul e shal l be i ncl uded wi t h t he sol i c i t at i on pr oposal and demonst r at e t hat t he pr oposed pl ant and r esour ces ar e capabl e of per f or mi ng t he wor k as schedul ed. The schedul i ng of const r uct i on i s t he r esponsi bi l i t y of t he Cont r act or . Cont r act or management per sonnel must act i vel y par t i c i pat e i n i t s devel opment . Subcont r act or s and suppl i er s wor ki ng on t he pr oj ect must al so cont r i but e i n devel opi ng and mai nt ai ni ng an accur at e Pr oj ect Schedul e. Per i odi c schedul e updat es shal l be pr ovi ded mont hl y wi t h each payment r equest , and whenever t her e i s a change i n l ogi c or t i me ext ensi on. Each submi ssi on shal l i ncl ude t he dat a di sks cont ai ni ng t he pr oj ect schedul e adher i ng t o t he SDEF f or mat speci f i ed i n ER 1- 1- 11, Appendi x A; t he ear ni ngs r epor t i ndi cat i ng mont hl y and cumul at i ve ear ni ngs;
a nar r at i ve r epor t wi t h a descr i pt i on of t he act i v i t i es i dent i f y i ng t he cr i t i cal pat h( s) , cur r ent or ant i c i pat ed pr obl ems of del ays and t hei r i mpact , and pr oposed cor r ect i ve act i ons; and t he schedul e r epor t s cont ai ni ng act i v i t y number , act i v i t y descr i pt i on, or i gi nal dur at i on, r emai ni ng dur at i on, ear l y st ar t dat e, ear l y f i ni sh dat e, l at e st ar t dat e, l at e f i ni sh dat e and t ot al f l oat . The schedul e r epor t s shal l be sor t ed as act i v i t y r epor t , l ogi c r epor t l i s t i ng pr ecedi ng and succeedi ng act i v i t i es f or each act i v i t y, t ot al f l oat r epor t l i s t ed i n ascendi ng or der by ear l y st at e dat e, ear l y st at e sor t and ear ni ng r epor t . A net wor k di agr am shal l be submi t t ed wi t h t he i ni t i al submi ssi on and each updat e. The net wor k di agr am shal l depi ct t he or der , sequence and i nt er dependence of act i v i t i es, shal l c l ear l y i ndi cat e mi l est one dat es and pr oj ect ed ear l y and l at e ear ni ngs.
I n t he event t hat t he Cont r act i ng Of f i cer di r ect s schedul e r evi s i ons and t hose r evi s i ons have not been i ncl uded i n subsequent Pr oj ect Schedul e r evi s i ons or updat es, t he Cont r act i ng Of f i cer may wi t hhol d 10 per cent of pay r equest amount f r om each payment per i od unt i l such r evi s i ons t o t he pr oj ect schedul e have been made
3. 1. 1 Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO)
I n conj unct i on wi t h t he post awar d conf er ence or pr e const r uct i on conf er ence t he Gover nment and t he Cont r act or wi l l hol d a separ at e and di st i nct Schedul i ng Expect at i ons Ki ckof f Meet i ng( SEKO) . The i nt ent of t hi s meet i ng i s f or t he Gover nment t o r evi ew wi t h t he cont r act or t he r equi r ement s of t he schedul i ng speci f i cat i on, communi cat e t he Gover nment ’ s expect at i ons r egar di ng schedul e devel opment and management , and answer any quest i ons t he Cont r act or may have r egar di ng t he schedul e r equi r ement s.
3. 2 PROJECT SCHEDULE DETAI LED REQUI REMENTS
3. 2. 1 Level of Det ai l Requi r ed
Devel op t he Pr oj ect Schedul e t o t he appr opr i at e l evel of det ai l t o addr ess maj or mi l est ones and t o al l ow f or sat i sf act or y pr oj ect pl anni ng and execut i on. Fai l ur e t o devel op t he Pr oj ect Schedul e t o an appr opr i at e l evel of det ai l wi l l r esul t i n i t s di sappr oval . The Cont r act i ng Of f i cer wi l l consi der , but i s not l i mi t ed t o, t he f ol l owi ng char act er i st i cs and r equi r ement s t o det er mi ne appr opr i at e l evel of det ai l :
SECTI ON 01 32 01. 00 10 Page 5
- Dr edgi ng sequenci ng
- Dr edgi ng pl ant ( s) t ype, s i ze, and ant i c i pat ed dai l y pr oduct i on r at e( s)
- Envi r onment al wi ndows t o i ncl ude appl i cabl e mobi l i zat i on and demobi l i zat i on of equi pment t o i ncl ude but not l i mi t ed t o pi pel i ne
- Accept ance Sect i ons ( by Reach per cont r act dr awi ngs and/ or cont r act or r equest ed ar eas appr oved by t he Gover nment )
- Mobi l i zat i on and demobi l i zat i on dur at i ons
- Mi ni mum of one act i v i t y per CLI N
- Pl acement Ar ea Wor k ( i f appl i cabl e)
- Submi t t ed schedul e t i mel i ne cal endar days f or each mont h mat ches t he cal endar days per mont h f or t he r espect i ve year
3. 2. 2 Act i v i t y Dur at i ons
Reasonabl e act i v i t y dur at i ons ar e t hose t hat al l ow t he pr ogr ess of ongoi ng act i v i t i es t o be accur at el y det er mi ned bet ween updat e per i ods.
