This solicitation seeks construction services for a Ground Transport Equipment Facility at Fort Huachuca, Arizona. The project includes construction of a vehicle maintenance shop, organizational storage building, vehicle parking areas, vehicle wash platform, vehicle loading dock, petroleum storage, hazardous waste storage, and supporting facilities. The fully designed project will provide a vehicle maintenance shop with mechanical, electrical and telecommunications rooms, HVAC, fire protection and building automation systems. Supporting site work includes utilities, lighting, paving, sidewalks and signage. Demolition of three existing buildings is also required. The estimated cost range for design and construction is $25-100 million. The NAICS code is 236220. The solicitation will be competed on a full and open basis without exclusion of sources. The response due date is not provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid Abstract W912PL-20-B-0002.pdf | ||
| W912PL21B0002_Amendment0005.pdf | ||
| W912PL21B0002_Amendment0003.pdf | ||
| W912PL21B0002_Amendment0002.pdf | ||
| Site Visit Sign In.pdf | ||
| W912PL21B0002_Amendment0001.pdf | ||
| Plans_W912PL21B0002_Ft Huachuca.pdf | ||
| Plans_W912PL21B0002_Ft Huachuca.pdf | ||
| Spec_W912PL21B0002_Ft Huachuca_AZ.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0004 02 NOV 2020
W912PL
U.S Army Corps of Engineers,Los Angeles Dist CESPL-CT-E, East Region Branch 915 Wilshire Blvd.
Los Angeles, CA 90017
SEE ITEM 6
W912PL-21-B-0002
18 September2020
FY18 GROUND TRANSPORT EQUIPMENT FACILITY, FORT HUACHUCA, AZ
BID DUE DATE HAS BEEN EXTENDED FROM 6 NOV 2020 TO MONDAY 9 NOV 2020 12PM (PDT).
SEE CONTINUATION PAGE FOR AMENDMENT 0004 SUMMARY OF CHANGES.
PLEASE BE ADVISED THAT DOD SAFE DROP-OFF CODES EXPIRE IN 14 DAYS. ALL BIDDERS MUST REQUEST A
NEW CODE IF THEIR EXISTING CODE WILL EXPIRE BEFORE BID SUBMITTAL.
GROUND TRANSPORTATION EQUIPMENT BUILDING (GTEB)
FORT HUACHUCA
AMENDMENT 0004
SUMMARY OF CHANGES
SPECIFICATIONS:
1) SF-1442
2) Replaced Table of Contents
3) Replaced submittal register on Section 01 33 00-SUBMITTAL
PROCEDURE
3) Replaced entire
FABRICATIONS
Section 05 50 13 - MISCELLANEOUS METAL
4) Replaced entire Section 08 33 23 - OVERHEAD COILING DOORS
5) Replaced entire Section 08 71 00 - DOOR HARDWARE
6) Added Section 32 01 19.61 - SEALING OF JOINTS IN RIGID
PAVEMENT
7) Added Section 32 13 13.06 - PORTLAND CEMENT CONCRETE
PAVEMENT FOR ROADS AND SITE FACILITIES
DRAWINGS:
1) Added PCC Option (contractor can use Resin Modified Pavement or PCC Pavement) and revised Drawing B101 PAVEMENT PLAN BASE BID OVERALL and Drawing B101.OP PAVEMENT PLANS
OVERALL-OPTIONS.
2) Revised drawing sheet M-602 – HVAC SCHEDULES.
APPENDICES:
1) Added to APPENDIX 1, Hazardous Materials Test Results for Bldg 68048.
2) Added APPENDIX 3 PCASE DETAILS FOR PCC PAVMEMENT OPTION.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
W912PL21B0002 X 18 SEP 2020 1 OF
USACE, Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd Los Angeles, CA 90017
DoD Secure Access File Exchange (DoD Safe) at https://safe.apps.mil/
See Section 00 22 13, Special Instructions Pertaining to Submission of Electronic Bids
JIMMY L. BARTON 213.452.3251
FY18 GROUND TRANSPORT EQUIPMENT FACILITY, FORT HUACHUCA, AZ
This a fully designed project (Design Bid Build). Construct a Ground Transport Equipment Building Complex. Project includes a vehicle maintenance shop (ground transport equipment building), organizational storage building, organizational vehicle parking, vehicle wash platform, vehicle loading dock, petroleum, oils and lubricants (POL) storage, and other hazardous waste/material storage. The vehicle maintenance facility will include mechanical and electrical rooms, telecommunications, HVAC, fire detection and sprinkler suppression systems, building information systems, intrusion detection system (IDS) installation, integrated energy, monitoring and control system (EMCS) connected to the base monitoring systems, and the installation of fire alarm systems. Supporting facilities will include connection to all utilities, lighting, paving, parking areas, sidewalks, curbs and gutters, rainwater harvesting systems, and signage. Heating and air conditioning will be provided by self-contained systems.
