Bid Abstract Attachment W912PL21B0005 - sam.gov.pdf
PDF 313 KB Posted
- Attached to
- Lower Norco Bluffs Toe Protection Federal contract opportunity
- Solicitation number
- W912PL21B0005
About this file
This solicitation package includes an invitation for bids for the Lower Norco Bluffs Toe Protection project. The project consists of constructing an earth embankment along approximately 7,330 feet of bluff to provide flood protection up to the 100-year water surface elevation. Work includes placing embankment fill between 12 to 25 feet high, constructing a 2H:1V embankment slope with 42-inch thick riprap protection, excavating down to 2 feet above groundwater, and installing a 9-foot high launchable stone toe blanket varying between 10 to 30 feet wide depending on expected scour depth. The period of performance is 720 calendar days with an estimated construction cost between $25 million to $100 million. The solicitation is being conducted by the U.S. Army Corps of Engineers Los Angeles District as a 100% small business set-aside with a NAICS code of 237990 and size standard of $36.5 million. The bid opening will be virtual and site visit is scheduled for May 17, 2021 at the specified location in Norco, California.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF 30 W912PL21B0005 - Amendment 0004- Final.pdf | ||
| SF 30 W912PL21B0005 - Amendment 0003- Final.pdf | ||
| W912PL21B0005_Amendment0002-Final.pdf | ||
| W912PL21B0005_Amendment0001-Final.pdf | ||
| For Information Only - Norco Bluffs - Pre-Bid-W912PL21B0005 Site Walk Sign In Sheet.pdf | ||
| W912PL21B0005_Solicitation_Specifications_VolumeI.pdf | ||
| W912PL21B0005_Solicitation_Plans.pdf | ||
| W912PL21B0005_Solicitation_Specifications_VolumeII.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lower Norco Bluffs Toe Protection Riverside County, CA
W912PL21B0005
Item Description Estimated Quantity
Unit Unit Price Amount
0001 Clear Site and Remove Obstructions
1 JOB JA 153,750$
1,900,000.00$ 2,237,000.00$ 1,950,660.00$
0002 Stripping Topsoil 67,000 CY $14.75 988,250$ 2.20$ 147,400.00$ 3.75$ 251,250.00$ 10.89$ 729,630.00$
0003 Diversion and Control of Water 1 JOB JA 3,050,000$
2,600,000.00$ 1,200,000.00$ 2,309,370.00$
0004 Well Abandonment 6 EA $3,333.50 20,001$ 3,200.00$ 19,200.00$ 12,000.00$ 72,000.00$ 2,600.00$ 15,600.00$
0005 Sound Wall 9,700 LF $69.50 674,150$ 38.00$ 368,600.00$ 86.00$ 834,200.00$ 225.70$ 2,189,290.00$
0006 Excavation - General 87,000 CY $16.50 1,435,500$ 2.20$ 191,400.00$ 2.75$ 239,250.00$ 11.00$ 957,000.00$
0007 Weathered Rock Excavation 350 CY $94.00 32,900$ 58.00$ 20,300.00$ 45.00$ 15,750.00$ 76.00$ 26,600.00$
0008 Geotextile Stabilizer 65,000 SY $2.00 130,000$ 3.80$ 247,000.00$ 10.00$ 650,000.00$ 4.90$ 318,500.00$
0009 Geotextile Filter 41,750 SY $1.90 79,325$ 8.00$ 334,000.00$ 5.00$ 208,750.00$ 3.41$ 142,367.50$
0010 Miscellaneous Unsorted Rock 8,000 TON $18.00 144,000$ 8.00$ 64,000.00$ 33.00$ 264,000.00$ 23,020.00$ 185,600.00$
0011 Crushed Rock
0011A First 35,000 TON 35,000 TON $42.50 1,487,500$ 22.00$ 770,000.00$ 38.00$ 1,330,000.00$ 36.10$ 1,263,500.00$ 0011B Over 35,000 TON 15,000 TON $41.00 615,000$ 18.00$ 270,000.00$ 30.00$ 450,000.00$ 36.10$ 541,500.00$