Non- pr ocur ement act i v i t i es Or i gi nal Dur at i ons ( OD) ar e not t o exceed 20 wor kdays or 30 cal endar days.
3. 2. 3 Pr ocur ement Act i v i t i es
I ncl ude i n t he schedul e act i v i t i es, i f appl i cabl e, associ at ed wi t h t he cr i t i cal submi t t al s and t hei r appr oval s, pr ocur ement , f abr i cat i on, and del i ver y of l ong l ead mat er i al s, equi pment , f abr i cat ed assembl i es, and suppl i es. Long l ead pr ocur ement act i v i t i es ar e t hose wi t h an ant i c i pat ed pr ocur ement sequence of over 90 cal endar days.
3. 2. 4 Mandat or y Act i v i t i es
I ncl ude t he f ol l owi ng act i v i t i es i n t he i ni t i al pr oj ect schedul e and al l updat es f or each r espect i ve dr edge ar ea or r each .
a. Submi ssi on, r evi ew and accept ance of SD- 01 Pr econst r uct i on Submi t t al s ( i ndi v i dual act i v i t y f or each t o i ncl ude but not l i mi t ed t o QCP, APP, and EPP) .
b. Envi r onment al Wi ndows ( st ar t t o f i ni sh)
c. Accept ance Sect i ons ( as appr oved by Govt )
d. Pl acement Ar ea & Spi l l way Sur vey and I nspect i ons - Pr e- Dr edge
e. Pl acement Ar ea & Spi l l way Sur vey and I nspect i ons - Post - Dr edge f . Beach Pl acement I nspect i on w/ Agenci es - Pr e- Dr edge
g. Beach Pl acement I nspect i on w/ Agenci es - Post - Dr edge
h. Mobi l i zat i on i . Demobi l i zat i on
3. 2. 5 Gover nment Act i v i t i es
Show i n schedul e, Gover nment and ot her agency act i v i t i es t hat coul d i mpact pr ogr ess. These act i v i t i es i ncl ude, but ar e not l i mi t ed t o envi r onment al per mi t appr oval s by St at e r egul at or s, i nspect i ons, sur veys ( bef or e dr edge
SECTI ON 01 32 01. 00 10 Page 6
( B/ D) and af t er dr edge ( A/ D) ) , and Not i ce t o Pr oceed ( NTP) f or phasi ng r equi r ement s.
3. 2. 6 St andar d Act i v i t y Codi ng Di ct i onar y
Use t he act i v i t y codi ng st r uct ur e def i ned i n t he St andar d Dat a Exchange For mat ( SDEF) i n ER 1- 1- 11. Thi s exact st r uct ur e i s mandat or y. Devel op and assi gn al l Act i v i t y Codes t o act i v i t i es as det ai l ed her ei n.
The SDEF f or mat i s as f ol l ows:
Fi el d Act i v i t y Code
Lengt h Descr i pt i on
1 WRKP 3 Wor ker s per day
2 AREA 4 Ar ea of wor k ( GOVERNMENT APPROVED
ACCEPTANCE WORK)
3 MODF 6 Modi f i cat i on Number
4 BI DI 6 Bi d I t em ( CLI N)
* Some syst ems r equi r e t hat FEATURE OF WORK val ues be pl aced i n sever al act i v i t y code f i el ds. The not at i on shown i s f or Pr i maver a P6. Ref er t o t he speci f i c sof t war e gui del i nes wi t h r espect t o t he FEATURE OF WORK f i el d r equi r ement s.
3. 2. 6. 1 Wor ker s Per Day ( WRKP)
Assi gn Wor ker s per Day f or al l f i el d const r uct i on or di r ect wor k act i v i t i es, i f di r ect ed by t he Cont r act i ng Of f i cer . Wor ker s per day i s based on t he aver age number of wor ker s expect ed each day t o per f or m a t ask f or t he dur at i on of t hat act i v i t y.
3. 2. 6. 2 Ar ea of Wor k Codi ng ( AREA)
Assi gn Wor k Ar ea code t o act i v i t i es based upon t he Govt appr oved Accept ance Sect i on wor k ar ea i n whi ch t he act i v i t y occur s.
Not al l act i v i t i es ar e r equi r ed t o be Wor k Ar ea coded. A l ack of Wor k Ar ea codi ng i ndi cat es t he act i v i t y i s not r esour ce or space const r ai ned.
3. 2. 6. 3 Modi f i cat i on Number ( MODF)
Assi gn a Modi f i cat i on Number Code t o any act i v i t y or sequence of act i v i t i es added t o t he schedul e as a r esul t of a Cont r act Modi f i cat i on, when appr oved by Cont r act i ng Of f i cer . Key al l Code val ues t o t he Gover nment ' s modi f i cat i on number i ng syst em. An act i v i t y can have onl y one Modi f i cat i on Number Code.
3. 2. 6. 4 Bi d I t em Codi ng ( BI DI )
Assi gn a Bi d I t em Code t o al l act i v i t i es usi ng t he Cont r act Li ne I t em Number ( CLI N) t o whi ch t he act i v i t y bel ongs, even when an act i v i t y i s not cost l oaded. An act i v i t y can have onl y one BI DI ( CLI N) Code.
SECTI ON 01 32 01. 00 10 Page 7
3. 2. 7 Cont r act Mi l est ones and Const r ai nt s
Mi l est one act i v i t i es ar e t o be used f or s i gni f i cant pr oj ect event s i ncl udi ng, but not l i mi t ed t o, pr oj ect phasi ng, pr oj ect st ar t and end act i v i t i es, or i nt er i m compl et i on dat es. The use of ar t i f i c i al f l oat const r ai nt s such as " zer o f r ee f l oat " or " zer o t ot al f l oat " ar e pr ohi bi t ed.