The estimated magnitude of project is between $25,000,000 and $100,000,000. This solicitation is UNRESTRICTED and all responsive and responsible parties are invited to submit a bid. The North American Industry Classification System (NAICS) code is 236220 Commercial and Institutional Building
BIDDERS PLEASE NOTE: “This project may be delayed, canceled or revised at any time prior to award.”
10 * 00 73 00
X X *Section 00 73 00
X 10
0 12PM
09 NOV 2020
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
Ground Transportation Equipment Building (GTEB), Fort Huachuca 2145
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 00.15 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 45 35 SPECIAL INSPECTIONS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORMWATER POLLUTION CONTROL (ARIZONA)
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00.15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 82 13 ASBESTOS ABATEMENT
02 83 13 LEAD IN CONSTRUCTION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 11 13 STRUCTURAL CAST-IN-PLACE CONCRETE FORMING
03 15 00 CONCRETE ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 00 CONCRETE FINISHING
03 39 00 CONCRETE CURING
03 42 13 PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW GRADE
CONSTRUCTION
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16 STRUCTURAL WELDING
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
PROJECT TABLE OF CONTENTS Page 1 Amendment 0004
06 20 00 FINISH CARPENTRY
06 41 10 COUNTERS AND CASEWORK
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 13 53 ELASTOMERIC SHEET WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 41 13 METAL ROOF PANELS
07 41 16 METAL SOFFIT PANELS
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 59 VAULT DOORS
08 51 13 ALUMINUM WINDOWS
08 60 45 SKYLIGHTS AND TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23 RESINOUS FLOORING
09 68 00 CARPETING
09 84 20 ACOUSTICAL WALL PANELS
09 90 00 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 21 13 TOILET COMPARTMENTS
10 26 13 CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 51 13 METAL LOCKERS
10 56 13 STEEL SHELVING
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 2 Amendment 0004
13 34 19 METAL BUILDING SYSTEMS
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
13 48 56 ALUMINUM PEDESTRIAN BRIDGE
DIVISION 21 - FIRE SUPPRESSION
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 31 00 WATER SOFTENERS, CATION-EXCHANGE (SODIUM CYCLE)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 15 COMMON PIPING FOR HVAC
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23.01 LONWORKS DIRECT DIGITAL CONTROL FOR HVAC AND OTHER
BUILDING CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 21 23 HYDRONIC PUMPS
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 35 00 OVERHEAD VEHICLE TAILPIPE EXHAUST REMOVAL SYSTEM(S)
23 52 00 HEATING BOILERS
23 54 16 HEATING SYSTEM; GAS-FIRED HEATERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED WATER PIPING SYSTEMS
23 82 02 UNITARY HEATING AND COOLING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11 CYBERSECURITY FOR FACILITY-RELATED CONTROL SYSTEMS
25 08 10 BUILDING LEVEL DDC TESTING
DIVISION 26 - ELECTRICAL
26 00 00 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 27 13.10 ELECTRIC METERS
26 28 01 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 31 00 SOLAR PHOTOVOLTAIC (PV) COMPONENTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 14.00 10 CABLE TELEVISION PREMISES DISTRIBUTION SYSTEM
27 05 28.36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
PROJECT TABLE OF CONTENTS Page 3 Amendment 0004
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23 COMMUNICATIONS OPTICAL BACKBONE CABLING
