AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 89

0002 Nov 20, 2019

W912PL

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 WILSHIRE BLVD, SUITE 930

LOS ANGELES, CA 90017

W912PL20R0002

Oct 9, 2019

CONSTRUCT AIR TRAFFIC CONTROL TOWER, AIR FORCE PLANT 42, AIR FORCE TEST CENTER, PALMDALE, CA

- Standard Form (SF)1442, Solicitation, Offer and Award;

- Section 00 22 16, Supplementary Instructions to Proposers;

- Section 00 73 46, General Decision Number CA20190022.

Due date for receipt of proposals is extended to January 8th, 2020 at 2:00 PM local time.

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date) .

(1)

(2)

(3)

(4)

(5)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(a)

(b)

(c)

(d)

(e)

(f)

Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data) .

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.

(2) Accounting classification Net decrease $

Include subject matter or short title of solicitation/contract where feasible.

Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.

(i)

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".

Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification) .

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

Total contract price increased by $

Total contract price decreased by $

Total contract price unchanged.

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

A reference to the letter determination; and

A statement of the net amount determined to be due in settlement of the contract.

(g)

(h)

(i)

(ii)

(1)

(2)

(3)

(4)

(5)

(6)

(i)

(ii)

(iii)

STANDARD FORM 30 (REV. 10-83) BACK

(1) Accounting classification Net increase $

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

3. DATE ISSUED PAGE OF PAGES

IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

9. FOR INFORMATION CALL

A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):

11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12B. CALENDAR DAYS

YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212

Designed using Perform Pro, WHS/DIOR, Oct 96

1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d)

W912PL20R0002

X

OCT 9, 2019 1 OF 3319

USACE, Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd, Suite 930 Los Angeles, CA 90017

See Item 7

Lucia A. Carvajal 213.452.3240

AIR TRAFFIC CONTROL TOWER, (ATCT) AF PLANT 42, AIR FORCE TEST CENTER,PALMDALE, CA.

Scope of Work includes but is not limited to a 160’ tower with: drilled shaft foundations, floor slabs, buckling-restrained brace frames, fire protection and detection, emergency power, Furniture Fixtures & Equipment (FF&E) for office spaces, FAA control cab with Slat-Wall Consoles, elevator, access control systems, HVAC, plumbing, parking lots, access driveways, fencing, and other supporting building systems and exterior infrastructure. The existing 93’ ATCT will also be demolished at the end of construction after commissioning of the new tower.

Offerors must submit both a technical proposal and a price proposal. The basis of award is best Value Trade-off, IAW FAR 15.101-1. This process permits trade-offs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal. In making this determination, all evaluation factors other than cost or price, when combined, are approximately equal to, cost or price.

The Government intends to evaluate proposals and award a contract without discussions with offerors. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary. FAR 52.215-1(f)(4).

The magnitude of construction is $10,000,000.00 - $25,000,000.00 The Notice of Price Evaluation Preference for HUBZone Small Business Concerns will apply to this procurement. See Section 00 70 00, Contract Clause No. FAR 52.219-4.

10 * 00 73 00

X X *Section 00 73 00

X 10

6 2 PM

January 8th, 2020

X

OFFER (Must be fully completed by offeror)

STANDARD FORM 1442 BACK (REV. 4-85)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGEMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24.SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and

(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN

(Type or print)

30B. SIGNATURE 30C. DATE

31A. NAME OF CONTRACTING OFFICER (Type or print)

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

DUNS NO.: TAX ID NO.:

CAGE CODE NO.:

( ) - ; FAX ( ) -

See Section 00 10 00 Solicitation Contract Line Item Number (CLIN) Schedule

USACE Los Angeles District Edwards AFB Resident Office 222 N. Rosamond Blvd, Building 3759 Edwards AFB, CA 93524-8501

USACE, Finance Center

ATTN: CEFCO-AO-D

5722 Integrity Drive Millington, TN 38054-5005

Construct Air Traffic Control Tower, Air Force Plant 42 W912PL20R0002 Air Force Test Center, Palmdale, CA

