R1-R15_MOTSU_Reference_Drawings.pdf
PDF 4 MB Posted
- Attached to
- Wilmington Harbor Mid-River & Military Ocean Terminal at Sunny Point Dredging Maintenance
- Solicitation number
- W912PM-16-B-0008
About this file
Amendment 0003 Reference Drawings
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MILITARY OCEAN TERMINAL AT SUNNY POINT (MOTSU)
SECURITY BOAT DOCK AND WAVE ATTENUATION SYSTEM - MOD 1
SUNNY POINT, NORTH CAROLINA
JAN 2011
SHEET NO. SHEET INDEX PAGE NO.
T-1 TITLE SHEET - MOD 1 1 OF 15
G-1 GENERAL NOTES, SHEET 1 - MOD 1 2 OF 15
(BASE BID AND AND OPTIONAL BID ITEMS)
G-2 GENERAL NOTES, SHEET 2 - MOD 1 3 OF 15
(BASE BID AND AND OPTIONAL BID ITEMS)
D-1 EXISTING LAYOUT AND DEMOLITION PLAN 4 OF 15
(OPTIONAL BID ITEMS)
C-1 SECURITY BOAT HARBOR LAYOUT - MOD 1 5 OF 15
(BASE BID AND AND OPTIONAL BID ITEMS)
C-2 FLOATING DOCK LAYOUT DETAILS, SHEET 1 - MOD 1 6 OF 15
(OPTIONAL BID ITEM)
C-3 FLOATING DOCK LAYOUT DETAILS, SHEET 2 - MOD 1 7 OF 15
(OPTIONAL BID ITEM)
C-4 FLOATING DOCK SECTIONS - MOD 1 8 OF 15
(OPTIONAL BID ITEM)
C-5 DETAILS - MOD 1 9 OF 15
(OPTIONAL BID ITEM)
C-6 PARTIAL-DEPTH SHEETPILE WALL DETAILS 10 OF 15
(BASE BID)
E-1 ELECTRICAL LEGEND AND NOTES - MOD 1 11 OF15
(OPTIONAL BID ITEM)
E-2 ELECTRICAL LAYOUT, SHEET 1 - MOD 1 12 OF15
(OPTIONAL BID ITEM)
E-3 ELECTRICAL LAYOUT, SHEET 2 - MOD 1 13 OF15
(OPTIONAL BID ITEM)
E-4 ONE-LINE, PANEL BOARD SCHEDULE AND DETAILS - MOD 1 14 OF15
(OPTIONAL BID ITEM)
E-5 ELECTRICAL DETAILS 15 OF15
(OPTIONAL BID ITEM)
CLIENT/OWNER:
U.S. ARMY CORP OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CESAW-TS-EE
69 DARLINGTON AVE.
WILMINGTON, NC 28403
ATTN: MAJ ANDREW BAKER, P.E., USACE
(910) 251-4562
ENGINEER:
TETRA TECH, INC.
401 E. OCEAN BLVD., SUITE 420
LONG BEACH, CA 90802
ATTN: FERNANDO PAGES, P.E.
TEL: (626) 688-1017
FAX: (787) 791-0803
PROJECT DESCRIPTION:
FURNISH AND INSTALL A NEW 2840 SF DOCK SYSTEM
AND A 463 LF PARTIAL-DEPTH SHEETPILE WALL.
TI
TL
E
SH
EE
T
T-1
.\area map.jpg
AERIAL MAP
N.T.S.
PROJECT SITE
.\MOTSU Vicinity.jpg
VICINITY MAP
N.T.S.
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
FI
LE
N
A M E:
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
R
EV
IE
W
ED
B Y:
D R A W
IN
G C
O D E:
A P P R O
VE
D B
Y:
C H
IE
F, E N G
IN
EE
R
IN
G B
R A N C H
C H
IE
F, D
ES
IG
N S
EC
TI
O N
P R
IN
C
IP
A L, A
E
FI
R M
P R
EP
A R
ED
B Y:
SHEET OF 15
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
M O D
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
SM
H
JW
FL
P A J/ W A P
JA
N
M O
TS
U D
R A W
IN
G S.
D W G
TE
TR
A T
EC
H
IN
C
R
EV
IS
ED
D R A W
IN
G S
ET
F O R F
IR
E
B O A T
SL
IP
JA
N1
FP
RE
G I
ST
ER
ED
PROF
ESS I ONAL
ENG I NEER
C I
S T ATE OF CAL I F O
RN
I A
No. C-56821 Exp. 06-30-11
I LV
FE
R N
A N O L. P AG
SE
D
AS-BUILT
K7TSEJAM
Typewritten Text R-1
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
G
EN
ER
A L N O
TE
S, G-1
ABBREVIATIONS
& AND
@ AT
APPROX APPROXIMATELY
ASCE AMERICAN SOCIETY OF CIVIL ENGINEERS
BGS BELOW GROUND SURFACE
C CENTERLINE
CLR CLEAR
CONT CONTINUOUS
COR CONTRACTING OFFICERS REPRESENTATIVE
CP CONCRETE PILE
CSK COUNTER SINK
CTR CENTER
DCI CORROSIVE INHIBITOR CONCRETE ADDITIVE
DIA DIAMETER
DWG DRAWING
E EASTING
(E) EXISTING
EF EACH FACE
EHW EXTREME HIGH WATER
ELECT ELECTRICAL
ELEV ELEVATION
ELW EXTREME LOW WATER
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EW EACH WAY
FG FINISHED GROUND
FRP FIBER REINFORCED PLASTIC
FT FOOT, FEET
H.D.G. HOT-DIPPED GALVANIZED
H.S. HIGH STRENGTH
H:V HORIZONTAL: VERTICAL
HEX HEXAGONAL
IBC INTERNATIONAL BUILDING CODE
MECH MECHANICAL
MFG MANUFACTURE
MHHW MEAN HIGHER HIGH WATER
MIN MINIMUM
MLLW MEAN LOWER LOW WATER
MOTSU MILITARY OCEAN TERMINAL, SUNNY POINT
N NORTHING
(N) NEW
NO NUMBER
NOAA NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION
NOM NOMINAL
N.T.S. NOT TO SCALE
O.C. ON CENTER
OG ORIGINAL GROUND
PL PLATE
PCC PORTLAND CEMENT CONCRETE
PDSW PARTIAL-DEPTH SHEETPILE WALL
PIP PROTECT-IN-PLACE
PT POINT
SAW SOUTH ATLANTIC, WILMINGTON DISTRICT
SIM SIMILAR
SQ SQUARE
STD STANDARD
STRUCT STRUCTURAL
SS STAINLESS STEEL
TH THICK
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
USACE UNITED STATES ARMY CORPS OF ENGINEERS
UTIL UTILITY
W/ WITH
WHS WELDED HEADED STUD
WOF SHEETPILE CONNECTORS (FEMALE)
WOM SHEETPILE CONNECTORS (MALE)
WT WALL THICKNESS
C1 C2
REFERENCE SHEET ON WHICH SECTION OR
DETAIL IS SHOWN
REFERENCE SHEET ON WHICH SECTION
OR DETAIL IS TAKEN
SECTION OR DETAIL IDENTIFICATION
NOTE:
LETTER INDICATES SECTION, NUMBER INDICATES DETAIL. WHERE THERE IS NO
REFERENCE SHEET INDICATED, THE DETAIL OR SECTION IS TAKEN AND SHOWN ON
THE SAME SHEET.
TIDAL DATUM:
HORIZONTAL DATUM: NORTH CAROLINA STATE PLANE NAD 1983
BASED ON NOAA'S TIDAL DATUM FOR:
STATION ID: 8658622
NAME: CENTER WHARF, MILITARY OCEAN TERMINAL, SUNNY POINT, NORTH CAROLINA
NOAA CHART: 11537
TIDAL EPOCH: 1960-1978 AND 1983-2001
ELEVATION DATUM FOR THIS PROJECT IS 0.0' MEAN LOWER LOW WATER (MLLW):
HIGHEST OBSERVED WATER LEVEL = 6.60'
NAVD 88 = 3.15'
MEAN TIDE LEVEL (MTL) = 2.20'
MEAN LOWER LOW WATER (MLLW) = 0.00'
LOWEST OBSERVED WATER LEVEL = -1.20'
NOTE:
CORDINATES APPROXIMATE, CONTRACTOR RESPONSIBLE
FOR ESTABLISHING HORIZONTAL CONTROLS FOR PDSW
AND FLOATING DOCK CONSTRUCTION.
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
SH
EE
T
BASE BID AND OPTIONAL BID ITEMS
IN
C
LU
D
ED
C O N C R
ET
E
P
IL
E
SC
H
ED
U
LE
JA
N1
FP
K7TSEJAM
R-2
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
G
EN
ER
A L N O
TE
S, G-2
GENERAL SPECIFICATIONS:
1. DOCK STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THESE SPECIFICATIONS AND THE
EXCEPTIONS ALLOWED AS APPROVED BY THE CONTRACTING OFFICERS REPRESENTATIVE (COR).
2. CONTRACTOR SHALL PROVIDE BARRICADES, WARNING LIGHTS, AND SIMILAR SAFETY MEASURES TO ASSURE PERSONNEL SAFETY DURING CONSTRUCTION. REFER TO ARMY CORPS SAFETY MANUAL, EM385-1-1, 15 SEPT 08.
3. CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ANY AND ALL DAMAGES TO EXISTING STRUCTURES AND UTILITIES DURING CONSTRUCTION. CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF EXISTING
UTILITIES.
4. CONTRACTOR SHALL EXERCISE EXTREME CARE IN WORKING NEAR EXISTING STRUCTURES. THE EXISTING FIXED PIER, ACCESS PLATFORM, AND 13'X100' MAINWALK AND PILES SHALL BE PROTECTED IN-PLACE. REPAIR ANY DAMAGE TO THE EXISTING STRUCTURES CAUSED BY OR DURING THE PERFORMANCE OF WORK AT NO
ADDITIONAL COST TO THE COR.
5. CONTRACTOR SHALL PROVIDE AND COMPLY WITH REQUIREMENTS OF ALL PERMITS FOR THE WORK. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND COUNTY LAWS AND ORDINANCES RELATING TO SAFETY AND CHARACTER OF WORK, EQUIPMENT AND LABOR PERSONNEL. THIS SHALL INCLUDE, BUT IS
NOT LIMITED TO, THE PREVENTION OF DEBRIS DISCHARGE TO THE CAPE FEAR RIVER.
6. CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PROPERTY ADJACENT TO THE WORK THROUGHOUT THE
PERIOD OF CONSTRUCTION.