Mandat or y const r ai nt s t hat i gnor e or ef f ect net wor k l ogi c ar e pr ohi bi t ed.
No const r ai ned dat es ar e al l owed i n t he schedul e ot her t han t hose speci f i ed her ei n. Submi t addi t i onal const r ai nt s t o t he Cont r act i ng Of f i cer f or appr oval on a case by case basi s.
3. 2. 7. 1 Pr oj ect St ar t Dat e Mi l est one and Const r ai nt
The f i r st act i v i t y i n t he pr oj ect schedul e must be a st ar t mi l est one t i t l ed " NTP Acknowl edged, " whi ch must have a " St ar t On" const r ai nt dat e equal t o t he dat e t hat t he NTP i s acknowl edged.
3. 2. 7. 2 End Pr oj ect Fi ni sh Mi l est one and Const r ai nt
The l ast act i v i t y i n t he schedul e must be a f i ni sh mi l est one t i t l ed " End Pr oj ect . "
Const r ai n t he pr oj ect schedul e t o t he Cont r act Compl et i on Dat e i n such a way t hat i f t he schedul e cal cul at es an ear l y f i ni sh, t hen t he f l oat cal cul at i on f or " End Pr oj ect " mi l est one r ef l ect s posi t i ve f l oat on t he l ongest pat h. I f t he pr oj ect schedul e cal cul at es a l at e f i ni sh, t hen t he " End Pr oj ect " mi l est one f l oat cal cul at i on r ef l ect s negat i ve f l oat on t he l ongest pat h.
3. 2. 7. 3 I nt er i m Compl et i on Dat es and Const r ai nt s
Const r ai n cont r act ual l y speci f i ed i nt er i m compl et i on dat es ( t o i ncl ude appl i cabl e Envi r onment al Wi ndows) t o show negat i ve f l oat when t he cal cul at ed l at e f i ni sh dat e of t he l ast act i v i t y i n t hat phase i s l at er t han t he speci f i ed i nt er i m compl et i on dat e.
3. 2. 7. 3. 1 St ar t Phase
Use a st ar t mi l est one as t he f i r st act i v i t y f or a pr oj ect phase. Cal l t he st ar t mi l est one " St ar t Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 2. 7. 3. 2 End Phase
Use a f i ni sh mi l est one as t he l ast act i v i t y f or a pr oj ect phase. Cal l t he f i ni sh mi l est one " End Phase X" wher e " X" r ef er s t o t he phase of wor k.
3. 2. 8 Adver se Weat her
Ensur e ant i c i pat ed adver se weat her i s account ed f or i n t he Pr oj ect Schedul e. AACE 84R- 13 pr ovi des met hodol ogi es f or t echni ques i n pl anni ng f or adver se weat her . The pr ef er r ed met hodol ogy i s t he use of a weat her cal endar . I f a met hod ot her t han a weat her cal endar i s pr oposed t he di scuss t he r eason dur i ng t he SEKO meet i ng.
3. 2. 9 Cal endar s
Schedul e act i v i t i es on a Cal endar t o whi ch t he act i v i t y l ogi cal l y
SECTI ON 01 32 01. 00 10 Page 8 bel ongs. Devel op cal endar s t o accommodat e any cont r act def i ned wor k per i od such as a 7- day cal endar f or Gover nment Accept ance act i v i t i es, Envi r onment al Wi ndows, , et c. Devel op t he def aul t Cal endar t o mat ch t he physi cal wor k pl an wi t h non- wor k per i ods i dent i f i ed i ncl udi ng weekends and hol i days. Devel op Seasonal Cal endar ( s) and assi gn t o seasonal l y af f ect ed act i v i t i es as appl i cabl e.
I f a weat her cal endar i s used i t s i mpl ement at i on and execut i on i s t o be i n accor dance wi t h AACE 84R- 13
3. 2. 10 Open Ended Logi c
Onl y t wo open ended act i v i t i es ar e al l owed: t he f i r st act i v i t y " NTP Acknowl edged" i s t o have no pr edecessor l ogi c, and t he l ast act i v i t y - " End Pr oj ect " i s t o have no successor l ogi c. Except as not ed above al l act i v i t i es ar e t o have at l east a st ar t - t o- st ar t or f i ni sh- t o- st ar t r el at i onshi p wi t h i t s pr edecessor ( s) and a f i ni sh- t o- f i ni sh or f i ni sh- t o- st ar t r el at i onshi p wi t h i t s successor ( s) .
Pr edecessor open ended l ogi c may be al l owed i n a t i me i mpact anal yses upon t he Cont r act i ng Of f i cer ' s appr oval .
3. 2. 11 Def aul t Pr ogr ess Dat a Di sal l owed
Act ual St ar t and Fi ni sh dat es must not aut omat i cal l y updat e wi t h def aul t mechani sms i ncl uded i n t he schedul i ng sof t war e. Updat i ng of t he per cent compl et e and t he r emai ni ng dur at i on of any act i v i t y must be i ndependent f unct i ons. Di sabl e pr ogr am f eat ur es t hat cal cul at e one of t hese par amet er s f r om t he ot her . Act i v i t y Act ual St ar t ( AS) and Act ual Fi ni sh ( AF) dat es assi gned dur i ng t he updat i ng pr ocess must mat ch t hose dat es pr ovi ded i n t he Cont r act or Qual i t y Cont r ol Repor t s. Fai l ur e t o document t he AS and AF dat es i n t he Dai l y Qual i t y Cont r ol r epor t wi l l r esul t i n di sappr oval of t he Cont r act or ' s schedul e.
