Bid Abstract -W912PL21B0007 WND GALLERY UTILITIES RELOCATION -Offerors Price Final Version.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
GALLERY UTILITIES RELOCATION PROJECT
Solicitation number
W912PL21B0007
Issued by

About this file

This document contains a bid abstract and related federal contract opportunity notice. The bid abstract is for the Gallery Utilities Relocation Project, solicitation number W912PL21B0007, issued by the Department of the Army Corps of Engineers Engineering District Los Angeles. The general work of the project consists of relocating two city water supply pipelines and relocating a Suburban Water Systems water supply pipeline and a Sanitation District of Los Angeles County brine sewer near the western and eastern embankments of the San Gabriel River. Additional work includes installing filter diaphragms along the pipelines and some structural modifications to both utility galleries. The estimated quantities include 7,000 cubic yards of excavation and approximately 1,500 linear feet of temporary pipeline bypasses. The estimated value of construction is between $5 million to $10 million, and the estimated period of performance is 210 days for the base work with an optional 455-day extension. The bid abstract provides pricing from six bidders for the base work and two options. The solicitation number is W912PL21B0007 and bids are due virtually.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SECTION 00 10 00
Solicitation Contract Line Item (CLIN) ScheduleName: Reyes Construction Inc.Name: AE West, LLCName: Green Building Corporation
Bidder #2Bidder #3Bidder #Bidder #Bidder #1
CONTRACTOR MUST FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
QuantityUnitUnit PriceAmountQuantityUnitUnit PriceAmountAmount 10%QuantityUnitUnit PriceAmountAmount 10%QuantityUnitUnit PriceAmountQuantityUnitUnit PriceAmountQuantityUnitUnit PriceAmountAmount 10%
Bidding Schedule
0001Performance and Payment Bonds1JA$31,762.00$ 31,7621JA$20,030.00$ 20,030$ 22,0331JA$35,000.00$ 35,000$ 38,5001JA$1.00$ 11JA$1.00$ 11JA$35,000.00$ 35,000$ 35,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0002Site/Yard Work1JA$149,177.00$ 149,1771JA$496,560.00$ 496,560$ 546,2161JA$487,988.00$ 487,988$ 536,7871JA$1.00$ 11JA$1.00$ 11JA$520,000.00$ 520,000$ 520,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0003SWPPP1JA$55,547.00$ 55,5471JA$207,690.00$ 207,690$ 228,4591JA$99,408.00$ 99,408$ 109,3491JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0004Traffic Handling Plan1JA$81,811.00$ 81,8111JA$55,760.00$ 55,760$ 61,3361JA$11,328.00$ 11,328$ 12,4611JA$1.00$ 11JA$1.00$ 11JA$15,000.00$ 15,000$ 15,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0005Temporary Access Ramp
(Dam Modification)1JA$884,762.00$ 884,7621JA$691,490.00$ 691,490$ 760,6391JA$1,083,749.00$ 1,083,749$ 1,192,1241JA$1.00$ 11JA$1.00$ 11JA$960,000.00$ 960,000$ 960,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0006Temporary Bypass 36" HDPE (COW)1JA$1,039,544.00$ 1,039,5441JA$855,600.00$ 855,600$ 941,1601JA$731,569.00$ 731,569$ 804,7261JA$1.00$ 11JA$1.00$ 11JA$840,000.00$ 840,000$ 840,000
$ - 0$ - 0$ - 0$ - 0$ - 0
