W912PM19B0018_P00001-_MOTSU_Potable_Water.pdf
PDF 144 KB Posted
- Attached to
- MOTSU Potable Water Improvements Federal contract opportunity
- Solicitation number
- W912PM19B0018
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PM19B0018_Amendment_02.pdf | ||
| W912PM19B0018_Amendment_02_CC.pdf | ||
| Technical_Summary_of_ChangesAmdt0002.pdf | ||
| S-II-201_Rev1.pdf | ||
| Addendum_1.pdf | ||
| W912PM19B0018_P00001-_MOTSU_Potable_Water_CC.pdf | ||
| MOTSU_WaterImprovPhII_PLANS_Revised14Aug2019.pdf | ||
| W912PM19B0018_MOSTU_Potable_Water_Repair.pdf | ||
| SPECS_-_PHASE_2_--_MOTSU_POTABLE_WATER2018-Revised14Aug2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1) Revise CLIN verbiage to reflect a change in specific instructions
2) Add Optional Bid Item #1
3) Change the period of performance from 180 calendar days to 365 calendar days updating FAR 52.211-10.
4) Include FAR 52.217-5 Evalaution of Options All other provisions of this solicitation remain unchanged.
//////////////////////////////////////////////////////LAST ITEM/////////////////////////////////////////////////////////////
1. CONTRACT ID CODE PAGE OF PAGES
J 1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM19B0018
X 9B. DATED (SEE ITEM 11)
14-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Aug-2019
CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM19B0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 185 days from 180 days to 365 days.
CLIN 0001
The CLIN description has changed from Demo of existing tank/pump house/etc. to Demolition of Existing Features.
The CLIN extended description has changed from:
Demolition of existing tank/pump house/associated structures- Provide all labor, equipment, transportation, and materials necessary to complete demolition work IAW SOW. All demolition work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
To:
Provide all labor, equipment, transportation, and materials necessary to complete demolition of existing features as follows: Building 151, emergency generator enclosure, 10,000-gallon hydropneumatic tank, 280-gallon diesel fuel tank and associated secondary containment structure and piping, and 500,000-gallon Concrete Above Ground Tank IAW SOW. All demolition work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
CLIN 0002
The CLIN description has changed from Construction of Water Main/Pipe Runs to Installation of Above Ground Tank.
The CLIN extended description has changed from:
Provide all labor, equipment, transportation, and materials necessary to complete construction work IAW SOW. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
transportation, and materials necessary to complete installation of 300,000-gallon Pre-Stressed Concrete Above Ground Tank and associated site work as shown on plans IAW SOW. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
CLIN 0003
The CLIN description has changed from Construction of Storage Tank to Installation of Support Buildings/System.
The CLIN extended description has changed from:
Provide all labor, equipment, transportation, and materials necessary to complete construction work IAW SOW. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most stringent requirements shall apply.
transportation, and materials necessary to complete construction/installation of support buildings/systems external to the Above Ground Tank including the pump house (with all controls), pipe work, exterior lighting, hydropneumatic tank, stand-by generator enclosure IAW SOW. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most
CLIN 0004
This CLIN has been renumbered to CLIN 0005.
CLIN 0005
This CLIN has been renumbered to CLIN 0006.
CLIN 0004 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0004 1 Job OPTION Removal of Earthen BermProvide all labor, equipment, transportation, and materials necessary to complete removal of earthen berm around the project site and clearing/dressing up the site IAW SOW. All work shall be performed in accordance with the contract specifications, manufacturer’s recommendations, and state building codes. Reference Specification Section 00 73 00, work performed under this contract shall comply with the latest edition of the publications dated at the time of the contract award. When a required publication is not referenced in the list found in Specification Section 00 73 00, the contractor shall utilize one that has national applications. Where conflicts arise between publications, the most
FOB: Destination
NET AMT
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
180 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
W912PM
CAGE
365 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
The following Delivery Schedule item for CLIN 0002 has been changed from:
CAGE
180 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
CAGE
365 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
The following Delivery Schedule item for CLIN 0003 has been changed from:
CAGE
180 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
CAGE
365 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
The following Delivery Schedule for CLIN 0004 has been added:
CAGE
365 dys. ANP 1 COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
(910) 251-4642
The following Delivery Schedule for CLIN 0005 has been deleted:
CAGE
180 dys. ANP 1 N/A
The following Delivery Schedule for CLIN 0006 has been added:
CAGE
365 dys. ANP 1 N/A
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been added by reference:
52.217-5
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following Acceptance/Inspection Schedule was added for CLIN 0004:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following Technical Office was added for CLIN 0004:
COASTAL HYDRO & HYDRA
DENNIS V LYNCH
69 DARLINGTON AVENUE
WILMINGTON NC 28403
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar days after commencement of work. The time stated for completion shall include final cleanup of the premises.
(End of clause)
(End of Summary of Changes)