Electrical Standard

View the file

Other files

File Type Posted
amendment0003.pdf PDF
sketchofbuilding.pdf PDF
RFIfinal.pdf PDF
amendbldg20.pdf PDF
Site_Visit_12-T-0026.pdf PDF
amendment0002.pdf PDF
Solicitation W912PM-12T-0026 RFIs.docx DOCX document
01 35 26.pdf PDF
MOTSU map 8 5 X 11.pdf PDF
JM Admin Area.pdf PDF
pd21.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 May 2012

SUBJECT: Military Ocean Terminal, Sunny Point (MOTSU) Electrical Standard

1. In addition to the contents of the latest edition of the National Electrical Code (NFPA 70) and the National Electrical Safety Code, the following items form the minimum electrical requirements for facilities located on MOTSU.

A. General:

1) All secondary electrical work done on MOTSU shall be performed by personnel authorized to engage in electrical contracting within the state of North Carolina and shall hold a North Carolina electrical license (suitable for the costs and voltages of the project). An electrical license from another state may be acceptable if it qualifies under North Carolina's reciprocity process. Submittal of a certified copy of the electrical license shall be required. This requirement does not apply to primary electrical distribution, street lights, generator work up to the transfer switch and area lights.

2) The construction contractor shall be responsible for obtaining a digging permit from DPW, prior to performing any digging on MOTSU. A digging permit shall also be required for any work on the wharfs. See attachment 3, titled “Application for Digging Permit“ for a digging permit request form. When properly completed, this permit will locate underground utilities which may be affected by the project. Markings for underground utilities are considered approximately only. The actual location of the utility shall be considered within a band ± 36 inches from either side of the painted mark or flag. The contractor shall be totally responsible for repairs to marked utilities that he may damage. Any damaged Utility shall immediately be reported to DPW at 910-457-8292. Any damaged utilities shall be repaired within eight hours of the initial damage, or the Government (at its option) may have the utility repaired and then charge the contractor. If an unmarked utility is damaged by the contractor, the Government will have it repaired, if all aspects to the Digging Permit have been followed. Typically, once a digging permit is submitted by the contractor, DPW shall have five business days to complete the application process and have utilities marked.

3) Any non-metallic conduit or inner-duct installed underground for installation of fiber optic cable, gas, or any other non-electrical conductive materials shall have a tracer wire installed. This tracer wire may be either part of the conduit, preinstalled or blown in after conduit or inner-duct installation. Tracer wire shall be accessible at least every two hundred feet.

Access points to the tracer wire may include valve boxes, hand-holes, manholes, vaults, marker posts, or other covered access devices. Access point covers should be clearly marked with the type of facility. Additionally, all fiber optic cable shall be clearly marked with a white marker post (minimum of 66 inches in length, with at least four feet above grade) by 3-1/2 inch minimum diameter which shall be located at least every two hundred feet along the length of the cable run (if no other access point to the tracer wire is available). The making post shall have an orange top (at least 18 inches in length) which states, as a minimum, “WARNING FIBER OPTIC CABLE” and shall have a graphic warning with a contact number. The contact number shall be 457-8292. Marker posts shall have a peg through the embedded portion of the marker post and into the surrounding soil for pullout resistance. An orange “Marker Tape” (with the words “BURRIED FIBER OPTIC CABLE BELOW” shall be install 12 to 24 inches below the surrounding grade. Fiber optic cable shall be installed four feet below final grade. Additional information can be found at MOTSU Utility Line Marking Specification, which is attached to this document.

4) Utility line marking shall be IAW the attached “MOTSU Utility Line Marking Specification”. See Attachment 4.

5) Typically, for new or rehabbed facilities, the following two electrical inspections (all projects under Corps of Engineer (COE) control will normally be inspected by COE; all other work requiring an inspection will be performed by DPW) are required prior to receiving approval to have BEMC energize electrical power at the site:

a. Rough-In Inspection: A rough-in inspection shall be required after all electrical conduit, wire, panels, outlet boxes, switch boxes, equipment boxes, isolation switch boxes, etc.

have been properly installed. Except for the final connection to switches, receptacles, and lighting fixtures, all ground wires and other wires in boxes must be spliced and pigtailed for the rough-in inspection. The rough-in inspection shall be conducted before insulation, sheet-rock, paneling, or other materials cover any wiring is installed. Underground wiring and under-slab wiring must be inspected before the trench is back-filled. Where wiring is concealed before rough-in inspection, the prime contractor shall be responsible for all costs associated with uncovering and replacing the covering material so all wiring can be inspected. A written report identifying any observed errors or defects will be provided to the contractor and DPW. Any faults identified by the inspector will be corrected before additional electrical work shall be allowed.

b. Final Inspection: A final inspection shall be required after all final connections for wiring, panels, lights, switches, receptacles, outlet boxes, switch boxes, equipment boxes, isolation switch boxes, etc. have been properly installed. All overcurrent protection, front covers, fixture lens, etc shall be completely installed prior to a final inspection. A written report identifying any observed errors or defects will be provided to the contractor and DPW. Any faults identified by the inspector shall be corrected before an approved final inspection is awarded. Upon completion of a successful final inspection, DPW will direct BEMC to make the facility service hot.

c. Request for inspection: A request for inspection (rough-in or final) can be obtained from COE for projects under their control and from DPW (910-457-8292; see subparagraph “d” below) for all other projects; the request should be submitted five (5) working days prior to the needed inspection date.

d. Use Attachment 1 for application to request an electrical inspection through DPW.

