A21 - W912PM22B0014-WarriorCreek_RTA_Plans.pdf
PDF 15 MB Posted
- Attached to
- Warrior Creek Park Roadway Repair, W Kerr Scott Reservoir, Wilkes County, North Carolina
- Solicitation number
- W912PM22B0014
About this file
This document provides details of a federal contract opportunity issued by the U.S. Army Corps of Engineers, Wilmington District. The opportunity is for the Warrior Creek Roadway Repair located in Wilkes County, North Carolina, and consists of removing a collapsed 24-inch corrugated metal pipe culvert from a roadway approximately 25 feet below the surface that is 130 linear feet in length. The contractor will replace the existing culvert with a reinforced concrete pipe that is 24 inches in diameter and 130 linear feet, and additionally construct clearing and grubbing of the roadway embankment, remove and replace asphalt pavement and water and sewer lines, remove timber bollards and replace with guardrail, and install new riprap on the culvert outlet. The solicitation number is W912PM22B0014 and is set aside 100% for small businesses as a firm fixed price contract between $500,000 to $1,000,000. The solicitation will be issued electronically on or around June 21, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
SO
LI
C
IT
AT
IO
N
O
D
ES
IG
ED
B
Y:
R
IP
TI
A
M
AR
K
SI
ZE
SU
BM
TE
E
TR
AC
T
H
EC
KE
AW
IS
E:
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
W
EE
PA
AD
AY
EP
AI
. K
ER
S
TT
AM
VO
IR
IL
U
TY
, N
TH
.S
. A
Y
PS
EN
IN
TO
IC
VE
US Army Corps of Engineers
FI
LE
KS
-0 1-
2P
B0
TB
JU
E.
LO
P
J.
AN
S.
LL
EL
L
"x
TA
PE
PE
PT
ET
CE503
EI
_W ar rio rC re ek
_C E5
_S
P_ et ai ls
2.
dw g
CE503 TYPE F SLOPE INTERRUPTION DETAIL
TU
BI
LS
CE504
FY
Tu rb ur ta in l.d w
CE504 TURBIDITY CURTAIN DETAILS
CP
10851080
107010651060
104510
00 1075
LWL
PP
CS101
LA
S1
.d
SCALE IN FEET
SCALE: 1" = 20'
20 20 40
EXISTING GATE HOUSE
EXISTING ACCESS GATE
CAMPGROUND ROAD
LIMITS OF GROUND SURVEY (TYP.)
INVin = 1041.5'
EXISTING ROAD CENTERLINE
W. KERR SCOTT
RESERVOIR LAKE
NOTES
1. FOR EXISTING CONDITIONS SURVEY, CONTROL
MONUMENTS, AND WETLAND DELINEATION SEE
SHEET R1.
2. CAMPGROUND ROAD SHALL BE RESTORED TO
PRE-CONSTRUCTION DIMENSIONS AND ELEVATIONS
AS DETERMINED BY THE PRE-CONSTRUCTION
SURVEY.
3. FOR SYMBOL LEGEND SEE SHEET GI01.
EXISTING ROAD SIGN
PROTECT IN PLACE
LIMITS OF LiDAR SURVEY
LIM
IT O
F Li
DAR S
URVEY
ITS OF LiDAR SURVEY
INVo =1038.93'
EXISTING OVERHEAD POWER
SAG POINT 1085.56'
SEE NOTE 1
EXISTING EDGE OF PAVEMENT (TYP.)
SEE NOTE 1APPROX. LIMITS OF CONSTRUCTION (TYP.)
KEY NOTES
INSTALL 24" DIA HDPE SOLID WALL PIPE SDR 17
PER DETAILS 1 & 2 ON SHEET CS501
INSTALL OUTLET PROTECTION PER DETAILS ON
SHEET CS503
INSTALL NEW ASPHALT PAVEMENT PER DETAILS
1, 2, & 3 ON SHEET CS500
JOIN NEW ASPHALT PAVEMENT TO EXISTING
ASPHALT PAVEMENT PER DETAIL 4 SHEET CS500
INSTALL YELLOW CENTER LINE OF ROAD PER
NCDOT DETAIL 1205.01
INSTALL 4" SANITARY SEWER PIPE AND CONNECT
TO EXISTING 4" SANITARY SEWER FORCE MAIN PER
DETAIL 3 ON SHEET CS501
INSTALL 1" WATER PIPE AND CONNECT TO EXISTING
WATER FORCE MAIN PER DETAIL 4 ON SHEET CS501
INSTALL WOOD RAIL BARRIER PER DETAILS ON
SHEET CS502
SEE NOTE 2
APPROX. EXCAVATION LIMITS (TYP.)