3. 2. 12 Out - of - Sequence Pr ogr ess
Act i v i t i es t hat have pr ogr essed bef or e al l pr ecedi ng l ogi c has been sat i sf i ed ( Out - of - Sequence Pr ogr ess) wi l l be al l owed onl y on a case- by- case basi s subj ect t o appr oval by t he Cont r act i ng Of f i cer .
Pr opose l ogi c cor r ect i ons t o el i mi nat e out of sequence pr ogr ess or j ust i f y not changi ng t he sequenci ng f or appr oval pr i or t o submi t t i ng an updat ed pr oj ect schedul e. Addr ess out of sequence pr ogr ess or l ogi c changes i n t he Nar r at i ve Repor t and i n t he per i odi c schedul e updat e meet i ngs.
3. 2. 13 Added and Del et ed Act i v i t i es
Do not del et e act i v i t i es f r om t he pr oj ect schedul e or add new act i v i t i es t o t he schedul e wi t hout appr oval f r om t he Cont r act i ng Of f i cer . Act i v i t y I D and descr i pt i on changes ar e consi der ed new act i v i t i es and cannot be changed wi t hout Cont r act i ng Of f i cer appr oval .
3. 2. 14 Or i gi nal Dur at i ons
Act i v i t y Or i gi nal Dur at i ons ( OD) must be r easonabl e t o per f or m t he wor k i t em. OD changes ar e pr ohi bi t ed unl ess j ust i f i cat i on i s pr ovi ded and appr oved by t he Cont r act i ng Of f i cer .
SECTI ON 01 32 01. 00 10 Page 9
3. 2. 15 Leads, Lags, and St ar t t o Fi ni sh Rel at i onshi ps
Lags must be r easonabl e as det er mi ned by t he Gover nment and not used i n pl ace of r eal i st i c or i gi nal dur at i ons, must not be i n pl ace t o ar t i f i c i al l y absor b or cr eat e f l oat , or t o r epl ace pr oper schedul e l ogi c.
a. Leads ( negat i ve l ags) ar e pr ohi bi t ed.
b. St ar t t o Fi ni sh ( SF) r el at i onshi ps ar e pr ohi bi t ed.
3. 2. 16 Ret ai ned Logi c
Schedul e cal cul at i ons must r et ai n t he l ogi c bet ween pr edecessor s and successor s ( " r et ai ned l ogi c" mode) even when t he successor act i v i t y( s) st ar t s and t he pr edecessor act i v i t y( s) has not f i ni shed ( out - of - sequence pr ogr ess) . Sof t war e f eat ur es t hat i n ef f ect sever t he t i e bet ween pr edecessor and successor act i v i t i es when t he successor has st ar t ed and t he pr edecessor l ogi c i s not sat i sf i ed ( " pr ogr ess over r i de" ) ar e not be al l owed.
3. 2. 17 Per cent Compl et e
Updat e t he per cent compl et e f or each act i v i t y st ar t ed, based on t he r eal i st i c assessment of ear ned val ue or quant i t y of mat er i al dr edged.
Act i v i t i es whi ch ar e compl et e but f or r emai ni ng mi nor punch l i s t wor k and whi ch do not r est r ai n t he i ni t i at i on of successor act i v i t i es may be decl ar ed 100 per cent compl et e t o al l ow f or pr oper schedul e management .
Budget ed cost of act i v i t y i s t o be r educed by t he amount needed t o cor r ect def i c i ency. The act i v i t y r ef er enced i n par agr aph COST LOADI NG of CLOSEOUT ACTI VI TI ES must have i t s budget ed cost i ncr eased by t hi s amount .
3. 2. 18 Remai ni ng Dur at i on
Updat e t he r emai ni ng dur at i on f or each act i v i t y based on t he number of est i mat ed wor kdays i t wi l l t ake t o compl et e t he act i v i t y. Remai ni ng dur at i on may not mat hemat i cal l y cor r el at e wi t h per cent age f ound under par agr aph ent i t l ed Per cent Compl et e. The r emai ni ng dur at i on f or unst ar t ed act i v i t i es ar e not t o be l ess t han i t s or gi nal dur at i on.
3. 2. 19 Ear l y Compl et i on Schedul e and t he Ri ght t o Fi ni sh Ear l y
An Ear l y Compl et i on Schedul e i s an I ni t i al Pr oj ect Schedul e ( I PS) t hat i ndi cat es al l scope of t he r equi r ed cont r act wor k wi l l be compl et ed bef or e t he cont r act ual l y r equi r ed compl et i on dat e.
a. No I PS i ndi cat i ng an Ear l y Compl et i on wi l l be accept ed wi t hout bei ng f ul l y r esour ce- l oaded ( i ncl udi ng cr ew si zes and manhour s) and t he Gover nment agr eei ng t hat t he schedul e i s r easonabl e and achi evabl e.
b. The Gover nment i s under no obl i gat i on t o accel er at e wor k i t ems i t i s r esponsi bl e f or t o ensur e t hat t he ear l y compl et i on i s met nor i s i t r esponsi bl e t o modi f y i ncr ement al f undi ng ( i f appl i cabl e) f or t he pr oj ect t o meet t he cont r act or ' s accel er at ed wor k.