6) Electrical panels, disconnects, or other switchgear mounted in mechanical rooms are allowed to be surface mounted; however, they shall be mounted flush against the supporting wall; in most cases, they shall not extend over eight (8) inches from the wall or purlin face. In metal buildings, they may be installed on uni-strut (or equal) directly fastened to purlins supporting the walls. Building bracing (tie cables) shall not run behind the panels or within the NEC required panel clearance. Typically, the upper edge of the panel shall be at 6-1/2 feet above the finished grade and the lower edge of the panel shall not be lower than 18 inches above the finished grade. Panels over 600 amperes may have the bottom edge of the panel closer to the floor; however, effort will be made to keep it at least two inches above finished grade. If these requirements cannot be met, then coordination prior to installation is required with DPW.

7) Main exterior building disconnect switches are allowed to be surface mounted;

however, the back edge of the disconnect shall be placed flush against the building (for its entire length). On new facilities, brickwork or other siding materials (on two tone structures, for example metal above brick) may require special attention to recess the disconnect switch in order to keep the back flush with the building. The top of the disconnect switch shall be 6 -1/2 feet above ground level. If these requirements cannot be met, then coordination prior to installation is required with DPW.

8) On new construction projects, temporary utilities (electricity, potable water, and sewage) will be made available to the contractor at no costs (if they are available in the work area or after site work is completed). This should not be misinterpreted as permanent electrical connection to the facility. A permanent electrical connection to the facility shall only be accomplished after a successful final electrical inspection has been obtained. The contractor shall perform all connections and disconnections (other than primary electrical; this shall be accomplished by BEMC) and shall supply any required temporary service pole, reducing valves, piping, etc... required to make such a temporary connection. All such connections shall be done by personnel licensed and qualified to perform such connections. The term "temporary utilities" shall specifically not include heat and/or air conditioning. If heat and/or air conditioning are required by the contractor prior to acceptance of the project by the Government, he shall provide it at no expense to the Government. Temporary electrical service shall not be utilized for heat and/or air conditioning. Fuel oil shall not be provided by the Government. If excessive or wasteful usage of utilities is detected, they shall be turned off.

9) If temporary electrical power is required at the site (especially on new construction projects), the prime contractor shall negotiate directly with BEMC to have the power run and connected to a contractor supplied temporary service pole. The prime contractor shall pay BEMC directly for this service. This shall be an agreement between the prime contractor and BEMC; the Government shall not be involved in these negotiations or subject to any financial obligations between the prime contractor and BEMC. All requirements within this MOTSU Electrical Standard shall be maintained. The contractor shall also pay BEMC to have the temporary electrical service removed. The Government will provide the electricity; however, if energy waste is detected the electricity shall be turned off.

10) On maintenance or rehab type projects, once the building envelope is closed in, the contractor may utilize existing electrical utilities. If heat or air conditioning is available, the heat shall not be set above 50 degrees and the air conditioning shall not be set lower than 80 degrees.

However, prior to turning on the HVAC, checks shall be made to ensure clean filters are in place (new filters will be installed by the contractor, based upon debris and dust in the air). Any locations where over 80 square feet of sheetrock or any other operation where large amounts of debris or dust are made/encountered shall have the ductwork professionally cleaned to a “clean system” level. If windows and doors are continually open or if excessive or wasteful usage of heating/air conditioning is detected, they shall be turned off.

11) The Fire Alarm Control Panel (FACP) shall be installed in the mechanical room of all new/rehab facilities. Only UL listed and UL labeled FACP and devices shall be allowed.

The FACP shall be on a separate electrical circuit controlled from a lockable circuit breaker (circuit breaker shall be red in color). There shall be a smoke detector install in the ceiling directly over the FACP. The MOTSU fire alarm system carrier frequency is 465.9625 and

469.8125 MHZ. The fire alarm system shall be a Class A, addressable system. Initiating Device Circuits (IDC) shall be Class A, Style Eα. Signaling Line Circuits (SLC) shall be Class A, Style 6α. All newly installed fire alarm systems shall be 100% compatible with the existing MOTSU fire alarm system and NFPA-72. This specifically means that all devices, signals, software, and hardware shall be capable of being used with the existing fire alarm systems and devices without the need for special modifications or conversions of the existing or newly installed system/device. MOTSU currently utilizes an EST/Keltron fire alarm system and devices. There shall be no proprietary fire alarm systems, FACP, or other fire alarm devices installed on MOTSU. Prior to ordering any fire alarm system or component, the contractor shall submit equipment/software submittals of the product to the authority having jurisdiction (Fire Department Fire Inspector) for approval; items not receiving a written approval shall not be ordered. Fire alarm systems on MOTSU shall be installed, tested, and certified by a NICET Level IV (minimum) Fire Alarm Technician. Prior to acceptance, any newly installed fire alarm system shall be completely tested (from each device in the new/rehabbed facility back to the Fire Command Center located in building 44). The contractor shall provide all hardware and software required for 100% communications linkage between the newly installed fire alarm system and the Fire Command Center located in building 44. A “Record of Completion” shall be completed by the contractor and provided to DPW and the MOTSU Fire Inspector for all installed fire alarm systems, IAW NFPA-72. Any maintenance and/or repairs done on any MOTSU Fire Alarm system shall be done by a certified NICET Level IV (minimum) Fire Alarm Technician.

