Bid Abstract -W912PL21B0007 WND GALLERY UTILITIES RELOCATION -Offerors Price Final Version.xlsx
XLSX spreadsheet 29 KB Posted
- Attached to
- GALLERY UTILITIES RELOCATION PROJECT
- Solicitation number
- W912PL21B0007
About this file
This document contains a bid abstract and related federal contract opportunity notice. The bid abstract is for the Gallery Utilities Relocation Project, solicitation number W912PL21B0007, issued by the Department of the Army Corps of Engineers Engineering District Los Angeles. The general work of the project consists of relocating two city water supply pipelines and relocating a Suburban Water Systems water supply pipeline and a Sanitation District of Los Angeles County brine sewer near the western and eastern embankments of the San Gabriel River. Additional work includes installing filter diaphragms along the pipelines and some structural modifications to both utility galleries. The estimated quantities include 7,000 cubic yards of excavation and approximately 1,500 linear feet of temporary pipeline bypasses. The estimated value of construction is between $5 million to $10 million, and the estimated period of performance is 210 days for the base work with an optional 455-day extension. The bid abstract provides pricing from six bidders for the base work and two options. The solicitation number is W912PL21B0007 and bids are due virtually.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SECTION 00 10 00 | |||||||||||||||||||||||||||||
| Solicitation Contract Line Item (CLIN) Schedule | Name: Reyes Construction Inc. | Name: AE West, LLC | Name: Green Building Corporation | ||||||||||||||||||||||||||
| Bidder #2 | Bidder #3 | Bidder # | Bidder # | Bidder #1 | |||||||||||||||||||||||||
| CONTRACTOR MUST FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO. | |||||||||||||||||||||||||||||
| Quantity | Unit | Unit Price | Amount | Quantity | Unit | Unit Price | Amount | Amount 10% | Quantity | Unit | Unit Price | Amount | Amount 10% | Quantity | Unit | Unit Price | Amount | Quantity | Unit | Unit Price | Amount | Quantity | Unit | Unit Price | Amount | Amount 10% | |||
| Bidding Schedule | |||||||||||||||||||||||||||||
| 0001 | Performance and Payment Bonds | 1 | JA | $31,762.00 | $ 31,762 | 1 | JA | $20,030.00 | $ 20,030 | $ 22,033 | 1 | JA | $35,000.00 | $ 35,000 | $ 38,500 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $35,000.00 | $ 35,000 | $ 35,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0002 | Site/Yard Work | 1 | JA | $149,177.00 | $ 149,177 | 1 | JA | $496,560.00 | $ 496,560 | $ 546,216 | 1 | JA | $487,988.00 | $ 487,988 | $ 536,787 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $520,000.00 | $ 520,000 | $ 520,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0003 | SWPPP | 1 | JA | $55,547.00 | $ 55,547 | 1 | JA | $207,690.00 | $ 207,690 | $ 228,459 | 1 | JA | $99,408.00 | $ 99,408 | $ 109,349 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0004 | Traffic Handling Plan | 1 | JA | $81,811.00 | $ 81,811 | 1 | JA | $55,760.00 | $ 55,760 | $ 61,336 | 1 | JA | $11,328.00 | $ 11,328 | $ 12,461 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $15,000.00 | $ 15,000 | $ 15,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0005 | Temporary Access Ramp | ||||||||||||||||||||||||||||