SUBJECT TO CHANGE BASED ON
EXCAVATION PLAN SUBMITTAL
WETLAND BOUNDARY SEE NOTE 1
APPROX. LAKE SHORELINE
W W W W
E E E E E E E E E E E E E E E E
AutoCAD SHX Text
CS101 SITE PLAN
2' 20' 2'
TACK COAT
1 TYPICAL SECTION
SEE EDGE
DETAIL 3
THIS SHEET
(TYP)
BITUMINOUS CONCRETE
- 2" NCDOT SURFACE COURSE
TOPSOIL (TYP.)
PAVEMENT
LIMIT
1:1
EDGE DETAIL3
NCDOT BITUMINOUS CONCRETE
SURFACE COURSE
TOPSOIL (TYP.)
2'
10'
PAVEMENT LIMIT
PAVEMENT TRANSITION
DETAIL
EXISTING
PAVEMENT
BITUMINOUS
CONCRETE
SURFACE
COURSE (2")
CS500PRIME COATNCDOT AGGREGATE
BASE COURSE (8")
BITUMINOUS CONCRETE
- 2" NCDOT BINDER COURSE
SEE DETAIL 3
SEE DETAIL 3
CS500
(COMPACTED TO 95% MODIFIED PROCTOR ASTM D1557)
NOTES:
ARE MINIMUM COMPACTED.
1) ALL THICKNESSES SHOWN
PRIOR TO CONSTRUCTION.
2) PAVEMENT SECTIONS ARE TO BE
MINIMUM UPPER 8" OF SUBGRADE COMPACTED TO 95%
3) FILL AS REQUIRED TO MEET
NEW ROAD FINAL GRADES.
STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698)
VERIFIED W/ CONTRACTING OFFICER
BITUMINOUS CONCRETE - 2" NCDOT SURFACE COURSE
BITUMINOUS CONCRETE - 2" NCDOT BINDER COURSE
NCDOT AGGREGATE BASE COURSE (8")
2 ASPHALT PAVING DETAIL
CS500 NTS
SAW CUT 1" THICK
DEPTH AND APPLY
NOTE: CONTRACTOR SHALL MILL
DOWN TO 1" BELOW EXISTING GRADE
AT THE ENDS OF THE NEW PAVEMENT
TO TIE IN TO THE EXISTING PAVEMENT.
EARTH FILL (TYP.)
AV
S5
CS500 ROAD PAVING DETAILS
HAUNCHING
4" BEDDING
MINIMUM EM
BE
IA
TOP OF PIPE
UNDISTURBED
TRENCH WALL
SPRING
LINE OF
PIPE
STANDARD PIPE BEDDING
1.
2. EMBEDMENT MATERIAL SHALL BE COMPACTED TO A MINIMUM 95% STANDARD
PROCTOR DENSITY FOR CLASS I MATERIAL.
NTSCS501
2 CULVERT PIPE DETAIL
EMBEDMENT MATERIAL MUST BE CLASS I (NO. 67 OR NO. 78M WASHED STONE).
24" DIA. HDPE SOLID
WALL PIPE SDR 17
COMPACTED BACK FILL
3 SANITARY SEWER FORCE MAIN PIPE DETAIL
EMBEDMENT MATERIAL MUST BE CLASS I (NO. 67 OR NO. 78M WASHED STONE).
SOLID WALLED
4" DIA. HDPE PIPE
3' MINIMUM COVER
COMPACTED BACK FILL
NEW DOMESTIC WATER FORCE MAIN PIPE SHALL BE INSTALLED TO THE LINES
AND GRADES OF THE EXISTING DOMESTIC WATER FORCE MAIN PIPE PRIOR TO
DEMOLITION. METALLIC TRACEABLE TAPE CONTAINING "WATER PIPE BELOW"
SHALL BE INSTALLED A MINIMUM OF 1' ABOVE PIPE FOR THE ENTIRE LENGTH
OF NEW PIPE.
4 DOMESTIC WATER FORCE MAIN PIPE DETAIL
EMBEDMENT MATERIAL MUST BE SAND.
1" DIA. WATER
3' MINIMUM COVER
1 CULVERT EXCAVATION SECTIONS
MULTIPLE BENCH
SLOPING AND BENCHING
a * b *
SIMPLE BENCH
a * b *
NOTE
* a AND b TO BE
DETERMINED BY
CONTRACTOR'S
EXCAVATION PLAN.
2. THE EARTHWORK AND EXCAVATION PLAN INCLUDES A RESPONSE PLAN IF A RAIN
EVENT RESULTS IN A SIGNIFICANT LAKE LEVEL RISE DURING CONSTRUCTION.