00 22 16 - 1 Amendment 0002

SECTION 00 22 16

SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS,

EVALAUTION PROCEDURES AND BASIS FOR AWARD

Table of Contents

1.0 OVERVIEW

2.0 EVALUATION PROCESS

3.0 GENERAL INSTRUCTIONS

4.0 PRICE BREAKDOWN REQUIREMENTS

5.0 VOLUME 1 - TECHNICAL PROPOSAL (NON-COST/PRICE FACTORS)

6.0 VOLUME 1 - EVALUATION AND RATING SCHEMES

7.0 VOLUME 1, GENERAL REQUIREMENTS FOR SUBMITTING PAST

PERFORMANCE INFORMATION

8.0 VOLUME 1, TAB A, FACTOR 1, PAST PERFORMANCE SUBMISSION CRITERIA

OF THE PRIME CONSTRUCTION CONTRACTOR

9.0 PAST PERFORMANCE EVALUATION PROCEDURES

10.0 VOLUME 1, TAB B, FACTOR 2, MANAGEMENT PLAN

11.0 VOLUME 1, TAB C, FACTOR 3, TECHNICAL APPROACH

12.0 VOLUME 1, TAB D, FACTOR 4, SMALL BUSINESS PARTICIPATION PLAN

13.0 ADDITIONAL DEFINITIONS USED ON ALL FACTORS

14 .0 NEED FOR DISCUSSIONS

15.0 BASIS FOR AWARD

16.0 DEBRIEFING OF OFFERORS

17.0 PROPOSAL EXPENSE AND PRE-AWARD COST

00 22 16 - 2

SECTION 00 22 16

SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS

PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS,

EVALAUTION PROCEDURES AND BASIS FOR AWARD

1.0 OVERVIEW

1.1 All offers received in response to this solicitation will be evaluated in accordance with Federal Acquisition Regulations (FAR) Subpart 15.1, Source Selection Process and Techniques. One contract will be awarded for the Air Traffic Control Tower, at Air Force Plant 42, CA.

1.2 Source Selection Team. The Source Selection Team (SST) is established as a separate organization and management chain of command whose only purpose is to ensure an impartial, equitable and comprehensive evaluation of all proposals received in response to this solicitation. The organization consists of a Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). Offerors are advised that the technical evaluations and rating of proposals will be conducted in strict confidence in that the technical proposals are reviewed and rated without knowledge of the price offered. The number and identities of the offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors.

1.3 Basis for Award. In accordance with FAR Subpart 15.101-1. Tradeoff Process. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest priced proposal.

In making this determination, all evaluation factors other than cost or price, when combined, are approximately equal to cost or price.

1.4 Proposals should parallel the submission requirements identified in Paragraph 3.3 below. Volume 1, Technical Proposals shall be submitted in original and six (6) copies. Volume 2, Price Proposal and other Administrative Requirements shall be submitted in original only.

2.0 EVALUATION PROCESS

2.1 All proposals received in response to this Request for Proposals will be evaluated. The Government will evaluate the Offferors’ qualifications based on the criteria described herein and will award the contract to the Offeror providing the “Overall Best Value” to the Government in accordance with the Traditional Subjective (technical-price) Tradeoff Process. FAR Subpart 15.101-1. The Government intends to award without discussions.

2.2 The source selection procedures will begin with the initial review of proposals and continue with technical and price evaluations conducted by the SSEB. The SSEB shall evaluate proposals based solely on the evaluation criteria identified in the following paragraphs. The results of the SSEB evaluations will be presented to the SSA for review. The SSA will make the final source selection decision. The Contracting Officer will determine whether it is appropriate to engage in clarifications or communications with the offerors prior to establishment of a competitive range, or to establish a competitive range and conduct discussions with those offerors that are included in the competitive range. All communications leading to the establishment of the competitive range will be conducted in accordance with FAR subpart 15.306(b). However, if a competitive range is established, discussions will be conducted with offerors who are included in the competitive range. After conclusion of discussions and receipt of final proposal revisions (if applicable), the SSEB will complete the evaluation and establish the final ratings and present them to the SSA. The SSA will then review the proposals and make the final source selection decision.