12) To satisfy requirements of Public Law 104-133, National Technology Transfer and

Advancement Act, the DOD Fire Engineering Committee has determined Military Handbook (MILHDBK) 1008 is the implementing document for this requirement. All fire protection designs on MOTSU shall use this consensus standard.

13) In HAZADROUS locations, INTRINSICALLY safe devices SHALL NOT be allowed. This specifically includes overhead door operating devices and controls.

14) As a minimum, a properly sized Surge Protective Device (SPD) which meets the minimum requirements of the “3rd Edition” of UL 1449 shall be provided at all new or modified panels. The SPD shall be UL listed and labeled as having been tested IAW UL 1449 and shall be marked for lightning protection system (LPS) application. Fuses shall not be used as surge suppression.

15) SPD suitable (shall meet UL 1449 3rd Edition and be installed IAW UL 96A) for the application shall be provided for all electrical, conductive signal, data, and communication lines at the point of entrance to all new or modified buildings. The protection provided shall be installed IAW Articles 800, 810, 820, or 830 (as applicable) of the NEC and shall comply with UL-452, UL-497, and UL-497C (as applicable).

16) All power lines entering an ammunition pad area shall require surge arresters IAW

DA PM 385-64, paragraphs 6-5.a/b and 12-2. Additionally, surge protection devices shall meet the minimum requirements of UL 1449, third edition and shall be marked for Lightning Protection System (LPS) use.

17) Graphical symbols for electrical wiring and layout diagrams used in architecture and building construction shall conform to ANSI Y32.9-1972. Graphic symbols for electrical and electronic diagrams shall conform to ANSI Y32.2-1975 and IEEE Standard 315-1975.

18) A short circuit analysis shall be performed on any new facility and a complete power coordination analysis shall be conducted. Proper power coordination shall be maintained. Short circuit amperage available shall be considered "unlimited".

19) On Military Construction projects, run underground telephone copper cabling to the nearest pedestal. Cable shall be run in four inch RNC (PVC) conduit buried a minimum of 24" below grade. Where it goes under roads, sidewalks, parking lots, etc., it shall be encased in concrete (4" minimum). Run 100% spare communication conduits (i.e... if it requires one duct, run two; if it requires two ducts, run four; etc....).

20) Local Area Networks and Voice Communications shall follow the standards provided by MOTSU DOIM. This standard is attached as attachment 2.

21) The construction contractor shall provide a minimum five (5) days notice to the Contracting Officer and receive written notice to proceed before interrupting any base utility.

22) Typically, all new underground utilities (electrical, telephone, fiber optic, water line, etc) shall be located within a “right-of-way” boundary of three feet to 15 feet parallel to roadways and parking lots. All utilities, signal, control, and security system circuits entering ammunition pads shall comply fully with DA PAM 385-64. Underground electrical, telephone, fiber optic, water lines, and other utilities shall not be run through open spaces or wooded areas without the specific written approval of DPW.

23) Typically, underground fiber optic conduit/cable shall be buried a minimum of 48 inches below final grade, except for the following situations:

a) 60 inches below the bottom of culverts

b) 42 inches (minimum) below the bottom of railroad tracks

c) 24 inches under (vertically) existing signal or communication wires

d) In ditches, 60 inches (minimum) below the bottom of the existing flow line

24) All new and rehabbed buildings on MOTSU shall fully comply with the requirements of UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings.

Appendix B (B-4), DoD Minimum Antiterrorism Standards for New and Existing Buildings;

specifically addresses electrical and mechanical design, utility distribution and installation, and Mass Notification Systems requirements.

B. LONWORKS:

1) All new and rehabbed facilities on MOTSU shall be wired for a Utility Monitoring and Control System (UMCS). All design and construction shall be based upon a Direct Digital Control (DDC) design. The installation shall be LonWorks based (ANSI/EIA 709.1) meeting the design intent of a “Flat-LON,” peer-to-peer architecture, in accordance with the UFC 3-410- 02FA, LONWORKS. The Direct Digital Control for HVAC and other local building systems (to include electric hot water heater and facility lights, as a minimum) shall meet UFGS 23-09-23 for the building level controls, and be compatible with a UMCS that meets UFC 3-401-01FA, LONWORKS. Additionally, the UMCS shall meet UFGS 25-10-10 for the front-end automation device controlling the HVAC and all other local building systems equipment. These devices shall be open, non-proprietary, and interoperable multi-vendor DDC systems that fully integrate with MOTSU’s UMCS. Unless otherwise directed, the systems shall be controlled at the building level with the capability to connect to MOTSU’s UMCS in the future via a simple plug and play connector. All LONWORKS devices shall have control wiring leading back to a wall mounted backer-board located in the mechanical room of the new or rehabbed facility.