| (Dam Modification) | 1 | JA | $884,762.00 | $ 884,762 | 1 | JA | $691,490.00 | $ 691,490 | $ 760,639 | 1 | JA | $1,083,749.00 | $ 1,083,749 | $ 1,192,124 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $960,000.00 | $ 960,000 | $ 960,000 | ||
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0006 | Temporary Bypass 36" HDPE (COW) | 1 | JA | $1,039,544.00 | $ 1,039,544 | 1 | JA | $855,600.00 | $ 855,600 | $ 941,160 | 1 | JA | $731,569.00 | $ 731,569 | $ 804,726 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $840,000.00 | $ 840,000 | $ 840,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0007 | 36" and 30" Pipe Demolition (COW) | 1 | JA | $62,127.00 | $ 62,127 | 1 | JA | $23,090.00 | $ 23,090 | $ 25,399 | 1 | JA | $40,498.00 | $ 40,498 | $ 44,548 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0008 | West Filter Diaphragm (Dam Modification) | 1 | JA | $365,999.00 | $ 365,999 | 1 | JA | $458,300.00 | $ 458,300 | $ 504,130 | 1 | JA | $636,802.60 | $ 636,803 | $ 700,483 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1,060,000.00 | $ 1,060,000 | $ 1,060,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 0009 | Replace Pipe 30" DIP (COW) | 1 | JA | $515,811.00 | $ 515,811 | 1 | JA | $389,100.00 | $ 389,100 | $ 428,010 | 1 | JA | $396,800.00 | $ 396,800 | $ 436,480 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $280,000.00 | $ 280,000 | $ 280,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 00010 | Temporary Bypass Removal 36" HDPE (COW) | 1 | JA | $219,701.00 | $ 219,701 | 1 | JA | $20,900.00 | $ 20,900 | $ 22,990 | 1 | JA | $45,140.00 | $ 45,140 | $ 49,654 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $120,000.00 | $ 120,000 | $ 120,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 00011 | Demolition & Replace West Gallery Entrance (Dam Modification) | 1 | JA | $161,717.00 | $ 161,717 | 1 | JA | $214,900.00 | $ 214,900 | $ 236,390 | 1 | JA | $176,039.00 | $ 176,039 | $ 193,643 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $160,000.00 | $ 160,000 | $ 160,000 | |
| EAST GALLERY | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | ||||||||||||||||||||||||
| 00012 | SWS Preconstruction Submittals (SWS) | 1 | JA | $64,922.00 | $ 64,922 | 1 | JA | $42,000.00 | $ 42,000 | $ 46,200 | 1 | JA | $25,000.00 | $ 25,000 | $ 27,500 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $15,000.00 | $ 15,000 | $ 15,000 | |
| TOTAL AMOUNT OF BASE BID: | |||||||||||||||||||||||||||||
| (Line Items 0001 through 0012) | $ 3,632,880 | $ 3,475,420 | $ 3,822,962 | $ 3,769,322 | $ 4,146,254 | $ 12 | $ 12 | $ 4,205,000 | $ 4,205,000 | ||||||||||||||||||||
| OPTION 1: EAST GALLERY | |||||||||||||||||||||||||||||
| 1001 | Performance and Payment Bonds | 1 | JA | $24,957.00 | $ 24,957 | 1 | JA | $15,250.00 | $ 15,250 | $ 16,775 | 1 | JA | $50,000.00 | $ 50,000 | $ 55,000 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $30,000.00 | $ 30,000 | $ 30,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1002 | Site/Yard Work | 1 | JA | $38,541.00 | $ 38,541 | 1 | JA | $59,870.00 | $ 59,870 | $ 65,857 | 1 | JA | $297,935.00 | $ 297,935 | $ 327,729 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $150,000.00 | $ 150,000 | $ 150,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1003 | SWPPP | 1 | JA | $65,823.00 | $ 65,823 | 1 | JA | $90,410.00 | $ 90,410 | $ 99,451 | 1 | JA | $231,866.00 | $ 231,866 | $ 255,053 