0012 Embankment Fill 220,000 CY $26.50 5,830,000$ 32.00$ 7,040,000.00$ 38.50$ 8,470,000.00$ 35.70$ 7,845,000.00$
0013 Engineered Fill 350 CY $37.50 13,125$ 58.00$ 20,300.00$ 70.00$ 24,500.00$ 34.80$ 12,180.00$
0014 Structural Fill 320 CY $39.50 12,640$ 68.00$ 21,760.00$ 40.00$ 12,800.00$ 38.00$ 12,160.00$
0015 42-inch Riprap 107,600 TON $65.50 7,047,800$ 88.00$ 9,468,800.00$ 62.50$ 6,725,000.00$ 76.10$ 8,188,360.00$
SECTION 00 10 00
SOLICITATION CONTRACT LINE ITEM (CLIN) SCHEDULE
Bidding Schedule CJW Maloney Odin JV Ahtna Great Lakes
4 June 2021 1 Amendment 0002
W912PL21B0005
0016 15-inch Riprap 3,600 TON $60.00 216,000$ 89.00$ 320,400.00$ 60.00$ 216,000.00$ 81.20$ 292,320.00$
Item Description Estimated Quantity
Unit Unit Price Amount
0017 Grouting 15-inch Grouted Stone 780 CY $165.50 129,090$ 480.00$ 374,400.00$ 540.00$ 421,200.00$ 562.00$ 438,360.00$
0018 Bedding 22,000 TON $54.25 1,193,500$ 72.00$ 1,584,000.00$ 48.00$ 1,056,000.00$ 29.90$ 657,800.00$
0019 Stone Infill 15,000 TON $25.00 375,000$ 1.00$ 15,000.00$ 10.00$ 150,000.00$ 14.20$ 213,000.00$
0020 Toe Backfill 78,500 CY $24.50 1,923,250$ 6.00$ 471,000.00$ 4.25$ 333,625.00$ 4.66$ 365,810.00$
0021 Asphaltic Concrete 3,300 TON $111.75 368,775$ 128.00$ 422,400.00$ 140.00$ 462,000.00$ 165.00$ 544,500.00$
0022 Aggregate Base Course 4,680 TON $47.75 223,470$ 88.00$ 411,840.00$ 35.00$ 163,800.00$ 38.10$ 178,308.00$
0023 Decomposed Granite 150 TON $71.00 10,650$ 208.00$ 31,200.00$ 80.00$ 12,000.00$ 77.00$ 11,550.00$
0024 4-foot Wide Concrete V-Ditch 6,520 LF $91.75 598,210$ 48.00$ 312,960.00$ 115.00$ 749,800.00$ 116.60$ 760,232.00$
0025 3-foot Wide Concrete V-Ditch 730 LF $75.50 55,115$ 52.00$ 37,960.00$ 100.00$ 73,000.00$ 94.00$ 68,620.00$
0026 3-foot Wide Concrete Swale 35 LF $42.00 1,470$ 84.00$ 2,940.00$ 100.00$ 3,500.00$ 210.00$ 7,350.00$
0027 2-foot Wide Concrete Swale 60 LF $30.50 1,830$ 80.00$ 4,800.00$ 100.00$ 6,000.00$ 220.00$ 13,200.00$
0028 6-inch Concrete Curb and Gutter 350 LF $8.50 2,975$
30.00$ 10,500.00$ 130.00$ 45,500.00$ 72.00$ 25,200.00$
0029 6-inch Concrete Curb 170 LF $7.50 1,275$ 58.00$ 9,860.00$ 130.00$ 22,100.00$ 73.00$ 12,410.00$
0030 8-inch Concrete Curb 110 LF $14.50 1,595$ 60.00$ 6,600.00$ 200.00$ 22,000.00$ 75.00$ 8,250.00$
0031 Concrete Mow Curb 1,530 LF $11.00 16,830$ 12.00$ 18,360.00$ 50.00$ 76,500.00$ 36.00$ 55,080.00$
0032 Concrete Ramp 1 JOB JA 132,000$ 80,000.00$ 175,000.00$ 149,500.00$
0033 Weep Hole Pipes 1 JOB JA 41,000$ 8,000.00$ 3,000.00$ 12,600.00$
0034 Side Drain 1, Catch Basin 1 1 JOB JA 42,000$ 54,000.00$ 70,000.00$ 156,650.00$
0035 Side Drain 2, Catch Basin 2 1 JOB JA 74,000$ 41,000.00$ 70,000.00$ 416,500.00$
0036 Side Drain 3, Catch Basin 3 1 JOB JA 42,000$ 48,000.00$ 70,000.00$ 428,790.00$
4 June 2021 2 Amendment 0002
W912PL21B0005
0037 Side Drain 4, Catch Basin 4 1 JOB JA 72,500$ 30,000.00$ 70,000.00$ 186,530.00$
0038 Culvert 1 1 JOB JA 243,000$ 102,000.00$ 150,000.00$ 318,700.00$
Item Description Estimated Quantity
Unit Unit Price Amount
0039 Stairs and Ramp At Culvert 1 1 JOB JA 43,750$ 46,000.00$ 70,000.00$ 79,440.00$
0040 Culvert 2 1 JOB JA 222,400$ 98,000.00$ 150,000.00$ 294,850.00$