2) All new or rehadded facilities shall have an Advanced Metering Device (AMD) installed on the secondary side (within the Main Distribution Panel – MDP). This AMD shall have a Direct Digital Control (DDC) device installed (to provide connections for future terminal UMCS). If one transformer feeds multiple facilities, each facility shall have its own separate AMD. Each sub-panel in a facility shall have an AMD installed. Any panel (600 amperes or larger) with an electrical load equal to 25% or greater of the rated panel capacity shall also have an AMD installed on that load. Unless otherwise directed, these AMD systems shall be controlled at the building level with the capability to be connected to MOTSU’s UMCS in the future via a simple plug and play connector. All AMD devices shall have control wiring leading back to the wall mounted LONWORKS backer-board located in the mechanical room.

Specifications for the advanced meter are:

a. Quantities measured:

1) Power (kilowatt), average demand over 15 minute intervals

2) Energy (kilowatt – hours)

3) Phase voltage, amps, frequency, true power, reactive power, apparent power, and power factor

b. Measurement configuration:

1) For single phase application, 120 – 240 VAC

2) For three phase application, 208 – 600 VAC, 3 wire delta or 4 wire wye

c. Operating temperatures:

1) -20 degrees C to +60 degrees C

2) For exterior mounting; use moisture proof enclosures

d. Humidity operating range: 5% to 90% (non-condensing)

e. Accuracy: Revenue grade:

1) ±0.5% at unity power factor

2) ±0.5% at 0.5 power factor

f. Frequency: 60 HZ, ±5%

g. Meter shall meet all LonWorks applications: ANSI/CEA-709.1b protocol

(LonTalk) output for communications using Standard Network Variable Types (SNVTs) for measured values.

h. Suggested manufacturer includes:

1) Continental Control Systems, LLC WattNode Plus http://www.ccontrolsys.com/products/wnp_for_lon.html

(888) 928-8663

2) Other manufacturers make similar products and should also be considered.

The above specifications for an AMD should be considered minimum requirements.

C. Electrical:

1) All low voltage (600 volts or less) electrical equipment furnished shall be listed and labeled by Underwriters Laboratories, Inc. (UL).

2) New construction will use pad-mounted transformers (22,800/13,200 grounded WYE primary), the secondary voltage depends on each facility requirement, however it normally will be a WYE connection. The transformer shall have dead front type primary construction (no high voltage wiring exposed with the enclosure doors open). Phase rotation for new three phase systems shall be clockwise. Phase rotation for rehab work shall match the existing rotation.

3) Each facility shall have a digital electrical service meter. Normally, this meter will be provided and installed by BEMC. The facility contractor shall install the meter base and conduit on new buildings or on rehabbed buildings. If the service meter is installed on a servicing pad mounted transformer, BEMC shall provide the meter base, meter and installation.

4) Each facility shall have a disconnecting means conveniently located on the outside wall readily accessible to fire department personnel. The disconnecting means device shall typically remove all electrical power to the facility.

5) The exterior of pad mounted transformers and all other exterior switchgear shall be factory primed and painted brown (Federal Specification number 20059 or Sherman William's number 1049), minimum of three mil's thick.

6) There shall be no high leg DELTA circuits allowed on MOTSU.

7) Underground electrical cables shall be buried within conduit. Riser conduit shall be rigid metal conduit (RMC) unless otherwise approved. Minimum burial depths will be as required in NEC 300 and 710. Use only clean backfill and use a marking tape 6 to 12 inches below the surface and 6 to 12 inches above the conduit (if the conduit is buried over 24 inches deep). Rigid Nonmetallic Conduit (RNC) (types DZYR and DZKT) conduit may be allowed underground (with DPW approval) up to the turn-up joint. No RNC conduit shall be allowed above ground level.

8) For secondary voltages and communication cables, a maximum of 270 degrees of bend shall be allowed in one length of underground conductor. If more degrees of bend are required, a manhole or handhold shall be required. All manhole/handhold boxes shall be level and flush with the surrounding ground, no protrusions above ground level shall be allowed. The manhole/handhold shall meet the requirements for TIER 15 (as a minimum) as defined in ANSI/SCTE 77-202. The manhole/handhold cover shall have the word "ELECTRICAL" embossed in the top. A maximum cable length of 600 feet shall be allowed. All cables shall be pulled at the same time. Pulling of individual cables shall not be allowed. Splices shall only be allowed within manhole/handholds (as required). Underground duct shall have a 4-inch slope per 100 feet toward the manhole/handhold.

9) All secondary wiring (under 600 volts) shall be run in conduit. Minimum conduit size shall be ¾ inch. Conduits allowed include: IMC, RMC, EMT, RNC (underground use only – not allowed under concrete, however it is allowed if embedded within concrete), Sheet Metal Auxiliary Gutters, Busways, Cablebus, Cellular Concrete Floor Raceways, Cellular Metal Floor Raceways, Metal Wireways, Strut-Type Channel Raceways, Underfloor Raceways (unless described conduits are specifically not allowed by this document), and Cable Trays. Liquidtight Flexible Metal Conduit (LFMC), FMC, and FMT shall only be allowed where flexibility is a concern and for connections to luminaries (maximum length six feet). The following types of conduit shall not be allowed: HDPE, NUCC, LFNC, ENT, Nonmetallic Wireways (Wiremold and Plugmold), Multioutlet Assembly, Nonmetallic Extensions, Surface Metal Raceways, and Surface Nonmetallic Raceways.