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1004 | Traffic Handling Plan | 1 | JA | $212,795.00 | $ 212,795 | 1 | JA | $13,500.00 | $ 13,500 | $ 14,850 | 1 | JA | $8,250.00 | $ 8,250 | $ 9,075 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $10,000.00 | $ 10,000 | $ 10,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1005 | LADWP Access | 1 | JA | $61,986.00 | $ 61,986 | 1 | JA | $45,480.00 | $ 45,480 | $ 50,028 | 1 | JA | $147,741.00 | $ 147,741 | $ 162,515 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1006 | Temporary Bypass 30" HDPE (SWS) | 1 | JA | $633,938.00 | $ 633,938 | 1 | JA | $283,800.00 | $ 283,800 | $ 312,180 | 1 | JA | $503,216.00 | $ 503,216 | $ 553,538 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $780,000.00 | $ 780,000 | $ 780,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1007 | Temporary Flow Meter (LACSD) | 1 | JA | $124,502.00 | $ 124,502 | 1 | JA | $32,080.00 | $ 32,080 | $ 35,288 | 1 | JA | $120,742.00 | $ 120,742 | $ 132,816 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $60,000.00 | $ 60,000 | $ 60,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1008 | Temporary Flow pump (LACSD) | 1 | JA | $450,551.00 | $ 450,551 | 1 | JA | $249,900.00 | $ 249,900 | $ 274,890 | 1 | JA | $826,802.00 | $ 826,802 | $ 909,482 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $180,000.00 | $ 180,000 | $ 180,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1009 | East Filter Diaphragm (Dam Modification) | 1 | JA | $389,829.00 | $ 389,829 | 1 | JA | $472,000.00 | $ 472,000 | $ 519,200 | 1 | JA | $878,011.00 | $ 878,011 | $ 965,812 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $600,000.00 | $ 600,000 | $ 600,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1010 | Chlorine Building Demolition (SWS) | 1 | JA | $19,048.00 | $ 19,048 | 1 | JA | $17,500.00 | $ 17,500 | $ 19,250 | 1 | JA | $18,924.00 | $ 18,924 | $ 20,816 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $90,000.00 | $ 90,000 | $ 90,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1011 | Vault Demolition (SWS) | 1 | JA | $5,232.00 | $ 5,232 | 1 | JA | $4,000.00 | $ 4,000 | $ 4,400 | 1 | JA | $59,459.00 | $ 59,459 | $ 65,405 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $20,000.00 | $ 20,000 | $ 20,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1012 | Toe Drain Pipe Demolition (Dam Modification) | 1 | JA | $49,414.00 | $ 49,414 | 1 | JA | $12,600.00 | $ 12,600 | $ 13,860 | 1 | JA | $69,458.00 | $ 69,458 | $ 76,404 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $60,000.00 | $ 60,000 | $ 60,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1013 | 36" Pipe Demolition (SWS) | 1 | JA | $45,159.00 | $ 45,159 | 1 | JA | $8,900.00 | $ 8,900 | $ 9,790 | 1 | JA | $87,477.00 | $ 87,477 | $ 96,225 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $70,000.00 | $ 70,000 | $ 70,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1014 | 24" Pipe Demolition (LACSD) | 1 | JA | $33,906.00 | $ 33,906 | 1 | JA | $9,100.00 | $ 9,100 | $ 10,010 | 1 | JA | $95,147.00 | $ 95,147 | $ 104,662 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $60,000.00 | $ 60,000 | $ 60,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1015 | Replace Pipe 36" WSP (SWS) | 1 | JA | $348,288.00 | $ 348,288 | 1 | JA | $320,400.00 | $ 320,400 | $ 352,440 | 1 | JA | $454,300.00 | $ 454,300 | $ 499,730 