27 51 16 RADIO AND PUBLIC ADDRESS SYSTEMS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 11 20 SUBBASES FOR FLEXIBLE PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 10 BITUMINOUS TACK COAT
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 12 18 RESIN MODIFIED PAVEMENT SURFACING MATERIAL
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 31 13.53 HIGH-SECURITY CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 51 13 NATURAL-GAS METERING
33 51 15 NATURAL-GAS DISTRIBUTION
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
41 22 13.13 BRIDGE CRANES
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 4 Amendment 0004
APPENDICES -
APPENDIX 1 HAZARDOUS MATERIAL REPORTS
APPENDIX 2 FORT HUACHUCA FIRE DEPARTMENT REQUIREMENTS
APPENDIX 3 PCASE DETAILS FOR PCC PAVEMENT OPTION
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 113 PAGES
Ground Transportation Equipment Building (GTEB), Fort Huachuca
01 32 01 SD-01 Preconstruction Submittals
1.3 GProject Scheduler Qualifications
3.5Bar Chart Schedule
3.1 GProject Schedule
3.5.1 GPreliminary Project Schedule
3.5.2 GInitial Project Schedule
3.6.1Data Optical Discs
3.5.3 GPeriodic Schedule Update
3.7.2 GPeriodic Schedule Update
3.9.1 GJustification of Delay
3.9.3 GTime Impact Analysis
3.9.4 GForensic Schedule Analysis
3.1.1 GSchedule Status Report
01 33 00 SD-01 Preconstruction Submittals
1.9 GSubmittal Register
SD-02 Shop Drawings
1.13Mechanical Room Layout
Drawings
01 33 29 SD-01 Preconstruction Submittals
1.5.3.1 G DOPreliminary High Performance
and Sustainable Building Checklist
1.4.1 G DOSustainability Action Plan
1.5.3.1 G DOPreliminary Sustainability
eNotebook
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Amendment 0004
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 113 PAGES
01 33 29 1.5.3.1 G DOFinal High Performance and
Sustainable Building Checklist
1.5.3.1 G DOFinal Sustainability eNotebook
1.5.3.1 G DOAmended Final Sustainability
eNotebook
1.5.3.1 G DOAmended Final High
Performance and Sustainable
Building Checklist
3.2 G DOThird Party Certification
Certificates or Validation
01 35 26 SD-01 Preconstruction Submittals
1.6 G DOAccident Prevention Plan (APP)
1.6.2.14 GHealth Hazard Control Plan
1.6.2.15 GEmergency Action Plan
1.6.2.2 GStandard Lift Plan
1.6.2.3 G DOCritical Lift Plan
1.7Activity Hazard Analysis (AHA)
SD-06 Test Reports
1.11.3Monthly Exposure Reports
1.11Notifications and Reports
1.11.2 G DOAccident Investigation Reports
1.11.4LHE Inspection Reports
1.11.6Regulatory Citations and
Violations
SD-07 Certificates
1.5.1.4Crane Operators/Riggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 113 PAGES
01 35 26 1.8.1Confined Space Entry Permit
1.8.1Hot Work Permit
1.11.5Certificate of Compliance
3.7Excavation Permit
1.5.1.4Proof of Current Qualification
01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control Plan
3.7.2.1 GMTC validation
SD-06 Test Reports
3.9.2Verification Statement
01 45 35 SD-01 Preconstruction Submittals
3.1.2Written Practices
3.1.2NDT Procedures and Equipment
Calibration Records
SD-06 Test Reports
3.1.2Daily Reports
3.1.1Biweekly Reports
SD-07 Certificates
2.1Fabrication Plant
2.1Steel Truss Plant
2.1Wood Truss Plant
2.1AC472 Accreditation
2.1Steel Joist Institute Membership
2.1Certified Plant
2.1Certificate of Compliance
1.5 GSpecial Inspector
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 113 PAGES
01 45 35 3.1.2Qualification Records
SD-11 Closeout Submittals
3.1.2 GComprehensive Final Report
01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
3.1.10.1 GTraffic Control Plan
1.4 GTemporary Earthwork Plan
3.1.10.3 GDust Control Methods And
Procedures
SD-06 Test Reports
2.4Backflow Preventer Tests
