Kure_Beach_Borrow_B_Vibracore_soils_data.pdf

PDF 5 MB Posted

Attached to
Coastal Storm Risk Management at Carolina and Kure Beach, North Carolina
Solicitation number
W912PM18B0007
Issued by

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix E

Master Gradation Table

BORING

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

KBV-18-1 1 0.0-0.5 10.23 0.00 CL 91.78 90.47 89.77 88.22 86.72 83.64 83.14 82.90 82.67 80.42 77.41 76.86 76.25 74.94 74.18 73.43

KBV-18-1 2 4.0-4.5 0.00 0.00 CL 100.00 100.00 100.00 100.00 100.00 99.99 99.69 99.40 99.09 98.45 97.69 96.59 96.02 95.81 95.52 95.22

KBV-18-1 3 8.0-8.5 0.00 0.00 CL 100.00 100.00 100.00 100.00 100.00 100.00 99.90 99.86 99.72 98.19 97.87 97.33 96.74 96.40 96.01 95.62

KBV-18-1 4 13.5-14.0 0.00 0.00 CL 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 99.79 99.54 98.21 97.47 96.82 96.18

KBV-18-2 1 2.5-3.0 4.04 0.00 SP 99.04 98.52 95.96 92.80 90.99 88.87 86.61 83.66 77.87 64.11 34.14 8.66 2.55 1.59 1.49 1.40

KBV-18-2 2 4.5-5.0 13.00 24.00 SW-SC 81.27 74.66 63.01 53.96 49.39 45.16 41.80 38.07 32.96 27.07 19.03 13.97 9.69 8.71 8.44 8.18

KBV-18-2 3 7.0-7.5 4.57 0.00 SP-SC 100.00 97.73 95.43 93.46 91.21 88.50 85.01 81.17 75.77 68.74 61.21 52.25 21.93 10.16 9.43 8.69

KBV-18-2 4 9.5-10.0 0.00 0.00 CL 100.00 100.00 100.00 100.00 99.89 99.50 98.46 96.66 93.89 90.51 86.80 84.61 81.23 78.56 77.59 76.61

KBV-18-3 1 4.0-4.5 18.01 0.00 SW 88.51 86.35 81.99 78.67 75.92 71.87 63.99 50.69 38.66 32.80 25.86 15.55 5.30 2.27 2.04 1.80

KBV-18-3 2 7.0-7.5 2.30 0.00 SP-SC 100.00 100.00 97.69 93.98 89.99 83.94 76.78 68.36 57.05 44.12 31.78 22.58 12.72 8.57 8.21 7.84

KBV-18-3 3 12.0-12.5 0.00 0.70 SP 100.00 100.00 99.34 98.16 96.31 92.68 84.61 70.00 47.91 29.31 11.71 6.54 4.49 4.06 3.92 3.77

KBV-18-3 4 13.5-14.0 0.00 11.24 SP-SC 100.00 98.14 88.76 75.59 63.81 51.00 41.35 34.98 28.67 22.92 14.93 8.33 5.52 5.07 5.00 4.93

KBV-18-4 1 4.5-5.0 7.52 0.00 SP 98.05 96.96 92.48 87.25 82.82 76.07 62.62 47.03 31.95 19.68 10.28 5.69 3.03 2.17 2.04 1.92

KBV-18-4 2 7.0-7.5 8.40 0.00 SP-SM 100.00 96.90 91.63 85.26 79.09 73.04 67.68 62.67 56.80 50.85 38.02 20.57 9.09 6.95 6.72 6.49

KBV-18-4 3 11.0-11.5 0.80 0.00 SP-SM 100.00 100.00 99.22 98.11 97.07 96.12 94.65 93.42 91.73 88.80 79.11 42.37 8.34 5.39 5.09 4.78

KBV-18-4 4 15.5-16.0 0.60 0.00 SP 100.00 99.44 99.44 98.94 97.36 91.65 78.98 59.56 36.97 19.04 9.22 4.54 2.64 2.05 1.94 1.83

KBV-18-5 1 3.0-3.5 2.40 0.00 SP 100.00 99.44 97.59 93.80 90.64 86.51 82.58 78.47 68.41 47.92 22.20 8.43 2.58 1.74 1.66 1.58

KBV-18-5 2 7.0-7.5 5.10 0.00 SP-SC 100.00 97.75 94.88 92.69 91.20 89.51 88.00 86.52 84.58 81.70 74.28 52.97 22.00 7.55 6.69 5.83

KBV-18-5 3 12.5-13.0 19.37 0.00 SP-SC 98.12 90.97 80.63 74.84 71.88 68.68 65.61 63.31 60.46 58.13 48.64 21.60 8.42 6.75 6.44 6.14

KBV-18-5 4 15.5-16.0 0.44 0.00 SP 100.00 100.00 99.56 98.66 97.52 94.53 87.42 74.63 56.23 37.96 18.73 9.25 6.25 5.16 4.80 4.44

KBV-18-6 1 3.0-3.5 3.06 0.00 SP 100.00 100.00 96.94 92.81 87.75 79.40 67.75 53.36 35.81 16.32 8.15 5.56 3.14 2.36 2.23 2.09

KBV-18-6 2 5.0-5.5 6.14 0.00 SP 100.00 99.39 93.86 87.88 81.53 70.11 59.26 44.55 29.00 16.34 9.62 6.65 3.39 2.55 2.42 2.30

