SOLICITATION NO. W912PL-18-R-0002
DATE: October 2017
U.S. ARMY CORPS OF ENGINEERS
DESIGN BID BUILD
FY16 Communications Facility
Project No. NUEX093016
Luke AFB Arizona
Bid Set—Specifications
Volume 3—Division 25 through Division 48
PROJECT TABLE OF CONTENTS Page 1
FY16 Communications Facility Bid Set Luke AFB, AZ Solicitation No. W912PL-18-R-0002
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS*
00 10 00 PROJECT INFORMATION SHEET (NOT INCLUDED) AND
PROPOSAL SCHEDULE
00 20 00 INSTRUCTIONS FOR PROCUREMENT (NOT INCLUDED)
00 21 16 INSTRUCTIONS TO PROPOSERS (NOT INCLUDED)
00 22 00 SUPPLEMENTARY INSTRUCTIONS (NOT INCLUDED)
00 22 16 SUPPLEMENTARY INSTRUCTIONS TO PROPOSERS (NOT INCLUDED)
00 70 00 CONDITIONS OF THE CONTRACT (NOT INCLUDED)
00 73 46 WAGE RATES (NOT INCLUDED)
00 80 00 SPECIAL CONTRACT REQUIREMENTS (NOT INCLUDED)
*DIVISION 00 SPECIFICATIONS TO BE PROVIDED BY LOS ANGELES DISTRICT
CONTRACTING DIVISION
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 GENERAL REQUIREMENTS
01 00 01 ENVIRONMENTAL HAZARDS
01 01 50 SEQUENCE OF WORK
01 02 00 SOLE SOURCE JUSTIFICATION
01 04 00 MECHANICAL ROOM LAYOUT AND COORDINATION
01 08 00 PERMITS
01 10 10 DESIGN REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRICTIONS
01 20 00 INTERFACE WITH OTHER WORK
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 31 00 PROJECT MEETINGS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 LEED DOCUMENTATION
LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS—
PROJECT CHECKLIST
01 34 10 COLOR/FINISH SAMPLE BOARDS
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 02 USACE QUALITY CONTROL SYSTEM (QCS)
01 45 35 SPECIAL INSPECTIONS, TESTS, AND OBSERVATIONS FOR
STRUCTURAL SYSTEMS
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 51 00 UTILITIES
01 53 00 TEMPORARY FENCING
01 54 00 SECURITY
01 57 00 TRAFFIC CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 PROJECT IDENTIFICATION
PROJECT TABLE OF CONTENTS Page 2
DIVISION 01 - GENERAL REQUIREMENTS (CONTINUED)
01 58 50 STAGING AREAS
01 59 00 OFFICE FACILITY
01 62 35 RECYCLED / RECOVERED MATERIALS
01 72 00 AS-BUILT DRAWINGS
01 72 80 TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY
01 73 00 OPERATION AND MAINTENANCE INSTRUCTIONS
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 OPERATIONS AND MAINTENANCE FACILITY DATA REQUIREMENTS
01 82 00 FUNDAMENTAL COMMISSIONING REQUIREMENTS
01 91 00.00 15 TOTAL BUILDING COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 10 00 ALKALI-SILICA REACTIVITY REDUCTION FOR NON-PAVEMENT
CONCRETE
03 11 13 STRUCTURAL CONCRETE FORMWORK
03 15 13 EXPANSION JOINTS, CONTRACTION JOINTS, AND WATERSTOPS
03 20 01 CONCRETE REINFORCEMENT
03 31 00 CAST-IN-PLACE STRUCTURAL CONCRETE
03 40 00 PRECAST CONCRETE FOR BELOW GRADE SITEWORK
03 45 01 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 MASONRY
DIVISION 05 - METALS
05 05 23 WELDING, STRUCTURAL
05 12 00 STRUCTURAL STEEL
05 21 02 STEEL JOISTS
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
PROJECT TABLE OF CONTENTS Page 3
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 11 13 BITUMINOUS DAMPPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 42 13 METAL WALL PANELS
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 14 00 WOOD DOORS
08 33 13 COILING COUNTER DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 60 45 TRANSLUCENT PANELS
08 71 00 DOOR HARDWARE
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC AND PORCELAIN TILE
09 51 00 ACOUSTICAL CEILINGS
09 62 38 STATIC-CONTROL FLOORING
09 65 00 RESILIENT FLOORING
09 68 00 CARPETING
09 69 13 RIGID GRID ACCESS FLOORING
09 90 00 PAINTS AND COATINGS
PROJECT TABLE OF CONTENTS Page 4
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 22 39 FOLDING PANEL PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 11 - EQUIPMENT
11 13 19.13 LOADING DOCK LEVELERS
DIVISION 12 - FURNISHINGS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
DIVISION 13 - SPECIAL CONSTRUCTION
13 48 00 SEISMIC PROTECTION FOR MISCELLANEOUS EQUIPMENT
13 48 00.00 10 SEISMIC PROTECTION FOR MECHANICAL EQUIPMENT
DIVISION 14 - CONVEYING EQUIPMENT
14 21 23 ELECTRIC TRACTION PASSENGER ELEVATORS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 22 00.00 40 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
PROJECT TABLE OF CONTENTS Page 5
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 01 30.41 HVAC SYSTEM CLEANING
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC
23 23 00 REFRIGERANT PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 31 13.00 40 METAL DUCTS
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS
23 76 00.00 10 EVAPORATIVE COOLING SYSTEMS
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 51 00 ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 08 00 APPARATUS INSPECTION AND TESTING
26 12 19.10 THREE-PHASE PAD-MOUNTED TRANSFORMERS