THE RESPONSE PLAN SHALL ADDRESS PROTECTION OF THE WORK SITE AND
EXCAVATION, AS WELL AS MITIGATION OF EROSION FROM RUNOFF ENTERING
THE LAKE FROM THE WORK SITE.
SEE SECTION 31 00 00 EARTHWORK FOR DETAILS REGARDING A CONTRACTOR
PREPARED EARTHWORK AND EXCAVATION PLAN.
4' MAX
5' MAX
4' MAX
3.
3. NEW SANITARY SEWER FORCE MAIN PIPE SHALL BE INSTALLED TO THE LINES
AND GRADES OF THE EXISTING SANITARY SEWER FORCE MAIN PIPE PRIOR TO
DEMOLITION. METALLIC TRACEABLE TAPE CONTAINING "SEWER PIPE BELOW"
SHALL BE INSTALLED A MINIMUM OF 1' ABOVE PIPE FOR THE ENTIRE LENGTH
OF NEW PIPE.
CS501
LV
CS501 CULVERT AND UTILITY DETAILS
CS502
BA
IE
1.6' SPACE 1.6' SPACE
CS502 WOOD RAIL BARRIER DETAIL
1. NEW PIPE SHALL BE 24" DIA. HDPE SOLID WALL PIPE SDR 17 AS
SPECIFIED.
2. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH
THE CONTRACT SPECIFICATIONS.
3. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE
FINES INTO BACKFILL MATERIAL, WHEN REQUIRED.
4. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE
CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE
CONTRACTORS ON SITE TESTING REPRESENTATIVE AND REPLACE
WITH SUITABLE MATERIAL. AS AN ALTERNATIVE AND AT THE
DISCRETION OF THE CONTRACTORS ON SITE TESTING
REPRESENTATIVE, THE TRENCH BOTTOM MAY BE STABILIZED
USING A GEOTEXTILE MATERIAL.
5. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE
CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL
SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE
ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" FOR 4"-24".
6. ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP
FOLLOWS THE REQUIRED LINES AND GRADES SHOWN IN THE PLAN.
COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO THE DENSITY
OF THE SURROUNDING UNDISTURBED MATERIAL. LOW AREAS IN
THE SUBGRADE ON UNDISTURBED SOIL MAY ALSO BE FILLED BY
INCREASING THE RIPRAP THICKNESS.THE RIPRAP AND GRAVEL
FILTER MUST CONFORM TO THE SPECIFIED GRADING LIMITS
SHOWN ON THE PLANS.
7. FILTER CLOTH, WHEN USED, MUST MEET DESIGN REQUIREMENTS
AND BE PROPERLY PROTECTED FROM PUNCHING OR TEARING
DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THE
RIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER
THE DAMAGED AREA. ALL CONNECTING JOINTS SHOULD OVERLAP
SO THE TOP LAYER IS ABOVE THE DOWNSTREAM LAYER A
MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE, REPLACE THE
ENTIRE FILTER CLOTH.
8. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN
THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF
PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR
MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE
INSTALLED AS REQUIRED IN THE CONTRACT SPECIFICATIONS.
9. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC
APPLICATIONS (GRASS MATERIAL OR LANDSCAPE AREAS) IS 24"
FROM THE TOP OF PIPE TO GROUND SURFACE ADDITIONAL COVER
MAY BE REQUIRED DURING CONSTRUCTION TO ACCOMMODATE
CONSTRUCTION EQUIPMENT LOADING.
10. RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID
DAMAGING THE FILTER.
11. THE RIPRAP MAY BE FIELD STONE OR ROUGH QUARRY STONE. IT
SHOULD BE HARD, ANGULAR, HIGHLY WEATHER-RESISTANT AND
WELL GRADED.
12. CONSTRUCT THE APRON ON GRADE WITH NO OVERFILL AT THE
END. MAKE THE TOP OF THE RIPRAP AT THE DOWNSTREAM END
LEVEL WITH THE RECEIVING AREA OR SLIGHTLY BELOW IT.
13. ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE
RECEIVING LAKE SHORELINE AND PREFERABLY STRAIGHT
THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDED TO FIT SITE
CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON.
14. IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED
AREAS WITH VEGETATION.