KBV-18-6 3 8.0-8.5 2.70 0.00 SP-SC 100.00 99.30 97.32 94.96 91.66 85.71 75.86 63.13 46.09 31.99 20.43 13.14 8.31 6.92 6.68 6.45

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

USACE; Master Gradation Table

AVS Project No. 18-0162

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-6 4 13.0-13.5 0.00 4.80 SM 100.00 98.02 95.17 91.98 86.85 76.35 62.28 48.31 37.14 29.52 22.79 18.25 14.93 12.85 12.31 11.77

KBV-18-7 1 3.0-3.5 2.00 0.00 SP 100.00 99.74 98.00 95.24 92.75 89.33 84.97 81.70 70.57 42.02 21.85 10.34 1.87 1.21 1.16 1.10

KBV-18-7 2 7.5-8.0 0.00 0.00 SP 100.00 100.00 100.00 99.62 98.53 95.85 92.36 88.39 83.30 74.46 37.55 11.12 3.64 2.83 2.74 2.66

KBV-18-7 3 12.5-13.0 6.50 0.00 SP 100.00 99.47 93.54 87.07 80.06 70.57 59.89 49.06 36.87 25.97 17.23 10.14 4.58 3.76 3.61 3.46

KBV-18-7 4 16.0-16.5 0.00 63.59 GP-GC 44.26 40.19 36.41 32.91 30.12 27.66 25.31 23.15 20.41 17.50 12.95 10.22 8.66 7.64 7.32 7.00

KBV-18-8 1 4.5-5.0 0.00 68.10 SP 100.00 100.00 100.00 99.88 99.74 99.43 99.32 98.56 98.04 97.40 93.51 44.48 7.75 3.79 3.51 3.24

KBV-18-8 2 9.5-10.0 2.15 0.00 SP 100.00 99.08 97.85 95.03 90.43 79.29 57.45 30.01 11.45 7.08 5.74 4.02 1.97 1.63 1.56 1.49

KBV-18-8 3 13.0-13.5 0.82 0.00 SP-SC 100.00 100.00 99.18 97.60 95.48 90.78 83.62 75.17 64.95 55.55 32.82 15.45 9.29 6.91 6.45 5.99

KBV-18-8 4 16.0-16.5 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.95 99.83 99.60 99.26 98.78 98.36 97.51 78.11 42.84 30.99 29.74 28.49

KBV-18-9 1 2.5-3.0 4.61 0.00 SP 100.00 99.69 95.39 90.97 87.33 83.55 80.04 75.98 65.20 43.38 20.73 9.81 4.25 3.23 3.14 3.04

KBV-18-9 2 6.0-6.5 0.85 0.00 SP 100.00 100.00 99.15 98.25 97.54 96.76 95.87 94.88 92.96 88.92 79.20 34.92 10.89 4.28 3.79 3.30

KBV-18-9 3 10.5-11.0 11.19 0.00 SP 100.00 97.45 88.81 81.20 77.21 73.09 68.55 64.40 60.88 56.56 40.39 17.87 6.47 3.89 3.59 3.29

KBV-18-9 4 15.5-16.0 21.91 0.00 SW 96.56 87.72 78.09 72.01 66.13 59.84 53.99 48.35 41.27 33.65 21.80 11.16 5.92 4.53 4.29 4.06

KBV-18-10 1 4.0-4.5 8.89 0.00 SP 100.00 97.31 91.11 84.46 79.48 73.81 67.65 60.78 51.94 41.97 26.92 11.98 3.92 2.24 2.05 1.85

KBV-18-10 2 8.5-9.0 0.32 0.00 SM 100.00 99.83 99.68 99.12 98.53 97.18 94.46 90.47 85.64 81.55 67.29 30.10 15.22 13.57 13.36 13.15

KBV-18-10 3 11.0-11.5 5.09 0.00 SP-SM 100.00 99.65 94.91 90.57 86.02 84.69 72.35 66.57 60.08 53.47 45.94 29.59 10.03 6.98 6.58 6.17

KBV-18-10 4 13.5-14.0 0.27 0.00 SM 100.00 100.00 99.73 99.10 98.61 98.16 97.81 97.41 96.86 96.01 94.58 84.96 53.08 37.76 36.16 34.56

KBV-18-11 1 2.0-2.5 2.86 0.00 SP 100.00 98.23 97.14 96.09 95.25 93.96 92.46 90.70 88.51 85.80 65.75 25.47 7.29 4.95 4.73 4.51

KBV-18-11 2 7.0-7.5 2.79 0.00 SP 100.00 100.00 97.22 88.13 77.89 63.09 46.80 34.02 23.98 16.12 9.38 5.88 2.76 1.99 1.87 1.74

KBV-18-11 3 12.5-13.0 5.50 0.00 SM 100.00 99.20 94.50 85.83 79.11 72.52 66.19 60.18 53.30 45.45 34.23 25.44 18.62 14.86 13.63 12.41

KBV-18-11 4 17.0-17.5 5.83 0.00 SM 100.00 97.62 94.17 90.53 85.98 84.11 81.02 75.70 68.08 58.33 44.14 33.85 25.10 19.94 18.87 17.81

KBV-18-12 1 3.0-3.5 0.64 0.00 SP 100.00 100.00 99.36 97.99 96.15 92.27 85.88 78.68 71.47 65.02 36.10 9.43 3.41 2.74 2.64 2.53