3. 3 PROJECT SCHEDULE SUBMI SSI ONS
Pr ovi de t he submi ssi ons as descr i bed bel ow. The dat a r epor t s and net wor k di agr ams r equi r ed f or each submi ssi on ar e cont ai ned i n par agr aph SUBMI SSI ON REQUI REMENTS. I f t he Cont r act or f ai l s or r ef uses t o f ur ni sh
SECTI ON 01 32 01. 00 10 Page 10 t he i nf or mat i on and schedul e updat es as set f or t h her ei n, t he Cont r act or wi l l be deemed not t o have pr ovi ded an est i mat e upon whi ch a pr ogr ess payment can be made.
Revi ew comment s made by t he Gover nment on t he schedul e( s) do not r el i eve t he Cont r act or f r om compl i ance wi t h r equi r ement s of t he Cont r act Document s.
3. 3. 1 I ni t i al Pr oj ect Schedul e Submi ssi on
Submi t t he I ni t i al Pr oj ect Schedul e f or appr oval wi t hi n wi t hi n 15 cal endar days af t er t he NTP i s acknowl edged. The schedul e must demonst r at e a r easonabl e and r eal i st i c sequence of act i v i t i es whi ch r epr esent al l wor k t hr ough t he ent i r e cont r act per f or mance per i od. No payment wi l l be made f or wor k i t ems not f ul l y det ai l ed i n t he Pr oj ect Schedul e.
3. 3. 2 Per i odi c Schedul e Updat es
Updat e t he Pr oj ect Schedul e on a r egul ar basi s, mont hl y at a mi ni mum , and wi t h al l r equest ed payment appl i cat i ons per t he f ol l owi ng: .
a. Updat e i nf or mat i on i ncl udi ng Act ual St ar t Dat es ( AS) , Act ual Fi ni sh Dat es ( AF) , Remai ni ng Dur at i ons ( RD) , and Per cent Compl et e. Updat ed i nf or mat i on i s subj ect t o t he appr oval of t he Gover nment at t he meet i ng.
b. AS and AF dat es must mat ch t he dat e( s) r epor t ed on t he Cont r act or ' s Qual i t y Cont r ol Repor t f or an act i v i t y st ar t or f i ni sh.
3. 4 SUBMI SSI ON REQUI REMENTS
Submi t t he f ol l owi ng i t ems f or t he I ni t i al Schedul e, and ever y Per i odi c Schedul e Updat e t hr oughout t he l i f e of t he pr oj ect :
3. 4. 1 El ect r oni c Schedul i ng Dat a
Pr ovi de el ect r oni c schedul i ng dat a cont ai ni ng t he cur r ent pr oj ect schedul e and al l pr evi ousl y submi t t ed schedul es i n t he f or mat of t he schedul i ng sof t war e ( e. g. . xer ) and Adobe PDF ( e. g. . pdf ) v i a RMS, emai l , and/ or CD/ DVD as per ar r angement wi t h Pr oj ect Engi neer . Each schedul e must have a uni que f i l e name and use pr oj ect speci f i c set t i ngs t o i ncl ude cont r act number and dat a dat e. The f i l e nami ng convent i on i s t o be det er mi ned at SEKO meet i ng.
3. 4. 2 Net wor k Di agr am
The Net wor k Di agr am i s r equi r ed f or t he I ni t i al and Per i odi c Updat es.
Depi ct and di spl ay t he or der and i nt er dependence of act i v i t i es and t he sequence i n whi ch t he wor k i s t o be accompl i shed. The Cont r act i ng Of f i cer wi l l use, but i s not l i mi t ed t o, t he f ol l owi ng condi t i ons t o r evi ew compl i ance wi t h t hi s par agr aph:
3. 4. 2. 1 Cont i nuous Fl ow
Show a cont i nuous f l ow f r om l ef t t o r i ght wi t h no ar r ows f r om r i ght t o l ef t . Show t he act i v i t y number , descr i pt i on, dur at i on, and est i mat ed ear ned val ue on t he di agr am.
SECTI ON 01 32 01. 00 10 Page 11
3. 4. 2. 2 Pr oj ect Mi l est one Dat es
Show dat es on t he di agr am f or st ar t of pr oj ect , any cont r act r equi r ed i nt er i m compl et i on dat es, and cont r act compl et i on dat es.
3. 4. 2. 3 Cr i t i cal Pat h
Show al l act i v i t i es on t he cr i t i cal pat h. The cr i t i cal pat h i s def i ned as t he l ongest pat h.
3. 4. 2. 4 Gr oupi ng and Sor t i ng
Gr oup and sor t act i v i t i es as di r ect ed t o assi st i n t he under st andi ng of t he act i v i t y sequence. Typi cal l y, t hi s f l ow wi l l gr oup act i v i t i es by maj or el ement s of wor k, cat egor y of wor k, wor k ar ea and/ or r esponsi bi l i t y .
3. 5 WEEKLY PROGRESS MEETI NGS
Conduct a weekl y meet i ng wi t h t he Gover nment and use t he cur r ent appr oved schedul e updat e f or t he pur poses of t hi s meet i ng and f or t he pr oduct i on and r evi ew of r epor t s. At t he weekl y pr ogr ess meet i ng, addr ess t he st at us of RFI s, RFPs and Submi t t al s.