SD-07 Certificates
1.7.1Backflow Tester
1.7Backflow Preventers
1.7.2Backflow Prevention Training
Certificate
01 57 20 SD-01 Preconstruction Submittals
1.7 G DOEnvironmental Protection Plan
01 57 23 SD-01 Preconstruction Submittals
1.5.1 G DOSWPPP
1.5.1 G DOSWPPP
1.5.2 G DOPRRs
1.5.2 G DOPRRs
1.5.2 G DOPRRs
SD-03 Product Data
1.5.1.3BMP Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 113 PAGES
01 57 23 3.1.1BMP Product Data
3.1.1BMP Product Data
3.1.1BMP Product Data
2.1.1.4 G DOGeotextiles And Mats
SD-06 Test Reports
3.1.1SWPPP Amendment
3.2.1SWPPP Amendment
3.2.1SWPPP Amendment
3.2.1SWPPP Amendment
3.2.1SWPPP Amendment
3.2.1SWPPP Amendment
1.5.2Sampling Results
3.2.4Sampling Results
3.2.2Inspection Reports
1.5.2Annual Report
3.1.2Annual Report
3.1.2Annual Report
SD-10 Operation and Maintenance
Data
3.1.2 G DOPost-Construction Stormwater
Management Plan
3.1.2 G DOPost-Construction Stormwater
Management Plan
SD-11 Closeout Submittals
3.1.2 G DOFinal SWPPP
3.2.1 G DOFinal SWPPP
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 113 PAGES
01 57 23 3.1.2 G DONOT Application
3.1.2 G DONOT Application
3.1.2 G DONOT Application
01 74 19 SD-01 Preconstruction Submittals
1.6 GWaste Management Plan
SD-11 Closeout Submittals
1.7Records
01 78 00 SD-03 Product Data
1.7.1Warranty Management Plan
1.7.5Warranty Tags
1.5Spare Parts Data
SD-06 Test Reports
3.1.4 Gworking as-built drawings
3.2 G DOfinal as-built record drawings
SD-08 Manufacturer’s Instructions
1.7.1Instructions
SD-10 Operation and Maintenance
Data
3.9Operation and Maintenance
Manuals
SD-11 Closeout Submittals
1.3.4 G DORecord Drawings
2.3 GCertification of EPA Designated
Items
3.11 GInterim DD FORM 1354
3.11 GChecklist for DD FORM 1354
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 113 PAGES
01 78 00 3.6 GFinal Approved Shop Drawings
3.7 GConstruction Contract
Specifications
3.8As-Built Record Of Equipment
And Materials
01 78 23 SD-10 Operation and Maintenance
Data
1.3 GO&M Database
3.1.1 GTraining Plan
3.1.3 GTraining Outline
3.1.2 GTraining Content
SD-11 Closeout Submittals
3.1.4 GTraining Video Recording
3.1.6 GValidation of Training Completion
01 91 00.15 SD-06 Test Reports
3.1.4 G DODesign Review Report
3.1.3.1 G DOInterim Construction Phase
Commissioning Plan
3.1.3.2 G DOFinal Construction Phase
Commissioning Plan
3.1.3.1.2 G DOTemplate Building Envelope
Inspection Checklists
3.1.6.2 G DOBuilding Envelope Inspection
Checklists
3.1.6.3 G DOPre-Functional Checklists
1.9Issues Log
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 113 PAGES
01 91 00.15 3.2 G DOCommissioning Report
3.3.1 G DOPost-Construction Trend Log
Report
SD-07 Certificates
1.10 G DOCertificate of Readiness
SD-10 Operation and Maintenance
Data
3.1.7 G ROTraining Plan
3.1.7 G ROTraining Attendance Rosters
3.1.8 G DOSystems Manual and
Computerized Maintenance
Management System Manual
3.1.9 G DOMaintenance and Service Life
Plans
SD-11 Closeout Submittals
3.1.3.1 S DOConstruction Phase
Commissioning Plan
3.2 S DOFinal Commissioning Report
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDemolition Plan
1.9Existing Conditions
SD-07 Certificates
1.6 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 82 13 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 113 PAGES
02 82 13 1.3 GDetailed Drawings
SD-03 Product Data
3.10.3.1 GAsbestos Waste Shipment
Records
2.1 GEncapsulants
1.8.1 G DORespiratory Protection Program
3.10 GCleanup and Disposal
1.5.1 GQualifications
1.10Training Program
1.7.1Licenses, Permits and
Notifications
3.10.3.2 G DOAsbestos Management Plan
SD-06 Test Reports
3.8Exposure Assessment and Air
Monitoring
1.6.3Local Exhaust System
SD-07 Certificates