7. CONTRACTOR SHALL KEEP DEBRIS, CONCRETE RUBBLE, AND OTHER MATERIALS FROM FALLING INTO THE WATER. IF, IN THE OPINION OF THE COR, THE CONTRACTOR IS NOT IN COMPLIANCE, THEN CONTAINMENT BOOMS SHALL BE PROVIDED BY THE CONTRACTOR. NO CONSTRUCTION MATERIALS, EQUIPMENT, DEBRIS, OR WASTE SHALL BE PLACED OR STORED WHERE IT MAY BE SUBJECT TO WAVE, WIND, OR RAIN EROSION AND DISPERSION. NON-BUOYANT DEBRIS DISCHARGED INTO COASTAL RIVERINE WATERS SHALL BE RECOVERED
BY DIVERS AS SOON AS POSSIBLE AFTER LOSS BUT NO LATER THAN THE END OF EACH DAY.
8. REFER TO ARMY CORPS SAFETY MANUAL, EM385-1-1, 15 SEPT 08, FOR HANDLING SPILLS OR HAZARDOUS
MATERIALS.
9. PROJECT SITE AND STAGING AREA SHALL BE CLEARED OF DEBRIS AND EQUIPMENT UPON COMPLETION OF PROJECT. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A NEAT AND ORDERLY CONDITION AT ALL TIMES.
THE CONTRACTOR SHALL REMOVE AND DISPOSE OF, USING AN APPROVED LEGAL METHOD, ALL SURPLUS MATERIALS AND DEBRIS FROM THE SITE. THE SURPLUS MATERIAL BELONGS TO THE CONTRACTOR, UNLESS
NOTED OTHERWISE ON THE PLANS OR SPECIFICATIONS.
10. ALL DIMENSIONS ARE NOMINAL. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND DISTANCES AT THE PROJECT SITE BEFORE STARTING WORK AND SHALL IMMEDIATELY NOTIFY THE COR OF ANY DISCREPANCIES.
11. CONTRACTOR IS RESPONSIBLE FOR ARRANGING FOR ALL REQUIRED INSPECTIONS. THE PRESENCE OR ABSENCE OF A COR OR OTHER INSPECTOR WILL NOT RELIEVE CONTRACTOR OF FULL RESPONSIBILITY FOR
THE PROPER PERFORMANCE OF WORK.
12. DUE TO THE SCALE OF THE DRAWINGS IT IS NOT POSSIBLE TO INDICATE ALL OFFSETS, FITTINGS, SLEEVES, ETC. THE CONTRACTOR SHALL INVESTIGATE THE FINISHED CONDITIONS AND PLAN THE WORK ACCORDINGLY, FURNISHING SUCH FITTINGS, ETC., AS MAY BE REQUIRED TO MEET SUCH CONDITIONS.
13. ALL MATERIALS SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR UNLESS OTHERWISE NOTED.
ANY AND ALL CONSTRUCTION MATERIAL SHALL BE REMOVED FROM THE SITE WITHIN 10 DAYS OF
COMPLETION OF CONSTRUCTION.
14. MACHINERY OR CONSTRUCTION MATERIALS NOT ESSENTIAL FOR PROJECT IMPROVEMENTS SHALL NOT BE
ALLOWED AT ANY TIME IN THE INTERTIDAL ZONE.
15. ANY CONFLICTS WITH THE DESIGN OR ANY CHANGES TO THE PLANS SHALL BE APPROVED BY THE COR
BEFORE CONTINUING WITH WORK.
16. AREAS OF THE FACILITY NOT UNDER CONSTRUCTION SHALL REMAIN IN OPERATION DURING CONSTRUCTION.
KEEP ALL CONSTRUCTION ACTIVITIES AND PERSONNEL AWAY FROM AND CLEAR OF FACILITY OPERATIONS AND PROVIDE FOR NORMAL USE ACCESS TO THESE AREAS. CONTRACTOR SHALL BE AWARE THAT MOTSU OPERATIONAL ACTIVITIES, SUCH AS MUNITIONS LOADING AND OFF LOADING AT WHARVES, COULD POSSIBLY
INTERFERE WITH PROGRESS OF CONTRACT WORK.
17. THESE DRAWINGS COMPRISE BOTH PERFORMANCE AND PRESCRIPTIVE WORK. THE CONTRACTOR SHALL RETAIN THE SERVICES OF PROFESSIONAL MECHANICAL, ELECTRICAL, STRUCTURAL AND CIVIL ENGINEER(S) REGISTERED IN THE STATE OF NORTH CAROLINA, AS REQUIRED, TO DESIGN THE COMPONENTS AND APPURTENANCES IDENTIFIED AS PERFORMANCE BASED. THE CONTRACTOR SHALL FURNISH AND INSTALL ALL COMPONENTS IDENTIFIED ON THE DRAWINGS. SEE SPECIFICATIONS FOR PERFORMANCE CRITERIA.
18. A GEOTECHNICAL REPORT IS AVAILABLE FOR REVIEW THROUGH THE COR. BIDDERS SHALL BE THOROUGHLY
FAMILIAR WITH THE CONTENT OF THIS REPORT PRIOR TO SUBMISSION OF THE BID.
19. HORIZONTAL AND VERTICAL DATUM ARE AS NOTED ON SHEET G-1.
20. ALL DEVIATIONS FROM THESE PLANS SHALL BE RECORDED ON A SET OF "AS-BUILT" DRAWINGS. THE CONTRACTOR SHALL SUBMIT "AS-BUILT" DRAWINGS TO THE COR IN ACCORDANCE WITH THE SPECIFICATIONS, SECTION 01 78 00 - CLOSEOUT SUBMITTALS.
21. CONTRACTOR SHALL BE RESPONSIBLE FOR FLOAT DESIGN. DESIGN DETAILS TO CONFORM TO DIMENSIONS
AND SPECIFICATION REQUIREMENTS PER PROJECT PLANS.
22. CONTRACTOR SHALL BE RESPONSIBLE TO DETERMINE FLOAT DEPTH DIMENSIONS AND SUBMIT FREEBOARD CALCULATIONS TO DEMONSTRATE THAT SUFFICIENT DEPTH IS PROVIDED TO SUPPORT THE BERTHING SYSTEM DEAD LOAD (INCLUDING UTILITIES AND ALL DOCK ACCESSORIES) AT THE SPECIFIED FREEBOARD.
23. CONTRACTOR SHALL DEVELOP FLOAT CONNECTION DETAILS NOT SHOWN ON THE DRAWINGS AND SUBMIT STRUCTURAL CALCULATIONS TO COR TO DEMONSTRATE THAT THE FLOATING DOCK SYSTEM MODULES AND
CONNECTORS SUPPORT THE SPECIFIED LOADS WITHIN ALLOWABLE STRESSES.
24. FLOAT MODULES SHALL CONSIST OF STEEL REINFORCED CONCRETE SHELLS, COMPLETELY FILLED WITH CLOSED CELL POLYSTYRENE FOAM. CONTRACTOR SHALL SUBMIT STRUCTURAL CALCULATIONS TO COR TO DEMONSTRATE THAT THE CONCRETE SHELLS SUPPORT THE SPECIFIED LOADS WITHIN ALLOWABLE
STRESSES FOR ALL ELEMENTS OF THE DOCK SYSTEM.
25. UTILITY SUPPORTS SHALL BE CONSTRUCTED OF NON-CORRODING MATERIALS. SUPPORTS SHALL BE
DESIGNED TO ALLOW FOR REMOVAL OF UTILITIES FOR MAINTENANCE PURPOSE WITHOUT
DEMOLISHING/DESTROYING THE SUPPORTS OR FLOAT MODULES.
26. THE ENTIRE FLOATING DOCK SYSTEM, INCLUDING BUT NOT LIMITED TO ITS FLOATATION AND STABILITY CHARACTERISTICS, CONCRETE DECKING, WALERS, PILE GUIDES, FASCIA BOARDS, HARDWARE, AND RELATED
APPURTENANCES SHALL CARRY A MINIMUM OF 6-YEAR WARRANTY.
DESIGN LOADS ON FLOATING DOCK SYSTEM:
1. DEAD LOADS SHALL CONSIST OF THE FLOATS, FRAMING, WALER SYSTEM, ATTACHMENT STEEL, MISCELLANEOUS CONNECTION DEVICES, AND ALL OTHER PERMANENTLY ATTACHED
EQUIPMENT, SUCH AS UTILITIES, DOCK BOXES, CLEATS, PLATES, ETC. CONTRACTOR SHALL
EXERCISE CAUTION TO INSURE THAT ALL DEAD LOADS ARE ACCURATELY DETERMINED AND
INCLUDED IN BUOYANCY CALCULATIONS. THESE LOADS SHALL INCLUDE APPROPRIATE SAFETY
FACTORS AND ANY SPECIFIC MANUFACTURING CONSIDERATIONS THAT AFFECT THE FINAL
FREEBOARD.
2. LIVE LOADS SHALL CONSIST OF:
a. UNIFORM VERTICAL LOAD (UVL) OF 20.0 POUNDS PER SQUARE FOOT OF DOCK.
b. CONCENTRATED VERTICAL LOAD (CVL) OF 400 POUNDS APPLIED AT ANY LOCATION ON THE
FLOATING DOCK.
3. WIND, WAVE, CURRENT, AND IMPACT LOAD ON A VESSEL/DOCK COMBINATION SHALL BE
APPLIED AS PER ASCE "PLANNING AND DESIGN GUIDELINES FOR SMALL CRAFT HARBORS", 2000
ED., AND OTHER APPLICABLE STANDARDS, SUCH AS IBC 2006 AND ASCE 7-05. SEE ALSO
TECHNICAL SPECIFICATION 35 51 13.00 20 - CONCRETE FLOATING PIER FOR SMALL CRAFT.
4. COMBINED LOADING CASES FOR DESIGN:
CASE 1 - DEAD LOAD + UNIFORM VERTICAL LOAD
CASE 2 - DEAD LOAD + CONCENTRATED VERTICAL LOAD
CASE 3 - DEAD LOAD + WIND LOAD + CURRENT LOAD + WAVE LOAD + IMPACT LOAD
MAXIMUM SLOPES:
1. UNDER DEAD LOAD (DL) ONLY, AND DL+UNIFORM LIVE LOAD (ULL):
a. MAXIMUM CROSS SLOPE 1/4 INCH PER FOOT, NOT TO EXCEED 1 INCH MAXIMUM
b. MAXIMUM LONGITUDINAL SLOPE 1/8 INCH PER FOOT, NOT TO EXCEED 1 INCH IN 10 FEET
2. UNDER DL+LIVE POINT LOAD (LPL):
a. MAXIMUM CROSS SLOPE 1/2 INCH PER FOOT, NOT TO EXCEED 2 INCHES MAXIMUM
b. MAXIMUM LONGITUDINAL SLOPE 1/4 INCH PER FOOT, NOT TO EXCEED 2 INCHES IN 10 FEET
CALCULATIONS:
1. CALCULATIONS FOR LOADS ON FLOATING DOCK SECTIONS IMPOSED BY THE HANDLING AND
LIFTING METHODS TO BE EMPLOYED SHALL ALSO BE SUBMITTED TO COR BASED ON THE
CONCRETE STRENGTH EXPECTED AT THE TIME OF LIFTING OR MOVING OF THE FLOATS.