00 22 16 - 3

2.3 The Government is not responsible for information overlooked during the evaluation which is not located in the appropriate proposal section. Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.

2.4 To ensure that evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal.

2.5 Price Evaluation. Price is not rated but will be evaluated for fairness and reasonableness through use of price analysis. The price analysts will also check for the appearance related to the unbalancing of bid line items. The price evaluations will document the fairness and reasonableness of the total evaluated price (Base Bid and Option Items). If, in the SSA’s opinion, adequate price competition exists, no additional cost/price information will be requested. However, if at any time during the competition, the SSA determines that further analysis is needed, detailed cost/price breakdowns may be requested. See Paragraph 4.0 entitled, “Price Breakdown Requirements.”

2.6 Price Evaluation Preference for HUBZone Small Business Concerns. The Notice of Price Evaluation Preference for HUBZone Small Business Concerns will be applied to this procurement in accordance with FAR subpart 19.1309(b) and FAR 52.219-4.

3.0 GENERAL INSTRUCTIONS

3.1 Who Can Submit

3.1.1 Any responsible, legally-organized entity not identified on the Government’s Excluded Parties List as a debarred or suspended entity or an “inverted domestic corporation” as described in Federal Acquisition Regulation Part 9.108 may submit a proposal. Construction contractors that have associated specifically for this project, consortia firms or any other interested parties may submit proposals.

3.1.2 Any firm that contributed to and/or participated in preparation of this solicitation, whether as a Government contractor or as a subcontractor to a Government contractor, is not eligible to participate in this solicitation as a prime contractor due to a conflict of interest. The Government considers such firms to have an unfair competitive advantage, and therefore will not consider such firms if proposed.

3.2 Where to Submit Proposals

3.2.1 Submit proposal packages to U. S. Army Corps of Engineers at the address shown in Block 8 of Standard Form 1442 in this solicitation. The Government must receive your proposal no later than the time and date specified in Block 13 of Standard Form 1442 in this solicitation. Any and all amendments shall be acknowledged by completion of Block 19 of the Standard Form 1442.

3.3 Proposal Submission Information Volume 1 and Volume 2

3.3.1 It is the responsibility of the offeror to submit proposal information organized sequentially under tabs and number all pages, to facilitate evaluation. Materials and requested information not organized under the appropriate tabs, and in sequence of subparagraphs set out below, may easily be overlooked during evaluations, thus possibly affecting the ratings of each factor and affecting the basis for award.

3.3.2 Proposals will be evaluated in accordance with the factors listed below. All evaluation factors other than cost or price, when combined, are approximately equal to cost or price. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised proposal. The Government may decide to award to the offeror whose proposal is determined to be the best value on the basis of initial proposals without conducting discussions.

00 22 16 - 4

3.3.3 Volume 1 Technical Proposal. Submit one (1) original and six (6) copies of the proposal. Each Volume shall contain a Table of Contents and all pages of each factor shall be sequentially numbered. All text must be legible and easily read. The page size of the offeror’s proposal shall not exceed 8.5” by 11”. Diagrams, charts and tables shall conform to the paper size. All text shall be typed single-spaced with a minimum size 10 font. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and are to be utilized, all sheets shall be reproduced on 11” by 7” and folded to 8.5” by 11” size. Offerors shall be limited to a maximum of 40 pages. A page is defined as text or information on one side of paper. If it is printed double-sided, each face will be counted as a page. Factor 1, Past Performance, will not be counted towards this page count.

