A23 - Questions and Responses - Site Visit.pdf

PDF 436 KB Posted

Attached to
Warrior Creek Park Roadway Repair, W Kerr Scott Reservoir, Wilkes County, North Carolina
Solicitation number
W912PM22B0014
Issued by

About this file

This document contains questions and responses from a site visit related to federal contract solicitation W912PM22B0014. The U.S. Army Corps of Engineers, Wilmington District requires a contractor to perform roadway repair work at Warrior Creek Park located in Wilkes County, North Carolina. The work includes removing a collapsed 24-inch culvert underneath the roadway that is approximately 130 feet long and 25 feet below the surface. The contractor must develop an excavation plan using a licensed geotechnical engineer and replace the culvert with a 24-inch reinforced concrete pipe. Additional work comprises clearing, grubbing, asphalt and utility removal and replacement, and installing timber guardrail. This is a 100% small business set-aside contract with a magnitude of construction between $500,000 and $1,000,000. The solicitation will be issued electronically on June 21, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912PM22B0014 – Warrior Creek Park Roadway Repair Questions and Responses

Question 1 – Is there a borrow source on site?

Response 1 – The intent is that the soil excavated to remove the existing culvert be stockpiles and reused to back fill the trench. The Contractor will need to supplement with offsite borrow to restore the roadway embankment to its current elevation.

Question 2 – The SOLICITATION, OFFER, AND AWARD Form SF 1442 has the statement THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $250,000 AND $500,000. It was pointed out that SAM.gov shows a magnitude of construction as $500,000 to $1,000,000. Which is correct?

Response 2 – The magnitude of construction as shown on SF 1442, $250,000 to $500,000 is the correct range.

Question 3 – Can attendees return to the site with additional Contractor personnel?

Response 3 – Mr. Nicholson requested that he be notified when personnel return for awareness and safety reasons.