W912PL21B0002_Amendment0002.pdf

PDF 3 MB Posted

Attached to
FY18 Ground Transport Equipment Facility Federal contract opportunity
Solicitation number
W912PL21B0002
Issued by
Department of the Army Corps of Engineers Engineering District Los Angeles

About this file

This document contains an amendment to a federal solicitation for construction services. The solicitation is for the construction of a Ground Transport Equipment Facility at Fort Huachuca, Arizona for the Department of the Army Corps of Engineers Engineering District Los Angeles. The project scope includes building a vehicle maintenance shop, organizational storage building, vehicle parking areas, wash platforms, loading docks, petroleum storage, and hazardous materials storage. Supporting construction includes utilities, lighting, paving, signage, and connections to base monitoring systems. The amendment provides additional schedule details requiring 30 days for equipment relocation after building completion. It also outlines eight optional bid items including demolition of existing buildings, covered parking structures, building additions, and additional storage facilities. Pricing is to be provided for the base project and each optional item. The total project cost is estimated between $25-100 million. The NAICS code is 236220 and the period of performance is to be provided within the bid.

View the file

Other files for this federal contract opportunity

Other files attached to FY18 Ground Transport Equipment Facility, newest first.
File Type Posted
Bid Abstract W912PL-20-B-0002.pdf PDF
W912PL21B0002_Amendment0005.pdf PDF
W912PL21B0002_Amendment0004.pdf PDF
W912PL21B0002_Amendment0003.pdf PDF
W912PL21B0002_Amendment0001.pdf PDF
Site Visit Sign In.pdf PDF
Plans_W912PL21B0002_Ft Huachuca.pdf PDF
Spec_W912PL21B0002_Ft Huachuca_AZ.pdf PDF
Plans_W912PL21B0002_Ft Huachuca.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(SEE ITEM 13)

Amendment 000

Amendment 0002

FY18 Ground Transport Facility W912PL21B0002 Ft Huachuca, AZ Amendment 2

SECTION 00 10 00

SOLICITATION CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE

CONTRACTOR SHALL FURNISH ALL PLANT, LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO

PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH IN

THE CONTRACT TO INCLUDE ALL

ATTACHMENTS THERETO.

PROJECT SCHEDULE: After BOD of Ground Transport Equipment Facility, the contractor shall allow the Government 30 calendar days to move equipment from the old motor pool to the new facility prior to starting demolition of the old facility. All work including the 30 days Government move time is to be performed within the specified Period of Performance.

Item Estimated Unit No. Description Quantity Unit Price Amount

BASE BID

0001 Primary Building 1 Job **** $ __________________

0002 Site Work Outside 5 Ft Bldg Line 1 Job **** $ ____ _

TOTAL BASE BID (0001-0002) $_____________________________

OPTIONS

0003 OPTION 1 Demolish Bldg 68048 in 1 Job **** $__________________ EPG Motor Pool Yard

0004 OPTION 2 Covered Parking Structure 1 Job **** $__________________ and Photovoltaic System

0005 OPTION 3 Construct Training Wing on 1 Job **** $__________________ East End of Building

0006 OPTION 4 Wash Rack 1 Job **** $__________________

0007 OPTION 5 Extend Facility Maintenance Yard 1 Job **** $__________________

0008 OPTION 6 HazMat Storage Building 1 Job **** $__________________

0009 OPTION 7 POL Building 1 Job **** $_________________

0010 OPTION 8 Organizational Storage Building 1 Job **** $_________________

TOTAL BASE BID (0001-0002 and

OPTIONS 1-8 (0003 – 0010) $

OPTION DESCRIPTIONS

. BID OPTION 1 consists of demolition of building 68048 in the existing EPG Motor Pool. See sheet CD104 for additional information.

2. BID OPTION 2 consists of all covered parking structures and associated top mounted photovoltaic panels within the overflow parking lot. It does not include the new A/C parking lot as this is part of the Base Bid. Only the covered parking structure and all items associated with the PV system are part of Option 2. See sheets CS102 and CS107 for the location of the overflow parking lot. See the electrical sheets for additional information on the PV system.

3. BID OPTION 3 consists of construction of the east end (approximately 6900 square feet) of the GTEF facility building referred to as the “Training Wing” of the facility. See civil, architectural, structural, mechanical, plumbing, electrical, communication for revision required due to elimination of this part of the building. If the bid option is not awarded, the concrete skirt surrounding the building shall be revised and the remaining footprint of the building area not constructed shall be paved with the same resin modified pavement as the surrounding maintenance yard, as shown on sheet CS102.

4 BID OPTION 4 consists of the construction of a second wash rack on the east end of the facility maintenance yard. This option includes the concrete paved pad, wash ramp structure, and wastewater collection system including 16 linear feet of sewer line connecting the wash rack drain to the sanitary sewer system. If this bid option is not awarded, the concrete footprint of the wash rack shall be paved with the same resin modified pavement as the surrounding maintenance yard. See sheet CG103 for grading of the area if the option is not awarded.

5. BID OPTION 5 consists extending the facility maintenance yard to the west by 150 feet. The bid option includes an approximately an additional 57,300 square feet of resin modified paved area on the west side of the maintenance yard. The bid option includes additional fencing and curb and gutter as shown on sheet CS103A. If the bid option is not awarded the perimeter fence, curb and gutter on the north side of the yard, pavement marking, and the northwest exit drive shall be as shown on sheet CS103. See the electrical drawings for maintenance yard lighting revisions if the bid option is not awarded.

6. BID OPTION 6 consists of the construction of the hazmat storage building on the southeast side of the maintenance yard. If this bid option is not awarded the footprint of the hazmat building shall be paved with the same resin modified pavement as the surrounding maintenance yard and graded to drain toward the south at 1 %.

7. BID OPTION 7 consists of the construction of the POL storage building on the southeast side of the maintenance yard. If this bid option is not awarded the footprint of the pol storage building shall be paved with the same resin modified pavement as the surrounding maintenance yard to drain toward the south at 1%.

8. BID OPTION 8 consists of the construction of the Organizational Storage Building on the south side of the maintenance yard. If this bid option is not awarded the footprint of the Organizational Storage Building shall be paved with the same resin modified pavement as the surrounding maintenance yard and graded to drain toward the south at 1%.

Section 00 10 00-Page 2

sf-30Noninteractive W912PL21B0002
SF-1442 W912PL21B0002 Noninteractive
00 10 00 GTEF Bid Sch W912PL21B0002 AMEND 2

File details come from the government source that posted it. Updated .