8'
7' 4"1'
6"
.NEW 24" DIA. HDPE
SOLID WALL PIPE
SDR 17
4"
CLASS B RIPRAP SLOPE
ON GRADE SEE NOTE 12
BEDDING MATERIAL
24" PIPE OUTLET PROTECTION PLAN VIEW
24" PIPE OUTLET PROTECTION PROFILE VIEW CROSS-SECTION A-A
24" OUTLET PROTECTION
1'
7' 4"
SEED DISTURBED AREA
MEETS EXISTING GRADE
MEETS EXISTING GRADE
GEOTEXTILE
GEOTEXTILE
INVo = 1038.93'
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
MAX SLOPE 3H:1V
TO NEW FILL
MAX 5' LENGTH
UNCOVERED
CS503
PI
AL
ST
CS503 TYPICAL PIPE INSTALLATION DETAILS
ISSUE DATE: JUNE 2022
of Engineers ®
Wilmington District
Approval Recommended: *
Approved: *
DATE
DATECHIEF, ENGINEERING BRANCH
* THIS PROJECT WAS DESIGNED BY THE U.S. ARMY CORPS OF ENGINEERS,
WILMINGTON DISTRICT. INDIVIDUALS WHOSE SIGNATURES AND REGISTRATION
DESIGNATIONS APPEAR ON THESE DOCUMENTS ARE OPERATING WITHIN THE
SCOPE OF THEIR EMPLOYMENT. SIGNATURES ARE REQUIRED BY ER 1110-1-8152.
CHIEF, DESIGN and GENERAL ENGINEERING SECTION
WARRIOR CREEK PARK ROADWAY REPAIR
WILKES COUNTY, NORTH CAROLINA
G-001
W. KERR SCOTT DAM AND RESERVOIR
SIGNATURES AFFIXED BELOW INDICATE OFFICIAL RECOMMENDATION
AND APPROVAL OF ALL DRAWINGS IN THIS SET AS INDEXED ON SHEET GI01.
AMENDMENTS:
IFB NO.: W912PM22B0014
CONTRACT NO.:
17 JUNE 2022
17 JUNE 2022
G-001 COVER SHEET
GI01
VI
AP
EX
S, JE
_G I0
PROJECT LOCATION
FALLS
LAKE
ONSLOW
DUPLIN
JONES
PENDER
HA
NO
NE
BRUNSWICK
COLUMBUS
BLADEN
ROBESON
HOKE
CUMBERLAND
SAMPSON
WAYNE
LENOIR
GREENE
PITT
CRAVEN
NORTHAMPTON
HALIFAX
NASH
WILSON
JOHNSTON
WAKE
FRANKLIN
VANCE
VI
WARREN
GREENSVILLE
HENRYPATRICK
STOKES ROCKINGHAM CASWELL PERSON
ORANGE
DURHAM
CHATHAM
MOORE
MONTGOMERY
RANDOLPH
DAVIDSON
FORSYTH
SURRY
ALLEGHANY
ASHE
WATAUGA WILKES
CALDWELL
AVERY
MITCHELL
YANCY
BURKE
CATAWBA
ALEXANDER
IREDELL
LINCOLN
GASTON
KL
BU
CABARRUS
STANLY
UNION
ANSON
RICHMOND
RUTHERFORD
McDOWELL
MADISON
BUNCOMBE
HENDERSON
TRANSYLVANIA
HAYWOOD
JACKSON
SWAIN
GRAHAM
CHEROKEE
CLAY
MACON
YADKIN
ROWAN
CLEVELANDPOLK
Georgia
Tennessee
South Carolina
FEAR
APE
RIVER
Virginia North Carolina
WM. O. HUSKE
LOCK & DAM
SC
OTL
EDGECOMBEDAVIE
GUILFORD
Cape Fear
HARNETT
LEE
SCALE IN MILES
W. KERR
SCOTT DAM
& RESERVOIR
JOHN H. KERR DAM & RESERVOIR
B. EVERETT
JORDAN DAM
& LAKE
NO. 2
NO. 1
Raleigh
20 40 60 80 100 12040 20
TITLE
INDEX OF DRAWINGS
GI01
DEMOLITION PLAN
CULVERT AND UTILITY DETAILS
WOOD RAIL BARRIER DETAILS
SCALE: 1" = 400'
400 400 800
SITE PLAN
ROAD PAVING DETAILS
INDEX OF DRAWINGS, PROJECT LOCATION AND VICINITY MAPS
NOTE: PHOTOGRAPHY DATED: FEBRUARY 8, 2018. COPYRIGHT 2018 DIGITAL GLOBE.
CD101
CS101
CS501
SHEET No.