3.3.4 Volume 1, Contents of Technical Proposal (three-ring binder) Original and Six (6) Copies:

Tab A Factor 1 Past Performance of Prime Construction Contractor

Tab B Factor 2 Management Plan

Tab C Factor 3 Technical Approach

Tab D Factor 4 Small Business Participation Plan

3.3.5 Volume 2, Administrative Requirements: Information submitted for Volume 2, includes the offeror’s price and other required information, including standard forms, etc. as described below. All the information required in Volume 2 shall be presented in a separate binder or envelope clearly marked VOLUME 2, ADMINISTRATIVE REQUIREMENTS. Submit the information in 8.5”x11” paper. For Volume 2, submit the original only. In the same envelope, the offeror is to submit an electronic copy of Volume 1 and Volume 2 that is equivalent to the printed original copy on one CD/DVD. The CD/DVD should be in PDF format and be Optical Character Recognition (OCR) compatible. OCR is a common method of digitizing printed text so that they can be electronically searched, stored compactly displayed on-line, and used in machine processes such as machine translation. All text must be legible and easily read. The Volumes shall contain a Table of Contents and all pages of each factor shall be sequentially numbered. Please note: The electronic version of Section 00 10 00, Solicitation, Contact Line Item Number (CLIN) Schedule, can be submitted within 24 hours after the due date of the Proposal. Please submit to Lucia a. Carvajal at lucia.a.carvajal@usace.army.mil.

3.3.6 Volume 2, Contents of Administrative Requirements (Binder or Sealed Envelope) Original only.

Prior to making an award the Contracting Officer must determine that any Offeror eligible for an award is responsible both financially and technically and has the capability to properly manage the contract during performance and complete the work on time. Offerors must submit the original of this volume in an envelope marked, Volume 2, Administrative Requirements.

The offeror is to submit the following information, tabbed as follows:

Proposal Cover Sheet. The proposal cover sheet is required by FAR 52.215-1(c) (Attachment No.1)

Tab A shall contain a completed SF 1442, “Solicitation, Offer and Award” including the Certifications, Section 00 01 05. The SF 1442 and the Certifications shall be completed by the offeror and duly executed with an original signature by an official authorized to bind the company in accordance with instructions at FAR 4.102

Acknowledgement of any and all amendments to the solicitation in accordance with the instructions of Standard Form 30 Amendment.

Section 00 10 00, Solicitation, Contract Line Item Number (CLIN) Schedule. The total cost for the construction will be considered for evaluation. Proposed price will be utilized in the establishment of the competitive range.

Provide a copy of your FAR/DFARS Report from System for Award Management (SAM)

00 22 16 - 5

Tab B Organizational Conflicts of Interest (OCI) Disclosure. The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning past or present organizational conflicts of interest relating to this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interests have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of the contract, the Contracting Officer will make a decision whether to terminate the contract.

Tab C A Bid Guarantee, Standard Form 24, Bid Bond, in accordance with Far 52.228-1 of Section 00 21 16.

Tab D Small Business Subcontracting Plan. Separate from the Small Business Participation Plan. Large Business concerns must also submit a Subcontracting Plan (Individual Contract Plan) as required by FAR 52.219-9 Small Business Subcontracting Plan - Alternate II (DEVIATIONS 2018-O0018 and 2019-O0005) located in Section 00 70 00. The Subcontracting Plan will not be rated by the SSEB, but rather reviewed by the Small Business Advisor and the Contracting Officer for acceptability. Proposals submitted in response to this solicitation shall include a subcontracting plan that separately addresses subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. If the offeror is submitting an individual contract plan, the plan must separately address subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns, with a separate part for the basic contract and separate parts for each option (if any). The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be negotiated within the time specified by the Contracting Officer. Failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.

The Subcontracting Plan shall reflect and be consistent with the commitments offered in the Small Business Participation Plan, Factor 4. In accordance with Defense Federal Acquisition Regulations, DFARS 215.304(c)(i), when an evaluation assesses the extent that small businesses are specifically identified in proposals, the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9, Alternate II (DEVIATIONS 2018-O0018 and 2019-O0005) and DFARS 252.219-7003 Small Business Subcontracting Plan (DoD Contracts)-Basic (Dec 2018). The assessment will consider if the plan adequately responds to each of the required elements of the FAR 52.219-9, Alternate II (DEVIATIONS 2018- O0018 and 2019-O0005) and if the commitments listed in the Offeror’s Subcontracting Plan are comparable to the commitments addressed in the Offeror’s Small Business Participation Plan submitted in Volume 1, Factor 4.