KBV-18-12 2 7.0-7.5 1.40 0.00 SP 100.00 99.83 98.60 96.66 94.47 90.29 83.83 75.93 66.32 57.98 46.11 23.97 5.75 2.81 2.64 2.46

AVS Project No. 16-0128

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-12 3 11.0-11.5 0.00 4.62 SM 100.00 100.00 95.38 87.38 78.85 70.12 64.28 59.41 54.18 48.64 41.20 32.74 24.97 20.45 19.33 18.20

KBV-18-12 4 15.5-16.0 0.00 0.06 SP-SM 100.00 100.00 99.94 97.84 94.71 90.74 84.93 77.51 64.61 42.19 26.17 18.91 13.50 10.92 10.29 9.67

KBV-18-13 1 3.0-3.5 3.86 0.00 SP 100.00 98.84 96.14 92.71 89.93 85.63 79.78 72.03 58.50 42.42 24.95 14.11 4.76 3.12 2.98 2.84

KBV-18-13 2 7.5-8.0 3.14 0.00 SP 100.00 98.22 96.86 95.24 93.46 90.98 87.35 83.37 78.80 72.73 57.05 20.74 4.24 3.75 3.04 2.33

KBV-18-13 3 11.5-12.0 1.22 0.00 SP 100.00 99.64 98.78 97.95 97.37 96.84 96.45 95.81 94.78 91.71 59.14 20.78 5.91 4.63 4.41 4.20

KBV-18-13 4 15.5-16.0 6.50 0.00 SP 100.00 99.23 93.55 78.09 66.01 53.64 41.19 27.71 15.30 10.38 6.32 5.48 2.09 1.42 1.33 1.25

KBV-18-14 1 1.5-2.0 1.70 0.00 SP 100.00 99.64 98.26 96.64 95.40 93.77 91.56 88.19 80.57 67.84 40.93 13.30 3.07 1.70 1.61 1.52

KBV-18-14 2 4.5-5.0 2.10 0.00 SP 100.00 98.83 97.90 96.58 95.72 95.48 93.11 91.01 86.31 76.69 46.25 14.73 2.85 1.33 1.24 1.16

KBV-18-14 3 9.0-9.5 0.47 0.00 SP 100.00 100.00 99.53 98.35 96.85 94.25 90.38 86.42 81.16 73.39 59.21 37.12 9.77 3.62 3.28 2.93

KBV-18-14 4 14.5-15.0 8.10 0.00 SW 100.00 97.97 91.90 82.53 74.58 64.20 53.66 43.44 32.84 24.77 17.17 8.89 3.92 2.95 2.91 2.87

KBV-18-15 1 2.5-3.0 3.93 0.00 SP 100.00 100.00 96.07 93.20 90.77 87.46 81.50 72.92 55.71 32.06 11.14 4.13 1.16 0.51 0.39 0.27

KBV-18-15 2 7.5-8.0 0.00 1.70 SP-SM 100.00 100.00 98.30 94.54 90.12 83.97 77.13 69.16 59.24 49.93 39.19 28.97 19.68 7.89 5.95 4.01

KBV-18-15 3 11.0-11.5 0.00 1.92 SM 100.00 100.00 98.08 94.86 90.17 83.16 74.39 64.25 49.92 35.23 23.24 17.66 14.52 13.31 13.02 12.74

KBV-18-15 4 14.0-14.5 1.00 5.00 SM 100.00 100.00 94.02 82.34 74.01 66.80 60.27 54.68 48.69 42.67 34.86 28.00 21.85 18.12 16.91 15.70

KBV-18-16 1 0.5-1.0 0.50 0.00 SP-SC 100.00 100.00 99.50 98.23 96.29 93.90 90.97 86.76 80.64 72.20 55.69 34.30 17.34 11.73 11.08 10.42

KBV-18-16 2 5.0-5.5 0.68 0.00 SP 100.00 100.00 99.32 98.08 96.22 92.23 83.92 69.52 50.89 37.61 25.63 11.74 3.08 2.24 2.15 2.07

KBV-18-16 3 9.5-10.0 2.80 0.00 SP 100.00 99.63 97.20 92.52 87.10 77.65 65.34 52.19 38.40 27.84 18.93 9.01 4.38 3.56 3.42 3.28

KBV-18-16 4 16.0-16.5 0.00 0.00 CL 100.00 100.00 100.00 99.97 99.92 99.85 99.74 99.58 99.36 99.13 98.60 85.04 53.31 37.14 35.52 33.91

KBV-18-17 1 3.0-3.5 2.62 0.00 SP-SM 100.00 99.59 97.38 95.08 93.31 91.26 88.73 86.01 80.78 72.41 54.41 26.08 11.46 9.63 9.51 9.39

KBV-18-17 2 7.0-7.5 0.22 0.00 SP 100.00 100.00 99.78 99.37 98.94 98.23 97.03 95.32 91.65 83.97 59.61 22.50 6.04 3.09 2.92 2.75

KBV-18-17 3 11.0-11.5 0.00 0.00 CL 100.00 100.00 100.00 100.00 100.00 100.00 99.78 99.72 98.91 97.92 96.38 92.59 88.64 87.38 87.14 86.90

KBV-18-17 4 14.5-15.0 0.18 0.00 SM 100.00 100.00 99.82 99.77 99.66 99.53 99.36 99.09 98.63 98.01 97.02 75.87 50.49 38.87 37.06 35.25

