Print Date Thu 10 September 2020 U.S. Army Corps of Engineers Time 10:12:07 Eff. Date 10/4/2017 Project : Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1

New Report Title Page

Labor ID: FB2016 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.0

This report is not copyrighted, but the information contained herein is For Official Use Only.

Estimated Construction Time 540 Days Effective Date of Pricing 10/4/2017

Preparation Date 10/4/2017

Prepared by

Estimated by Designed by

Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1

Eff. Date 10/4/2017 Project : Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1

New Report Table of Contents

Description Page

Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1 1

Labor ID: FB2016 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.0

Eff. Date 10/4/2017 Project : Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1

New Report Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1 Page 1

Description Quantity UOM DirectLabor DirectMatl DirectEQ DirectCost CostToPrime CostToPrime ContractCost ProjectCost

Ft. Bragg, NC, SOF Parachute Rigging Facility, Corrected Final 100pc REV1

Labor ID: FB2016 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.0