PROJECT LOCATION
DESIGNATED
STOCKPILE AREA
SEE DETAIL 1
SHEET CE502
DESIGNATED
SEE DETAIL 1
SHEET CE502
PG
EROSION AND SEDIMENT CONTROL PLANCE101
EROSION AND SEDIMENT CONTROL DETAILSCE501
TEMPORARY STOCKPILE DETAILCE502
TYPE F SLOPE INTERRUPTION DETAILCE503
TURBIDITY CURTAIN DETAILSCE504
REFERENCE: TOPOGRAPHIC SURVEY SINKHOLE WARRIOR CREEKR1
CONTRACTOR OFFICE,
PARKING, AND
STAGING AREA
HIGHWAY 268
CAM
PG
ROUND R
OAD
TYPICAL PIPE INSTALLATION DETAILSCS503
SYMBOL LEGEND
WATER FORCE MAIN
OVERHEAD ELECTRICAL
BOLLARD
SIGN
USACE CONTROL POINT
WETLAND LINE
WWWW
EEEE
WL WL WL WL
POWER POLE
GI01 INDEX OF DRAWINGS, PROJECT LOCATION AND VICINITY MAPS
2022-06-02T16:25:13-0400
JACARUSO.JAMES.D.1229829170
CD101
EM
EXISTING BOLLARD (TYP.)
SEE NOTE 2
EXISTING 24" CMP
INVin = 1041.53'
SEE NOTE 6
EXISTING SINKHOLE
1. FOR EXISTING CONDITIONS SURVEY, CONTROL
MONUMENTS, AND WETLAND DELINEATION SEE SHEET
R1.
2. REMOVE AND DISPOSE OFFSITE ALL EXISTING
BOLLARDS.
3. REMOVE AND DISPOSE OFFSITE 1-INCH WATER
FORCE MAIN FROM SOUTH SIDE OF PAVEMENT AS
NECESSARY FOR EXCAVATION. CAP OFF FORCE MAIN
LEFT IN PLACE. RESTORE FORCE MAIN UPON
COMPLETION OF ROADWAY REPAIRS.
4. REMOVE AND DISPOSE OFFSITE 4-INCH SANITARY
SEWER FORCE MAIN FROM NORTH SIDE OF PAVEMENT
AS NECESSARY FOR EXCAVATION. CAP OFF FORCE
MAIN LEFT IN PLACE. RESTORE FORCE MAIN UPON
COMPLETION OF ROADWAY REPAIRS.
5. REMOVE AND DISPOSE OFFSITE ASPHALT PAVEMENT
AS NECESSARY FOR EXCAVATION.
6. REMOVE AND DISPOSE OFFSITE EXISTING 24-INCH
CMP CULVERT.
7. CONTRACTOR SHALL DEVELOP AND SUBMIT FOR
APPROVAL AN EXCAVATION PLAN IN ACCORDANCE
WITH USACE SAFETY MANUAL, EM 385-1-1. EXCAVATION
LIMITS SHOWN ARE APPROXIMATED AND WILL VARY
BASED ON APPROVED EXCAVATION PLAN.
8. CLEAR AND GRUB SLOPES OF ROADWAY
EMBANKMENT AS NECESSARY FOR EXCAVATION AND
REPLACEMENT OF CULVERT.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR
COORDINATING WITH DUKE POWER THE TEMPORARY
DISCONNECTION AND RECONNECTION OF OVERHEAD
ELECTRICAL LINES AS NECESSARY TO SAFELY
EXCAVATE THE CULVERT. DUKE POWER POINT OF
CONTACT PHONE NUMBER IS 1-800-653-5307.
10. CONTRACTOR SHALL VERIFY LOCATIONS OF ALL
EXISTING UTILITIES WITHIN THE PROJECT LIMITS PRIOR
TO START OF WORK.
11. FOR SYMBOL LEGEND, SEE SHEET GI01.
EXISTING 24" CMP
INVout = 1033.15'
SEE NOTE 6.
EXISTING 4" SANITARY SEWER
FORCE MAIN, SEE NOTE 4
EXISTING 1-INCH WATER FORCE
MAIN, SEE NOTE 3
APPROX. LIMITS OF CONSTRUCTION (TYP.)
EXISTING ASPHALT PAVEMENT (TYP.)
SEE NOTE 5
APPROX. CLEARING AND
GRUBBING LIMITS. SEE
NOTE 8.
APPROX. CLEARING AND GRUBBING
LIMITS (TYP.), SEE NOTE 8
SEE NOTE 9
CD101 DEMOLITION PLAN
CE101
IM
PL
E1
1. FOR EXISTING CONDITIONS SURVEY, WETLAND
DELINEATION, AND AND CONTROL MONUMENTS SEE
SHEET R1.
2. FOR SITE PLAN SEE SHEET CS101.
3. INSTALL SILT FENCE AT THE BASE OF DISTURBED
SLOPES AND SOIL PER DETAIL SHEET CE501.
4. FOR STOCKPILE LOCATIONS SEE SHEET GI01. FOR
DETAIL SEE SHEET CE502.
5. INSTALL TYPE F SLOPE INTERRUPTION DEVICE ON
DISTURBED SLOPES PER DETAIL SHEET CE503.