KBV-18-18 1 2.0-2.5 0.00 0.00 SP 100.00 100.00 100.00 99.70 99.04 97.02 92.89 85.35 65.80 39.86 19.72 9.06 3.85 3.21 3.12 3.03

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-18 2 7.5-8.0 0.08 0.00 SM 100.00 100.00 99.92 96.37 91.24 83.27 76.11 69.94 62.87 56.56 50.06 45.88 43.42 42.48 42.28 42.08

KBV-18-18 3 11.5-12.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.29 98.62 98.15 97.81 97.44 97.10 96.17 75.14 45.36 35.65 33.97 32.28

KBV-18-18 4 17.5-18.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.92 99.85 99.71 99.58 99.44 98.93 83.64 42.11 28.55 25.04 24.43 23.82

KBV-18-19 1 0.5-1.0 6.05 0.00 SP 99.08 95.74 93.95 85.96 81.96 76.61 68.99 60.39 52.94 47.64 36.94 16.56 4.61 1.91 1.73 1.54

KBV-18-19 2 2.5-3.0 0.74 0.00 SP 100.00 100.00 99.26 97.72 95.96 92.32 91.49 80.26 70.78 59.03 38.19 16.49 5.25 2.55 2.32 2.09

KBV-18-19 3 9.5-10.0 12.38 0.00 SW 93.47 91.88 87.62 79.81 71.34 59.37 46.23 34.01 24.80 19.96 14.34 8.58 3.29 2.23 2.11 2.00

KBV-18-19 4 10.5-11.0 0.46 0.00 SP 100.00 99.97 99.54 98.89 98.34 97.63 96.56 95.11 92.81 88.96 71.86 32.17 11.23 4.17 3.63 3.08

KBV-18-20 1 1.0-1.5 0.00 16.93 SM 88.63 85.44 83.07 80.48 77.61 72.96 66.22 58.05 47.94 38.09 29.11 23.89 19.73 18.00 17.69 17.38

KBV-18-20 2 4.0-4.5 0.00 9.71 SM 97.40 94.68 90.29 86.07 82.35 77.14 70.35 61.63 50.02 38.15 27.12 21.08 16.63 14.51 14.04 13.57

KBV-18-20 3 8.0-8.5 3.28 0.00 SM 100.00 99.86 96.72 91.82 85.75 76.45 65.71 54.47 41.92 32.62 25.05 20.32 16.18 13.40 12.59 11.78

KBV-18-20 4 13.0-13.5 0.48 0.00 SP-SM 100.00 100.00 99.52 95.70 87.52 74.94 61.25 47.85 33.79 24.42 18.13 14.45 11.90 10.27 9.85 9.44

KBV-18-21 1 2.5-3.0 1.45 0.00 SP 100.00 99.96 98.55 96.95 95.81 94.26 92.52 90.09 83.78 72.88 44.99 15.28 3.23 1.31 1.19 1.07

KBV-18-21 2 7.0-7.5 9.91 0.00 SP-SM 95.88 94.44 90.09 84.86 79.71 72.81 66.21 60.33 54.38 48.75 41.28 31.80 17.01 9.93 9.39 8.84

KBV-18-21 3 11.5-12.0 0.12 0.00 SP 100.00 100.00 99.88 99.08 97.18 91.21 79.56 64.01 43.81 25.66 11.00 5.61 3.35 2.63 2.53 2.43

KBV-18-21 4 14.5-15.0 1.85 0.00 SP-SM 100.00 100.00 98.15 96.21 92.72 85.17 73.17 58.28 42.62 29.83 17.67 12.14 8.57 7.42 7.26 7.09

KBV-18-22 1 3.0-3.5 2.33 0.00 SP-SM 100.00 100.00 97.77 95.28 91.70 85.17 75.02 63.33 51.35 41.63 24.13 11.50 7.25 6.29 6.17 6.05

KBV-18-22 2 6.0-6.5 0.00 0.00 SM 100.00 100.00 100.00 99.67 99.45 99.15 98.79 98.40 97.93 97.39 95.94 74.48 47.03 38.85 37.56 36.27

KBV-18-22 3 10.0-10.5 0.06 0.00 SM 100.00 100.00 99.94 99.86 99.79 99.67 99.56 99.43 99.34 99.11 98.56 79.88 39.20 26.36 24.68 23.00

KBV-18-22 4 16.0-16.5 0.00 0.00 SM 100.00 100.00 100.00 99.88 99.77 99.67 99.59 99.50 99.37 99.21 98.42 85.26 47.75 37.01 34.51 32.02

KBV-18-23 1 1.0-1.5 3.45 0.00 SP-SM 100.00 99.62 96.55 91.67 84.63 73.78 61.69 51.31 41.62 33.24 24.21 16.44 11.91 9.03 8.75 8.48

KBV-18-23 2 6.5-7.0 1.23 0.00 SM 100.00 100.00 98.77 97.46 96.86 96.32 95.84 95.38 94.90 94.36 93.06 84.54 55.34 34.13 31.59 29.06

KBV-18-23 3 12.5-13.0 1.03 0.00 SM 100.00 100.00 98.97 97.71 97.08 96.55 96.23 95.90 95.55 95.13 93.81 70.43 49.12 37.64 35.58 33.52