2. THE ALLOWABLE STRESSES FOR THE MATERIALS USED SHALL BE AS DEFINED BY THE
APPLICABLE CODE. THE ACTUAL DESIGN STRESSES SHALL NOT EXCEED THE ALLOWABLE
STRESSES, EXCEPT THAT A 1.33 OVERSTRESS FACTOR IS ALLOWED FOR LOADING
COMBINATIONS WHEN EITHER WIND, CURRENT, WAVE, OR IMPACT LOADS ARE APPLIED. FOR
ALL WOOD STRESSES, THE ALLOWABLE STRESS SHALL BE REDUCED IN ACCORDANCE WITH
THE IBC FOR WET USE CONDITIONS AND THE OVERSTRESS SHALL BE APPLIED TO THIS
REDUCED STRESS.
3. THE DESIGN CALCULATIONS SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING:
a. DETERMINATION OF EXTREME FIBER STRESSES IN MAJOR MEMBERS.
b. EFFECTS OF COMBINED LOADING ON THE CONNECTIONS DUE TO VERTICAL AND LATERAL
FORCES.
c. TRANSFER OF FORCES TO GUIDE PILES.
d. DETAIL DESIGN AT GUIDE PILE GUIDE FRAMING AND CONNECTIONS.
e. TRANSFER OF FORCES AT DOCK MODULE CONNECTIONS.
f. FREEBOARD CALCULATIONS FOR ALL SYSTEM COMPONENTS.
PILE GUIDES:
1. PILE GUIDES AND PILES SHALL NOT BEND UNDER LOADED CONDITIONS SUCH THAT IT WOULD
CAUSE EXCESSIVE STRESS ON THE PILE GUIDE-TO-DOCK CONNECTION.
2. PILE GUIDES SHALL BE LEVEL WITH THE DOCK SURFACE AND SHALL MAINTAIN THAT
ORIENTATION THROUGHOUT THE USEFUL LIFE OF THE DOCK (PILE GUIDES WHICH DEFORM
OVER TIME WILL BE REPLACED BY THE CONTRACTOR WITHIN THE WARRANTY PERIOD).
PILE DRIVING NOTES:
1. CONTRACTOR IS RESPONSIBLE TO FIELD VERIFY EXACT LOCATION PRIOR TO CONSTRUCTION.
2. DAMAGED PILE SHALL BE REMOVED ENTIRELY, INCLUDING STUBS.
3. CONTRACTOR SHALL BE RESPONSIBLE FOR SELECTION OF DRIVING EQUIPMENT AND
EMPLOYING OPERATIONS THAT WILL DRIVE PILE TO THE TIP ELEVATIONS INDICATED ON THE
PLANS WITHOUT DAMAGING PILE. DRIVING EQUIPMENT SHALL BE APPROVED BY THE COR.
4. PDSW DRIVEN PILES:
ROUND STEEL PIPE PILE SHALL BE ROLLED OR WELDED AND SHALL CONFORM TO THE
REQUIREMENTS OF ASTM 572 GRADE 50. STEEL PIPE PILES SHALL BE PLACED AT THE
COORDINATES SHOWN IN THE PILE SCHEDULE ON G-1 WITHIN A MAXIMUM TOLERANCE OF 3” IN EITHER PLANE DIRECTION AND SHALL BE DRIVEN TO THE MINIMUM TIP ELEVATION INDICATED.
DEVIATION IN FINAL PILE LOCATION SHALL BE DETERMINED BY AS-BUILT SURVEY OF THE PILE TOP (CUT-OFF ELEVATION) TO DETERMINE THE TOTAL DEVIATION IN PILE LOCATION INCLUDING
INITIAL MIS-LOCATION AND VERTICAL MIS-ALIGNMENT OF THE PILE (NON-PLUMBNESS).
5. ALL PIPE SHALL BE COATED AS A MINIMUM ON THE EXTERIOR TO 16 MILS (DFT) USING
"CARBOLINE 300M COAL TAR EPOXY COATING", OR APPROVED EQUAL. COATING SHALL BE
APPLIED FROM THE TOP OF DRIVEN PILE TO A DEPTH AT LEAST FIVE (5) FEET BELOW MUDLINE.
CONTRACTOR SHALL REPAIR ANY DAMAGED OR SCRATCHED COATING AREAS TO THE
REQUIRED COATING THICKNESS IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS.
6. ALL STEEL SHEETING SHALL BE COATED AS A MINIMUM ON ALL SURFACE AREAS TO A MINIMUM
16 MILS (DFT) USING "CARBOLINE 300M COAL TAR EPOXY COATING", OR APPROVED EQUAL.
COATING SHALL BE APPLIED FOR THE FULL INSTALLED LENGTHS. CONTRACTOR SHALL REPAIR
ANY DAMAGED OR SCRATCHED COATING SURFACES TO THE REQUIRED MINIMUM COATING
THICKNESS IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS.
CONCRETE DOCK:
1. 8'X130' MARGINAL WALKWAY INDIVIDUAL FLOAT SECTION LENGTHS TO BE SPECIFIED BY
CONTRACTOR.
2. 5'X40' FINGERS TO BE MONOLITHIC CONCRETE FLOATS.
3. 8'X75' FINGERS TO BE COMPOSED OF NO MORE THAN ONE SECTION BETWEEN INTERNAL PILES.
4. CONCRETE FLOATING DOCK TO BE MONOLITHIC, DOUBLE POST-TENSIONED IN 8X FLOATS AND
SINGLE POST-TENSIONED IN 4X FLOATS.
MATERIALS:
1. MISCELLANEOUS METAL: ALL MISCELLANEOUS STEEL ITEMS SHALL CONFORM TO ASTM A36,
FABRICATED IN ACCORDANCE WITH AISC AND SHALL BE HOT-DIP GALVANIZED AFTER FABRICATION IN ACCORDANCE WITH ASTM A123. ALL SCREWS, BOLTS, NUTS, AND LOCK WASHERS SHALL CONFORM TO ASTM A307 AND BE HOT-DIP GALVANIZED IN ACCORDANCE WITH ASTM 153 UNLESS OTHERWISE
NOTED. FLAT WASHERS SHALL COMPLY WITH ANSI B27.2 AND BE HOT-DIP GALVANIZED IN
ACCORDANCE WITH ASTM A153. ALL STAINLESS STEEL ITEMS SHALL BE TYPE 316.
2. ROUND STEEL PIPE PILE SHALL BE ROLLED OR WELDED AND SHALL CONFORM TO THE
REQUIREMENTS OF ASTM A 572, GRADE 50. STEEL PIPE PILES SHALL BE PLACED AT THE
COORDINATES SHOWN IN THE PILE SCHEDULE ON SHEET G-1 WITHIN A MAXIMUM TOLERANCE OF 3" IN EITHER PLANE DIRECTION AND SHALL BE DRIVEN TO THE MAXIMUM TIP ELEVATION INDICATED.
DEVIATION IN FINAL PILE LOCATION SHALL BE DETERMINED BY AS-BUILT SURVEY OF THE PILE TOP (CUT-OFF ELEVATION) TO DETERMINE THE TOTAL DEVIATION IN PILE LOCATION INCLUDING INITIAL
MISLOCATION AND VERTICAL MISALIGNMENT OF THE PILE (NON-PLUMBNESS). CONTRACTOR IS
RESPONSIBLE FOR PROVIDING SURVEY DURING CONSTRUCTION AND AS-BUILT SURVEY.
3. ALL LUMBER SHALL BE PRESSURE-TREATED PER APWA STANDARD C-2 (ACQ), MINIMUM RETENTION
0.6 PCF. ALL FIELD CUTS AND BORED HOLES SHALL RECEIVE A BRUSH COAT OF CONCENTRATED PRESERVATIVE IN ACCORDANCE WITH AWPA M.4 "STANDARD FOR THE CARE OF PRESSURE-TREATED
WOOD PRODUCTS".
4. FLOATATION SHALL BE CLOSED-CELL, CROSS-LINKED EXPANDED POLYESTYRENE (EPS) WITH POSITIVE FLOATATION USING EPS CORES WITH A MINIMUM DENSITY OF 0.90 PCF AND MAXIMUM DENSITY OF 1.15 PCF. EPS FOAM SHALL HAVE A PROTECTIVE LAYER OF POLYURETHANE COATING
WITH A MINIMUM THICKNESS OF 50 MIL TO AVOID CONTACT WITH WATER.
5. PILE CAPS SHALL BE MOLDED FIBERGLASS REINFORCED PLASTIC, WITH A MINIMUM THICKNESS OF 1/8 INCH AND A WHITE GEL COAT FINISH, AS DISTRIBUTED BY "HENDERSON MARINE SUPPLY", OR
APPROVED EQUAL. ATTACH TO THE GUIDE PILES AND PDSW PILES WITH AN EPOXY ADHESIVE
RECOMMENDED BY THE PILE CAP MANUFACTURER.
6. CLEATS SHALL BE 12", 18", AND 24" (AS NOTED), H.D.G., CAST-GREY IRON CLEATS, AS SUPPLIED BY "HENDERSON MARINE SUPPLY", OR APPROVED EQUAL, AND FASTENED WITH H.D.G. HEX-BOLTS, NUTS, FLAT AND LOCK WASHERS.
7. GUIDE PILE RUB BLOCKS SHALL CONSIST OF A MOUNTING BRACKET FABRICATED FROM 1/4 INCH THICK STEEL PLATE, TO WHICH IS ATTACHED A RUB BLOCK MADE OF ULTRA-HIGH, MOLECULAR WEIGHT (UHMW) PLASTIC. MOUNTING BRACKET SHALL BE HOT-DIP GALVANIZED AFTER FABRICATION.
8. ALL BOLTED CONNECTIONS SHALL USE FLAT AND LOCK WASHERS INSTALLED AT BOLT HEADS AND
NUTS BEARING ON TIMBER.
9. CONCRETE:
a. MINIMUM COMPRESSIVE STRENGTH @ 28 DAYS = 6,000psi.
b. CONCRETE MIX TO HAVE MINIMUM OF 4 GAL OF DCI CORROSION INHIBITOR PER CUBIC YARD.
c. EXTERIOR SURFACES SHALL BE HARD, DENSE, SMOOTH FINISHED LUMBER.
d. ALL WALKING SURFACES SHALL HAVE SLIP RESISTANT BROOMED DECK FINISH. BROOMED FINISH
SHALL BE TRANSVERSE TO LONGITUDINAL AXIS OF A FLOAT.
e. ALL SURFACES TO RECEIVE CONTACTING TIMBER SHALL BE SMOOTH AND TRUE TO WITHIN 132 INCH.
10. REINFORCING :
REINFORCING BARS SHALL CONFORM TO ASTM A615 GRADE 60 - EPOXY COATED AFTER FABRICATION.