INSTALL TURBIDITY CURTAIN
PER DETAIL SHEET CE504
SEE NOTE 1APPROX. LIMITS OF CONSTRUCTION (TYP.)
APPROX. EXCAVATION LIMITS (TYP.)
SUBJECT TO CHANGE BASED ON
EXCAVATION PLAN SUBMITTAL
CE101 EROSION & SEDIMENT CONTROL PLAN
SEEDING AND MULCHING
IMMEDIATELY AFTER SEEDING, FIRM ENTIRE AREA EXCEPT FOR SLOPES IN EXCESS OF
3 TO 1 WITH ROLLER NOT EXCEEDING 90 POUNDS FOR EACH FOOT OF ROLLER WIDTH.
IF SEEDING IS PERFORMED WITH CULTIPACKER-TYPE SEEDER OR HYDROSEEDING,
ROLLING MAY BE ELIMINATED.
TEMPORARY SEED SPECIES FOR SURFACE EROSION CONTROL OR OVER SEEDING SHALL
BE AS FOLLOWS:
PLANTING PERIOD COMMON NAME
15 MAR - 14 SEP BROWNTOP, PROSO OR GERMAN
(FOXTAIL) MILLET 50
15 SEP - 14 JAN RYE GRAIN 112
15 JAN - 14 MAR SPRING OATS 128
PERMANENT SEED MIXTURE SHALL BE AS FOLLOWS:
1 FEB - 30 APR PENSACOLA BAHIAGRASS
COMMON OR KOBE LESPEDEZA 25
SPRING OATS 32
1 MAY - 31 AUG COMMON OR KOBE LESPEDEZA 25
BROWNTOP PROSO OR GERMAN
(FOXTAIL) MILLET 30
1 SEP - 31 JAN COMMON OR KOBE LESPEDEZA 40
RYE (GRAIN) 56
ADDITIONAL PERMANENT SEED SPECIES SHALL BE PLACED AS FOLLOWS:
1 NOV - 28 FEB COMMON BERMUDAGRASS 20
(UNHULLED)
1 MAR - 31 JUL COMMON BERMUDAGRASS 12
(HULLED)
FERTILIZER SHALL BE COMMERCIAL GRADE, FREE FLOWING, UNIFORMLY COMPOSED.
FERTILIZER SHALL BE BALANCED WITH THE INCLUSION OF TRACE MINERALS AND
MICRO NUTRIENTS.
SYNTHETIC, GRANULAR CONTROLLED RELEASE FERTILIZER CONTAINING
THE FOLLOWING MINIMUM PERCENTAGES, BY WEIGHT OF PLANT FOOD NUTRIENTS:
10 PERCENT AVAILABLE NITROGEN
10 PERCENT AVAILABLE PHOSPHORUS
10 PERCENT AVAILABLE POTASSIUM
CONTROLLED RELEASE FERTILIZER, TO USE WITH HYDROSEEDING AND COMPOSED OF PILLS
COATED WITH PLASTIC RESIN TO PROVIDE A CONTINUOUS RELEASE OF NUTRIENTS FOR AT
LEAST 6 MONTHS AND CONTAINING THE FOLLOWING MINIMUM PERCENTAGES, BY WEIGHT, OF
PLANT FOOD NUTRIENTS:
10 PERCENT AVAILABLE NITROGEN
10 PERCENT AVAILABLE PHOSPHORUS
10 PERCENT AVAILABLE POTASSIUM
MINIMUM LBS
PER ACRE
VEGETATIVE STABILIZATION - SEEDING
TEMPORARY SEED
PERMANENT SEED
FERTILIZER
HAY OR STRAW MULCH
STRAW
HAY
MECHANICAL ANCHOR
WOOD CELLULOSE FIBER
SOIL PREPARATION
SEED PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITH 3H : 1V SLOPES OR
FLATTER WITHIN 14 CALENDAR DAYS AFTER COMPLETION OF CONSTRUCTION AND ALL
DISTURBED AREAS WITH SLOPES STEEPER THAN 3H : 1V WITHIN 7 CALENDAR DAYS AFTER
COMPLETION OF CONSTRUCTION.
TEMPORARY SILT FENCE (TSF) DETAIL
WIRE FABRIC
GROUND LINE
3'
" M
AX
" M
4"
8"
COMPACTED FILL
2' MIN' (TYP)
STEEL POST
MIN. 12.5 GA.
INTERMEDIATE
WIRES
MIN. 10 GA.
TOP & BOTTOM
WIRES
FILTER
FABRIC
" F
FA
BR
36" MIN WIDTH
FILTER FABRIC
(8' MAX. STANDARD STRENGTH FABRIC WITH WIRE FENCE)
MIN. 12.5 GA.