000736" and 30" Pipe Demolition (COW)1JA$62,127.00$ 62,1271JA$23,090.00$ 23,090$ 25,3991JA$40,498.00$ 40,498$ 44,5481JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0008West Filter Diaphragm (Dam Modification)1JA$365,999.00$ 365,9991JA$458,300.00$ 458,300$ 504,1301JA$636,802.60$ 636,803$ 700,4831JA$1.00$ 11JA$1.00$ 11JA$1,060,000.00$ 1,060,000$ 1,060,000
$ - 0$ - 0$ - 0$ - 0$ - 0
0009Replace Pipe 30" DIP (COW)1JA$515,811.00$ 515,8111JA$389,100.00$ 389,100$ 428,0101JA$396,800.00$ 396,800$ 436,4801JA$1.00$ 11JA$1.00$ 11JA$280,000.00$ 280,000$ 280,000
$ - 0$ - 0$ - 0$ - 0$ - 0
00010Temporary Bypass Removal 36" HDPE (COW)1JA$219,701.00$ 219,7011JA$20,900.00$ 20,900$ 22,9901JA$45,140.00$ 45,140$ 49,6541JA$1.00$ 11JA$1.00$ 11JA$120,000.00$ 120,000$ 120,000
$ - 0$ - 0$ - 0$ - 0$ - 0
00011Demolition & Replace West Gallery Entrance (Dam Modification)1JA$161,717.00$ 161,7171JA$214,900.00$ 214,900$ 236,3901JA$176,039.00$ 176,039$ 193,6431JA$1.00$ 11JA$1.00$ 11JA$160,000.00$ 160,000$ 160,000
EAST GALLERY$ - 0$ - 0$ - 0$ - 0$ - 0
00012SWS Preconstruction Submittals (SWS)1JA$64,922.00$ 64,9221JA$42,000.00$ 42,000$ 46,2001JA$25,000.00$ 25,000$ 27,5001JA$1.00$ 11JA$1.00$ 11JA$15,000.00$ 15,000$ 15,000
TOTAL AMOUNT OF BASE BID:
(Line Items 0001 through 0012)$ 3,632,880$ 3,475,420$ 3,822,962$ 3,769,322$ 4,146,254$ 12$ 12$ 4,205,000$ 4,205,000
OPTION 1: EAST GALLERY
1001Performance and Payment Bonds1JA$24,957.00$ 24,9571JA$15,250.00$ 15,250$ 16,7751JA$50,000.00$ 50,000$ 55,0001JA$1.00$ 11JA$1.00$ 11JA$30,000.00$ 30,000$ 30,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1002Site/Yard Work1JA$38,541.00$ 38,5411JA$59,870.00$ 59,870$ 65,8571JA$297,935.00$ 297,935$ 327,7291JA$1.00$ 11JA$1.00$ 11JA$150,000.00$ 150,000$ 150,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1003SWPPP1JA$65,823.00$ 65,8231JA$90,410.00$ 90,410$ 99,4511JA$231,866.00$ 231,866$ 255,0531JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1004Traffic Handling Plan1JA$212,795.00$ 212,7951JA$13,500.00$ 13,500$ 14,8501JA$8,250.00$ 8,250$ 9,0751JA$1.00$ 11JA$1.00$ 11JA$10,000.00$ 10,000$ 10,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1005LADWP Access1JA$61,986.00$ 61,9861JA$45,480.00$ 45,480$ 50,0281JA$147,741.00$ 147,741$ 162,5151JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1006Temporary Bypass 30" HDPE (SWS)1JA$633,938.00$ 633,9381JA$283,800.00$ 283,800$ 312,1801JA$503,216.00$ 503,216$ 553,5381JA$1.00$ 11JA$1.00$ 11JA$780,000.00$ 780,000$ 780,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1007Temporary Flow Meter (LACSD)1JA$124,502.00$ 124,5021JA$32,080.00$ 32,080$ 35,2881JA$120,742.00$ 120,742$ 132,8161JA$1.00$ 11JA$1.00$ 11JA$60,000.00$ 60,000$ 60,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1008Temporary Flow pump (LACSD)1JA$450,551.00$ 450,5511JA$249,900.00$ 249,900$ 274,8901JA$826,802.00$ 826,802$ 909,4821JA$1.00$ 11JA$1.00$ 11JA$180,000.00$ 180,000$ 180,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1009East Filter Diaphragm (Dam Modification)1JA$389,829.00$ 389,8291JA$472,000.00$ 472,000$ 519,2001JA$878,011.00$ 878,011$ 965,8121JA$1.00$ 11JA$1.00$ 11JA$600,000.00$ 600,000$ 600,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1010Chlorine Building Demolition (SWS)1JA$19,048.00$ 19,0481JA$17,500.00$ 17,500$ 19,2501JA$18,924.00$ 18,924$ 20,8161JA$1.00$ 11JA$1.00$ 11JA$90,000.00$ 90,000$ 90,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1011Vault Demolition (SWS)1JA$5,232.00$ 5,2321JA$4,000.00$ 4,000$ 4,4001JA$59,459.00$ 59,459$ 65,4051JA$1.00$ 11JA$1.00$ 11JA$20,000.00$ 20,000$ 20,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1012Toe Drain Pipe Demolition (Dam Modification)1JA$49,414.00$ 49,4141JA$12,600.00$ 12,600$ 13,8601JA$69,458.00$ 69,458$ 76,4041JA$1.00$ 11JA$1.00$ 11JA$60,000.00$ 60,000$ 60,000