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 32 15.00 10 DIESEL-GENERATOR SET STATIONARY 100-2500 KW, WITH
AUXILIARIES
26 32 33.00 10 UNINTERRUPTIBLE POWER SUPPLY (UPS) SYSTEM ABOVE 15 KVA
CAPACITY
26 36 00.00 10 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 28.36 40 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 13 23.00 40 COMMUNICATIONS OPTICAL BACKBONE CABLING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 08 10 ELECTRONIC SECURITY SYSTEM ACCEPTANCE TESTING
28 10 05 ELECTRONIC SECURITY SYSTEMS (ESS)
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
PROJECT TABLE OF CONTENTS Page 6
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 00 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 19 FIELD MOLDED SEALANTS FOR SEALING JOINTS IN RIGID PAVEMENTS
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 16 SUBBASE COURSE
32 11 23 AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SITE
FACILITIES
32 16 13 CONCRETE SIDEWALKS AND CURBS AND GUTTERS
32 17 23 PAVEMENT MARKINGS
32 93 00 EXTERIOR PLANTS
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- END OF PROJECT TABLE OF CONTENTS --
Project: Luke Air Force Base 56th Civil Engineer Squadron, AZ
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
January 3, 2017
PART 1 - GENERAL
1.0 ABBREVIATIONS AND SYMBOLS
1.1 Specification Nomenclature - Acronyms used in this specification are as follows:
EMCS Energy Management Control System DDC Direct Digital Control GUI Graphical User Interface HTTP Hyper Text Transfer Protocol LAN Local Area Network LCU Local Control Unit NCU Network Control Unit OBIX Open Building Information Exchange ODBC Open Data Base Connectivity protocol OOT Object Oriented Technology OPC Object linking and embedding for Process Control OWS Operator Workstation PDA Personnel Data Assistant PICS Protocol Implementation Conformance Statement PWS Portable (Operator) Workstation SNVT Standard Network Variables Types SQL Standard Query Language TCP/IP Transmission Control Protocol / Internet Protocol TCU Terminal Control Unit UPS Uninterruptable Power Supply WAN Wide Area Network WAP Wireless Application Protocol WBI Web Browser Interface XML Extensible Markup Language XIF External Interface Files
2.0 WORK INCLUDED
2.1 Provide an Energy Management Control System to control and monitor the building’s mechanical and electrical systems. The system installed shall seamlessly connect devices other than HVAC as needed throughout the building regardless of subsystem type. LONWORKS components not supplied by the primary manufacturer shall be integrated to share common software for network communications, time scheduling, alarm handling, and history logging.
2.2 Coordinate interface requirements for integration into the EMCS of following building-level equipment and systems:
2.2.1 Variable Frequency Drives
2.2.2 Factory HVAC equipment ie., chillers, computer room air conditioners, etc.
2.3 Provide new controllers of the latest revisions with input and output points as specified herein.
2.4 Provide control valves, control dampers (gravity, fire and smoke control dampers by others), flow switches, thermal wells for pressure and temperature control, and air flow stations as necessary.
2.5 Provide submittal data sheets, control drawings schematics (in Visio or AutoCAD and also PDF), data entry, pneumatic (as required) and electrical installation, programming, startup, test and validation acceptance documentation, as-built, maintenance manuals and system warranties.
2.6 All labor, material, equipment and services not specifically referred to in this specification or on associated drawings that are required to fulfill the functional intent of this specification shall be provided at no additional cost to the Owner.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
2.7 The work covered by this specification and related sections consists of providing shop drawings, equipment, labor, materials, engineering, technical supervision, and transportation as required to furnish and install a fully operational EMCS to monitor and control the facilities listed herein, and as required to provide the operation specified in strict accordance with these documents, and subject to the terms and conditions of the contract. The work in general consists of but is not limited to, the following:
2.7.1 The preparation of submittals and provision of all related services.
2.7.2 Operator workstations located as listed in the specifications.
2.7.3 Furnish and install all controllers to achieve system operation, any control devices, conduit and wiring, in the facility as required to provide the operation specified.
2.7.4 Furnish and load all software required to implement a complete and operational EMCS.
2.7.5 Furnish complete operating and maintenance manuals and field training of operators, programmers, and maintenance personnel.