VERTICAL WIRES
STEEL
POST
(TYP)
N.T.S.
VARIES AS DIRECTED BY THE CONTRACTING OFFICER
OR HIS/HER DESIGNATED REPRESENTATIVE
MULCH SHALL BE FREE FROM NOXIOUS WEEDS, MOLD, AND OTHER
DELETERIOUS MATERIALS. MULCH MATERIALS SHALL BE NATIVE TO
THE REGION. HAY OR STRAW MULCH SHALL BE SPREAD UNIFORMLY
AT THE RATE OF 2 TONS PER ACRE. MULCH SHALL BE SPREAD BY
HAND, BLOWER-TYPE MULCH SPREADER, OR OTHER APPROVED
METHOD. MULCHING SHALL BE STARTED ON THE WINDWARD SIDE
OF RELATIVELY FLAT AREAS OR ON THE UPPER PART OF STEEP
SLOPES, AND CONTINUED UNIFORMLY UNTIL THE AREA IS COVERED.
THE MULCH SHALL NOT BE BUNCHED OR CLUMPED. SUNLIGHT SHALL
NOT BE COMPLETELY EXCLUDED FROM PENETRATING TO THE GROUND
SURFACE. ALL AREAS INSTALLED WITH SEED SHALL BE MULCHED ON
THE SAME DAY AS THE SEEDING. MULCH SHALL BE ANCHORED
IMMEDIATELY FOLLOWING SPREADING.
STALKS FROM OATS, WHEAT, RYE, BARLEY, OR RICE. FURNISH IN
AIR-DRY CONDITION AND OF PROPER CONSISTENCY FOR PLACING
WITH COMMERCIAL MULCH BLOWING EQUIPMENT. STRAW SHALL
CONTAIN NO FERTILE SEED.
HAY SHALL BE NATIVE HAY, SUDAN-GRASS HAY, BROOMSEDGE HAY,
OR OTHER HERBACEOUS MOWING. AIR-DRY CONDITION AND OF
PROPER CONSISTENCY FOR PLACING WITH COMMERCIAL MULCH
BLOWING EQUIPMENT. HAY SHALL BE STERILE, CONTAINING NO
FERTILE SEED.
MECHANICAL ANCHOR SHALL BE A V-TYPE-WHEEL LAND PACKER;
A SCALLOPED-DISK LAND PACKER DESIGNED TO FORCE MULCH INTO
THE SOIL SURFACE; OR OTHER SUITABLE EQUIPMENT.
WOOD CELLULOSE FIBER SHALL BE APPLIED AS PART OF THE
HYDROSEEDING OPERATION. THE MULCH SHALL BE MIXED AND
APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S
RECOMMENDATIONS.
SOIL ON SLOPES UP TO A MAXIMUM 3-HORIZONTAL-TO-1-VERTICAL
SHALL BE TILLED TO A MINIMUM 4 INCH DEPTH. ON SLOPES BETWEEN
3-HORIZONTAL-TO-1-VERTICAL AND 1-HORIZONTAL-TO-1-, THE SOIL
SHALL BE TILLED TO A MINIMUM 2 INCH DEPTH BY SCARIFYING
WITH HEAVY RAKES, SPIKED TOOTH HARROW, CHISEL PLOWS, OR
SIMILAR IMPLEMENTS, OR OTHER SIMILAR METHOD. ROTOTILLERS
SHALL BE USED WHERE SOIL CONDITIONS AND LENGTH OF SLOPE
PERMIT. AREAS COMPACTED BY CONSTRUCTION OPERATIONS SHALL
BE COMPLETELY PULVERIZED BY TILLAGE. THE FERTILIZER MAY BE
APPLIED DURING THIS PROCEDURE.
SOIL EROSION AND SEDIMENT CONTROL MEASURES
1. ALL EROSION AND SEDIMENTATION CONTROL MEASURES NOTED SHALL BE INSTALLED PRIOR TO START OF CONSTRUCTION AND
SHALL REMAIN IN EFFECT AND BE MAINTAINED THROUGHOUT THE PERIOD OF CONSTRUCTION.
2. SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED ON THE SITE AND SHALL NOT BE ALLOWED TO COLLECT ON ANY
OFFSITE AREA OR IN WATERWAYS.
3. CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THESE PLANS OR AS DIRECTED BY THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE. CONTRACTOR SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES, AND OTHER EARTH CHANGES HAVE BEEN ACCOMPLISHED.
4. DAILY INSPECTION SHALL BE MADE BY THE CONTRACTOR TO DETERMINE THE EFFECTIVENESS OF EROSION CONTROL MEASURES, AND
ANY NECESSARY REPAIRS SHALL BE MADE WITHOUT DELAY.