$ - 0$ - 0$ - 0$ - 0$ - 0
101336" Pipe Demolition (SWS)1JA$45,159.00$ 45,1591JA$8,900.00$ 8,900$ 9,7901JA$87,477.00$ 87,477$ 96,2251JA$1.00$ 11JA$1.00$ 11JA$70,000.00$ 70,000$ 70,000
$ - 0$ - 0$ - 0$ - 0$ - 0
101424" Pipe Demolition (LACSD)1JA$33,906.00$ 33,9061JA$9,100.00$ 9,100$ 10,0101JA$95,147.00$ 95,147$ 104,6621JA$1.00$ 11JA$1.00$ 11JA$60,000.00$ 60,000$ 60,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1015Replace Pipe 36" WSP (SWS)1JA$348,288.00$ 348,2881JA$320,400.00$ 320,400$ 352,4401JA$454,300.00$ 454,300$ 499,7301JA$1.00$ 11JA$1.00$ 11JA$420,000.00$ 420,000$ 420,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1016Replace Pipe 24" RCP (LACSD)1JA$22,048.00$ 22,0481JA$24,690.00$ 24,690$ 27,1591JA$433,224.00$ 433,224$ 476,5461JA$1.00$ 11JA$1.00$ 11JA$30,000.00$ 30,000$ 30,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1017Remove Bypass Pump (LACSD)1JA$49,227.00$ 49,2271JA$25,640.00$ 25,640$ 28,2041JA$40,089.00$ 40,089$ 44,0981JA$1.00$ 11JA$1.00$ 11JA$40,000.00$ 40,000$ 40,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1018Temporary Bypass Removal 30" HDPE (SWS)1JA$57,845.00$ 57,8451JA$9,500.00$ 9,500$ 10,4501JA$25,739.00$ 25,739$ 28,3131JA$1.00$ 11JA$1.00$ 11JA$140,000.00$ 140,000$ 140,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1019Replace Toe Drain Pipe 18" RCP (Dam Modification)1JA$143,179.00$ 143,1791JA$39,800.00$ 39,800$ 43,7801JA$168,070.00$ 168,070$ 184,8771JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1020Site Work (SWS)1JA$27,878.00$ 27,8781JA$32,370.00$ 32,370$ 35,6071JA$59,794.00$ 59,794$ 65,7731JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
$ - 0$ - 0$ - 0$ - 0$ - 0
1021Demoition & Replace East Gallery Entrance (Dam Modification)1JA$161,717.00$ 161,7171JA$169,400.00$ 169,400$ 186,3401JA$242,482.00$ 242,482$ 266,7301JA$1.00$ 11JA$1.00$ 11JA$100,000.00$ 100,000$ 100,000
TOTAL AMOUNT OF OPTION 1 ITEMS:
(Line Items 1001 through 1021)$ 2,965,863$ 1,936,190$ 2,129,809$ 4,818,726$ 5,300,599$ 21$ 21$ 3,240,000$ 3,240,000
OPTION 2: Vault and Meter Install
2001Meter Vault (SWS)1JA$91,683.00$ 91,6831JA$110,850.00$ 110,850$ 121,9351JA$46,048.00$ 46,048$ 50,6531JA$1.00$ 11JA$1.00$ 11JA$180,000.00$ 180,000$ 180,000
$ - 0$ - 0$ - 0$ - 0$ - 0
2002Flow Meter (SWS)1JA$44,879.00$ 44,8791JA$34,970.00$ 34,970$ 38,4671JA$46,654.00$ 46,654$ 51,3191JA$1.00$ 11JA$1.00$ 11JA$60,000.00$ 60,000$ 60,000
TOTAL AMOUNT OF OPTION 2 ITEMS:
(Line Items 2001 through 2002$ 136,562$ 145,820$ 160,402$ 92,702$ 101,972$ 2$ 2$ 240,000$ 240,000
TOTAL AMOUNT OF BASE BID PLUS OPTION 1 AND OPTION 2 ITEMS:
(Line Items 0001 through 2002$ 6,735,305$ 5,557,430$ 6,113,173$ 8,680,750$ 9,548,8251JA$1.00$ 11JA$1.00$ 1$ 7,685,000$ 7,685,000
TOTAL AMOUNT:$ 6,735,305Total Amount:$ 5,557,430$ 6,113,173Total Amount:$ 8,680,750$ 9,548,825Total Amount:$ 36Total Amount:$ 36Total Amount:$ 7,685,000
(Line Items 0001 through 2002)
ROUNDED UP TO NEAREST DOLLAR

File details come from the government source that posted it. Updated .