Tab E Pre-Award Survey Data Information. In accordance with FAR 9.103(a)… contracts shall be awarded to responsible prospective contractors only. To be determined responsible, a prospective contractor must meet the standards at FAR 9.104 that requires a prospective contractor to have adequate financial resources to perform a contract or the ability to obtain them. As an aid in assessing responsibility, the offeror shall provide the following:

(1) A list of present commitments, including the dollar value thereof, and name of the organization under which the work is being performed. Include names and telephone numbers of personnel within each organization who are familiar with the prospective contactor’s performance. For a newly formed Joint Venture (JV), each JV member must submit a list of present commitments.

(2) Financial Statement. Submit a copy of your most recent financial statements. The statements must include a

Balance Sheet and Income Statement. Include the names of banks or other financial institutions with which business is conducted (mailing addresses, Point of Contact and phone number). If the financial statements are more than 60 days old, attach a certificate stating that the financial condition is substantially the same, or if not the same, describe the changes which have taken place since the financial statements were prepared. Provide evidence of adequate financing arrangements, such as commitments from lending institutions, etc., to perform this contract. This information will be treated confidentially but may be verified. For a newly formed JV, each JV member must submit financial statements and information. The financial statements will not be rated by the SSEB. The Government will analyze the financial statements and make a risk assessment of the Offeror’s financial capability to successfully accomplish this project.

00 22 16 - 6

(3) The Offeror shall also submit a certified statement listing: (1) each contract award received within the preceding three month period exceeding $1,000,000.00 in value with a brief description of the contract; and (2) each contract award received within the preceding three year period not already physically completed and exceeding $5,000,000.00 in value with a brief description of the contract. For a newly formed JV, each JV member must submit the aforementioned certified statement.

Pre-award survey information will not be rated by the SSEB. The Government will analyze the pre-award data information and make a risk assessment of the offeror’s financial capability to successfully accomplish this project.

Tab F For Joint Ventures, submit the following information:

Joint Ventures shall submit the following additional documentation regarding their business entities:

1) A certified copy of their Joint Venture Agreement.

2) A detailed statement outlining the following in terms of percentages, where appropriate.

a. The relationship of the joint venture parties in terms of business ownership, capital contribution, and profit distribution or loss sharing.

b. The management approach of the joint venture in terms of who will conduct, direct, supervise and control the project and have custody and control of the assets of the Joint Venture and perform the duties necessary to complete the work.

c. The structure of the joint venture and decision-making responsibilities of the Joint Venture parties in terms of who will control the manner and method of performance of the work.

d. The bonding responsibilities of the Joint Venture parties.

e. Identification of the key personnel having authority to legally bind the Joint Venture to subcontracts and state who will provide or contract for the labor and materials for the Joint Venture.

f. Identification of party maintaining the Joint Venture bank accounts for the payment of all expenses and the deposits of all receipts for the Joint Venture.

g. Identification of party furnishing the facilities, such as office supplies and telephone service.

h. Identification of party having overall control of the Joint Venture.

Other sections of the proposal shall identify, where appropriate, whether key personnel are employees of the individual Joint Venture parties and identify the party, or hired as employees of the Joint Venture.

If one of the Joint Venture parties possesses experience and/or past performance as a Federal Government contractor or as a Corps of Engineers’ contractor, that experience and/or past experience will be included as the experience and/or past experience of the Joint Venture.

4.0 PRICE BREAKDOWN REQUIREMENTS

Upon the Government’s request, submit a price breakdown, in sufficient detail, of the CLIN items directly to the Contracting Officer. Details on where and how to send the breakdown will be provided by the person making the request on behalf of the Government.

00 22 16 - 7

5.0 VOLUME 1 - TECHNICAL PROPOSAL (NON-COST/PRICE FACTORS)

5.1 There are four (4) evaluation factors as indicated below. The factors are listed in order of relative importance.

Offerors are reminded to include their best technical and capability information in their initial offer and not assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.