11. TIMBER:
a. GLUE-LAMINATED TIMBER - IF GLUE-LAMINATED STRUCTURAL TIMBER IS USED IT SHOULD BE
DOUGLAS-FIR OR SOUTHERN YELLOW PINE, IN CONFORMANCE WITH VOLUNTARY PRODUCT
STANDARD PS 56 (STRUCTURAL GLUE-LAMINATED TIMBER) AND THE AMERICAN INSTITUTE OF
TIMBER CONSTRUCTION (AITC) INSPECTION MANUAL, AITC 200. ALL ADHESIVES FOR STRUCTURAL
LAMINATED WOOD SHALL BE FOR WOOD USED UNDER EXTERIOR (WET USE) CONDITION AS PER
ASTM D2559. APPEARANCE OF MEMBERS SHALL BE ARCHITECTURAL GRADE V8, RATED F25. ALL
MEMBERS SHALL BE PRESSURE PRESERVATIVE TREATED TO 0.6 PCF PENTACLOROPHENOL PER
AWPA C28 WITH NO INCISING FOR APPEARANCE. ALL CUTS AND DRILL HOLES OF TREATED
MATERIAL SHALL BE FIELD TREATED BY CONTRACTOR IN ACCORDANCE WITH "STANDARD FOR THE
CARE OF PRESSURE-TREATED WOOD PRODUCTS."
b. SAWN LUMBER SHALL BE NO. 1 SOUTHERN YELLOW PINE OR BETTER. ALL WALERS SHALL BE
FABRICATED FROM PARALLEL STRAND LUMBER (PSL) IN ACCORDANCE WITH ASTM D5456.
12. FIRE PROTECTION:
THIS DOCK SYSTEM WILL NOT HAVE ANY BUILT-IN OR POST-FABRICATED FIRE PROTECTION SYSTEM.
13. ELECTRICAL:
FOR GENERAL NOTES, DETAILS, AND SPECIFICATIONS, SEE ELECTRICAL SHEETS E-1 TO E-5.
FIREBOAT
1. PRINCIPAL DIMENSIONS:
LENGTH, OVERALL = 82'-6"
LENGTH, MOULDED = 75'-8"
LENGTH, WATERLINE = 67'-11"
BEAM, MOULDED = 20'-6"
DRAFT = 4'-2"
2. FIRE BOAT DISPLACEMENT = 135,000 LBS.
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
SH
EE
T
BASE BID AND OPTIONAL BID ITEMS
R
EV
IS
ED
N O
TE
S
JA
N1
FP
K7TSEJAM
R-3
E 228000N 15000E 229000N 15000E 230000N 15000E 231000N 15000 E 232000N 15000 E 233000N 15000E 234000N 15000E 235000N 15000E 228000N 25000E 229000N 25000E 230000N 25000E 231000N 25000 E 232000N 25000 E 233000N 25000E 234000N 25000E 235000N 25000E 228000N 35000E 229000N 35000E 230000N 35000E 231000N 35000 E 232000N 35000 E 233000N 35000E 234000N 35000E 235000N 35000E 228000N 45000E 229000N 45000E 230000N 45000E 231000N 45000 E 232000N 45000 E 233000N 45000E 234000N 45000E 235000N 45000E 228000N 55000E 229000N 55000E 230000N 55000E 231000N 55000 E 232000N 55000 E 233000N 55000E 234000N 55000E 235000N 55000E 228000N 65000E 229000N 65000E 230000N 65000E 231000N 65000 E 232000N 65000 E 233000N 65000E 234000N 65000E 235000N 65000E 228000N 75000E 229000N 75000E 230000N 75000E 231000N 75000 E 232000N 75000 E 233000N 75000E 234000N 75000E 235000N 75000E 228000N 85000E 229000N 85000E 230000N 85000E 231000N 85000 E 232000N 85000 E 233000N 85000E 234000N 85000E 235000N 85000
E 228000 N 95000 E 229000 N 95000 E 230000 N 95000
E 231000 N 95000
E 232000 N 95000
E 233000 N 95000 E 234000 N 95000 E 235000 N 95000
E 228000 N 105000 E 229000 N 105000 E 230000 N 105000
E 231000 N 105000
E 232000 N 105000
E 233000 N 105000 E 234000 N 105000 E 235000 N 105000
E 228000N 115000E 229000N 115000E 230000N 115000E 231000N 115000 E 232000N 115000 E 233000N 115000E 234000N 115000E 235000N 115000
E 228000N 5000E 229000N 5000E 230000N 5000 E 231000N 5000E 228000N -5000E 229000N -5000E 230000N -5000E 231000N -5000E 228000N -15000E 229000N -15000E 230000N -15000E 231000N -15000E 228000N -25000E 229000N -25000E 230000N -25000E 231000N -25000 E 232000N 5000 E 233000N 5000E 234000N 5000E 235000N 5000E 232000N -5000 E 233000N -5000E 234000N -5000E 235000N -5000E 232000N -15000 E 233000N -15000E 234000N -15000E 235000N -15000E 232000N -25000 E 233000N -25000E 234000N -25000E 235000N -25000
NC 87
N C
BRUNSWICK RD
N C
HEADQUARTER LOOP
HE
AD
Q
UA
RT
ER
L O
O P
PERIMETER RD
BRUNSW
IC
K R D
KEZIA
H D
R
EXPLOSIVE RD
FB 10FB 10
FB
FB 7
FB 7
FB 5
FB 3
FB 6
FB 1
FB 2
TRUCK
APRON
IN
SPECTIO
N
FB 4
E X
P
LO
S
IV
E
SUSPECT RD
SUSPECT TRUCK RD
FB 14
FB
FB
FB 3
FB
R
D
TR
U C
K
CONTAINER
SUSPECT
AREA
FB 15
FB
SOUTH
SO
U
TH
R
O
AD
FB
BRUNSWICK RD
PERIMETER RD
RIVER RD
CREEK
WALDEN
TA
-3
TA
-2
402401
CA
RG
O T
RA
NS
FE
R
BE
R
TH
400 P A
D S
D R
IV
E
FO
R
T FIS
H
E R
R D
BATTERY
RD
BUCHANAN
HOLDING YARD RD A
SOUTH RR
YA
R
D D
U N
N
AG
E
SO
U
TH
RAMP
BE
R
TH
BE
R
TH
C O
N
TA
IN
ER
H
AN
D
LI
N G
C R
AN
E
ROAD TO PAD 405
PERIMETER RD
PERIMETER RD
BATTERY LAMB RD
C O
N
TA
IN
E
R
TR
A N
S
FE
R R
D
SO
U
TH
W
H
AR
F R
D
BATTERY LAMB RD
TA
-3
CREEK
RIV
ER
R
DSO
U
TH
R O
AD
SOUTH ROAD 3
SO
U
TH
R
O
AD
SOUTH ROAD 4
SO
U
TH
R
O
AD
SOUTH ROAD 2
SO
U
TH
R
D
SOUTH RIVER RD
WALDEN SOUTH
32.01
U.S .42
U .S
.4
SOUTH
FO
RT F
IS
HER B
LV
D
U.S.421 U.S.421 U.S.421
U.S .42
NORTH LOOP ROAD
(O
LD
H
IG
HW
AY
PE
R
IM
ET
ER
R
D
PERIMETER RD
PERIM
ETER R
D
NORTH
R
IV
ER R
D
N O
R
TH
L O
O P
N O
R
TH
L O
O P
R
IV
E R
R D
(O
LD
H
IG
H W
AY 130)
NORTH LOOP 2
BE
RT
H
CENTER LOOP RD
N O
R
TH
R
IV
ER
R
D (O
LD
H
IG
H
W
AY
221 203
BE
RT
H
TA-1
SU
N
N Y
PO
IN
T R
D
R
IV
ER
R
D
CENTER WHARF RD
NORTH
W
HARF R
D
ST PHILLIPS RD
KA
RL
M
AN
L N
W E
LL R
D
NORTH LOOP 1
FB 37
MIDDLE LOOP RD
FB
BU
N
KE
R
L O
O P
R D
C R
EE
K
R D
H U
N
TE
R S
R O
AD
JO
N
ES
R
O
AD
TA
R
P
IT
R O
AD
WEST REEVES RD
EAST REEVES RD
FB 17
FB 18
FB 19
FB 44
0 P
AD
NORTH R
IVER R
D
FB 45
500 PAD RD
600 PAD RD
BRUNSWICK RD
NORTH
R
IV
ER
R D
REAVES
RD
SOUTH
R
IV
ER
R
O
AD
BU
N
KE
R
L O
O P
R D
R O
AD
T
O
TR
AN
SF
ER
AR
EA
YAR
D
R D
H O
LD
IN
G
N O
R
TH
R
AILR
O
AD
NORTH LOOP 1
11.49 17 D
O W
R O
AD
SUMPTER AVE
SPARTANBURG AVE
ATLANTA AVE
8T H
A
VE
CLARENDONAVE
COLUMBIA AVE
BIRMINGHAM
7T H
A
VE
FAYETTEVILLE AVE
HAMLET AVE
CHARLOTTE AVE
D O
W R
O
AD
OCEAN BLVD.
