Bid Abstract W912PL-20-B-0002.pdf
PDF 108 KB Posted
- Solicitation number
- W912PL-20-B-0002
About this file
This abstract of bids document summarizes bids received in response to Solicitation Number W912PL-20-B-0002 issued by the Department of the Army Corps of Engineers Engineering District Los Angeles. The solicitation requests bids for the demolition of various buildings located at Nellis Air Force Base and Creech Air Force Base in Nevada. Services required include demolishing two three-story dormitory buildings, thirteen single-family homes, a compressed natural gas station, and various trailers. Demolition will include asbestos remediation, and debris must be disposed of. The estimated duration of the contract is 720 calendar days. Bids were received from fourteen contractors, with total bids ranging from $3,424,339.55 to $5,190,235.00. The small business set-aside solicitation closed on November 19, 2019. Award will be made to the responsible bidder offering the most advantageous price.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D. UNIT PRICE E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT E. ESTIMATED AMOUNT
1 1 JOB $ 1,022,062.00 $ 393,210.00 $ 517,246.00 $ 427,367.00 $ 444,365.00 $ 524,901.00 $ 393,924.00 $ 758,145.46 $ 526,168.00 $ 670,293.00 $ 562,900.00 $ 710,973.28 $ 947,957.46 $ 1,125,000.00
2 1 JOB $ 1,374,879.00 $ 592,965.00 $ 703,473.00 $ 627,370.00 $ 687,527.00 $ 973,657.00 $ 1,073,856.00 $ 720,251.65 $ 934,765.00 $ 958,303.00 $ 850,700.00 $ 1,125,828.03 $ 2,319,040.49 $ 2,595,000.00
3 1 JOB $ 1,773,230.00 $ 566,580.00 $ 385,727.00 $ 622,340.00 $ 645,467.00 $ 533,193.00 $ 624,546.00 $ 592,793.97 $ 430,292.00 $ 783,335.00 $ 1,440,750.00 $ 1,119,982.92 $ 430,318.28 $ 725,000.00
4 1 JOB $ 87,679.00 $ 92,644.00 $ 50,827.00 $ 107,046.00 $ 127,126.00 $ 82,110.00 $ 57,451.50 $ 111,187.52 $ 336,910.00 $ 184,590.00 $ 85,740.00 $ 98,043.49 $ 77,435.47 $ 120,000.00
5 1 JOB $ 687,711.00 $ 74,169.00 $ 125,079.00 $ 117,361.00 $ 144,502.00 $ 79,535.00 $ 87,189.60 $ 160,442.76 $ 336,056.00 $ 267,689.00 $ 239,170.00 $ 206,179.55 $ 103,760.85 $ 130,000.00
6 1 JOB $ 244,674.00 $ 55,190.00 $ 91,397.00 $ 107,298.00 $ 134,351.00 $ 84,285.00 $ 106,012.00 $ 173,904.93 $ 361,080.00 $ 267,901.00 $ 84,900.00 $ 163,332.28 $ 114,995.64 $ 145,000.00
TOTAL $ 5,190,235.00 $ 1,774,758.00 $ 1,873,749.00 $ 2,008,782.00 $ 2,183,338.00 $ 2,277,681.00 $ 2,342,979.10 $ 2,516,726.29 $ 2,925,271.00 $ 3,132,111.00 $ 3,264,160.00 $ 3,424,339.55 $ 3,993,508.19 $ 4,840,000.00
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is usable
OPTIONAL FORM 1419A (11-88)
NO.: 12
A. OFFEROR
Vann Companies
LLC
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.: 13
A. OFFEROR
Bowen Engineering
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
C. AMENDMENTS
ACKNOWLEDGED
NO.: 11
A. OFFEROR
Arriola Consulting & Inspection LLC
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.:10
A. OFFEROR
Defenders for You
B. BID SECURITY (Type and amount)
Bid Bond 0%
NO.: 8
A. OFFEROR
Heffler Contracting Group
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.: 9
A. OFFEROR
Center Point Services, INC
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.: 5
A. OFFEROR
Clauss Construction
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.: 7
A. OFFEROR
Ayuda Companies
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.: 6
A. OFFEROR
Phase Solutions
LLC
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION
SHEET
1. SOLICITATION NUMBER
W912PL-20-B-0002
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation 2. PROJECT TITLE
DEMOLITION OF 6 SITES, NELLIS &
CREECH AFBs, NV
NO.: 1 NO.: 2
A. OFFEROR
Government Estimate (IGE)
A. OFFEROR
Multi Corp Resources, Inc
A. OFFEROR
LinnCo Inc
B. BID SECURITY (Type and amount)
N/A B. BID SECURITY (Type and amount)
Bid Bond 20%
B. BID SECURITY (Type and amount)
Bid Bond
4. OFFERS (Continued)
3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED
N/A
C. AMENDMENTS
ACKNOWLEDGED
C. AMENDMENTS
ACKNOWLEDGED
A. ITEM
NO.
B. ESTIMATED
QUANTITY
C. UNIT
E. ESTIMATED AMOUNT
NO.: 3
A. OFFEROR
S&B Christ Consulting LLC
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
NO.:4
A. OFFEROR
JG Contracting
B. BID SECURITY (Type and amount)
Bid Bond 20%
C. AMENDMENTS
ACKNOWLEDGED
$ 1,022,062.00
$ 1,374,879.00
$ 1,773,230.00
$ 87,679.00
$ 687,711.00
$ 244,674.00
$ 5,190,235.00
Table 1
File details come from the government source that posted it. Updated .