Table 1 – Evaluation Factors and Relative Weighting

Location

VOLUME I

Factor Number Description Relative Importance

TAB A

Factor 1

Past Performance of Prime Construction

Contractor

Equal in relative importance to factors 2 and 3 and more important than factor 4

TAB B

Factor 2

Management Plan factors 1 and 3 and more

TAB C

Factor 3

Technical Approach factors 1 and 2 and more

TAB D

Factor 4

Small Business Participation Plan

Less important than factors

1, 2 and 3

Volume 2

NA

Price, Section 00 10 00

Price is not rated.

Approximately equal to all non-cost factors.

Volume 2 NA Administrative Requirements Checked for Compliance, Not Rated

6.0 VOLUME 1 - EVALUATION AND RATING SCHEMES

6.1 There are three (3) rating schemes used in the evaluation of the proposals as described in the following paragraphs and as illustrated in the Tables below.

6.2 For Factor 1, Past Performance of the Prime Construction Contractor, the SST will assign the offeror one of the ratings shown in Table 3. The past performance evaluation results in an assessment of the offeror’s probability of meeting the solicitation requirements. The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying products and services that meet the contract’s requirements.

In accordance with FAR 15.305(a)(2), the currency and relevancy of the information, source of the information, context of the data, and general trends in the contractor’s performance shall be considered. These are combined to establish one performance confidence assessment rating for each offeror. See Table 3.

6.3 For any “Technical” Factor (meaning all non-cost factors, excluding Past Performance). The SST will use a combined technical/risk rating method for Factor 2, Management Plan and Factor 3, Technical Approach. The combined technical/risk rating includes consideration of risk in conjunction with the strengths, weaknesses, significant weaknesses, uncertainties, and deficiencies in determining technical ratings. The assessment of technical

00 22 16 - 8 risk, which is manifested by the identification of weaknesses, considers potential disruption of schedule, degradation of performance, the need for increased Government oversight, and/or the likelihood of unsuccessful contract performance. Combined technical/risk evaluations shall utilize the combined technical/risk ratings listed in Table 4 and the risk descriptions set forth in Table 5

6.4 For Factor 4, Small Business Participation Plan, the SST will evaluate the extent of anticipated participation by small business concerns in the contract. The SST will use the Small Business Rating Method listed in Table 6.

6.5 No overall rating will be assigned to the Offerors’ non-cost/price proposals.

7.0 VOLUME 1, GENERAL REQUIREMENTS FOR SUBMITTING PAST

PERFORMANCE INFORMATION

7.1 This general submission criteria relates to Tab A, Factor 1, Past Performance of the Prime Construction Contractor. There are three aspects to the past performance evaluation: recent, relevant (including context of data), and quality (including general trends in contractor performance and source of information). The Offeror may use the Attachment No. 2 at the end of this section for submitting the required information for the factor.

7.2 Where the word “project(s)” appears in this solicitation, it is understood to mean a construction project performed under a single task order or contract. For multiple award and indefinite delivery/indefinite quantity type contracts, the contract as a whole shall not be submitted as a project; rather offerors shall submit the work performed under a task order as a project. Examples of a project submitted by the offeror may include projects performed for a City, State or a Federal Agency; or for a commercial or private sector customer. If projects submitted were design-build projects, please identify them as such.

7.3 Where the word “recent” appears it is understood to mean design type projects that have been 100% completed (final construction documents completed) within six (6) TEN (10) years from the RFP release date. A recent construction type project is defined in paragraph 8.3(d) in relation to the RFP advertisement date. It is the responsibility of the Offeror to clearly indicate the percentage of completion on construction project examples that are in progress at the time of this submission.

7.4 “Relevant” past performance is one indicator of an Offeror’s ability to perform the contract successfully. Where the word “relevant” appears it is understood to mean that the project is comparable to the type of work covered by this requirements, in terms of size, scope and complexity. A brief description of work is found in RFP Section 01 10 10 paragraph entitled, “PROJECT DESCRIPTION.” There are four levels of relevancy as shown in Table 2.