0041 Stairs and Ramp At Culvert 2 1 JOB JA 43,500$ 46,000.00$ 60,000.00$ 62,100.00$
0042 Culvert 3 1 JOB JA 230,000$ 142,000.00$ 150,000.00$ 361,000.00$
0043 Stairs and Ramp At Culvert 3 1 JOB JA 44,000$ 48,000.00$ 60,000.00$ 87,800.00$
0044 20-foot Wide Pipe Swing Gate 2 EA $18,000.00 36,000$ 8,000.00$ 16,000.00$ 15,000.00$ 30,000.00$ 15,500.00$ 31,000.00$
0045 15-foot Wide Pipe Swing Gate 2 EA $16,750.00 33,500$ 6,000.00$ 12,000.00$ 15,000.00$ 30,000.00$ 12,600.00$ 25,200.00$
0046 Chain Link Fence 780 LF $45.50 35,490$ 48.00$ 37,440.00$ 50.00$ 39,000.00$ 48.00$ 37,440.00$
0047 Cable Fence 220 LF $41.25 9,075$ 80.00$ 17,600.00$ 70.00$ 15,400.00$ 120.00$ 26,400.00$
0048 Geotechnical Instrumentation and Monitoring
1 JOB JA 60,000$
140,000.00$ 229,000.00$ 193,000.00$
0049 Landscape Planting and Hydroseeding
65 AC $8,750.00 568,750$ 8,000.00$ 520,000.00$ 16,500.00$ 1,072,500.00$ 16,550.00$ 1,075,750.00$
0050 Temporary Irrigation 65 AC $11,500.00 747,500$ 4,000.00$ 260,000.00$ 18,000.00$ 1,170,000.00$ 18,335.00$ 1,191,775.00$
0051 Landscape Establishment 65 AC $2,525.00 164,125$ 1,000.00$ 65,000.00$ 9,500.00$ 617,500.00$ 10,000.00$ 650,000.00$
0052 Borrow Area Restoration 1 Job JA 35,000$ 16,000.00$ 220,000.00$ 189,700.00$
0053 Reconstruction of Parking Lot Area
1 Job JA 269,000$
48,000.00$ 80,000.00$ 224,870.00$
0054 Removable Metal Bollard 1 Job JA 4,275$ 4,000.00$ 9,000.00$ 2,800.00$
0055 City of Norco Utility Retrofit Work
1 Job JA 38,000$
40,000.00$ 80,000.00$ 148,000.00$
4 June 2021 3 Amendment 0002
W912PL21B0005
$30,063,841 29,436,020.00$ 31,487,925.00$ 36,698,702.50$
Item Description Estimated Quantity
Unit Unit Price Amount
1001 Prado Office Maintenance 24 Month $27,500.00 660,000$
6,800.00$ 163,200.00$ 21,000.00$ 504,000.00$ 141,600.00$
1002 Security Guard Service 24 Month $12,500.00 300,000$ 6,200.00$ 148,800.00$ 16,000.00$ 384,000.00$ 665,400.00$
$960,000.00 312,000.00$ 888,000.00$ 807,000.00$
$31,023,841 29,748,020.00$ 32,375,925.00$ 37,505,702.50$ TOTAL ESTIMATED AMOUNT OF BASE AND OPTION ITEMS:
(Line Items 0001 through 1002)
TOTAL ESTIMATED AMOUNT BASE ITEMS:
(Line Items 0001 through 0055)
ESTIMATED AMOUNT OF OPTION ITEMS:
(Line Items 1001 through 1002)
Option Items
4 June 2021 4 Amendment 0002
W912PL21B0005
2,813,703.00$ 4,270,000.00$ 1,363,380.43$
23.91$ 1,601,970.00$ 5.50$ 368,500.00$ 35.50$ 2,378,500.00$
1,994,990.00$ 3,990,000.00$ 2,884,165.03$
9,440.00$ 56,640.00$ 15,000.00$ 90,000.00$ 20,119.33$ 120,715.98$
84.10$ 815,770.00$ 181.00$ 1,755,700.00$ 184.17$ 1,786,449.00$
14.00$ 1,218,000.00$ 5.50$ 478,500.00$ 0.01$ 870.00$
38.10$ 13,335.00$ 100.00$ 35,000.00$ 118.35$ 41,422.50$
8.90$ 578,500.00$ 6.95$ 451,750.00$ 11.83$ 768,950.00$
4.90$ 204,575.00$ 4.90$ 204,575.00$ 9.47$ 395,372.50$
62.50$ 500,000.00$ 18.00$ 144,000.00$ 15.39$ 123,120.00$
62.40$ 2,184,000.00$ 37.00$ 1,295,000.00$ 48.12$ 1,684,200.00$ 42.90$ 643,500.00$ 35.00$ 525,000.00$ 48.13$ 721,950.00$
32.60$ 7,172,000.00$ 38.00$ 8,360,000.00$ 66.28$ 14,581,600.00$
30.30$ 10,605.00$ 54.00$ 18,900.00$ 71.01$ 24,853.50$
51.00$ 16,320.00$ 278.00$ 88,960.00$ 70.01$ 22,723.20$
75.30$ 8,102,280.00$ 61.00$ 6,563,600.00$ 76.49$ 8,230,324.00$
BristolEmpire Equipment Services, Inc. Nordic Industries, Inc.