KBV-18-23 4 17.5-18.0 0.00 0.00 SM 100.00 100.00 100.00 98.85 98.20 97.75 97.34 97.00 96.67 96.42 95.34 82.31 50.14 36.82 34.80 32.78

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-24 1 1.5-2.0 0.58 0.00 SP 100.00 99.88 99.42 98.07 96.74 94.54 91.55 87.09 81.13 74.94 56.92 24.67 7.05 3.51 3.17 2.84

KBV-18-24 2 6.0-6.5 0.88 0.00 SP-SM 100.00 100.00 99.12 97.56 94.49 87.45 76.09 60.90 44.19 30.16 18.70 11.64 7.75 6.57 6.34 6.11

KBV-18-24 3 10.5-11.0 0.00 0.00 SM 100.00 100.00 100.00 99.97 99.97 99.94 99.91 99.88 99.79 99.70 99.35 83.00 45.20 32.80 31.30 29.80

KBV-18-24 4 15.5-16.0 0.00 0.00 SM 100.00 100.00 100.00 98.45 97.92 97.44 97.22 96.67 96.24 94.27 93.50 85.62 47.57 34.70 34.49 34.28

KBV-18-25 1 1.0-1.5 3.30 0.00 SM 100.00 97.73 96.71 95.29 93.91 91.61 88.97 85.77 81.23 76.54 72.09 68.27 58.11 48.28 47.37 46.45

KBV-18-25 2 6.5-7.0 0.72 0.00 SM 100.00 100.00 99.28 98.25 97.82 97.50 97.23 97.03 96.76 96.44 95.46 82.13 59.46 43.80 41.34 38.87

KBV-18-25 3 12.5-13.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.61 99.40 99.22 99.09 98.92 98.73 97.81 71.48 43.29 34.72 33.30 31.88

KBV-18-25 4 18.0-18.5 0.39 0.00 SM 100.00 100.00 99.61 99.48 99.35 99.24 99.19 99.10 98.95 98.87 98.19 76.75 46.45 35.74 34.35 32.96

KBV-18-26 1 2.5-3.0 1.59 0.00 SP-SM 100.00 100.00 98.41 95.17 90.96 84.39 74.92 62.83 47.61 31.74 18.46 12.38 9.47 8.73 8.57 8.42

KBV-18-26 2 6.0-6.5 0.00 0.00 SM 100.00 100.00 100.00 99.57 98.88 97.42 94.15 88.27 77.51 61.87 39.90 29.46 22.55 18.66 17.92 17.19

KBV-18-26 3 10.0-10.5 0.00 0.00 SP-SM 100.00 100.00 100.00 99.78 99.20 97.09 92.89 87.97 83.37 77.48 59.90 30.05 13.74 7.97 7.54 7.11

KBV-18-26 4 14.0-14.5 0.00 0.00 SM 100.00 100.00 100.00 99.96 99.95 99.88 99.72 99.43 98.82 97.66 83.02 41.67 28.21 24.82 24.34 23.87

KBV-18-27 1 2.5-3.0 3.10 3.20 SP 100.00 99.45 93.71 85.90 78.83 69.85 61.96 54.60 43.76 28.74 14.79 8.08 4.22 2.85 2.84 2.83

KBV-18-27 2 4.0-4.5 0.92 0.00 SM 100.00 99.80 99.08 97.36 95.07 90.69 85.08 79.80 73.30 63.20 47.20 30.84 18.51 14.92 14.59 14.26

KBV-18-27 3 7.0-7.5 1.63 0.00 SP-SM 100.00 100.00 98.37 96.62 94.64 91.03 85.33 77.07 77.04 61.39 40.58 18.43 10.27 6.15 5.47 4.78

KBV-18-27 4 12.5-13.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.92 99.88 99.82 99.75 99.63 99.46 99.06 89.51 54.80 38.73 36.92 35.10

KBV-18-28 1 2.0-2.5 0.30 0.00 SM 100.00 100.00 99.70 98.08 95.73 91.29 85.38 77.93 67.77 57.66 47.59 38.75 28.57 23.67 23.14 22.61

KBV-18-28 2 4.0-4.5 0.15 0.00 SP 100.00 100.00 99.85 99.34 98.49 95.24 88.32 75.73 47.15 20.92 9.10 3.73 2.01 1.58 1.48 1.37

KBV-18-28 3 9.0-9.5 0.19 0.00 SM 100.00 100.00 99.81 99.48 99.03 98.65 98.36 98.10 97.81 97.48 96.59 77.68 53.11 45.26 44.55 43.83

KBV-18-28 4 15.5-16.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.93 99.86 99.80 99.56 99.28 98.86 97.92 83.37 42.90 29.62 27.99 26.35

KBV-18-29 1 1.5-2.0 0.54 0.00 SP 100.00 99.92 99.46 98.75 98.12 97.24 96.75 94.39 90.13 83.15 65.14 26.40 5.88 1.78 1.54 1.30

KBV-18-29 2 4.5-5.0 0.43 0.20 SM 100.00 100.00 99.57 96.71 93.13 87.00 78.21 67.44 52.81 39.92 27.31 19.41 13.97 12.38 12.15 11.93

KBV-18-29 3 7.5-8.0 0.46 0.00 SM 100.00 100.00 99.54 99.08 98.70 98.35 98.04 97.74 97.37 97.01 95.82 79.37 49.70 39.34 38.87 38.41