5. PERMANENT SOIL EROSION CONTROL MEASURES FOR ANY DISTURBED LAND AREA SHALL BE STABLIZIED AS SOON AS POSSIBLE. WHEN IT IS NOT POSSIBLE TO PERMANENTLY STABILIZE A DISTURBED AREA IMMEDIATELY AFTER COMPLETION OF GRADING WORK, TEMPORARY SOIL EROSION CONTROL MEASURES SHALL BE IMPLEMENTED IMMEDIATELY. ALL TEMPORARY SOIL EROSION CONTROL MEASURES SHALL
BE MAINTAINED UNTIL PERMANENT SOIL EROSION CONTROL MEASURES ARE IMPLEMENTED.
6. CONTRACTOR SHALL PROVIDE PERMANENT GROUND COVER FOR ALL DISTURBED AREAS WITH 3H:1V SLOPES OR FLATTER WITHIN 14 CALENDAR DAYS FOLLOWING THE COMPLETION OF CONSTRUCTION AND ALL DISTURBED AREAS WITH SLOPES STEEPER THAN 3H:1V WITHIN 7 CALENDAR DAYS
AFTER COMPLETION OF CONSTRUCTION.
7. SEE SECTION 32 92 19 IN THE SPECIFICATIONS FOR DETAILS REGARDING MAINTENANCE AND APPLICATION OF SEEDING, SOIL CONDITIONERS, FERTILIZERS, AND MULCH.
TEMPORARY SILT FENCE NOTES:
1. THE EXISTING TEMPORARY SILT FENCE (TSF) LOCATED WITHIN THE FOOTPRINT OF THE PROPOSED
CELL 1 EXTERIOR TOE BERMS SHALL BE REMOVED AND DISPOSED OF OFF GOVERNMENT
PROPERTY. NEW TEMPORARY SILT FENCE SHALL BE INSTALLED AT LOCATIONS SHOWN ON THE
PLANS. THE CONTRACTOR SHALL COMPLETE ALL TEMPORARY SILT FENCE INSTALLATION PRIOR TO
COMMENCEMENT OF CLEARING AND EARTHWORK OPERATIONS.
2. WIRE FABRIC SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL HAVE A MINIMUM OF 6 LINE WIRES
WITH 12" STAY SPACING.
3. FILTER FABRIC SHALL HAVE A MINIMUM OF 36" WIDTH. FILTER FABRIC SHALL BE FASTENED
ADEQUATELY TO THE FENCE FABRIC AS DIRECTED BY THE CONTRACTING OFFICER.
4. STEEL POSTS SHALL BE 5 FEET (MIN) IN HEIGHT AND SHALL BE OF THE SELF-FASTENER ANGLE
STEEL TYPE.
5. THE CONTRACTOR SHALL INSPECT TEMPORARY SILT FENCE AT LEAST ONCE EVERY 7 DAYS AND AFTER ANY SIGNIFICANT STORM THAT PRODUCES 0.5 INCHES OR MORE RAINFALL AT THE SITE
AND MAKE ANY REQUIRED REPAIRS IMMEDIATELY. REMOVE SEDIMENT DEPOSITS AS NECESSARY
TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON
THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
6. THE CONTRACTOR SHALL PERFORM ALL WORK IN SUCH A MANNER THAT STATE WATER QUALITY
STANDARDS OUTSIDE OF THE CONSTRUCTION AREA ARE NOT VIOLATED. ALL EROSION AND
SEDIMENT CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION
AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.
IM
CE501
CE501 EROSION & SEDIMENT CONTROL DETAILS
NTSCE502
TEMPORARY STOCKPILE AREA
3:1
3:1
SOIL/SEDIMENT
ORIGINAL GROUND SURFACE
10"
(TYP.) SILT FENCE
(SEE DETAIL 1
SHEET CE501)
TEMPORARY STOCKPILE DETAIL
TEMPORARY STOCKPILE - GENERAL NOTES
1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOPE THE SILT FENCE
IS TO EXTEND ALONG CONTOURS OF THE DOWN-GRADIENT AREA.
2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION MEASURES MUST BE IMPLEMENTED.
3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED AND THE ORIGINAL GROUND SURFACE PERMANENTLY STABILIZED OR THE STOCKPILE IS PERMANENTLY STABILIZED AS APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS: WEEKLY INSPECTIONS, INSPECTIONS AFTER RAIN EVENTS, ROUTINE
MAINTENANCE, AND REGULAR SEDIMENT REMOVAL.
PO
ST
KP
CE502
EI
2.
CE502 TEMPORARY STOCKPILE DETAIL
File details come from the government source that posted it. Updated .