3. 6 REQUESTS FOR TI ME EXTENSI ONS
ASCE 67- 17 pr ovi des del ay anal ysi s gui del i nes. I f t her e i s a conf l i c t bet ween t he cont r act and gui dance pr ovi ded i n ASCE 67- 17, t he cont r act wi l l gover n. Pr ovi de j ust i f i cat i on of del ay t o t he Cont r act i ng Of f i cer i n accor dance wi t h t he cont r act pr ovi s i ons and cl auses f or appr oval , wi t hi n 10 days of a del ay occur i ng. Al so pr epar e a t i me i mpact anal ysi s f or each Gover nment r equest f or pr oposal ( RFP) .
3. 6. 1 Just i f i cat i on of Del ay
Pr ovi de a descr i pt i on of t he event ( s) t hat caused t he del ay and/ or i mpact t o t he wor k. As par t of t he descr i pt i on, i dent i f y al l schedul e act i v i t i es i mpact ed. Show t hat t he event t hat caused t he del ay/ i mpact was t he r esponsi bi l i t y of t he Gover nment . Pr ovi de a t i me i mpact anal ysi s t hat demonst r at es t he ef f ect s of t he del ay or i mpact on t he pr oj ect compl et i on dat e, or i nt er i m compl et i on dat e( s) . Eval uat e mul t i pl e i mpact s chr onol ogi cal l y; each wi t h i t s own j ust i f i cat i on of del ay. Wi t h mul t i pl e i mpact s consi der any concur r ences of del ay. A t i me ext ensi on and t he schedul e f r agment becomes par t of t he pr oj ect schedul e and al l f ut ur e schedul e updat es upon appr oval by t he Cont r act i ng Of f i cer .
3. 6. 2 Ti me Ext ensi ons f or Unusual l y Sever e Weat her
( a) Thi s pr ovi s i on speci f i es t he pr ocedur e f or det er mi nat i on of t i me ext ensi ons f or unusual l y sever e weat her i n accor dance wi t h t he cont r act c l ause ent i t l ed " DEFAULT ( FI XED- PRI CE CONSTRUCTI ON) . " I n or der f or t he Cont r act i ng Of f i cer t o awar d a t i me ext ensi on under t hi s c l ause, t he f ol l owi ng condi t i ons must be f ound t o be sat i sf i ed i n t he sol e di scr et i on of t he Cont r act i ng Of f i cer :
( 1) The weat her exper i enced at t he pr oj ect s i t e dur i ng t he cont r act per i od must be f ound t o be unusual l y sever e, t hat i s , mor e sever e t han t he adver se weat her ant i c i pat ed f or t he pr oj ect l ocat i on dur i ng any gi ven mont h.
SECTI ON 01 32 01. 00 10 Page 12
( 2) The unusual l y sever e weat her must act ual l y cause a del ay t o t he compl et i on of t he pr oj ect . The del ay must be beyond t he cont r ol and wi t hout t he f aul t or negl i gence of t he Cont r act or .
( b) Upon acknowl edgment of t he Not i ce t o Pr oceed ( NTP) and cont i nui ng t hr oughout t he cont r act , t he Cont r act or shal l r ecor d on t he dai l y CQC r epor t , t he occur r ence of adver se weat her and r esul t ant i mpact t o nor mal l y schedul ed wor k. Act ual adver se weat her del ay days must pr event wor k on cr i t i cal act i v i t i es f or 50 per cent or mor e of t he Cont r act or ' s schedul ed wor k day.
( c) The number of act ual adver se weat her del ay days shal l i ncl ude days i mpact ed by act ual adver se weat her ( even i f adver se weat her occur r ed i n pr evi ous mont h) , be cal cul at ed chr onol ogi cal l y f r om t he f i r st t o t he l ast day of each mont h, and be r ecor ded as f ul l days. The Cont r act i ng Of f i cer wi l l conver t any qual i f y i ng del ays t o cal endar days, gi v i ng f ul l consi der at i on f or equi val ent f ai r weat her wor k days, and i ssue a modi f i cat i on i n accor dance wi t h t he cont r act c l ause ent i t l ed " DEFAULT
( FI XED- PRI CE CONSTRUCTI ON) . "
3. 6. 3 Changes That Do Not Cause Del ay
I f i t i s det er mi ned t hat a change does not const i t ut e a schedul e t i me ext ensi on, a f r agment as descr i bed i n par agr aph FRAGMENTARY NETWORK, i s t o be cr eat ed and i nser t ed i nt o t he Pr oj ect schedul e.
3. 6. 4 Ti me I mpact Anal ysi s ( Pr ospect i ve Anal ysi s)
Pr epar e a t i me i mpact anal ysi s f or appr oval by t he Cont r act i ng Of f i cer based on i ndust r y st andar d AACE 52R- 06. Ut i l i ze a copy of t he l ast appr oved schedul e pr i or t o t he f i r st day of t he i mpact or del ay f or t he t i me i mpact anal ysi s. I f Cont r act i ng Of f i cer det er mi nes t he t i me f r ame bet ween t he l ast appr oved schedul e and t he f i r st day of i mpact i s t oo gr eat , pr epar e an i nt er i m updat ed schedul e t o per f or m t he t i me i mpact anal ysi s. Unl ess appr oved by t he Cont r act i ng Of f i cer , no ot her changes may be i ncor por at ed i nt o t he schedul e bei ng used t o j ust i f y t he t i me i mpact .