D O
W R
O
AD
D O
W R
O
AD
PERIM
ETER RD
FB
FB 38
NC H
IG
HWAY 13
NORTH
LOOP
NC H
IG
HWAY 13
H
IG
H W
AY
FB
FB
FB
NORTH LOOP 2
SU
BS
TA
TI
O N
R D
FACILITY RD
M
ILLVAN
R
EPAIR
R
DBRUNSW
IC
K R
D
OVERNIGHT YARD RD
SUB-STATION RD
CLASS YARD OUTER LOOP RD
CONTAINER RESTUFFING RD
PERIM
ETER RD
RECLAIM YARD
FB 35
FB 33
FB
MIDDLE LOOP RD
INNER RD
FB 34
FB
FB 32
CONTAINER
RESTUFFING
R D
BARRIC
ADED
TRUCK
HOLD
IN
G
YARD
LOADING AREA
CLASS YARD CENTER LOOP RD
NORTH LOOP 1
FB 35
FB 36
BRUNSWICK RD
INNER LOOP RD
FB 14
FB
OUTER LOOP RD
MAIN
ENTRANCE
BRUNSW
IC
K R D
EXPLOSIVE RD
BRUNSWICK RD
N C
NC 87
N C
SUBSTATION RD
BRUNSWICK RD
PERIMETER RD PERIMETER RD
S U
N N
Y P
O
IN
T R D
PERIM
ETER RD
SO
UT
H
RI
VE
R
RD
NC 13
MAIN
ENTRANCE
GATE
N C
PERIMETER RD
PE
R
IM
ET
ER
R
D
(E) NORTH WHARF
(PROTECT-IN-PLACE)
(E) CONCRETE PLATFORM
(PROTECT-IN-PLACE)
(E) 5'X40' GANGWAY
(PROTECT-IN-PLACE)
(E) 42" GUARDRAIL
(PROTECT-IN-PLACE)
/4
1.69
E 2317800 N 98800
E 2317600 N 98800
E 2318000 N 99000
E 2318200 N 99000
E 2318400 N 99000
E 2317800 N 99000
E 2317600 N 99000
E 2318000 N 99200
E 2318200 N 99200
E 2318400 N 99200
E 2317800 N 99200
E 2317600 N 99200
E 2318000 N 99400
E 2318200 N 99400
E 2318400 N 99400
E 2317800 N 99400
E 2317600 N 99400
E 2318000 N 99600
E 2318200 N 99600
E 2318400 N 99600
E 2317800 N 99600
E 2317600 N 99600
E 2318000 N 99800
E 2318200 N 99800
E 2318400 N 99800
E 2317800 N 99800
E 2317600 N 99800
E 228000N 15000E 229000N 15000E 230000N 15000E 231000N 15000 E 232000N 15000E 233000N 15000E 234000N 15000E 235000N 15000E 228000N 25000E 229000N 25000E 230000N 25000E 231000N 25000 E 232000N 25000E 233000N 25000E 234000N 25000E 235000N 25000E 228000N 35000E 229000N 35000E 230000N 35000E 231000N 35000 E 232000N 35000E 233000N 35000E 234000N 35000E 235000N 35000E 228000N 45000E 229000N 45000E 230000N 45000E 231000N 45000 E 232000N 45000E 233000N 45000E 234000N 45000E 235000N 45000E 228000N 55000E 229000N 55000E 230000N 55000E 231000N 55000 E 232000N 55000E 233000N 55000E 234000N 55000E 235000N 55000E 228000N 65000E 229000N 65000E 230000N 65000E 231000N 65000 E 232000N 65000E 233000N 65000E 234000N 65000E 235000N 65000E 228000N 75000E 229000N 75000E 230000N 75000E 231000N 75000 E 232000N 75000E 233000N 75000E 234000N 75000E 235000N 75000E 228000N 85000E 229000N 85000E 230000N 85000E 231000N 85000 E 232000N 85000E 233000N 85000E 234000N 85000E 235000N 85000E 228000N 95000E 229000N 95000E 230000N 95000E 231000N 95000 E 232000N 95000E 233000N 95000E 234000N 95000E 235000N 95000
E 228000N 105000E 229000N 105000E 230000N 105000E 231000N 105000E 232000N 105000E 233000N 105000E 234000N 105000E 235000N 105000E 228000N 115000E 229000N 115000E 230000N 115000E 231000N 115000E 232000N 115000E 233000N 115000E 234000N 115000E 235000N 115000
E 228000N 5000E 229000N 5000E 230000N 5000E 231000N 5000E 228000N -5000E 229000N -5000E 230000N -5000E 231000N -5000E 228000N -15000E 229000N -15000E 230000N -15000E 231000N -15000E 228000N -25000E 229000N -25000E 230000N -25000E 231000N -25000E 232000N 5000E 233000N 5000E 234000N 5000E 235000N 5000E 232000N -5000E 233000N -5000E 234000N -5000E 235000N -5000E 232000N -15000E 233000N -15000E 234000N -15000E 235000N -15000E 232000N -25000E 233000N -25000E 234000N -25000E 235000N -250001 MILE2 MILE
3 MILE4 MILE5 MILE3.
2.
2.3
2.082.00
2.02
1.87
1.03
1.84 1.92
2.031.97 1.121.21 1.37 1.63 3.47
0.76 4.05
2.61 2.12
3.38
6.44 7.05
1.1
CHECK VALVE
ENCLOSURE F
ELECTRICAL
SU
BSTATIO
N
PAN
EL
3'-
7"
7'-4" (TYP)
36'-9"
29'-4"
110'-2"
0 25' 50'
(E) LAYOUT AND DEMOLITION PLAN
SCALE: 1" = 25'-0"
D-1
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
EX
IS
TI
N G L A
YO
U T A N D
D-1
D
EM
O
LI
TI
O N P
LA
N
(E) 13'X100' MAINWALK
(PROTECT-IN-PLACE)
0 6' 12'
DETAIL: (E) ACCESS PLATFORM LAYOUT
SCALE: 1" = 6'-0"
D-1
ACCESS HATCH
FIRE HYDRANT
HOSE BIB
42" GUARDRAIL
(E) 14" CONCRETE GUIDE PILES (10
TOTAL) (PROTECT-IN-PLACE)
5' x 40' ALUMINUM GANGWAY
(E) POWER PEDESTAL
TO BE REMOVED
FIRE HOSE CABINET
(E) KNEE BRACKETS TO BE
REMOVED (TYP OF 5)
SEE DETAIL 2
(E) 14" SQUARE PRESTRESSED CONCRETE PILE
(E) DEPTH SOUNDINGS, BATHYMETRY SURVEY 16
FEBRUARY 2010 BY USACE USING 200 KHZ SOUNDING
EQUIPMENT, DATUM: NAD83, LOCAL MLLW
*ALL SOUNDINGS IN FEET MLLW
LEGEND
-15
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
(E) WATER LINE TO BE REPLACED W/
IN-KIND (1-1/2" SCH 80 PVC PIPE W/
BACKFLOW PREVENTER)
OPTIONAL BID ITEM
PARTIALLY DEMOLISH EXISTING
FASCIA BOARD AND WALER
(REPLACE PER DRAWING C-2)
K7TSEJAM
R-4
E 2317800 N 98800
E 2317600 N 98800
E 2318000 N 99000
E 2318200 N 99000
E 2318400 N 99000
E 2317800 N 99000
E 2317600 N 99000
E 2318000 N 99200
E 2318200 N 99200
E 2318400 N 99200
E 2317800 N 99200
E 2317600 N 99200
E 2318000 N 99400
E 2318200 N 99400
E 2318400 N 99400
E 2317800 N 99400
E 2317600 N 99400
E 2318000 N 99600
E 2318200 N 99600
E 2318400 N 99600
E 2317800 N 99600
E 2317600 N 99600
E 2318000 N 99800
E 2318200 N 99800
E 2318400 N 99800
E 2317800 N 99800
E 2317600 N 99800
E 228000N 15000E 229000N 15000E 230000N 15000E 231000N 15000 E 232000N 15000 E 233000N 15000E 234000N 15000E 235000N 15000E 228000N 25000E 229000N 25000E 230000N 25000E 231000N 25000 E 232000N 25000 E 233000N 25000E 234000N 25000E 235000N 25000E 228000N 35000E 229000N 35000E 230000N 35000E 231000N 35000 E 232000N 35000 E 233000N 35000E 234000N 35000E 235000N 35000E 228000N 45000E 229000N 45000E 230000N 45000E 231000N 45000 E 232000N 45000 E 233000N 45000E 234000N 45000E 235000N 45000E 228000N 55000E 229000N 55000E 230000N 55000E 231000N 55000 E 232000N 55000 E 233000N 55000E 234000N 55000E 235000N 55000E 228000N 65000E 229000N 65000E 230000N 65000E 231000N 65000 E 232000N 65000 E 233000N 65000E 234000N 65000E 235000N 65000E 228000N 75000E 229000N 75000E 230000N 75000E 231000N 75000 E 232000N 75000 E 233000N 75000E 234000N 75000E 235000N 75000E 228000N 85000E 229000N 85000E 230000N 85000E 231000N 85000 E 232000N 85000 E 233000N 85000E 234000N 85000E 235000N 85000
E 228000 N 95000 E 229000 N 95000 E 230000 N 95000
E 231000 N 95000
E 232000 N 95000
E 233000 N 95000 E 234000 N 95000 E 235000 N 95000
E 228000 N 105000 E 229000 N 105000 E 230000 N 105000
E 231000 N 105000
E 232000 N 105000
E 233000 N 105000 E 234000 N 105000 E 235000 N 105000
E 228000N 115000E 229000N 115000E 230000N 115000E 231000N 115000 E 232000N 115000 E 233000N 115000E 234000N 115000E 235000N 115000
E 228000N 5000E 229000N 5000E 230000N 5000 E 231000N 5000E 228000N -5000E 229000N -5000E 230000N -5000E 231000N -5000E 228000N -15000E 229000N -15000E 230000N -15000E 231000N -15000E 228000N -25000E 229000N -25000E 230000N -25000E 231000N -25000 E 232000N 5000 E 233000N 5000E 234000N 5000E 235000N 5000E 232000N -5000 E 233000N -5000E 234000N -5000E 235000N -5000E 232000N -15000 E 233000N -15000E 234000N -15000E 235000N -15000E 232000N -25000 E 233000N -25000E 234000N -25000E 235000N -25000
B A
SI
N C
O N N
EC
TI
N G
C H A N N
EL
NC 87
N C
BRUNSWICK RD
N C
HEADQUARTER LOOP
HE
AD
Q
UA
RT
ER
L O
O P
PERIMETER RD
BRUNSW
IC
K R D
KEZIA
H D
R
EXPLOSIVE RD
FB 10FB 10
FB
FB 7
FB 7
FB 5
FB 3
FB 6
FB 1
FB 2
TRUCK
APRON
IN
SPECTIO
N
FB 4
E X
P
LO
S
IV
E
SUSPECT RD
SUSPECT TRUCK RD
FB 14
FB
FB
FB 3
FB
R
D
TR
U C
K
CONTAINER
SUSPECT
AREA
FB 15
FB
SOUTH
SO
U
TH
R
O
AD
FB
BRUNSWICK RD
PERIMETER RD
RIVER RD
CREEK
WALDEN
TA
-3
TA
-2
402401
CA
RG
O T
RA
NS
FE
R
BE
R
TH
400 P A
D S
D R
IV
E
FO
R
T FIS
H
E R
R D
BATTERY
RD
BUCHANAN
HOLDING YARD RD A
SOUTH RR
YA
R
D D
U N
N
AG
E
SO
U
TH
RAMP
BE
R
TH
BE
R
TH
C O
N
TA
IN
ER
H
AN
D
LI
N G
C R
AN
E
ROAD TO PAD 405
PERIMETER RD
PERIMETER RD
BATTERY LAMB RD
C O
N
TA
IN
E
R
TR
A N
S
FE
R R
D
SO
U
TH
W
H
AR
F R
D
BATTERY LAMB RD
TA
-3
CREEK
RIV
ER
R
DSO
U
TH
R O
AD
SOUTH ROAD 3
SO
U
TH
R
O
AD
SOUTH ROAD 4
SO
U
TH
R O
AD
SOUTH ROAD 2
SO
U
TH
R
D
SOUTH RIVER RD
WALDEN SOUTH
32.01
U.S .42
U .S
.4
SOUTH
FO
RT F
IS
HER B
LV
D
U.S.421 U.S.421 U.S.421
U.S .42
NORTH LOOP ROAD
(O
LD
H
IG
HW
AY
PE
R
IM
ET
ER
R
D
PERIMETER RD
PERIM
ETER R
D
NORTH
R
IV
ER R
D
N O
R
TH
L O
O P
N O
R
TH
L O
O P
R
IV
E R
R D
(O
LD
H
IG
H W
AY 130)
NORTH LOOP 2
BE
RT
H
CENTER LOOP RD
N O
R
TH
R
IV
ER
R
D (O
LD
H
IG
H
W
AY
221 203
BE
RT
H
TA-1
SU
N
N Y
PO
IN
T R
D
R
IV
ER
R
D
CENTER WHARF RD
NORTH
W
HARF R
D
ST PHILLIPS RD
KA
RL
M
AN
L N
W E
LL R
D
NORTH LOOP 1
FB 37
MIDDLE LOOP RD
FB
BU
N
KE
R
L O
O P
R D
C R
EE
K
R D
H U
N
TE
R S
R O
AD
JO
N
ES
R
O
AD
TA
R
P
IT
R O
AD
WEST REEVES RD
EAST REEVES RD
FB 17
FB 18
FB 19
FB 44
0 P
AD
NORTH R
IVER R
D
FB 45
500 PAD RD
600 PAD RD
BRUNSWICK RD
NORTH
R
IV
ER
R D
REAVES
RD
SOUTH
R
IV
ER
R
O
AD
BU
N
KE
R
L O
O P
R D
R O
AD
T
O
TR
AN
SF
ER
AR
EA
YAR
D
R D
H O
LD
IN
G
N O
R
TH
R
AILR
O
AD
NORTH LOOP 1
11.49 17 D
O W
R O
AD
SUMPTER AVE
SPARTANBURG AVE
ATLANTA AVE
8T H
A
VE
CLARENDONAVE
COLUMBIA AVE
BIRMINGHAM
7T H
A
VE
FAYETTEVILLE AVE
HAMLET AVE
CHARLOTTE AVE
D O
W R
O
AD
OCEAN BLVD.