1.6.3Local Exhaust System
2.1 GEncapsulants
1.8Medical Surveillance
Requirements
02 83 13 SD-01 Preconstruction Submittals
1.5.2.2 GLead Compliance Plan
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.8 GLead waste management plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 113 PAGES
02 83 13 3.5.2.1 GWritten evidence
1.5.2.4 GMedical Examinations
SD-06 Test Reports
1.5.2.3 GSampling results
1.5.2.3 GOccupational and Environmental
Assessment Data Report
SD-07 Certificates
1.5.1.3Testing laboratory
3.5.1.1Clearance Certification
SD-11 Closeout Submittals
3.5.2.1hazardous waste manifest
3.5.2.1turn-in documents or weight tickets
02 84 16 SD-06 Test Reports
3.3.1 GTesting Results
SD-07 Certificates
1.8.1Qualifications of CIH
1.8.1Training Certification
1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
3.2.4 GCertification of Decontamination
SD-11 Closeout Submittals
3.5.2 GTransporter certification
3.5.2.1Certificate of Disposal and/or recycling
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 113 PAGES
02 84 16 3.5.3DD Form 1348-1
03 11 13 SD-02 Shop Drawings
2.2.1 GFormwork
3.1.1 GFormwork
2.2.1 GForm Removal Schedule
SD-03 Product Data
2.2Form Materials
SD-04 Samples
1.3 GSample Panels
SD-05 Design Data
2.1Calculations
SD-06 Test Reports
3.2Inspection
03 15 00 SD-03 Product Data
2.2Preformed Expansion Joint Filler
2.3Sealant
SD-04 Samples
2.3.2Lubricant for Preformed
Compression Seals
2.3.3Field-Molded Type
SD-07 Certificates
2.2Preformed Expansion Joint Filler
2.3Sealant
03 20 00 SD-02 Shop Drawings
3.1 GReinforcement
SD-03 Product Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 113 PAGES
03 20 00 2.3.1Mechanical Butt-Splices
SD-07 Certificates
2.3Reinforcing Steel
1.3.1Qualified Welders
1.3.2Qualification of Steel Bar
Butt-Splicers
03 30 00 SD-01 Preconstruction Submittals
1.4.2 GQuality Control Plan
1.4.1Laboratory Accreditation
3.9.5.4 GSampling Plan
SD-03 Product Data
Part 2Recycled Content Products
2.2Cementitious Materials
2.11Vapor Barrier
2.1.5Floor Finish
2.9Floor Hardener
2.4Chemical Admixtures
SD-04 Samples
2.4.5Surface Retarder
SD-05 Design Data
2.1.1 GMixture Proportions
SD-06 Test Reports
2.1.1 GMixture Proportions
3.9 GTesting and Inspection for CQC
2.2.2Fly Ash
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 113 PAGES
03 30 00 2.2.3Ground Granulated Blast-Furnace
(GGBF) Slag
2.3Aggregates
3.9.5.1Air Content
3.9.5.2Slump
3.9.5.4Compressive Strength
2.5Water
SD-07 Certificates
1.4Contractor Quality Control personnel
3.2.1Ready-Mix Plant
03 35 00 SD-03 Product Data
Part 2Recycled Content Products
SD-04 Samples
1.3.1Field Test Panels
1.3.1.1Sample Wall Panels
1.3.1.2Slab Panels
03 39 00 SD-03 Product Data
2.1Curing Materials
SD-06 Test Reports
3.2Testing and Inspection for CQC
SD-08 Manufacturer’s Instructions
2.1Curing Compound
03 42 13 SD-01 Preconstruction Submittals
1.3.2.2Quality Control Procedures
SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 113 PAGES
03 42 13 2.1.1 GStandard Precast Units
2.1.2 GCustom-Made Precast Units
3.2.4.3Special Finishes
SD-03 Product Data
2.1.1Standard Precast Units
2.1.3Proprietary Precast Units
3.1.3Embedded Items
2.2.4Accessories
SD-05 Design Data
2.1.2 GDesign Calculations
2.1.5.1Concrete Mix Proportions
SD-06 Test Reports
1.3.2.4Test Reports
SD-07 Certificates
1.3.2.2Quality Control Procedures
04 20 00 SD-02 Shop Drawings
3.3.2.1 GCut CMU
3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2.2.1 GCement
2.4.1.1 GCementitious Materials
SD-04 Samples
1.3.1.1 GMock-Up Panel
2.4.1.4 GAdmixtures for Masonry Mortar
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 113 PAGES
04 20 00 2.6.2 GAnchors, Ties, and Bar
Positioners
1.3.1.3 GJoint Reinforcement