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-29 4 11.5-12.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.92 99.87 99.79 99.67 99.45 99.27 98.39 78.65 47.50 36.71 35.69 34.67

KBV-18-30 1 1.5-2.0 0.00 9.62 SP-SM 100.00 99.21 90.38 79.68 72.10 64.43 57.85 52.54 47.21 41.36 32.75 24.44 16.87 12.72 11.81 10.90

KBV-18-30 2 6.0-6.5 12.40 24.49 SW-SM 85.36 74.03 63.11 55.62 51.15 46.65 42.62 38.92 34.87 30.26 23.51 17.55 12.44 8.94 7.85 6.75

KBV-18-30 3 10.0-10.5 0.70 0.90 SM 100.00 100.00 98.40 95.56 91.15 83.78 75.08 64.94 50.59 37.23 25.23 18.83 14.75 12.54 12.02 11.50

KBV-18-30 4 14.5-15.0 3.00 3.66 SP-SM 100.00 98.55 93.34 89.25 85.74 79.33 69.73 56.92 40.99 34.03 21.26 16.39 12.43 9.97 9.35 8.72

KBV-18-31 1 1.5-2.0 1.53 0.00 SP 100.00 100.00 98.47 96.40 94.12 91.07 86.87 80.48 70.42 58.72 37.23 13.61 3.59 1.68 1.53 1.38

KBV-18-31 2 5.5-6.0 6.66 0.00 SP 100.00 98.82 93.34 85.56 78.99 69.64 56.58 41.14 26.65 17.84 10.50 4.52 2.45 2.10 2.03 1.96

KBV-18-31 3 10.5-11.0 0.00 0.00 SM 100.00 100.00 100.00 99.99 99.99 99.95 99.95 99.86 99.81 99.72 99.20 84.93 46.79 27.93 26.09 24.25

KBV-18-31 4 15.5-16.0 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.99 99.93 99.90 99.82 99.74 99.59 98.98 89.15 55.94 41.37 39.30 37.22

KBV-18-32 1 1.0-1.5 0.55 0.00 SP 100.00 100.00 99.45 98.60 97.73 96.42 94.67 92.29 87.96 81.46 66.52 23.34 5.63 2.48 2.43 2.37

KBV-18-32 2 4.0-4.5 2.40 0.00 SP-SM 100.00 98.63 97.60 96.91 95.16 89.91 81.71 69.98 53.72 38.50 20.38 19.37 7.83 6.75 6.52 6.29

KBV-18-32 3 9.0-9.5 0.03 0.00 SM 100.00 100.00 99.97 99.65 99.45 99.17 98.85 98.49 97.85 97.52 96.46 69.30 35.19 26.77 25.64 24.52

KBV-18-32 4 14.0-14.5 0.00 0.00 SM 100.00 100.00 100.00 99.20 97.65 95.42 92.36 89.90 87.85 86.14 82.81 54.78 30.86 23.84 22.41 20.98

KBV-18-33 1 3.5-4.0 0.94 0.00 SP 100.00 99.69 99.06 97.50 95.64 92.33 86.69 77.59 63.96 53.07 40.49 18.81 5.65 3.53 3.35 3.18

KBV-18-33 2 8.0-8.5 0.15 0.00 SP 100.00 100.00 99.85 99.36 98.95 98.43 97.67 96.14 92.24 86.43 67.84 24.15 6.39 2.21 1.94 1.68

KBV-18-33 3 12.0-12.5 0.00 51.25 GP-GM 68.86 57.41 48.75 42.52 38.72 34.88 31.03 27.19 22.55 18.20 14.06 11.13 8.99 7.60 7.24 6.89

KBV-18-33 4 15.0-15.5 7.48 0.00 SP-SM 94.16 94.16 92.52 85.75 76.78 63.93 50.49 37.84 26.34 18.88 13.85 11.01 8.83 7.55 7.29 7.03

KBV-18-34 1 2.0-2.5 0.15 0.00 SP 100.00 100.00 99.85 99.40 98.88 97.97 96.67 93.65 86.00 76.42 57.90 27.17 8.72 4.51 4.14 3.76

KBV-18-34 2 5.5-6.0 0.00 19.41 SM 90.41 88.12 80.59 72.39 67.35 65.10 57.45 52.29 46.10 39.43 31.32 24.55 18.74 15.33 14.26 13.19

KBV-18-34 3 10.5-11.0 0.00 13.86 SW-SM 88.72 87.59 86.14 83.31 80.11 75.32 69.33 63.27 53.44 41.09 27.61 19.01 14.51 12.32 11.62 10.92

KBV-18-34 4 15.5-16.0 0.00 41.87 SW-SM 90.13 68.48 58.13 51.80 47.85 45.42 40.40 36.67 32.24 26.08 18.81 13.83 9.54 8.35 7.81 7.27

KBV-18-35 1 2.0-2.5 0.33 0.00 SP 100.00 100.00 99.67 99.05 98.45 97.25 94.96 87.19 72.01 58.14 39.73 18.50 7.64 3.40 3.22 3.04

KBV-18-35 2 4.5-5.0 4.20 6.43 SM 97.12 97.12 89.37 76.78 69.34 62.33 55.61 48.74 40.65 34.04 27.79 21.68 15.08 12.76 12.33 11.90

NUMBER

SAMPLE

No.