D O
W R
O
AD
D O
W R
O
AD
PERIM
ETER RD
FB
FB 38
NC H
IG
HWAY 13
NORTH
LOOP
NC H
IG
HWAY 13
H
IG
H W
AY
FB
FB
FB
NORTH LOOP 2
SU
BS
TA
TI
O N
R D
FACILITY RD
M
ILLVAN
R
EPAIR
R
DBRUNSW
IC
K R
D
OVERNIGHT YARD RD
SUB-STATION RD
CLASS YARD OUTER LOOP RD
CONTAINER RESTUFFING RD
PERIM
ETER RD
RECLAIM YARD
FB 35
FB 33
FB
MIDDLE LOOP RD
INNER RD
FB 34
FB
FB 32
CONTAINER
RESTUFFING
R D
BARRIC
ADED
TRUCK
HOLD
IN
G
YARD
LOADING AREA
CLASS YARD CENTER LOOP RD
NORTH LOOP 1
FB 35
FB 36
BRUNSWICK RD
INNER LOOP RD
FB 14
FB
OUTER LOOP RD
MAIN
ENTRANCE
BRUNSW
IC
K R D
EXPLOSIVE RD
BRUNSWICK RD
N C
NC 87
N C
SUBSTATION RD
BRUNSWICK RD
PERIMETER RD PERIMETER RD
S U
N N
Y P
O
IN
T R D
PERIM
ETER RD
SO
UT
H
RI
VE
R
RD
NC 13
MAIN
ENTRANCE
GATE
N C
PERIMETER RD
PE
R
IM
ET
ER
R
D
(E) NORTH WHARF
(PROTECT-IN-PLACE)
(E) CONCRETE PLATFORM
(PROTECT-IN-PLACE)
B A
SI
N C
O N N
EC
TI
N G
C H A N N
EL
(E) 5'X40' GANGWAY
(PROTECT-IN-PLACE)
8'
40'
(N) 20" SQUARE PRESTRESSED
CONCRETE PILE GUIDE (TYP)
SEE DETAIL 5 ON C-5
43'-2"
(N) 5'X40' FINGER (TYP OF 3)
Terracon 2
Terracon 3
TH-SBD-01
TH-SBD-02
TH-SBD-03
(E) FUELING STATION
TO REMAIN
(E) 14" SQ. CONC.
PILE (PIP)
(N) PARTIAL DEPTH SHEETPILE WALL
(WAVE ATTENUATOR)
SEE DETAIL 1 FOR ISOMETRIC VIEW
AND C-6 FOR DETAILS
(E) 13'x97' MAINWALK
(PROTECT-IN-PLACE)
Terracon 1
4'-2"
(E) 42" GUARDRAIL
(PROTECT-IN-PLACE)
'-9
(N) PZC13 SHEET PILE, TYP
SEE ELEVATION 1/C-6 (63 TOTAL)
(N) 30" Ø PIPE PILE, TYP
(64 TOTAL)
(N) 8'x130'
MARGINAL
WALKWAY
(N) 8'X75' FINGER (TYP OF 2)
3'-
7"
7'-4" (TYP)
36'-9"
29'-4"
110'-2"
40'-2"
5'
0'
4X12 WALER AND 2X16 FASCIA BOARD
PER DETAIL 1 AND 2 ON C-4 (TYP)
8'
40'
75'
CP01
CP02
CP03
CP04
CP05
CP06
CP07CP08
CP09
CP10
CP11
CP12
CP13
CP15
CP16
CP17
CP14
'.9 8'
.4 6'
.8 8'
.5 2'
.0 9'
110.36'
36.85'
3.
29.7 3'
103.28'
T.P. = 17.42'
T.P. = 17.21'
T.P. = 17.23'
T.P. = 17.15'
T.P. = 17.11'
T.P. = 17.20'
T.P. = 17.32'T.P. = 19.21'
T.P. = 18.92'
T.P. = 19.59'
T.P. = 20.05'
T.P. = 17.28'
T.P. = 17.43'
T.P. = 17.38'
T.P. = 17.07'
T.P. = 17.43'
T.P. = 17.45'
1.69
39.59'
39.81'
39.49'
74.54'
0 25' 50'
PROPOSED SECURITY BOAT DOCK AND PDSW LAYOUT
SCALE: 1" = 25'-0"
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
SE
C U R
IT
Y
B O A T
C-1
H A R B O R L A
YO
U T
NOTES:
• BATHYMETRY SURVEY 16 FEBRUARY 2010 BY USACE USING 200 KHZ
SOUNDING EQUIPMENT.
• DEPTHS IN FEET MLLW.
• BASE BID INCLUDES PARTIAL DEPTH SHEETPILE WALL (WAVE
ATTENUATION SYSTEM). ALL OTHER WORK IS INCLUDED IN OPTIONAL BID
ITEM.
TOE OF PROPOSED DREDGE LINE
(-12 MLLW + 2' OVER DEPTH)
WORK BY OTHERS (NOT IN CONTRACT)
SEE PLAN VIEW 1 ON C-2
SEE PLAN VIEW 1 ON C-3
DETAIL: PDSW ISOMETRIC VIEW (BASE BID)
N.T.S.
C-1
GREEN LIGHT BUOY AT EASTERN MOST TOE OF DREDGED AREA
DEMARKING ENTRANCE TO BOAT BASIN.
(WORK BY OTHERS)
(N) FACIA BOARD AND WALER TO BE
REPLACED PER DRAWING C-2
(N) AMBER LIGHT AT EACH VERTEX AND AT
LEAST EVERY 50 FEET OF SHEETPILE, UNO
SEE DETAIL 11 ON SHEET C-6. (TYP OF 13)
(N) RED LIGHT ON TOP OF CORNER
PILE (P50) TO DEMARK ENTRANCE
ATON AND CHANNEL MARKER SCHEDULE
(y)99249.52, (x)2318147.57
(y)99129.69, (x)2317851.20
(y)99061.17, (x)2317786.67
(y)98955.13, (x)2317777.33
(y)98877.78, (x)2317838.55
(y)98811.27, (x)2317962.66
NOTE: AS-BUILT LOCATIONS AS PROVIDED BY SAW, 16MAR10
A1
A2
A3
A4
A2
A5
A5
A4
(N) ATON (TYP. OF 5)
WORK BY OTHERS
A3
A1
P01
P10
P20
P30
P40
P50
P60
P64
(N) 4'X6'
TRANSITION
PLATE
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
DREDGE BOUNDARY LINE
BASE BID AND OPTIONAL BID ITEMS
BASE BID
OPTIONAL BID ITEM
OPTIONAL BID ITEM
BASE BID
BASE BID
BASE BID
(E) SHOAL BUOY
(E) ENTRANCE CHANNEL MARKER - GREEN BUOY
(N) AMBER LIGHT (RED IF NOTED)
PLACED AT EVERY VERTEX OF SHEETPILE AND AT LEAST
EVERY 50 FEET - SEE SHEET C-6, DETAIL 11
(E) DEPTH SOUNDINGS, BATHYMETRY SURVEY 16
FEBRUARY 2010 BY USACE USING 200 KHZ SOUNDING
EQUIPMENT, DATUM: NAD83, LOCAL MLLW
LEGEND
A1
-15
R
EV
IS
ED
F O R F
IR
E
B O A T
JA
N1
FP
K7TSEJAM
R-5
E 2317600
N 98800
E 2318000
N 99000
E 2318200
N 99000
E 2318400
N 99000
E 2317800
N 99000
E 2317600
N 99000
E 2318000
N 99200
E 2318200
N 99200
E 2318400
N 99200
E 2317800
N 99200
E 2317600
N 99200
E 2318000
N 99400
E 2318200
N 99400
E 2318400
N 99400
E 2317800
N 99400
E 2317600
N 99400
E 2318000
N 99600
E 2318200
N 99600
E 2318400
N 99600
E 2317800
N 99600
E 2317600
N 99600
E 2318000
N 99800
E 2318200
N 99800
E 2318400
N 99800
E 2317800
N 99800
E 2317600
N 99800
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
0E 2
N 9
E 2
N 9
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
00E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
NC 87
NC
BRUNSWICK RD
NC
HEADQUARTER LOOP
H E
A D
Q U
A R
TE
R
L O
O P
PERIMETER RDBR
U
N
SW
IC
K
R D
KE
ZI
AH
D
R
EXPLOSIVE RD
FB 10
FB 10FB
FB 7FB 7FB
FB 3
FB 6FB
FB
TR
U C
K
AP
R O
N
IN
SP
EC
TI
O
N
FB
EXPLOSIVE
SUSPECT RD
SU
SP
EC
T
TR
UCK
RD
FB 14
FB
FB
FB 3FB 30
RDTRUCK
CONTAINER
SUSPECT
AREAFB 15
FB
SO
UT
H
SO
U
TH
R
O
AD
FB
BRUNSWICK RD
PERIMETER RD RI
VE
R
RD
C R
EE
K
WALDENTA
-3
TA
-2
222223204232233 312 313 314 315316321 322 323C
AR
G O
T R
AN
SF
ER
BE
R
TH
400 PADS DRIVE
FO
RT FISHER RD
BATTERY
RDBUCHANAN
HOLD
IN
G Y
ARD R
D A
SOUTH
R
R
319318 317 330 YA
R
D D
U N
N
AG
E
SO
U
TH
RAMP
BE
R
TH
BE
R
TH
C O
N
TA
IN
ER
H
AN
D
LI
N G
C R
AN
E
ROAD TO PAD 405
PERIMETER RD PE
RI
M
ET
ER
R
D
BATTERY LAMB RD
CO
NTAINER TRANSFER RD
SO
U
TH
W
H
AR
F R
D
BATTERY LAMB RDTA
-3
CREEK R
IV
ER
R
D
SO
U
TH
R
O
AD
SOUTH
R
OAD 3
SOUTH ROAD 4
SOUTH
R
OAD 4
SOUTH ROAD 5
SOUTH
R
OAD 2
SO
U
TH
R
D
SO
UT
H
RI
VE
R
RD
WALDEN
SO
U
TH
32.01 U
.S .4
U
.S .4
SO
U
TH
F O
R T
FI
SH
ER
B
LV
D
U.S.421
U.S.421
U.S .42
U
.S .4
NORTH LOOP ROAD
(O
LD
H
IG
H W
AY
PE
R
IM
ET
ER
R
D
PERIMETER RD
PE
R
IM
ET
ER
R D
800N O
R
TH
R
IV
ER
R
D N
O R
TH
L
O O
P
N O
R
TH
L O
O P
RIVER RD
(OLD HIGHW
AY 130)
NORTH LOOP 2
B E
R
TH
CENTER LOOP RD
N O
R
TH
R
IV
ER
R
D
(O
LD
H
IG
H W
AY
22022120320210410523023124324424524
21421
213103102101 302 303301 311 310 320 306304 305
B E
R
TH