7.4 Quality of Product or Services. The past performance evaluation will establish the overall quality of the offeror’s past performance.

8.0 VOLUME 1, TAB A, FACTOR 1, PAST PERFORMANCE SUBMISSION

CRITERIA OF THE PRIME CONSTRUCTION CONTRACTOR

8.1 The past performance evaluation will considered the following:

(a) Recent

(b) Relevant Company Effort

(c) Quality of Past Performance (including general trends in contractor performance and source of information)

8.2 Submission Requirements

00 22 16 - 9

The offeror shall submit a project portfolio containing three (3) example projects.

8.3 RECENT AND RELEVANT COMPANY EFFORT. The offeror is to submit three (3) examples of its most “recent” and “relevant” construction type effort performed as a prime construction contractor to demonstrate accomplishments that are similar to the scope and magnitude of effort and complexities required by this solicitation.

If more than three (3) projects are submitted for the Prime Offeror, only the first three (3) submitted for the firm will be evaluated, starting from the most recent and working backwards in time.

Each project cited shall meet the following criteria:

(a) Magnitude: Three (3) projects with a final construction cost of $7,500,000 or greater.

(b) Scope: New construction of multistory buildings (minimum 75 feet) Three Stories (or 50 feet) with deep foundations, specialized seismic force-resisting steel systems, fire protection and detection, emergency power, elevator, access control systems, HVAC, plumbing, and other supporting building systems and exterior infrastructure.

(c) One (1) of the three (3) projects must have occurred on a military installation or located at an FAA operated airport.

(d) Completed or substantially completed within the last six (6) TEN (10) years of the RFP advertisement Date. A project will be considered substantially complete if it is a design bid build type construction project that is 50% complete (final construction documents completed) within six (6) TEN (10) years from the RFP advertisement date. A recent design build construction type project is defined as a construction type project for which design is 100% complete and the construction is at least 50% complete (measured by the period of performance days) within six (6) TEN (10) years as of the RFP advertisement date. At least one (1) projects must be 100% complete.

(e) Projects that reflect the following features will receive additional consideration:

1) Projects that demonstrate experience and capability with multi-story construction over 125 feet;

2) Projects that demonstrate experience and capability with large diameter (6 feet or greater) drilled shaft foundations;

3) Projects that demonstrate experience and capability with FAA control cab with Slant- Wall Consoles;

4) Projects that demonstrate the contractor’s steel fabricator/erector has experience working with Buckling Restrained Braced Frames (BRBF) manufacturers for projects in high seismic zones;

5) The Government will give more consideration to projects submitted that clearly demonstrate an Offeror’s ability to construction a project that is similar in size and scope to this project and to execute the project successfully, while containing cost and maintaining schedule.

8.4 For each “recent”, “relevant” project submitted, the Offeror shall furnish the information specified below (Attachment 2, Relevant Company Effort at the end of this Section may be used). If the Offeror is submitting “task order type projects,” each task order project shall be submitted on a separate project data sheet. At a minimum, provide the following information:

(1) Project Title

(2) Location

(3) Contact Number

00 22 16 - 10

(4) Contract Type (Design-Build; Design-Bid-Build)

(5) Role of Offeror (address; type of work performed, including design, percentage of work performed by the offeror, if applicable, and any proposed team members that were directly involved in this project, including work performed, roles and responsibilities)

(6) Total Dollar Amount

(7) Start and Completion Dates. If project is not complete, indicate the percentage complete and anticipated completion date

(8) Brief Description of Project. Address how this project is similar to the type of work to be issued under this contract.

(9) Customer Primary Point of Contact (name, relationship to project, agency/firm, phone number and e-mail address). The Government may contact and interview project references. Reference information will not be revealed to other parities.