DEPTH

(ft)

SHELL

% LS USCS

3/4 percent passing

3/8 percent passing

#4 percent passing

#7 percent passing

#10 percent passing

#14 percent passing

#18 percent passing

#25 percent passing

#35 percent passing

#45 percent passing

#60 percent passing

#80 percent passing

#120 percent passing

#170 percent passing

#200 percent passing

#230 percent passing

Subsurface Investigation and Geotechnical Laboratory Testing, New Hanover County, NC Kure Beach Storm Reduction Project, Borrow Site B Investigation

SUMMARY OF LABORATORY TESTING RESULTS

FOR GRAIN SIZE ANALYSIS

KBV-18-35 3 8.5-9.0 0.04 0.00 SP-SM 100.00 100.00 99.96 99.32 96.58 86.84 71.25 54.32 38.09 28.23 21.04 16.79 13.51 11.50 10.82 10.15

KBV-18-35 4 12.5-13.0 1.09 2.20 SM 100.00 99.71 96.71 90.85 83.41 75.06 66.50 57.56 47.07 38.50 29.62 23.13 17.86 15.07 14.19 13.32

KBV-18-36 1 1.0-1.5 0.79 0.00 SP 100.00 99.85 99.21 98.41 97.93 98.18 96.27 94.29 89.12 81.86 65.35 31.30 8.90 2.22 1.94 1.66

KBV-18-36 2 2.0-2.5 2.69 0.00 SP 100.00 98.46 97.31 95.40 93.82 91.62 88.14 79.36 62.70 47.88 29.58 11.18 2.41 1.00 0.85 0.69

KBV-18-36 3 4.5-5.0 0.00 0.00 SM 100.00 100.00 100.00 99.86 99.74 99.59 99.39 99.06 98.50 97.81 96.16 82.04 46.27 32.92 31.61 30.29

KBV-18-36 4 6.0-6.5 0.19 0.00 SM 100.00 100.00 99.81 98.65 98.01 97.50 97.09 96.79 96.49 96.12 95.13 87.15 55.95 40.36 38.69 37.02

KBV-18-37 1 2.0-2.5 0.28 0.30 SP 100.00 100.00 99.42 98.30 97.09 95.41 93.13 88.15 76.57 63.14 43.49 18.91 5.20 2.97 2.74 2.52

KBV-18-37 2 3.5-4.0 0.00 0.00 SM 100.00 100.00 100.00 99.91 99.85 99.69 99.46 99.19 98.64 97.83 95.42 82.19 56.50 48.02 46.36 44.69

KBV-18-37 3 7.0-7.5 0.00 0.00 SM 100.00 100.00 100.00 100.00 99.73 99.36 99.06 98.73 98.36 97.83 96.15 77.16 52.25 45.32 43.89 42.45

KBV-18-37 4 13.5-14.0 0.10 0.00 SP-SM 100.00 100.00 99.92 99.85 99.79 99.67 99.56 99.44 99.22 98.89 97.20 58.61 26.04 8.10 7.48 6.86

KBV-18-38 1 3.5-4.0 0.15 0.00 SP 100.00 100.00 99.85 98.56 98.32 96.87 93.41 84.15 71.98 60.74 41.57 15.69 3.50 1.82 1.74 1.67

KBV-18-38 2 8.0-8.5 0.53 0.00 SP-SM 100.00 100.00 99.47 96.50 91.67 84.64 74.84 62.12 44.87 31.33 21.34 15.82 12.75 11.07 10.67 10.27

KBV-18-38 3 12.0-12.5 2.01 0.00 SP-SM 100.00 100.00 97.99 92.41 85.87 76.37 64.36 51.25 37.08 27.06 18.51 13.39 10.02 8.17 7.78 7.39

KBV-18-38 4 15.0-15.5 1.97 2.00 SP-SM 100.00 100.00 96.03 87.42 80.50 71.47 60.80 49.38 36.08 26.39 19.26 14.92 11.93 10.00 9.40 8.79

KBV-18-39 1 3.5-4.0 0.56 0.00 SP-SM 100.00 100.00 99.44 97.97 95.37 90.64 82.44 69.16 48.68 30.90 18.14 13.16 9.40 8.16 7.93 7.70

KBV-18-39 2 6.5-7.0 0.00 0.00 SM 100.00 100.00 100.00 99.88 99.77 99.58 99.32 99.04 98.64 98.23 97.29 74.21 51.96 46.31 45.78 45.25

KBV-18-39 3 11.0-11.5 0.00 0.00 SM 100.00 100.00 100.00 99.82 99.69 99.60 99.48 99.32 99.14 98.92 98.22 72.59 40.80 33.66 32.83 32.01

KBV-18-39 4 17.5-18.0 0.00 0.00 SM 100.00 100.00 100.00 99.99 99.94 99.91 99.85 99.79 99.71 99.61 99.18 81.91 47.25 33.01 32.00 30.99

Appendix F

Grain Size Distribution Curves

Sample No. Depth (ft) Project

1 0.0-0.5 Area

Boring No.

Date

Classification

KBV-18-01

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 10.2

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

GRAIN SIZE IN MILLIMETERS

U.S. Standard Sieve Opening in Millimeters

2 4.0-4.5 Area

Boring No.

Date

Classification

KBV-18-01

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 8.0-8.5 Area

Boring No.

Date

KBV-18-01

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 13.5-14.0 Area

Boring No.

Date

Classification

KBV-18-01

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 2.5-3.0 Area

Boring No.