TA-1 SU
N
N Y
PO
IN
T R
D
R
IV
ER
R
D
CENTER WHARF RD
N O
R
TH
W H
AR
F
R D
ST PHILLIPS RD
K
A R
LM
A
N L
N
W
ELL RD
NORTH LOOP 1
FB 37MIDDLE LOOP RD
FB
BU
N
KE
R L
O O
P R
D
C R
EE
K
R D
H U
N
TE
R S
R O
AD
JO
N
ES
R
O
AD
TA
R
P
IT
R O
AD
WEST REEVES RD
EAST REEVES RD
FB 17 FB 18
FB 19
FB 44
PA
D
N O
R
TH
R
IV
ER
R
D
FB
500 PAD RD
600 PAD RD
BRUNSWICK RD
N O
R
TH
R
IV
ER
R
D
REAVES
RDSO
U
TH
R
IV
ER
R
O
AD
BU
N
KE
R
L O
O P
R D
R O
AD
T
O
TR
AN
SF
ER
AR
EA
YARD RD
HOLDING
NORTH RAILROAD
NORTH LOOP 1
11.49 17 D
O W
R O
AD
SUMPTER AVE
SPARTANBURG AVE
ATLANTA AVE
8T H
A
VE
CLARENDON
AVECOLUMBIA AVE
BIRMINGHAM
7T H
A
VE
FAYETTEVILLE AVE
HAMLET AVE
CHARLOTTE AVE
D O
W R
O
AD
OCEAN BLVD.
D O
W R
O
AD
D O
W R
O
AD
PE
RI
M
ET
ER
R
D
FB
FB 38
N C
H
IG
H W
AY
NORTH
LO
O P
N C
H
IG
H W
AY
H
IG
H W
AY
FB 30
FB
FB
NORTH LOOP 2
SU
BS
TA
TI
O N
R D
FACILITY RD
MILLVAN REPAIR RD
BR
U
N
SW
IC
K
R D
OVERNIGHT YARD RD
SUB-STATION RD
CLA
SS YARD O
UTER LO
OP R
D
CONTAINER RESTUFFING RD
PE
RI
M
ET
ER
R
D
RECLAIM YARD
FB
FB
FB
MIDDLE LOOP RD
INNER RD
FB 34
FB
FB 32CONTAINER
RESTUFFING
RDBA
R
R
IC
AD
ED
TR
U
C K
H O
LD
IN
G
YA
R D
LOADING
AREA
CLASS YARD CENTER LOOP RD
NORTH LOOP 1
FB
FB 36
BRUNSWICK RD
INNER LOOP RD
FB 14
FB
OUTER LOOP R
D
MAINENTRANCEBR
U
N
SW
IC
K
R D
EXPLOSIVE RD
BRUNSWICK RD
NC
NC 87
NC
SUBSTATION RD
BRUNSWIC
K R D
PERIMETER RD PE
RI
M
ET
ER
R
D
SUNNY PO
INT RD
PE
RI
M
ET
ER
R
D
SO
U
TH
R
IV
ER
R D
N C
MAINENTRANCE
GATE
NC
PERIMETER RD
PE
R
IM
ET
ER
R
D
1.69
± 1'-6"
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
FL
O A
TI
N G D
O C K L A
YO
U T
C-2
PLAN VIEW: PARTIAL DOCK LAYOUT
SCALE: 1" = 6'-0"
2' 16.41' 16.41'
C2 C4
12" CLEAT (TYP)
SEE C-5 FOR KNEE BRACKET DETAIL
97'
13'
(E) 5' X 40' GANGWAY (PROTECT-IN-PLACE)
25'
(E) 13' X 97' MAINWALK (PROTECT-IN-PLACE)
8'
5.5'
(N) 20" SQUARE CONCRETE PILES (TYP)
SEE SHEET C-5 FOR DETAILS
(E) 14" SQUARE CONCRETE PILES (TYP 1 OF 10)
5'
1' (TYP.)
(N) 8'X130' MARGINAL WALKWAY
(N) 5'X40' FINGER
SECTION: TRANSITION PLATE DETAIL
SCALE: 1" = 2'-0"
NOTE: PROVIDE 60"X12"X1
2" UHMW STRIP SECURED TO
TRANSITION PLATE. ENSURE THAT PLATE MAINTAINS CONTACT
WITH UHMW STRIP ATTACHED TO TRANSITION PLATE AT ALL
TIMES.
C-2
60"X6"X1
2" UHMW STRIP, BEVELED
EDGE,
BOLTED TO PLATE
4'X6'X5
16" H.D.G. SLIP-RESISTANT
BENT TRANSITION PLATE
1" Ø HINGE ROD, H.D.G., WELDED
TO 4"X12"X5
8" H.D.G. PL
0 2' 4'
0 6' 12'
C-2
(N) 4'X6'X5
16" H.D.G. BENT TRANSITION PLATE, SEE DETAIL 2
ON THIS SHEET
(E) LIGHTHOUSE POWER PEDESTAL
(PROTECT-IN-PLACE)
(N) 12"X16"X1
4" H.D.G. UTILITY PULL BOX COVER PLATE,
FLUSH WITH DECK, TYP (LOCATION APPROXIMATE)
D
ET
A
IL
S, S
H
EE
T
REPLACE (E) GUARD RAIL PER DETAIL 2 ON C-4
8"X41
2" Ø H.D.G. INSERT, 31
3" MINIMUM
EDGE DISTANCE, (3 TOTAL)
8"X41
2" H.D.G. HEX BOLT WITH
LOCK & FLAT WASHERS
REFURBISH AND REINFORCE EXISTING PILE GUIDES TO THE
SATISFACTION OF THE COR
INSPECT AND REPAIR (E) WALER AND FASCIA BOARD TO
MATCH NON-DAMAGED SECTIONS
1'-6"
(N) POWER PEDESTAL, SEE DETAIL 2 ON E-5
(E) MAINWALK (N) MARGINAL WALKWAY
5.5'
C-2
(E) LIGHTHOUSE POWER PEDESTAL
TO BE REMOVED
CHTRON AN
IL
ORA
M E T ST O N U
I N E E RE N G
SEFORP LA
NOIS
03 41 9
SE AL
OPTIONAL BID ITEMS
14'
1' (TYP.)
R
EV
IS
ED
F O R F
IR
E
B O A T
JA
N1
FP
K7TSEJAM
R-6
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 2
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 3
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 4
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 6
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 7
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 8
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
E 2
N 9
0E 2
N 9
E 2
N 9
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
00E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 1
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N 5
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
E 2
N -
NC 87
NC
BRUNSWICK RD
NC
HEADQUARTER LOOP
H E
A D
Q U
A R
TE
R
L O
O P
PERIMETER RDBR
U
N
SW
IC
K
R D
KE
ZI
AH
D
R
EXPLOSIVE RD
FB 10
FB 10FB
FB 7FB 7FB
FB 3
FB 6FB
FB
TR
U C
K
AP
R O
N
IN
SP
EC
TI
O
N
FB
EXPLOSIVE
SUSPECT RD
SU
SP
EC
T
TR
UCK
RD
FB 14
FB
FB
FB 3FB 30
RDTRUCK
CONTAINER
SUSPECT
AREAFB 15
FB
SO
UT
H
SO
U
TH
R
O
AD
FB
BRUNSWICK RD
PERIMETER RD RI
VE
R
RD
C R
EE
K
WALDENTA
-3
TA
-2
222223204232233 312 313 314 315316321 322 323C
AR
G O
T R
AN
SF
ER
BE
R
TH
400 PADS DRIVE
FO
RT FISHER RD
BATTERY
RDBUCHANAN
HOLD
IN
G Y
ARD R
D A
SOUTH
R
R
319318 317 330 YA
R
D D
U N
N
AG
E
SO
U
TH
RAMP
BE
R
TH
BE
R
TH
C O
N
TA
IN
ER
H
AN
D
LI
N G
C R
AN
E
ROAD TO PAD 405
PERIMETER RD PE
RI
M
ET
ER
R
D
BATTERY LAMB RD
CO
NTAINER TRANSFER RD
SO
U
TH
W
H
AR
F R
D
BATTERY LAMB RDTA
-3
CREEK R
IV
ER
R
D
SO
U
TH
R
O
AD
SOUTH
R
OAD 3
SOUTH ROAD 4
SOUTH
R
OAD 4
SOUTH ROAD 5
SOUTH
R
OAD 2
SO
U
TH
R
D
SO
UT
H
RI
VE
R
RD
WALDEN
SO
U
TH
32.01 U
.S .4
U
.S .4
SO
U
TH
F O
R T
FI
SH
ER
B
LV
D
U.S.421
U.S.421
U.S .42
U
.S .4
NORTH LOOP ROAD
(O
LD
H
IG
H W
AY
PE
R
IM
ET
ER
R
D
PERIMETER RD
PE
R
IM
ET
ER
R D
800N O
R
TH
R
IV
ER
R
D N
O R
TH
L
O O
P
N O
R
TH
L O
O P
RIVER RD
(OLD HIGHW
AY 130)
NORTH LOOP 2
B E
R
TH
CENTER LOOP RD
N O
R
TH
R
IV
ER
R
D
(O
LD
H
IG
H W
AY
22022120320210410523023124324424524
21421
213103102101 302 303301 311 310 320 306304 305
B E
R
TH
TA-1 SU
N
N Y
PO
IN
T R
D
R
IV
ER
R
D
CENTER WHARF RD
N O
R
TH
W H
AR
F
R D
ST PHILLIPS RD
K
A R
LM
A
N L
N
W
ELL RD
NORTH LOOP 1
FB 37MIDDLE LOOP RD
FB
BU
N
KE
R L
O O
P R
D
C R
EE
K
R D
H U
N
TE
R S
R O
AD
JO
N
ES
R
O
AD
TA
R
P
IT
R O
AD
WEST REEVES RD
EAST REEVES RD
FB 17 FB 18
FB 19
FB 44
PA
D
N O
R
TH
R
IV
ER
R
D
FB
500 PAD RD
600 PAD RD
BRUNSWICK RD
N O
R
TH
R
IV
ER
R
D
REAVES
RDSO
U
TH
R
IV
ER
R
O
AD
BU
N
KE
R
L O
O P
R D
R O
AD
T
O
TR
AN
SF
ER
AR
EA
YARD RD
HOLDING
NORTH RAILROAD
NORTH LOOP 1
11.49 17 D
O W
R O
AD
SUMPTER AVE
SPARTANBURG AVE
ATLANTA AVE
8T H
A
VE
CLARENDON
AVECOLUMBIA AVE
BIRMINGHAM
7T H
A
VE
FAYETTEVILLE AVE
HAMLET AVE
CHARLOTTE AVE
D O
W R
O
AD
OCEAN BLVD.