4 June 2021 5 Amendment 0002
W912PL21B0005
59.00$ 212,400.00$ 71.00$ 255,600.00$ 69.37$ 249,732.00$
198.30$ 154,974.00$ 455.00$ 354,900.00$ 591.74$ 461,557.20$
53.80$ 1,183,600.00$ 49.00$ 1,078,000.00$ 59.91$ 1,296,020.00$
35.30$ 529,500.00$ 26.00$ 390,000.00$ 42.92$ 643,800.00$
21.90$ 1,719,150.00$ 39.00$ 3,061,500.00$ 61.52$ 4,830,890.00$
116.80$ 385,440.00$ 103.00$ 339,900.00$ 142.02$ 468,666.00$
37.50$ 175,500.00$ 41.00$ 191,880.00$ 54.02$ 252,813.60$
57.90$ 8,685.00$ 170.00$ 25,500.00$ 59.17$ 8,875.50$
85.00$ 554,200.00$ 102.00$ 665,040.00$ 102.96$ 671,299.20$
103.60$ 75,628.00$ 100.00$ 73,000.00$ 85.21$ 62,203.30$
45.20$ 1,582.00$ 75.00$ 2,625.00$ 52.07$ 1,822.45$
46.80$ 2,808.00$ 73.00$ 4,380.00$ 55.62$ 3,337.20$
56.50$ 19,775.00$ 73.00$ 25,550.00$ 82.84$ 28,994.00$
53.40$ 9,078.00$ 65.00$ 11,050.00$ 82.84$ 14,082.80$
56.20$ 6,182.00$ 70.00$ 7,700.00$ 82.84$ 9,112.40$
26.90$ 41,157.00$ 51.00$ 78,030.00$ 35.50$ 54,315.00$
90,860.00$ 247,000.00$ 147,936.24$
15,345.00$ 38,000.00$ 17,752.35$
77,560.00$ 147,000.00$ 147,936.24$
100,476.00$ 159,000.00$ 106,514.10$
78,976.00$ 147,000.00$ 136,101.35$
4 June 2021 6 Amendment 0002
W912PL21B0005
83,956.00$ 147,000.00$ 159,771.14$
115,640.00$ 183,000.00$ 207,110.74$
47,520.00$ 75,000.00$ 118,349.00$
119,928.00$ 183,000.00$ 236,697.99$
44,000.00$ 76,000.00$ 118,349.00$
126,447.00$ 211,000.00$ 224,863.09$
47,282.00$ 77,300.00$ 118,349.00$
12,980.00$ 25,960.00$ 16,300.00$ 32,600.00$ 17,752.35$ 35,504.70$
11,800.00$ 23,600.00$ 16,000.00$ 32,000.00$ 17,752.35$ 35,504.70$
43.70$ 34,086.00$ 73.00$ 56,940.00$ 53.26$ 41,542.80$
62.60$ 13,772.00$ 57.00$ 12,540.00$ 124.27$ 27,338.62$
171,690.00$ 365,000.00$ 71,009.40$
17,134.10$ 1,113,716.50$ 15,000.00$ 975,000.00$ 32,368.45$ 2,103,949.25$
16,000.00$ 1,040,000.00$ 13,550.00$ 880,750.00$ 36,415.99$ 2,367,039.35$
6,734.70$ 437,755.50$ 73,000.00$ 474,500.00$ 7,465.09$ 485,230.85$
357,848.00$ 249,000.00$ 118,349.00$
105,020.00$ 141,000.00$ 591,744.98$
8,850.00$ 12,500.00$ 5,917.45$
177,000.00$ 88,444.00$ 71,009.40$
4 June 2021 7 Amendment 0002
W912PL21B0005
37,462,835.00$ 40,214,714.00$ 51,879,987.52$
446,342.00$ 237,600.00$ 312,831.36$
334,932.00$ 301,200.00$ 483,466.56$
781,274.00$ 538,800.00$ 796,297.92$
38,244,109.00$ 40,753,514.00$ 52,676,285.44$
4 June 2021 8 Amendment 0002
File details come from the government source that posted it. Updated .