10) Minimum wire size used shall be #12. The normal wire type is THWN/THHW with a 90 degree “C” temperature rating of conductor. Conductors for #8 and larger shall be stranded. Conductors over 500 KCMIL shall not be used, use parallel runs if higher ampere ratings are required. Wire splices shall only be allowed within suitable junction boxes or electrical fixtures. Nonmetallic-Sheathed cable (NM or NMC) shall not be allowed (unless specifically stated as acceptable by DPW). All secondary wiring (low voltage side of transformers) shall be copper.

11) Normally, three-phase power is required in facilities, with a minimum panel size of 225 amperes and 42 slots. This panel size may be reduced with DPW approval. Each facility shall have one main disconnect (one movement of the hand). The length of the Service–Entrance conductors (from the outside point of entrance of the facility to the “disconnecting means”) shall be kept to a minimum (maximum length shall be 36 inches). All panels shall have a main circuit breaker, unless the panel is fed as a sub-panel. If a sub-panel, it may be a Main Lugs Only (MLO) type if it is fed from a correctly sized circuit breaker and it meets all of the following criteria: the sub-panel is located within 25 feet from the MDP; the sub-panel is in the same room as the MDP; and the sub-panel is in direct visual sight of the MDP.

12) All panel buss bars shall be copper (includes power buss, neutral and ground buses).

Aluminum or tin-coated buses are not acceptable.

13) All circuit breakers shall be bolt-on types unless PW agrees to different types.

14) Electrical wiring for all panels and disconnects shall be sized for the full (100%) panel or disconnect rating, regardless of the breaker or fuse size actually installed. For example, if a 225-ampere rated panel is installed with a 100-ampere circuit breaker, then wiring shall be sized for the 225-ampere rated panel. In this example, 100-ampere rated wire is not acceptable.

15) All wiring going into electrical lugs shall have conductive protective grease applied in such a manner as to totally enclose the wire end which fits into the lug. The purpose of the grease is to reduce corrosion.

16) All wiring entering electrical lugs, circuit breakers, fuses, disconnects or any other electrical device shall have no more than 1/4 inch of exposed wire visible from the edge of the electrical device, where the electrical conductor enters the device to the edge of the wire insulation.

17) 20A/120V branch circuits exceeding 100' and 20A/277V branch circuits exceeding 230' in length from control panel to farthest device or fixture shall use number 10 AWG conductors. 20A/120V branch circuits exceeding 150' shall use number 8 AWG conductors.

18) All electrical circuits shall include a green grounding conductor.

19) A UL listed firestop system shall be used to seal penetrations of electrical and signal conduits through fire rated partitions/walls/ceilings. The system shall consist of a fire rated caulk type substance and high temperature fiber insulation. See NEC Article 300-21.

20) Provide and install an engraved white laminated plastic nameplate on each electrical panel with ½ inch red lettering. Verbiage shall indicate the panel name and if it is the service disconnect; it shall state "Service Disconnect".

21) The construction contractor shall use an indelible ink wide tip marker to identify on the cover plate of each junction box and pull box the circuit designation installed therein.

22) In general, all circuits shall be flush mounted using NEC accepted wiring methods.

Surface mounting will be allowed in mechanical rooms.

23) All ground rods shall be copper clad and shall be a minimum of 3/4" x 10' with the ability to have an additional rod screwed into the top to extend the length of the ground rod.

24) All connections to underground grounding system points shall be via Underwriter's Laboratory (UL) listed exothermic welds (Cadweld).

25) All receptacle devices shall be installed with ground on top.

26) Typically a maximum of five (5) 120 VAC receptacles will be powered from one 20 ampere circuit breaker.

27) If dry type transformers are required, they shall be installed on a concrete housekeeping pad four inches high and extending three inches beyond all sides of the transformer base. Install four (1/2 inch thick) neoprene pads between the transformer base and the concrete pad. Bolt the transformer to the concrete pad.

28) All underground cables (electrical and/or communication) running under roads, parking lots, sidewalks and other "hard" surfaces shall be bored under these structures. The technique of cutting and resurfacing shall not be allowed.

29) Typically, all exterior lights mounted on buildings shall be LED "Wall Washer" types. The color should be 4,500 to 5,000 degrees Kelvin. If for some reason, LED lighting cannot be utilized, the use of High-Pressure Sodium (HPS) type lighting is acceptable. Typical size is 35 watts.

30) Normally in office or administrative spaces, interior fluorescent lighting shall be type T-8, with electronic ballast, and shall be switched to allow one, two, or three lamps (for a three tube fixture) or either two or four lamps (for a four tube fixture) to be lit depending on lighting needs in a particular area.

31) Typically in high bay areas lighting shall be fluorescent type T-5, with electronic ballast, and shall be switched to allow photo cell control through a standard electric switch.

32) No incandescent lighting shall be allowed on MOTSU.

33) All EXIT lights shall be on a separate circuit controlled from a lockable circuit breaker (circuit breaker shall be red in color). EXIT signs shall be of the Electroluminescent or Light Emitting Capacitor (LEC) type only.

34) In general emergency lights shall be fluorescent types. They shall fully meet NEC

Article 700 and shall be UL 924 listed and labeled. The branch circuit feeding the emergency luminaire shall be the same branch circuit as that serving the normal lighting in the area and shall be connected ahead of any local switches. The branch circuit that feeds the emergency luminaire shall be clearly identified at the distribution panel. Typically, these emergency fluorescent luminaire shall consist of two electronic ballasts to allow one tube of a three or four tube luminaire to light when power is lost. The light shall be wired so it functions as a normal fluorescent luminaire, except that when branch circuit power is lost a single tube will illuminate from an internal ballast and backup battery. The battery should supply power to the lamp for 90 minutes. An emergency luminaire which continually lights one or more tubes 24/7 shall not be allowed. One company that makes such luminaire is Cooper Lighting.

35) On secondary systems (other than MDP feeders – which are owned by BEMC), when underground conduit is run (1 1/2" and larger), it shall be encased in concrete and shall have spare runs equal to 100 percent of the base run (for base runs of three conduits or less). For base runs of four to eight, 50 percent spare runs shall be required (rounded upward). Additional runs will be determined on case-by-case bases. Spare runs shall have installed a nylon fish-wire extending to each end; each end shall be permanently marked as to where the other end is located, and shall be capped.

36) Primary power lines shall not be installed over any building and new facilities shall not be built under primary power lines. Minimum clearance between the edge of the building and primary power lines shall be nine (9) feet.

37) Where electrical panels are flush mounted, a minimum of three 1" empty conduits shall be run to an area above the ceiling. The empty conduit shall have a nylon pull line and be capped at both ends. Where the panel is installed above a crawl space, install three additional empty and capped 1" conduits between the bottom of the panel and six inches below the floor joists.

Attachment 1

Application for Electrical Inspection Military Ocean Terminal, Sunny Point, NC

This form must be completed; returned to Bldg. 3, Room 114; and approved before any work commences

Contact Information

Requestor: __________________________________________________________ Date: ____________

Organization / Company: _______________________________________________________________

Electrical license information: State issued ___; License number _______; Expiration date __________

Telephone: (_____) _____-________ Cell Phone: (_____) _____-________

E-Mail Address: ___________________________________________

MOTSU Sponsor / COR / COE: ____________________________ Telephone: (_____) _____-________

Project Information

Project Name or Contract Number: _______________________________________________________

Project Location: _____________________________________________________________________

Contractor Requested Inspection Date: ____________________________________________________

Inspector Approved Inspection Date: ______________________________________________________

Type of Inspection: □ Rough-In

□ Final

Inspection: Approved or Disapproved: (Inspectors Name) ____________________________________ (Inspectors Signature) _______________________________________________________ Date of Inspection __________________________________________________________

Attachments Required (No Attachments = No Permit)

1. Facility electrical drawings.

Attachment 2

Local Area Network and Voice Communication Standard

LOCAL AREA NETWORKS

- All connections must be clearly labeled at both ends with port number from Switch Room punch down block.

- Use a 3/4" inch home run conduit (EMT) from the outlet to the cable tray, wireway or directly to the telecommunications room, with pull boxes every 80 feet. In the case of an outlet's conduit terminating in a cable tray, the conduit must be mechanically fastened to the cable tray using a UL approved grounding clamp. The total wire path length from the outlet to the Switch Room must not exceed 295 feet (90 meters) in any case.

- 4 pair enhanced Category 6 UTP cable is the minimum cable allowed.

- Maximum segment length is 295 feet (90 meters) from the Switch Room.

- Labeling of data cables shall use a sequential marking system, preceded by the letter “D”

- CAT 6 cable ends will follow ANSI/TIA/EIA 568B.1 standards. Female (RJ45) cable plug ends will be at each wall jack. CAT 6 cable will be punched down to a 110 punch down block provided by the contractor. This punch down block shall be large enough to accommodate each data cable in the design plus 10% for later expansion.

- Each wall jack will consist of 2 data plugs and 2 phone (voice) plugs.

- Information Management will provide the necessary design spacing of communication wall plugs during the design phase of each project.

- All data and voice communication equipment shall be provided with a backboard complete with an AWG #6 solid copper wire with an earth ground of 25 ohms or less.

VOICE COMMUNICATIONS STANDARDS

- Telephone punch down blocks are to be of the Type 110 IDC.

- Voice Cables are to be a minimum of 4 pair / 24 AWG / and Type Cat 5e.

- Voice cables are to be terminated at user end within the standards of Electronic Industries Alliance/Telecommunications Industry Association (EIA/TIA) 568B specifications.

- Labeling of voice cables shall use a sequential marking system, preceded by the letter “V”.

- All wall plates or female jacks are to be of the RJ45 type with all conductors terminated. Each wall jack will consist of 2 data plugs and 2 phone (voice) plugs.

- Wall plates are to be located as a group with Data and Voice together.

- ¾ inch EMT conduit is recommended for all riser locations to an area six inches above ceiling locations.

Attachment 3 Application for Digging Permit

Military Ocean Terminal, Sunny Point, NC This form must be completed; returned to Bldg. 3, Room 114; and approved before any work starts

Contact Information

Requestor: __________________________________________________________ Date: ____________

Organization / Company: _______________________________________________________________

Telephone: (_____) _____-________ Cell Phone: (_____) _____-________

Emergency Telephone: (_____) _____-________

E-Mail Address: ___________________________________________

Alternate Contact: _______________________________________ Telephone: (_____) _____-________

MOTSU Sponsor / COR / COE: ____________________________ Telephone: (_____) _____-________ Project Information

Project Name or Contract Number: _______________________________________________________

Project Location: _____________________________________________________________________

Proposed Start Date: ________________________Completion Date: ___________________________

Task: □ Digging □ Pavement Cutting □ Drilling □ Boring □ Trenching

Other: _____________________________________________________________________________

Attachments Required (No Attachments = No Permit)

1. Site drawing of work area..

2. Details of digging location, depth, and description of work (can be combined with item # 1).

Applicant Coordinates Completion of this Section

Contractor to remove all items within work area upon completion of job: Utility flags, marking components or any other items used on site for locating purposes:

Contractor ________________________________________________________________ Date ____________

Bldg. 44 Fire Dept__________________________________________________________ Date ____________

Bldg. 32 Security___________________________________________________________ Date ____________

(Return completed Application to Public Works Annex Bldg. 3, Room 114, after coordination)

(Continuation) Application for Digging Permit

This form must be completed; returned to Bldg. 3, Room 114; and approved before any work starts

Digging Permit Notices – Please read MOTSU REG. 420-49-XX for details

1. Verify locations of all utilities by hand digging prior to using machinery.

2. Exercise caution when excavating, since unknown utilities may exist.

3. Any other utilities, MOTSU facilities or equipment that is damaged by this digging project must be immediately reported to DPW at (910) 457-8292.

4. Contractors are responsible for maintaining utility location marks in good condition during the digging phase of the project.

5. All utilities that are uncovered during digging must be reported to DPW at (910) 457-

8293 or 457-8787 for GIS mapping before they are buried.

6. Digging permits are site specific. Excavations at other locations (even on the same project) are not covered by this permit.

7. Location markings are valid for 15 calendar days from the Issue Date below. Time extensions for a permit must be requested a minimum of 48 hours prior to expiration date.

8. All personal protective equipment as required by OSHA must be used.

9. Cave-in protection is required by OSHA in accordance with CFR 1926.652.

STOP WORK IMMEDIATELY and Notify DPW at (910) 457-8787 if:

1. Conditions are different from those that have been investigated.

2. Unusual odors are detected during excavation.

3. Soils that are stained, signs of contamination or buried debris are noticed.

4. Items of archeological nature are found.

5. If there is any question about the validity of this permit or accuracy of utility locations.

DPW Coordinates Completion of This Section

A. Completed Form was received: Date ___________

B. Bldg. 3 DPW (REM): ____________________________________ Date ___________

C. Bldg. 17 DOIM: ________________________________________ Date ___________

D. Bldg. 3 Environmental____________________________________ Date ___________

E. Bldg. 4 SPSS____________________________________________ Date ___________

F. BEMC / NCOCC ________________________________________ Date ___________

Approval Notes: ______________________________________________________________________

Approved By: ________________________________________________________________________

MOTSU Digging Permit Number: _______ Issue Date: _________ Expiration Date: ___________

Attachment 4

MOTSU UNDERGROUND UTILITIES LOCATING & MARKING SPECIFICATIONS

Underground utilities at MOTSU shall be located and marked according to the following:

PART 1: EXISTING UTILITIES

A. Existing underground utilities will be located using one or more of the following methods:

1. Using locating equipment such as a “Pipe Horn” or similar locator devices.

2. Using ground penetrating radar.

3. Using a metal detector (valve box detector).

4. Using local knowledge and existing utility maps.

5. Carefully hand digging (potholing) to uncover the utility.

6. Using the services of the North Carolina One-Call Center.

B. Located utilities will be marked according to the “Virginia Underground Utility Marking

Standards”. Copies of the standard are available on the internet at http://www.scc.virginia.gov/urs/mutility/docs/va_uums.pdf or from the MOTSU Public Works office.

C. Located utilities will be marked using the following methods:

1. Painted on the grass or pavement using the standard utility identification colors designated by the American Public Works Association (APWA).

2. Flags (preferred for grass areas) using the standard utility identification colors designated by the APWA.

3. In paved areas, permanent marker disks using the standard utility identification colors designated by the APWA will be adhered to the pavement.

4. GIS Administrator will take GPS readings before the trench is closed.

PART 2: NEW UTILITIES

New utilities will be marked as follows:

1. MOTSU GIS Administrator will take GPS readings before the trench is closed.

2. MOTSU DPW shall inspect and approve the tracing wire prior to closing the trench.

3. Metalized marker tape buried in the trench at 1 or 2 depths depending on depth of the trench. The ends of the tape must be easily accessible inside of pull boxes.

4. Marker posts installed alongside the trench and at pull boxes.

5. Permanent marker disks adhered to the pavement using the standard utility identification colors designated by the APWA.

6. Additionally, an easily accessible tracer wire is required for any non-metallic utility lines (inner duct) to aid in locating in the future. The ends of the wire must be easily accessible inside of pull boxes.