3. 6. 5 Fr agment ar y Net wor k ( Fr agment )
Pr epar e a pr oposed f r agment f or t i me i mpact anal ysi s consi st i ng of a sequence of new act i v i t i es t hat ar e pr oposed t o be added t o t he pr oj ect schedul e t o demonst r at e t he i nf l uence of t he del ay or i mpact t o t he pr oj ect ' s cont r act ual dat es. Cl ear l y show how t he pr oposed f r agment i s t o be t i ed i nt o t he pr oj ect schedul e i ncl udi ng al l pr edecessor s and successor s t o t he f r agment act i v i t i es. The pr oposed f r agment must be appr oved by t he Cont r act i ng Of f i cer pr i or t o i ncor por at i on i nt o t he pr oj ect schedul e.
3. 6. 6 Ti me Ext ensi on
The Cont r act i ng Of f i cer must appr ove t he Just i f i cat i on of Del ay i ncl udi ng t he t i me i mpact anal ysi s bef or e a t i me ext ensi on wi l l be gr ant ed. No t i me ext ensi on wi l l be gr ant ed unl ess t he del ay consumes al l avai l abl e Pr oj ect Fl oat and ext ends t he pr oj ect ed f i ni sh dat e ( " End Pr oj ect " mi l est one) beyond t he Cont r act Compl et i on Dat e. The t i me ext ensi on wi l l be i n cal endar days.
Act ual del ays t hat ar e f ound t o be caused by t he Cont r act or ' s own act i ons, SECTI ON 01 32 01. 00 10 Page 13 whi ch r esul t i n a cal cul at ed schedul e del ay, ar e not a cause f or an ext ensi on t o t he per f or mance per i od, compl et i on dat e, or any i nt er i m mi l est one dat e.
3. 6. 7 I mpact t o Ear l y Compl et i on Schedul e
No ext ended over head wi l l be pai d f or del ay pr i or t o t he or i gi nal Cont r act Compl et i on Dat e f or an Ear l y Compl et i on I PS unl ess t he Cont r act or act ual l y per f or med wor k i n accor dance wi t h t hat Ear l y Compl et i on Schedul e. The Cont r act or must show t hat an ear l y compl et i on was achi evabl e had i t not been f or t he i mpact .
3. 7 FAI LURE TO ACHI EVE PROGRESS
Shoul d t he pr ogr ess f al l behi nd t he appr oved pr oj ect schedul e f or r easons ot her t han t hose t hat ar e excusabl e wi t hi n t he t er ms of t he cont r act , t he Cont r act i ng Of f i cer may r equi r e pr ovi s i on of a wr i t t en r ecover y pl an f or appr oval . The pl an must det ai l how pr ogr ess wi l l be made- up t o i ncl ude whi ch act i v i t i es wi l l be accel er at ed by addi ng addi t i onal cr ews, l onger wor k hour s, ext r a wor kdays, et c.
3. 7. 1 Ar t i f i c i al l y I mpr ovi ng Pr ogr ess
Ar t i f i c i al l y i mpr ovi ng pr ogr ess by means such as, but not l i mi t ed t o, r evi s i ng t he schedul e l ogi c, modi f y i ng, or addi ng const r ai nt s, shor t eni ng act i v i t y dur at i ons, or changi ng cal endar s i n t he pr oj ect schedul e i s pr ohi bi t ed. I ndi cat e assumpt i ons made and t he basi s f or any l ogi c, const r ai nt , dur at i on, and cal endar changes used i n t he cr eat i on of t he r ecover y pl an. Any addi t i onal r esour ces, manpower , or dai l y and weekl y wor k hour changes pr oposed i n t he r ecover y pl an must be evi dent at t he wor k s i t e and document ed i n t he dai l y r epor t al ong wi t h t he Schedul e Nar r at i ve Repor t .
3. 7. 2 Fai l ur e t o Per f or m
Fai l ur e t o per f or m wor k and mai nt ai n pr ogr ess i n accor dance wi t h t he suppl ement al r ecover y pl an may r esul t i n an i nt er i m and f i nal unsat i sf act or y per f or mance r at i ng and may r esul t i n cor r ect i ve act i on di r ect ed by t he Cont r act i ng Of f i cer pur suant t o FAR 52. 236- 15 Schedul es f or Const r uct i on Cont r act s, FAR 52. 249- 10 Def aul t ( Fi xed- Pr i ce Const r uct i on) , and ot her cont r act pr ovi s i ons.
3. 7. 3 Recover y Schedul e
Shoul d t he Cont r act i ng Of f i cer f i nd i t necessar y, submi t a r ecover y schedul e pur suant t o FAR 52. 236- 15 Schedul es f or Const r uct i on Cont r act s.
3. 8 OWNERSHI P OF FLOAT
Except f or t he pr ovi s i on gi ven i n t he par agr aph I MPACT TO EARLY COMPLETI ON SCHEDULE, f l oat avai l abl e i n t he schedul e, at any t i me, bel ongs t o t he Pr oj ect and i s avai l abl e f or Cont r act or and Gover nment use. Thi s i ncl udes act i v i t y and pr oj ect f l oat . Act i v i t y f l oat i s t he number of wor kdays t hat an act i v i t y can be del ayed wi t hout causi ng a del ay t o t he " End Pr oj ect " f i ni sh mi l est one. Pr oj ect f l oat ( i f appl i cabl e) i s t he number of wor k days bet ween t he pr oj ect ed ear l y f i ni sh and t he " End Pr oj ect " f i ni sh.