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.2.5Fire-Rated Concrete Masonry
Units
3.2.5 GBracing Calculations
SD-06 Test Reports
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.3Prism Tests
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.4.1.1Cementitious Materials
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
1.3.1.3Joint Reinforcement
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 113 PAGES
04 20 00 3.8Take-Back Program
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.5Welder, Welding Operator, and
Tacker Qualification
1.3.6Inspector Qualification
1.3.2Previous Qualifications
1.3.3Pre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
05 12 00 SD-01 Preconstruction Submittals
1.5.1.1 GErection Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 113 PAGES
05 12 00 SD-02 Shop Drawings
1.5.2 GFabrication drawings
SD-03 Product Data
2.6.2Shop primer
2.4.1Welding electrodes and rods
2.3.2.3Direct Tension Indicator Washers
2.4.2Non-Shrink Grout
2.3.3Tension control bolts
SD-06 Test Reports
2.6.2Class B coating
2.3.1.1Bolts
2.3.2.1Bolts
2.3.1.2Nuts
2.3.2.2Nuts
2.3.1.3Washers
2.3.2.4Washers
3.8.1.2Weld Inspection Reports
3.8.2.1Direct Tension Indicator Washer
Inspection Reports
3.8.3.1Bolt Testing Reports
3.8.4Embrittlement Test Reports
SD-07 Certificates
2.2Steel
2.3.1.1Bolts
2.3.2.1Bolts
2.3.1.2Nuts
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 113 PAGES
05 12 00 2.3.2.2Nuts
2.3.1.3Washers
2.3.2.4Washers
2.5Galvanizing
1.3AISC Fabrication Plant Quality
Certification
1.3AISC Erector Quality Certification
1.5.3.1Welding procedures and qualifications
2.4.1Welding electrodes and rods
05 21 00 SD-01 Preconstruction Submittals
1.3.2Welder Qualification
SD-02 Shop Drawings
1.3.1 GSteel Joist Framing
SD-05 Design Data
2.2 GDesign Calculations
SD-06 Test Reports
3.4Erection Inspection
3.4Welding Inspections
SD-07 Certificates
1.3.2Certification of Compliance
SD-11 Closeout Submittals
2.3 SRecycled Content of Steel
Products
05 30 00 SD-02 Shop Drawings
1.3.4 G ROFabrication Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 113 PAGES
05 30 00 2.3 G RORoof Deck Units
2.3.2.1 G ROCant Strips
2.3.2.2 G RORidge and Valley Plates
2.3.2.3 G ROMetal Closure Strips
SD-03 Product Data
2.2Accessories
2.3.1 G RODeck Units
2.1.5Galvanizing Repair Paint
2.1.4Joint Sealant Material
2.3Roof Deck Units
2.3.4Repair Paint
1.3.2Welder Qualifications
1.3.2Welding Equipment
1.3.2Welding Rods and Accessories
SD-04 Samples
2.3Roof Deck Units
2.1.6Flexible Closure Strips
2.3Flexible Closure Strips
2.2Accessories
SD-05 Design Data
2.3.1 G RODeck Units
SD-07 Certificates
1.3.2Welding Procedures
1.3.3.1Fire Safety
1.3.3.2Wind Storm Resistance
05 40 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 113 PAGES
05 40 00 1.6.1 GFraming Components
SD-03 Product Data
2.1Studs, Joists
SD-05 Design Data
1.6.2 GMetal Framing Calculations
SD-07 Certificates
1.4Load-Bearing Cold-Formed Metal
Framing
3.2.1Welds
SD-11 Closeout Submittals
2.1 SRecycled Content of Steel
Products
05 50 13 SD-02 Shop Drawings
2.4 GFloor Gratings
2.4 GRoof Walkways
2.5 GBollards/Pipe Guards
SD-03 Product Data
2.4 GFloor Gratings
2.4 GRoof Walkways
SD-07 Certificates
2.1 GCertificates of Compliance
2.2 GCertified Mill
SD-11 Closeout Submittals
2.1 SRecycled Content
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 113 PAGES
05 51 00 2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.4 GConcrete Inserts
2.3.5 GMasonry Anchorage Devices
2.2.4 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
2.3.2 GSteel Stairs, Circular
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 113 PAGES
05 51 00 2.4.1 GStructural-Steel Plates, Shapes, and Bars
