Market Research Survey - r2.xls

XLS spreadsheet 31 KB Posted

Attached to
Aircraft Bed-down Program, Construction Services at Nellis Air Force Base, Nevada
Solicitation number
W912PL26S0004
Issued by

About this file

This is a Market Research Survey distributed by the Department of the Army, Los Angeles District, U.S. Army Corps of Engineers (USACE) for the Aircraft Bed-down Program at Nellis Air Force Base, Nevada. The survey is designed to gather information from interested prime contractors seeking to qualify for a Prequalified Sources List (PQSL) in accordance with DFARS 236.272. The program is expected to be executed in three phases and requires responses addressing company qualifications, bonding capacity, relevant project experience, and labor market conditions.

Respondents must provide company information including firm name, address, contact details, and Unique Entity ID, along with a clear statement of intent to submit a prequalification package. The survey requests documentation of previous Design-Build and Design-Bid-Build projects of similar scope and complexity completed within the past five years, including contract values and customer information. Additional requirements include disclosure of bonding capacity per single contract action and in aggregate, evaluation of prevailing labor agreement (PLA) applicability in the local area, identification of skilled labor availability issues, assessment of time-sensitive scheduling requirements, and detailed information on any PLA projects completed in the last two to five years, including initial versus actual costs, on-time completion status, craft trades involved, and challenges encountered. The survey also requests contractor perspectives on whether a PLA would advance the Federal Government's interests in economy and efficiency, and any other relevant information to support USACE's acquisition strategy development.

View the file

Other files

File Type Posted
Aircraft Bed-down Phase 1- Sources Sought_rev2.docx DOCX document
F-47 Bed-down Phase 1- Sources Sought_rev1.docx DOCX document
Market Research Survey_r1.xls XLS spreadsheet
Market Research Survey .xls XLS spreadsheet
F-47 Bed-down Phase 1- Sources Sought.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

DEPARTMENT OF THE ARMY, LOS ANGELES DISTRICT

U.S. ARMY CORPS OF ENGINEERS

Market Survey Questions Aircraft Bed-down Program, Nellis AFB, Nevada
1Company information
Firm Name:
Address:
Phone Number:
E-mail Address:
Unique Entity ID (UEI)
2Statement of Intent: A clear statement of your firm's intent to submit a prequalification package if a formal request is advertised.
3Type of business and size status (e.g., Small Business, 8(a), WOSB, HUBZone, SDVOSB, or Other Than Small Business).
4Provide your firm's bonding capacity per single contract action and in the aggregate.
5Detail your firms skills, experience, and knowledge to perform the specified work.
6List of two or three Design Build (D-B) construction projects of similar scope, size, and complexity within the past five years.
Contract Number (if any)Customer (Entity/POC)Project Title/LocationPrime/Sub-Contractor/Joint VentureContract Value
7List of two or three Design-Bid-Build (D-B-B) projects of similar scope, size, and complexity within the past five years.
Contract Number (if any)Customer (Entity/POC)Project Title/ LocationPrime/Sub/JV?Contract Value
8Do you have knowledge that a PLA has been used in the local area on projects of this kind? If so, please provide supporting documentation.
9Are you aware of skilled labor shortages in the area for those crafts that will be needed to complete the referenced project? If so, please elaborate and provide supporting documentation where possible.
10Are you aware of time sensitive issues/scheduling requirements that would affect the rate at which the referenced project should be completed? If so, please elaborate and provide supporting documentation where possible.
11Identify specific reasons why or how you believe a PLA would advance the Federal Governments interest in achieving economy and efficiency in federal procurement.
12Identify any additional information you believe should be considered on the use of a PLA on the referenced project.
13Identify any additional information you believe should be considered on the non- use of a PLA on the referenced project.
14If applicable, include the following on PLA projects completed in the last 2-5 years: (1) Project Name/Locations; (2) Project Descriptions; (3) Initial Cost vs. Actual Final Cost; (4)Was the project completed on time? (5) Number of craft trades present on the project; (6) Were there any challenges experienced during the project?
15Is there any other information or suggestions you would like to share and think would be helpful to USACE in developing an acquisition strategy for Prequalified Sources List?