Date

Classification

KBV-18-02

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 4.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 4.5-5.0 Area

Boring No.

Date

KBV-18-02

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 24.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SW-SC

Visual % Shell: 13.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 7.0-7.5 Area

Boring No.

Date

Classification

KBV-18-02

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 4.6

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 9.5-10.0 Area

Boring No.

Date

KBV-18-02

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 4.0-4.5 Area

Boring No.

Date

KBV-18-03

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SW

Visual % Shell: 18.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 7.0-7.5 Area

Boring No.

Date

Classification

KBV-18-03

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 2.3

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 12.0-12.5 Area

Boring No.

Date

Classification

KBV-18-03

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.7 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-03

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 11.2 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 4.5-5.0 Area

Boring No.

Date

KBV-18-04

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 7.5

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-04

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 8.4

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 11.0-11.5 Area

Boring No.

Date

Classification

KBV-18-04

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 0.8

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 15.5-16.0 Area

Boring No.

Date

Classification

KBV-18-04

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.6

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 3.0-3.5 Area

Boring No.

Date

KBV-18-05

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.4

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-05

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 5.1

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 12.5-13.0 Area

Boring No.

Date

Classification

KBV-18-05

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 19.4

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-05

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.4

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-06

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 3.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 5.0-5.5 Area

Boring No.

Date

Classification

KBV-18-06

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 6.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-06

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 2.7

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 13.0-13.5 Area

Boring No.

Date

KBV-18-06

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 4.8 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-07

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 7.5-8.0 Area

Boring No.

Date

Classification

KBV-18-07

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-07

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 6.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 16.0-16.5 Area

Boring No.

Date

Classification

KBV-18-07

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 63.6 Borrow Site B Investigation

AVS Geotechnical Laboratory

GP-GC

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 4.5-5.0 Area

Boring No.

Date

KBV-18-08

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 9.5-10.0 Area

Boring No.

Date

Classification

KBV-18-08

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.2

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 13.0-13.5 Area

Boring No.

Date

KBV-18-08

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 0.8

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-08

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-09

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 4.6

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 6.0-6.5 Area

Boring No.

Date

Classification

KBV-18-09

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.9

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 10.5-11.0 Area

Boring No.

Date

KBV-18-09

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 11.2

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-09

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SW

Visual % Shell: 21.9

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 4.0-4.5 Area

Boring No.

Date

KBV-18-10

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 8.9

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 8.5-9.0 Area

Boring No.

Date

Classification

KBV-18-10

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.3

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-10

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 5.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-10

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.3

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 2.0-2.5 Area

Boring No.

Date

KBV-18-11

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.9

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-11

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.8

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-11

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 5.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 17.0-17.5 Area

Boring No.

Date

Classification

KBV-18-11

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 5.8

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-12

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.60

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-12

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 1.4

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-12

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 4.6 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-12

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.1 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-13

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 3.9

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-13

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 3.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 11.5-12.0 Area

Boring No.

Date

Classification

KBV-18-13

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 1.2

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-13

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 6.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 1.5-2.0 Area

Boring No.

Date

KBV-18-14

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 1.7

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-14

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 9.0-9.5 Area

Boring No.

Date

Classification

KBV-18-14

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 14.5-15.0 Area

Boring No.

Date

Classification

KBV-18-14

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SW

Visual % Shell: 8.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-15

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 3.9

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-15

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 1.7 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-15

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 1.9 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 14.0-14.5 Area

Boring No.

Date

Classification

KBV-18-15

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 5.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 1.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 0.5-1.0 Area

Boring No.

Date

KBV-18-16

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SC

Visual % Shell: 0.5

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 5.0-5.5 Area

Boring No.

Date

Classification

KBV-18-16

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.7

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 9.5-10.0 Area

Boring No.

Date

Classification

KBV-18-16

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 2.8

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-16

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-17

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 2.6

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-17

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.2

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-17

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

CL

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-17

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.2

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-18

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-18

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-18

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 17.5-18.0 Area

Boring No.

Date

Classification

KBV-18-18

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 0.5-1.0 Area

Boring No.

Date

KBV-18-19

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 6.1

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

2 2.5-3.0 Area

Boring No.

Date

Classification

KBV-18-19

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.7

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

3 9.5-10.0 Area

Boring No.

Date

Classification

KBV-18-19

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SW

Visual % Shell: 12.4

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 10.5-11.0 Area

Boring No.

Date

Classification

KBV-18-19

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

1 1.0-1.5 Area

Boring No.

Date

KBV-18-20

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 16.9 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-20

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 9.7 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 0.0

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-20

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SM

Visual % Shell: 3.3

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

4 13.0-13.5 Area

Boring No.

Date

Classification

KBV-18-20

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 0.5

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-21

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 1.5

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-21

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 9.9

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-21

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP

Visual % Shell: 0.1

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-21

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 1.9

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

KBV-18-22

07/10/2018

Subsurface Investigation and Geotechnical Laboratory Testing, Kure Beach Storm Damage Reduction Project

Visual % Limestone: 0.0 Borrow Site B Investigation

AVS Geotechnical Laboratory

SP-SM

Visual % Shell: 2.3

Classification

0.0010.010.1110100

P E

R C

E N

T F

IN

E

R B

Y W

E

IG

H T

Boring No.

Date

Classification

KBV-18-22

07/10/2018

Subsurface…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.