W912PM22B0033-0004(1).pdf
PDF 124 KB Posted
- Attached to
- MOTSU Berm Repair Construction Phase 1 Federal contract opportunity
- Solicitation number
- W912PM22B0033
About this file
This document provides details for a federal contract opportunity to conduct site preparation work at the Military Ocean Terminal at Sunny Point in Brunswick County, North Carolina. The project involves improving deficient earthen berms separating ammunition and explosive storage areas and may include heavy tree clearing, erosion control, wetland mitigation primarily in the North Rail Holding Yard, and significant earthwork. The solicitation number is W912PM22B0033 and will be set aside 100% for competitive small businesses. The contract value is estimated between $10-25 million. Interested offerors must register in the System for Award Management and check the provided Internet address for any amendments to the solicitation. The primary agency is the U.S. Army Corps of Engineers Wilmington District. Questions should be directed to the named Contract Specialist and Contracting Officer. The anticipated award is a single firm fixed price contract.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Opening Sign-in Sheet.pdf | ||
| B1 Abstract W912PM22B0033.pdf | ||
| South_Rail_Holding_Yard.pdf | ||
| Conformed-AMDT004_W912PM22B0033-MOTSU-Berms-Tech-Summary-Changes-25OCT22.pdf | ||
| Conformed-AMDT003_W912PM22B0033-MOTSU-Berms-Tech-Summary-Changes.pdf | ||
| W912PM22B0033-0003 SF30(1).pdf | ||
| Conformed-AMDT0002_W912PM22B0033_MOTSU-BermImp_Tech_Summary_Changes.pdf | ||
| W912PM22B0033-0002 (Conformed Copy).pdf | ||
| W912PM22B0033-0002.pdf | ||
| W912PM22B0033-0001 (Conformed Copy).pdf | ||
| W912PM22B0033-0001.pdf | ||
| SAW_MO-20-03 MOTSU BLAST BERM DESIGN - PHASE 1 - RTA - CDs (UnLocked).pdf | ||
| NCIC CONSENT FORM.pdf | ||
| SAW_MO-20-03 MOTSU BLAST BERM DESIGN - PHASE 1 - RTA - CDs (Locked).pdf | ||
| MOTSU-Berms-Phase1-Specs-RTA.pdf | ||
| W912PM22B0033.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
W912PM
John T. Hill, Contracting Officer
The purpose of this amendment is to:
1. Provide revised specifications due to bidder inquiries and responses, titled Conformed-AMDT004_W912PM22B0033- MOTSU-Berms-Tech-Summary-Changes-25OCT22.pdf.
2. Provide an aerial image of MOTSU installation to identify the South Rail Holding Yard, titled South_Rail_Holding_Yard.pdf.
3. All other terms and conditions remain unchanged.
///////////////////////////////////LAST ITEM//////////////////////////////////////
U.S. ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
See Item 6
J
W912PM22B0033
1 1
10/26/2022
14-Sep-2022
File details come from the government source that posted it. Updated .