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $420,000.00 | $ 420,000 | $ 420,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1016 | Replace Pipe 24" RCP (LACSD) | 1 | JA | $22,048.00 | $ 22,048 | 1 | JA | $24,690.00 | $ 24,690 | $ 27,159 | 1 | JA | $433,224.00 | $ 433,224 | $ 476,546 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $30,000.00 | $ 30,000 | $ 30,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1017 | Remove Bypass Pump (LACSD) | 1 | JA | $49,227.00 | $ 49,227 | 1 | JA | $25,640.00 | $ 25,640 | $ 28,204 | 1 | JA | $40,089.00 | $ 40,089 | $ 44,098 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $40,000.00 | $ 40,000 | $ 40,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1018 | Temporary Bypass Removal 30" HDPE (SWS) | 1 | JA | $57,845.00 | $ 57,845 | 1 | JA | $9,500.00 | $ 9,500 | $ 10,450 | 1 | JA | $25,739.00 | $ 25,739 | $ 28,313 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $140,000.00 | $ 140,000 | $ 140,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1019 | Replace Toe Drain Pipe 18" RCP (Dam Modification) | 1 | JA | $143,179.00 | $ 143,179 | 1 | JA | $39,800.00 | $ 39,800 | $ 43,780 | 1 | JA | $168,070.00 | $ 168,070 | $ 184,877 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1020 | Site Work (SWS) | 1 | JA | $27,878.00 | $ 27,878 | 1 | JA | $32,370.00 | $ 32,370 | $ 35,607 | 1 | JA | $59,794.00 | $ 59,794 | $ 65,773 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 1021 | Demoition & Replace East Gallery Entrance (Dam Modification) | 1 | JA | $161,717.00 | $ 161,717 | 1 | JA | $169,400.00 | $ 169,400 | $ 186,340 | 1 | JA | $242,482.00 | $ 242,482 | $ 266,730 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $100,000.00 | $ 100,000 | $ 100,000 | |
| TOTAL AMOUNT OF OPTION 1 ITEMS: | |||||||||||||||||||||||||||||
| (Line Items 1001 through 1021) | $ 2,965,863 | $ 1,936,190 | $ 2,129,809 | $ 4,818,726 | $ 5,300,599 | $ 21 | $ 21 | $ 3,240,000 | $ 3,240,000 | ||||||||||||||||||||
| OPTION 2: Vault and Meter Install | |||||||||||||||||||||||||||||
| 2001 | Meter Vault (SWS) | 1 | JA | $91,683.00 | $ 91,683 | 1 | JA | $110,850.00 | $ 110,850 | $ 121,935 | 1 | JA | $46,048.00 | $ 46,048 | $ 50,653 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $180,000.00 | $ 180,000 | $ 180,000 | |
| $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||||||||||||||||||||||
| 2002 | Flow Meter (SWS) | 1 | JA | $44,879.00 | $ 44,879 | 1 | JA | $34,970.00 | $ 34,970 | $ 38,467 | 1 | JA | $46,654.00 | $ 46,654 | $ 51,319 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | 1 | JA | $60,000.00 | $ 60,000 | $ 60,000 | |
| TOTAL AMOUNT OF OPTION 2 ITEMS: | |||||||||||||||||||||||||||||
| (Line Items 2001 through 2002 | $ 136,562 | $ 145,820 | $ 160,402 | $ 92,702 | $ 101,972 | $ 2 | $ 2 | $ 240,000 | $ 240,000 | ||||||||||||||||||||
| TOTAL AMOUNT OF BASE BID PLUS OPTION 1 AND OPTION 2 ITEMS: | |||||||||||||||||||||||||||||
| (Line Items 0001 through 2002 | $ 6,735,305 | $ 5,557,430 | $ 6,113,173 | $ 8,680,750 | $ 9,548,825 | 1 | JA | $1.00 | $ 1 | 1 | JA | $1.00 | $ 1 | $ 7,685,000 | $ 7,685,000 |
| TOTAL AMOUNT: | $ 6,735,305 | Total Amount: | $ 5,557,430 | $ 6,113,173 | Total Amount: | $ 8,680,750 | $ 9,548,825 | Total Amount: | $ 36 | Total Amount: | $ 36 | Total Amount: | $ 7,685,000 | |
| (Line Items 0001 through 2002) | ||||||||||||||
| ROUNDED UP TO NEAREST DOLLAR |