D O
W R
O
AD
D O
W R
O
AD
PE
RI
M
ET
ER
R
D
FB
FB 38
N C
H
IG
H W
AY
NORTH
LO
O P
N C
H
IG
H W
AY
H
IG
H W
AY
FB 30
FB
FB
NORTH LOOP 2
SU
BS
TA
TI
O N
R D
FACILITY RD
MILLVAN REPAIR RD
BR
U
N
SW
IC
K
R D
OVERNIGHT YARD RD
SUB-STATION RD
CLA
SS YARD O
UTER LO
OP R
D
CONTAINER RESTUFFING RD
PE
RI
M
ET
ER
R
D
RECLAIM YARD
FB
FB
FB
MIDDLE LOOP RD
INNER RD
FB 34
FB
FB 32CONTAINER
RESTUFFING
RDBA
R
R
IC
AD
ED
TR
U
C K
H O
LD
IN
G
YA
R D
LOADING
AREA
CLASS YARD CENTER LOOP RD
NORTH LOOP 1
FB
FB 36
BRUNSWICK RD
INNER LOOP RD
FB 14
FB
OUTER LOOP R
D
MAINENTRANCEBR
U
N
SW
IC
K
R D
EXPLOSIVE RD
BRUNSWICK RD
NC
NC 87
NC
SUBSTATION RD
BRUNSWIC
K R D
PERIMETER RD PE
RI
M
ET
ER
R
D
SUNNY PO
INT RD
PE
RI
M
ET
ER
R
D
SO
U
TH
R
IV
ER
R D
N C
MAINENTRANCE
GATE
NC
PERIMETER RD
PE
R
IM
ET
ER
R
D
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
FL
O A
TI
N G D
O C K L A
YO
U T
C-3
4' 22' 22' 22'
12" CLEAT (TYP)
PLAN VIEW: PARTIAL DOCK LAYOUT
SCALE: 1" = 6'-0"
NOTE:
• VESSEL OPERATOR SHALL MOOR VESSEL WITH APPROPRIATELY
SIZED DOCK LINES AND UNIFORMLY LOADED TO AVOID DAMAGE TO DOCK
AND MOORING SYSTEM DUE TO CONCENTRATED PEAK LOADS. CAUTION
SHALL BE TAKEN AS TO NOT OVERSTRESS ANY SINGLE POINT OF
MOORING.
40' TYP
75'
8'
83'
8'
26'
(N) 20" SQUARE PRE-STRESSED CONCRETE GUIDE PILE (TYP),
SEE C-5 FOR DETAIL
C3 C4
5' TYP
16'
1' (TYP.)
8'
5.5'
(N) 20" SQUARE CONCRETE PILES (TYP),
SEE SHEET C-5 FOR DETAILS
0 6' 12'
(N) 18" CLEAT (6 TOTAL)
(N) 12"X16"X1
4" H.D.G. UTILITY PULL BOX COVER PLATE,
FLUSH WITH DECK, TYP (LOCATION APPROXIMATE)
(N) POWER PEDESTAL, SEE DETAIL 2 ON E-5
(N) DOCK BOX ITEM NO. 11-001 AS SUPPLIED BY
HENDERSON MARINE (OR APPROVED EQUAL), TYP
D
ET
A
IL
S, S
H
EE
T
C-3
C3 C4
(N) FASCIA BOARD WITH GUARD RAIL
WITH SUPPORTS AT 5' O.C.
SEE DETAILS ON C-4
SPACE PILES EQUALLY, ADJUST CLEAT LOCATIONS TO AVOID INTERFERENCE WITH PILES
OPTIONAL BID ITEMS
37.5'
15'
5.5'
2'
(N) HEAVY DUTY DOCK FENDER, TYP FOR THIS BERTH
(N) POWER PEDESTAL, SEE E-4 FOR ELECTRICAL
SCHEMATIC
RE
G I
ST
ER
ED
PROF
ESS I ONAL
ENG I NEER
C I
S T ATE OF CAL I F O
RN
I A
No. C-56821 Exp. 06-30-11
I LV
FE
R N
A N O L. P AG
SE
D
(N) 24" CLEAT (8 TOTAL)
2' 16.41' 16.41'
1' (TYP.)
4'
EQUAL DISTANCE BETWEEN PILES
MOORING LAYOUT (TYP.)
(N) 18" CLEAT (6 TOTAL)
(N) 24" CLEAT (8 TOTAL)
12" CLEAT (TYP)
R
EV
IS
ED
F O R F
IR
E
B O A T
JA
N1
FP
C3 C4
K7TSEJAM
R-7
3" MIN.
2 1/2" MIN.
3" MIN.
2 1/2" MIN.
(N) 20" SQUARE PILE
(N) H.D.G. PILE GUIDE (CONTRACTOR TO SUBMIT DETAILED SHOP DRAWINGS &
CALCULATIONS FOR THE PROPOSED PILE GUIDE DESIGN TO BE APPROVED BY COR)
5'-0"
7'-91 2"
4X12 WALER
(6X12 GLULAM WALER
AT FIREBOAT BERTH)
2X16 FASCIA-BOARD
4" H.D.G. THRU ROD, PLACED IN 1" Ø PVC
SLEEVE, COUNTER-SUNK FLUSH WITH
FASCIA-BOARD @ 12" O.C., (TYP)
8" H.D.G. THRU ROD, PLACED IN 1" Ø PVC SLEEVE,
12" O.C., COUNTER-SUNK FLUSH WITH FASCIA-BOARD
(6" O.C. TYP AT 24" CLEATS)
EPS FOAM
EPS FOAM
4X12 WALER
2X16 FASCIA-BOARD
FB = ± 18"
FB = ± 18"
8" X 3" H.D.G. COUNTERSUNK LAG SCREWS
(OR APPROVED EQUAL) @ 24" O.C.
8" X 3" H.D.G. LAG SCREWS (OR
APPROVED EQUAL) @ 24" O.C.
12" CLEAT
24" CLEAT
1 1/2"
12"
8" Ø H.D.G. INSERTS
18" LONG SS 316 SAFETY CHAIN
WITH CARABINER
(N) 2" MIN. Ø, 42" TALL ALUMINUM GUARD
RAIL (CONTRACTOR TO SUBMIT DESIGN
DETAILS TO BE APPROVED BY COR),
SEE PLAN FOR EXTENT AND LOCATION
CONNECTION DETAIL TO BE
DESIGNED BY CONTRACTOR AND
APPROVED BY COR
+17' MLLW
MTL @ +2.1' MLLW
-43' MLLW MIN. TIP ELEVATION
APPROX MUD LINE ELEVATION
@ -12' TO -14' MLLW
H.D.G. INSERTS
TO ACCEPT CLEAT
BOLTS (TYP)
POLYURETHANE COATING 50 MIL
MIN. THICKNESS (TYP)
BLACK EPDM "D" BUMPER AT
LOCATIONS SPECIFIED ON C-3.
VINYL SIDE BUMPER
4"x6" Treated Waler/Facia
2"x6" Treated Lumber Lag bolted to 4"x6" Facia
C H K B
Y:
D
ES
IG
N
ED
B Y:
A
B C D
E F G H
U .S A R M Y
EN
G
IN
EE
R D
IS
TR
IC
T
PLOTTED DIMENSIONS 35.30" X 24.00"
D A
TE
SHEET OF 15
C O R P S
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N N O R
TH
C A R O
LI
N A
TE
TR
A T
EC
H
IN
C
E.
O
C
EA
N B
LV
D
SU
IT
E
LO
N G B
EA
C H C A
TM
FL
P
JW
FL
P A J
M A R
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SY
M B O L
SY
M B O L
D
ES
C R
IP
TI
O N
D A
TE
A P P R O
VE
D
SU
N N Y
P O
IN
T, N
O R
TH
C A R O
LI
N A
SY
ST
EM
A N D B
O A T D O C K
W H A R F R
EP
A
IR
S
W
A
VE
A
TT
EN
U A
TI
O N
M
IL
IT
A R Y
O C
EA
N T
ER
M
IN
A L
FL
O A
TI
N G D
O C K S
EC
TI
O N S
C-4
SECTION: 5' WIDE FLOATING DOCK SECTION
SCALE: 1" = 1'-0"
NOTE:
• DOCK FASCIA-BOARDS SHALL BE PLASTIC LUMBER, ATTACHED TO
THE DOCK BY H.D.G. THRU-RODS.
• PROVIDE VINYL SIDE BUMPER WITH SS SCREWS AT 6" O.C.,
VERTICAL AND HORIZONTAL.
0 1' 2'
SECTION: 8' WIDE FLOATING DOCK SECTION AT PILE
SCALE: 1" = 1'-0"
NOTE:
• DOCK FASCIA BOARDS SHALL BE PLASTIC LUMBER, ATTACHED TO THE DOCK BY
H.D.G. THRU RODS AND LAG SCREWS AS INDICATED.
• 7
8" Ø THRU RODS SHALL BE HIGH STRENGTH STEEL CONFORMING TO THE
REQUIREMENTS OF ASTM A588.
C2 C4
C3 C4
DETAIL: 42"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .