amendbldg20.pdf
PDF 29 KB Posted
- Solicitation number
- W912PM-12-T-0026
About this file
Amendment 0001 (which failed to upload previously)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment0003.pdf | ||
| sketchofbuilding.pdf | ||
| RFIfinal.pdf | ||
| Site_Visit_12-T-0026.pdf | ||
| amendment0002.pdf | ||
| Solicitation W912PM-12T-0026 RFIs.docx | DOCX document | |
| 01 35 26.pdf | ||
| MOTSU map 8 5 X 11.pdf | ||
| JM Admin Area.pdf | ||
| MOTSU Electrical Standard Dated 24 May 2012 _24 May 2012_.pdf | ||
| pd21.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81LJ821779809
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation has been amended as follow s:
1. To specify that all materials described in this requirement are to be name brand or equal and to include the clause found at FAR 52.211-6 that pertains to this.
2. To include specific site visit information in the clause found in Section 0100 of the solicitation.
3. To remove the w ording in section 4.4 of the Statement of Work.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Jul-2012
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PM-12-T-0026
X 9B. DATED (SEE ITEM 11)
03-Jul-2012
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Jul-2012
CODE
USACE CONTRACTING, WILMINGTON DISTRICT
ATTN: BILL BONDURANT
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912PM-12-T-0026
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: EUGENE BURNS
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
to
U S ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
REVISED SCOPE OF WORK
Demolition and Replacement of Building 20
July 6, 2012
1. GENERAL DESCRIPTION: Provide all necessary labor, materials, and equipment to demolish and erected a pre-engineered building at the Military Ocean Terminal at Sunny Point (MOTSU). All work shall meet the requirements of the listed references below and the requirements of this statement of work.
2. REFERENCES:
2.1 All work shall meet (as a minimum) the following requirements as stated in the latest issue of the below listed documents:
a. Occupational Safety & Health Administration (OSHA) safety requirements
b. Electrical Requirements for Facilities on Military Ocean Terminal, Sunny Point (MOTSU), NC; 24 May 2012.
c. Corps of Engineers Safety and Health Manual EM385-1-1, 2010
3. DESIGN REQUIREMENTS:
a. Demolish and dispose of the existing pre-engineered building off post. The existing building is approximately 960 sqft.
b. Purchase and Install a new code compliant pre-engineered general use building meeting the following requirements:
Building Design Loads and Criteria
Design Code: IBC 2009 International Building Code; Latest adopted Edition Wind speed: 135 mph Seismic Zone: Ss = 35, S1 = 11 Site Exposure: C Soil Profile: D Live Load: 20 psf Roof Snow Load: 10 psf Collateral Load: 3 psf
Framing System 960 sq ft Butler name brand or equal Building System 20-ft wide x 48-ft long x 10’ eave height Clear span framing system Rigid end walls Roof Bracing Rods Corner Wind Posts Roof System Butler name brand or equal metal roof panels, 26 gage 1:12 pitch, double slope roof Galvalume name brand or equal finish 2-ft end wall gable overhang Matching gutters and downspouts Matching Trim, flashing and transitions MOTSU shall select the color
Wall System 26 gage Butler name brand or equal wall panels Galvalume name brand or equal finish Matching trim, flashing and transitions MOTSU shall select the color Ventilation Two (2) Wall mounted louvers 10-ft ridge vent Manual Operation Windows Ten (10) each 4-ft x 3-ft windows, horizontal slide Solar Bronze name brand or equal frame (MOTSU shall select the final color) Insulated Panes Overhead Door One (1) each 10-ft x 7-ft sectional overhead door External Personnel Door One (1) each 3-ft x 7-ft door 16 gauge leafs 14 gauge frames
Mortise with lever Extra heavy duty closer Powder coated hinges 7-pin lock Kick plate MOTSU shall select the color Canopy One (1) each 3-ft x 5-ft canopy Aluminum roof panel Aluminum tube supports back to the building Integral perimeter gutter MOTSU shall select the final color Concrete Ramp Install new concrete ramp at the overhead door Electrical New 100 amp panel board Six (6) each 4-ft T-8 type fluorescent light fixtures, two (2) tubes each
Eight (8) each new duplex 15 Amp receptacles Two (2) each LED type light fixtures, one (1) each located at the personnel and overhead door Contractor is only responsible for the electrical to main distribution panel and conduit to five (5) feet outside the building footprint. The installation electrical private utility will install the underground electrical to the main distribution panel.
The contractor shall make the final electrical connection.
4. ADDITIONAL REQUIREMENTS
4.1 The contractor shall obtain an approved digging permit prior to performing any digging on MOTSU. This permit shall be obtained from MOTSU Public Works.
4.2 At the completion of the project, the contractor shall inspect all work in the presence of the Contracting Officer Representative (COR) to show that it meets the requirements of this contract.
4.3 The contractor shall comply with the included Government Safety
Requirements specification section 01 35 26.
5. PROJECT DURATION
5.1 The contractor shall be allowed forty-five (45) calendar days to fully complete the entire project after the Notice to Proceed (NTP) is issued. For each day the contractor is delayed due to Governments actions, an equal number of days (rounded upwards to full eight hour days) shall be added to the contract performance period.
6. SECURITY, WASTE DISPOSAL AND CLEANUP
6.1 The worksite shall be kept clean of debris and waste. Cleanup shall be performed at the completion of each day’s work. The contractor shall not be allowed to store materials and supplies in the work area. The contractor shall dispose of debris off site at approved locations.
6.2 In the event that the Government requires access to this site for any reason, the contractor shall leave the area and shall remove all moveable construction/test/repair equipments.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit will be held at 9:00 AM on 12 July 2012 :
Address: Visitors Center 6280 Sunny Point Road, SE, Military Ocean Terminal Sunny Point, Southport NC 28461
POC Name: Keith Ranker Telephone: 910-457-8529
(End of provision)
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.211-6 Brand Name or Equal AUG 1999
(End of Summary of Changes)