8.5 QUALITY OF PAST PERFORMANCE

8.6 Offerors are responsible for indicating the percentage of work that is completed, if currently underway. The Offeror shall submit evidence of the quality of their past performance on submitted projects. The Offeror shall provide in their initial proposal a completed offeror performance evaluation, whether interim or final, found in the Contractor Performance Assessment Reporting System (www.cpars.gov). If a completed offeror performance evaluation does not exist in CPARS (example, non-U.S. Government projects) the Offeror shall provide a Past Performance Questionnaire, hereinafter PPQ (Attachment 3 may be used). If, at time of evaluation, a completed offeror performance evaluation exists in CPARS that conflicts with a submitted PPQ, the completed offeror performance evaluation shall govern. Offerors shall not incorporate by reference into their proposal PPQ’s previously submitted for other RFPs. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror. Letters of Recommendation or Appreciation are considered supplemental information to demonstrate customer satisfaction and are not considered equal to offeror performance evaluations and/or detailed PPQs.

8.7 The Offeror may also provide in its initial proposal, information (i.e., letters of appreciation, safety awards, customer awards, etc.) of other completed projects that are relevant, to further demonstrate owner satisfaction with the Offeror’s general trend in construction performance. Information submitted must be “recent” and “relevant” as previously defined.

8.8 If an Offeror has been required to take corrective action for any substandard performance, the Offeror should explain the circumstances and the corrective actions taken. If an Offeror has experienced other performance problems such as cost overruns, extended performance periods, numerous warranty calls, etc., the Offeror should explain.

8.9 Joint Venture Submission Requirements. The Offeror submitting a proposal as a Joint Venture (JV) shall obtain a DUNS number and be registered in the System for Award Management (SAM, as the offering Joint Venture).

8.10 If the offeror is a Joint Venture (JV), relevant project experience should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared experience, projects may be submitted for the Joint Venture partner. Offerors are still limited to a total of three (3) projects combined. For a JV, the offeror shall submit the signed JV agreement. See paragraph 3.3.6, Tab F. For 8(a) Mentor-Protégé Joint Ventures, the offeror shall submit the signed and U.S. Small Business Administration (SBA) approved Mentor-Protégé agreement. For offerors who are a Joint Venture, an offerors’s proposal may be considered ineligible for award if this information is not provided.

8.11 Verification: The Government reserves the right to verify the past performance record of cited projects, or other recent projects not submitted by reviewing CPARS, or other Government appraisal systems or by interview of the owner or references. The Government may check any and all cited references to verify supplied information.

An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.

http://www.cpars.gov/

00 22 16 - 11

9.0 PAST PERFORMANCE EVALUATION PROCEDURES

Factor 1 Past Performance of the Prime Construction Contractor.

9.1 The past performance evaluation considers each offeror’s demonstrated recent and relevant record of performance in supplying services that meet the solicitation requirements. The Government will assign a Performance Confidence Assessment rating for Factor 1 after evaluating the past performance information submitted, and focusing on whether the information is recent and relevant, the source of the information, context of the data, and general trends in the contractor’s performance. The Performance Confidence Assessment rating is based on the offeror’s overall record of recency, relevancy, and quality of performance. The SSEB shall use all the confidence ratings identified in Table 3.

9.2 Past Performance Relevancy Ratings. Before the Performance Confidence Assessment rating is assigned, the Government will first evaluate the projects submitted under factor 1; determine if they are recent and determine how relevant the recent effort accomplished by the offeror is to the effort to be acquired through this source selection. In making this determination, the following definitions for relevancy will apply:

Table 2. Past Performance Relevancy Rating Method

Adjectival Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

Note:

With respect to relevancy, past performance of greater relevancy will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment than past performance of lesser relevance.

If a project example lacks the minimum required information or if the proposal is vague and ambiguous, that project example will be rated “not relevant.”

9.3 The Government will evaluate each of the projects submitted under Factor 1 comparing the past project information and effort and comparing it to the effort needed to accomplish the project described in this solicitation.

9.4 For Factor 1, the Government will only evaluate the past performance information of the corporate entity named on the signed Standard Form 1442.