2.4.2 GStructural-Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.2.4 GProtective Coating
2.3.5 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.3Ladders
2.3.3Ship's Ladder
SD-03 Product Data
2.3Ladders
2.3.3Ship's Ladder
2.3.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 113 PAGES
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural Steel Plates, Shapes, and Bars
2.2.2 GStructural Steel Tubing
2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.2.7 GConcrete Inserts
2.2.8 GMasonry Anchorage Devices
2.1.3 GProtective Coating
2.2.10 GSteel Railings and Handrails
2.2.11 GAluminum Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2 GInstallation Instructions
06 10 00 SD-03 Product Data
1.8Fire-retardant Treatment
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 113 PAGES
06 10 00 2.2.2Adhesives
SD-06 Test Reports
1.4.3Preservative-treated
SD-07 Certificates
1.9.1Certificates of Grade
1.7Preservative Treatment
06 20 00 SD-02 Shop Drawings
1.3 GDetail Drawings Indicating All
Wood Assemblies
SD-03 Product Data
2.2 GWood Products
2.3 GCountertops
1.4 GTreated Wood Products
3.4 GSoffits
2.7 GHardware and Accessories
SD-04 Samples
1.5 GSamples
SD-07 Certificates
1.7.1.1 GCertificates of Grade
1.7.1.2 GCertified Sustainably Harvested
Wood
1.7.1.3 GIndoor Air Quality
SD-11 Closeout Submittals
2.2.5 SCertified Sustainably Harvested
Softwood Plywood
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 113 PAGES
06 20 00 2.2.7 SCertified Sustainably Harvested
Hardboard
2.2.5 SVOC Content for Softwood
Plywood
2.2.6 SVOC Content for Hardwood
Plywood
2.8.1.2 SIndoor Air Quality for Non-aerosol
Adhesives
2.8.1.2 SIndoor Air Quality for Aerosol
Adhesives
06 41 10 SD-02 Shop Drawings
3.1.2 GShop Drawings
3.1Installation
SD-03 Product Data
2.1.1Laminated Plastic Covered
2.2.1Hardware Finish
1.4Certification
SD-04 Samples
2.2Cabinet Hardware
2.2.2Casework Hardware
06 61 16 SD-02 Shop Drawings
2.1.3 GSolid Polymer Material
2.3 GSolid Polymer Material
2.3.2 GSolid Polymer Material
SD-03 Product Data
2.1.3Solid Polymer Material
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 113 PAGES
06 61 16 2.3Solid Polymer Material
2.3.2Solid Polymer Material
SD-04 Samples
2.1.3 GSolid Polymer Material
2.3 GSolid Polymer Material
2.3.2 GSolid Polymer Material
SD-06 Test Reports
2.1.3Solid Polymer Material
2.3Solid Polymer Material
2.3.2Solid Polymer Material
SD-08 Manufacturer’s Instructions
2.1.3Solid Polymer Material
2.3Solid Polymer Material
2.3.2Solid Polymer Material
07 05 23 SD-01 Preconstruction Submittals
1.4 GWork Plan
SD-03 Product Data
2.2 GThermal Imaging Camera
SD-05 Design Data
3.2 GEnvelope Surface Area
Calculations
SD-07 Certificates
1.6.2.1Pressure Test Agency
1.6.2.2Thermographer Qualifications
1.6.3Test Instruments
1.6.3Date Of Last Calibration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 113 PAGES
07 05 23 SD-06 Test Reports
3.5 GPressure Test Procedures
3.5.8 GAir Leakage Test Report
3.6.5 GDiagnostic Test Report
07 13 53 SD-03 Product Data
1.3 GManufacturer's Standard Details
2.2 GElastomeric Waterproofing Sheet
Material
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
SD-06 Test Reports
2.2 GElastomeric Waterproofing Sheet
Material
3.6 GField Quality Control
3.7 GProtective Covering
SD-07 Certificates
2.2Elastomeric Waterproofing Sheet
Material
1.4 GPrimers, Adhesives, and Mastics
2.2 GPrimers, Adhesives, and Mastics
1.4 GProtective Coverings
1.8 GSpecial Warranties
1.8 GSpecial Warranties
2.1.1 GCertificates Of Compliance
2.1.2 GCertificates Of Compliance
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 113 PAGES
07…
This is the start of the file's text. The full file is on GovTribe.