SECTI ON 01 32 01. 00 10 Page 14
3. 9 TRANSFER OF SCHEDULE DATA I NTO RESI DENT MANAGEMENT SYSTEM
Ensur e schedul e dat a i s upl oaded t o RMS. Thi s dat a i s addi t i onal suppor t i ng dat a i n a f or m and det ai l r equi r ed by t he Cont r act i ng Of f i cer pur suant t o FAR 52. 232- 5 Payment s under Fi xed- Pr i ce Const r uct i on Cont r act s. The r ecei pt of a pr oper payment r equest pur suant t o FAR
52. 232- 27 Pr ompt Payment f or Const r uct i on Cont r act s i s cont i ngent upon t he Gover nment r ecei v i ng bot h accept abl e and appr ovabl e har d copi es and mat chi ng el ect r oni c ver si ons of t he appl i cat i on f or pr ogr ess payment .
3. 10 PRI MAVERA P6 MANDATORY REQUI REMENTS
Ensur e Pr i maver a P6 set t i ngs pr ovi de a schedul e capabl e of f ul f i l l i ng t he r equi r ement s of t he cont r act . The f ol l owi ng set t i ngs ar e mandat or y and r equi r ed i n al l schedul e submi ssi ons t o t he Gover nment :
a. Act i v i t y Codes must be Pr oj ect Level , not Gl obal or EPS l evel .
b. Cal endar s must be Pr oj ect Level , not Gl obal or Resour ce l evel .
c. Act i v i t y Dur at i on Types must be set t o " Fi xed Dur at i on & Uni t s. "
d. Per cent Compl et e Types must be set t o " Physi cal . "
e. Ti me Per i od Admi n Pr ef er ences must r emai n t he def aul t " 8. 0 hr / day, 40 hr / week, 172 hr / mont h, 2000 hr / year . " Set Cal endar Wor k Hour s/ Day t o
8. 0 Hour days.
f . Set Schedul e Opt i on f or def i ni ng Cr i t i cal Act i v i t i es t o " Longest Pat h. "
g. Set Schedul e Opt i on f or def i ni ng pr ogr essed act i v i t i es t o " Ret ai ned Logi c. "
h. Set up cost l oadi ng usi ng a s i ngl e l ump sum non- l abor r esour ce. The Pr i ce/ Uni t must be $1/ hr , Def aul t Uni t s/ Ti me must be " 8h/ d" , and set t i ngs " Aut o Comput e Act ual s" and " Cal cul at e cost s f r om uni t s" un- sel ect ed.
i . Act i v i t y I D' s must not exceed 10 char act er s.
j . Act i v i t y Names must have a ver b- noun st r uct ur e and cont ai n t he most def i ni ng and det ai l ed descr i pt i on wi t hi n t he f i r st 30 char act er s.
k. The dai l y endi ng hour f or al l wor k cal endar s must be t he same.
- - End of Sect i on - -
SECTI ON 01 32 01. 00 10 Page 15
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18, CHG 4: 02/ 21
PART 1 GENERAL
1. 1 SUMMARY
1. 1. 1 Submi t t al I nf or mat i on
1. 1. 2 Pr oj ect Type
1. 1. 3 Submi ssi on of Submi t t al s
1. 2 DEFI NI TI ONS
1. 2. 1 Submi t t al Descr i pt i ons ( SD)
1. 2. 2 Appr ovi ng Aut hor i t y
1. 2. 3 Del egat i on of Aut hor i t y
1. 2. 4 Wor k
1. 3 SUBMI TTALS
1. 4 SUBMI TTAL CLASSI FI CATI ON
1. 4. 1 Gover nment Appr oved ( G)
1. 4. 2 For I nf or mat i on Onl y
1. 5 PREPARATI ON
1. 5. 1 Tr ansmi t t al For m
1. 5. 2 Submi t t al For mat
1. 5. 2. 1 For mat of SD- 01 Pr econst r uct i on Submi t t al s
1. 5. 2. 2 For mat f or SD- 02 Shop Dr awi ngs
1. 5. 2. 2. 1 Dr awi ng I dent i f i cat i on
1. 5. 2. 3 For mat of SD- 03 Pr oduct Dat a
1. 5. 2. 3. 1 Pr oduct I nf or mat i on
1. 5. 2. 3. 2 St andar ds
1. 5. 2. 3. 3 Dat a Submi ssi on
1. 5. 2. 4 For mat of SD- 04 Sampl es
1. 5. 2. 4. 1 Sampl e Char act er i st i cs
1. 5. 2. 4. 2 Sampl e I ncor por at i on
1. 5. 2. 4. 3 Compar i son Sampl e
1. 5. 2. 5 For mat of SD- 05 Desi gn Dat a
1. 5. 2. 6 For mat of SD- 06 Test Repor t s
1. 5. 2. 7 For mat of SD- 07 Cer t i f i cat es
1. 5. 2. 8 For mat of SD- 08 Manuf act ur er ' s I nst r uct i ons
1. 5. 2. 8. 1 St andar ds
1. 5. 2. 9 For mat of SD- 09 Manuf act ur er ' s Fi el d Repor t s
1. 5. 2. 10 For mat of SD- 11 Cl oseout Submi t t al s
1. 5. 3 Sour ce Dr awi ngs f or Shop Dr awi ngs
1. 5. 3. 1 Sour ce Dr awi ngs
1. 5. 3. 2 Ter ms and Condi t i ons
1. 6 QUANTI TY OF SUBMI TTALS
1. 6. 1 Number of SD- 01 Pr econst r uct i on Submi t t al Copi es
1. 6. 2 Number…