PART 3: MARKING PRODUCTS

A. General: Marker tapes shall be manufactured specifically for warning and identification of buried utility cables and pipes. Metalized marker tape shall be used for non-metallic lines (plastic pipe, etc.). Marker tapes shall be inert plastic specially formulated for prolonged use underground and shall be resistant to alkalis, acids and other destructive agents found in the soil. Tape shall be provided in rolls, 3-inch minimum width, color coded for appropriate utility with warning and identification imprinted in bold black letters repeatedly over entire length of the tape. Warning and identification shall be "CAUTION BURIED [COMMUNICATION CABLE – TELEPHONE or FIBER OPTIC] [ELECTRIC CABLE] [SEWER PIPELINE] [WATER PIPELINE] BELOW" or similar wording. Color code and lettering shall be permanent, unaffected by moisture and other substances contained in backfill material.

B. APWA Color Codes:

1. Electric cables: Red

2. Water pipelines: Blue

3. Sewer pipelines: Green

4. Communication cables: Orange

5. Gas, steam & petroleum products: Yellow

6. Reclaimed water, irrigation & slurry pipelines: Purple

C. Buried warning, identification and locator tape used in trenches containing electrical cable shall be 4-mil polyethylene plastic tape conforming to ASTM D882.

D. Buried warning, identification and locator tape for use in trenches containing non-metallic water and sewer lines shall be 5.5 mil composition film containing one layer of metalized foil laminated between two layers of inert plastic film conforming to ASTM D2103. Tape shall be detectable by cable locating equipment used to locate underground utility lines. Additionally, an easily accessible tracer wire shall be required for any non-metallic utility lines to aid in line locating in the future. The ends of the wire must be easily accessible inside of pull boxes or utility marker posts. Each wire shall be fully identified with permanent markings as to what system it traces.

E. Utility Marker Posts may be either:

1. Flexible, durable, reinforced composite posts manufactured specifically for warning and identification of buried utility lines. Posts shall be 3-1/2 inches minimum width and a minimum of 66 inches in length, color coded for intended service with a 3-inch wide warning and identification decal attached. Warning and identification shall be "CAUTION BURIED [COMMUNICATION CABLE – TELEPHONE or FIBER

OPTIC] [ELECTRIC CABLE] [SEWER PIPELINE] [WATER PIPELINE]

BELOW" or similar wording. Code and letter coloring shall be permanent. Utility markers will have the GIS map reference number for that location (i.e. valve # 149).

Or:

2. White post 3.5 inches diameter with a minimum of 66 inches in length and a dome top color coded for the appropriate utility. See Flexible post identification details above.

F. All tracer wiring shall be 12 AWG min. copper wire coated with a 30 mil (min.)

polyethylene jacket designed specifically for direct burial use. Tracer wire may be embedded in the wall of the inner duct.

G. Permanent marker disks adhered with a permanent adhesive must be a minimum of 1.5 inches in diameter and color coded with APWA standard utility identification colors and the utility designation i.e. water, sewer, electric, etc.

H. Pull boxes will have all conduit contents labeled.

PART 4: MARKER INSTALLATION PROCEDURES

A. Buried Warning and Identification Tape (marker tape):

1. Install marker tape continuously (unbroken) in accordance with Sandia National Laboratories Facilities Engineering Drawing Detail No. WU5006STD (http://www.sandia.gov/engstds/StdDwgs/StdDwgsPDF/W_CivilWork/WG5006STD .pdf) directly over buried utility line.

2. A minimum of 12 inches of marker tape will be visible inside of pull boxes.

B. Marker Posts:

1. Install utility marker posts in unpaved areas at intervals not to exceed 250 feet of sight distance and wherever changes in horizontal direction occur.

2. Install markers in a true, vertical plane directly over or immediately adjacent to the utilities to which they relate. Marker posts will be located approximately three (3) feet away from valve boxes and cable pull boxes so as not to interfere with any maintenance and repair operations. Marker posts shall be installed to provide a minimum marker post anchoring depth of 18 inches.

3. Utility marker posts will be installed per the manufacturer’s instructions.

C. Tracer Wire:

1. Tracer wires will be installed in accordance with Sandia National Laboratories

Facilities Engineering Drawing Detail No. WG5005STD (http://www.sandia.gov/engstds/StdDwgs/StdDwgsPDF/W_CivilWork/WG5005STD .pdf). Ends of the tracer wire (10” minimum) must be accessible without the need for tools.

D. Utilities Pavement Marker Disks:

1. Pavement markers may be acquired from http://www.dasmanufacturing.com/product_guide.html . There are numerous other manufacturers who make these devices. This listed manufacturer is a producer of such products, but the listing of this manufacture shall not be interpreted as a recommendation of the Government.

2. Water valve location markers will be installed approximately 2’ from the edge of the pavement with the arrow pointing to the valve box. Where a valve is located at the intersection of two roads, markers will be installed on both roads to indicate a single valve.

3. Markers indicating locations of cables and pipes under paved areas less than 25’ wide shall be installed in the following locations: 1) approximately two feet from each edge of the pavement; 2) one at the midpoint of the pavement; and 3) at every 25 feet or fraction thereof, along the entire length of the utility under the pavement.

4. Permanent markers shall also be required when there is a change in the direction of a utility under the pavement.