A21 - AMD 1- W912PM21B0008-0001_RHDC.pdf
PDF 403 KB Posted
- Attached to
- South Atlantic Regional Harbor Dredging Federal contract opportunity
- Solicitation number
- W912PM21B0008
About this file
This solicitation requests proposals for South Atlantic Regional Harbor Dredging services. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to provide maintenance dredging for five harbor projects - Brunswick Harbor, Georgia with an estimated 1.5 million cubic yards; Savannah Harbor, Georgia with 600,000 cubic yards; Wilmington Harbor, North Carolina with 900,000 cubic yards; Morehead City Harbor, North Carolina with 800,000 cubic yards; and Charleston Harbor, South Carolina with 1.2 million cubic yards. The work involves dredging fine sands and silts to depths ranging from -40 to -58 mean lower low water depending on the harbor, and transporting dredged materials up to 15 miles for disposal in ocean dredged material disposal sites. The solicitation will be issued electronically on or around June 30, 2021 with a to-be-determined bid opening date. This is an unrestricted procurement conducted under North American Industry Classification System code 237990 with a size standard of $30 million. The resulting contract will be firm-fixed-price. Interested parties must register in the System for Award Management to be eligible for award.
View the file
Other files for this federal contract opportunity
Show all 30
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See the Technical Summary of Changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Jul-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM21B0008
X 9B. DATED (SEE ITEM 11)
16-Jul-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Jul-2021
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM21B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
CWK0616- South Atlantic Regional Harbor Dredging AMENDMENT 0001 July 22, 2021
SOLICITATION NO. W912PM21B0008
TECHNICAL SUMMARY OF CHANGES
SPECIFICATIONS: NO CHANGE
PLANS: Amendment 1 Changes pertain ONLY for sheet CN302.
Section D-D
The channel width dimensions were incorrect, compared to the plan view drawings. The left and right channel dimensions were changed from “205’” to read “250’”. The entire channel width was also incorrect and changed from “409’” to read “500’”.
Section E-E
The channel width dimensions were incorrect, compared to the plan view drawings. The left and right channel dimensions were changed from “205’” to read “250’”. The entire channel width was also incorrect and changed from “409’” to read “500’”.
Section F-F
The stationing was changed from “STA. -6472B TO -6+786B” to be read as “STA. -6+472B TO - 6+786B”, simply adding the “+”.
Section G-G
The channel width dimensions were incorrect, compared to the plan view drawings. The left and right channel dimensions were changed from “205’” to read “250’”. The entire channel width was also incorrect and changed from “491’” to read “600’”.
Section H-H
The channel width dimensions were incorrect, compared to the plan view drawings. The left and right channel dimensions were changed from “205’” to read “250’”. The entire channel width was also incorrect and changed from “409’” to read “500’”.
--End of Summary—
0.0' M.L.L.W.
C - C
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. 0+000 TO STA. -6+472B
N.T.S.
164' 164'
327'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
C C
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
D - D
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. -6+786B TO STA. -14+000B
N.T.S.
250' 250'
500'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
D D
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
E - E
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. -40+000B TO STA. -45+000B
N.T.S.
250' 250'
500'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
E E
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
G - G
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. -14+000B TO STA. -17+000B
STA. -20+000B TO STA. -29+000B
N.T.S.
250' 250'
600'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
G G
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
H - H
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. -17+000B TO STA. -20+000B
STA. -29+000B TO STA. -40+000B
N.T.S.
250' 250'
500'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
H H
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
F - F
BRUNSWICK ENTRANCE CHANNEL
TYPICAL SECTION
STA. -6+472B TO STA. -6+786B
N.T.S.
VARIES 200' - 250' VARIES 200' - 250'
VARIES 400' - 500'
-40' M.L.L.W. ALLOWABLE OVERDEPTH
-38' M.L.L.W. REQUIRED DEPTH
F F
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
* TRANSITION VARIES 0' TO 100' FROM
STATIONS -14+000B TO -15+000B,
STATIONS -16+000B TO -17+000B,
STATIONS -20+000B TO -21+000B, AND
STATIONS -28+000B TO -29+000B.
0.0' M.L.L.W.
CH4 - CH4
CEDAR HAMMOCK TYPICAL SECTION
STA. 10+000 TO STA. 13+000
STA. 16+000 TO STA. 21+330
STA. 22+330 TO STA. 25+000
N.T.S.
200' 200'
400'
-38' M.L.L.W. ALLOWABLE OVERDEPTH
-36' M.L.L.W. REQUIRED DEPTH
CH4 CH4
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
0.0' M.L.L.W.
CH3 - CH3
CEDAR HAMMOCK TYPICAL SECTION
STA. 13+000 TO STA. 16+000
STA. 21+330 TO STA. 22+330
N.T.S.
200' *VARIES
*VARIES
-38' M.L.L.W. ALLOWABLE OVERDEPTH
-36' M.L.L.W. REQUIRED DEPTH
CH3 CH3
MAXIMUM PAY
SLOPE PLANE
REQUIRED DREDGING
SECTION
* WIDTH TRANSITION VARIES FROM 200' TO 700'
* WIDTH TRANSITIONS FROM 200' TO 400'
CN302
B R
U N
S W
I C
K
H
A R
B O
R
A
N D
C E
D A
R
H
A M
M O
C K
T
Y P
I C
A L
D R
E D
G I N
G
S
E C
T I O
N S
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
D A
T E
C O
N T
R A
N
O
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
U S
A
R M
Y
C
O R
P S
F
E
N G
I N
E E
R S
C A
T E
G O
R Y
D
E
C H
E C
K E
D
B
Y
S U
B M
I T
T E
D
B
Y
A N
S I
D
-W P
M B
J U
E
W I L M
I N
G T
O N
N
C
D
A R
L I N
G T
A
V E
W I L M
I N
G T
D
I S
T R
I C
T
S A
V A
N N
A H
G
A
W
O
G L E
T H
O R
E
V E
S A
V A
N N
H
S
T R
I C
T
U S
A
R M
Y
C
O R
F
E
N G
I N
E E
R S
F Y
M A
I N
T E
N A
N C
E
D
R E
D G
I N
G
S A
V A
N N
A H
B
R U
N S
W I C
K
E
N T
R A
N C
E
H
A R
B O
R
C
H A
N N
E L
S A
V A
N N
B
R U
N S
W I C
K
H
A R
B O
R
G
E O
R G
I A
READY TO ADVERTISE (RTA)
C W
K
L
W
I L L I A
M S
K6ENHCMC 7/21/2021 2:43:54 PM C:\USERS\K6ENHCMC\DESKTOP\CWK0616 SAV-BRUNS ENTRANCE HARBOR REGIONAL\CWK0616\HYDRO\DRAWINGS\CONSTRUCTION\CN301-CN303.DWG
C
C
L A
R K
E
C
C
L A
R K
E
L
W
I L L I A
M S
C
O R
R E
C T
I O
N
T
O
C
H A
N N
E L
W
I D
M
E N
S I O
| AMD 1 Front End.pdf |
| Summary of Tech Changes_RHDC_Amendment_1 |
| CN302.pdf |
| Sheets and Views |
| CN302 |
File details come from the government source that posted it. Updated .