2.7.6 Perform acceptance tests and commissioning as indicated.
2.7.7 Provide full documentation for all application software and equipment.
2.7.8 As needed, provide funding for network data port thru LAFB 56 CS Base I
2.7.8 Miscellaneous work as indicated in these specifications.
3.0 WORK BY OTHERS
3.1 Setting in place of valves and dampers, access doors, flow meters, water pressure and differential taps, flow switches, thermal wells, fire and smoke control dampers, and air flow stations shall be by others.
3.2 Smoke detectors shall be provided under Division 28. Connection of auxiliary terminals of smoke detectors shall be wired to the building automation system for monitoring purposes by this section.
3.3 High and low temperature thermostats shall be provided by this section.
3.4 The installation of motor starters that are not factory installed, thermal overload switches, and power wiring to motors, starters, thermal overload switches, and contactors, is specified in Division 26. This Section includes the furnishing and installation of controls and wiring for automatic controls, electric damper and valve operators, terminal control units, interlocks, starting circuits, and wiring to power consuming control devices.
3.4.1 Duct smoke detectors shall be installed by Division 23, provided and wired by Division 28.
4.0 APPROVED MANUFACTURERS
4.1 Provide a building automation system supplied by a company regularly engaged in the manufacturing and distribution of Energy Management Control Systems. The EMCS Manufacturer shall meet the following qualifications as a minimum:
4.1.1 The manufacturer of the hardware and software components must be primarily engaged in the manufacture of Energy Management Control Systems as specified herein, and must have been so for a minimum of five (5) years.
4.1.2 The manufacturer of the hardware and software components as well as its subsidiaries must be a member in good standing of the LONMARK Association.
4.1.3 At least 75% of the manufacture product line shall be produced under their own direction, including R&D and assembly. Rebranding of another manufacture product shall not qualify.
4.1.4 The manufacturer of the hardware and software components shall have a technical support group accessible via a toll free number that is staffed with qualified personnel, capable of providing instruction and technical support service for networked control systems.
4.2 Approved manufacturers:
4.2.1 Distech Controls purchased from Factory Authorized Dealer within the State of Arizona.
4.3 Unsolicited bids from Manufacturers or Contractors not listed herein will not be considered.
4.4 Alternate bids will not be considered.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
5.0 QUALITY ASSURANCE
5.1 All new building automation system products on this project shall be provided by a firm that is a registered ISO 9001:2005 manufacturer at time of bid.
5.1.1 The manufacturer of the Energy Management Control System digital controllers shall provide documentation supporting compliance with ISO 9001:2005 (Model for Quality Assurance in Design/Development, Production, Installation and Servicing).
5.1.2 Provide a copy of the registration certificate that contains the ISO 9001:2005 Certification bearing the name of the registered auditor.
5.2 The Energy Management Control System shall be furnished, engineered, installed, tested and calibrated by factory certified technicians qualified for this work. Certification must be current with minimum of 1 year experience from the construction start date. The contractor shall have in place a support facility located within 50 miles of the project site with technical staff, spare parts inventory and all necessary test and diagnostic equipment. The contractor shall be a Factory Authorized System Integrator in good standing with the Manufacturer. Factory trained technicians shall provide instruction, routine maintenance, and emergency service within 24 hours upon receipt of request.
5.2.1 Upon request, installer shall present records of successful completion of factory training courses including course outlines.
5.2.2 Upon request the installer shall provide a letter from the manufacturer that they are a Factory Authorized System Integrator in good standing.
5.2.3 If awarded contractor is not a Factory Authorized Dealer per 4.2.1 above, contractor must provide a letter of partnership with one of the three Distech recognized dealerships within the State of Arizona.
-- Synergetic Systems -- Therm-air -- Integrated Controls Systems -- Harris Mechanical
5.3 Provide satisfactory operation without damage at 110% above and 85% below rated voltage and at 3 hertz variation in line frequency. Provide static, transient, and short circuit protection on all inputs and outputs. Communication lines shall be protected against incorrect wiring, static transients and induced magnetic interference. Bus connected devices shall be AC coupled, or equivalent so that any single device failure will not disrupt or halt bus communication.
5.4 All controllers provided as part of this system and used for indoor applications shall operate under ambient environmental conditions of 32 degF (0 degC) to 122 degF (50 degC) dry bulb and 5% to 90% relative humidity, non-condensing as a minimum.
5.5 All controllers provided as part of this system and used for outdoor applications shall operate under ambient environmental conditions of -40 degF (-40 degC) to 158 degF (70 degC) dry bulb and 5% to 90% relative humidity, non-condensing as a minimum.
6.0 CODES AND STANDARD
6.1 The complete EMCS installation shall be in strict compliance and meet with the requirements of all governing bodies, authorities having jurisdiction, applicable national or local standards and codes, except where the Contract Documents detail a more stringent requirement.
6.2 Apply for, obtain and pay for all permits, licenses, inspections, examinations and fees required. Also submit, if required, information and other data from the Contracting Officer. Should the authorities require the information on specific forms, fill in these forms by transcribing the information provided by the Contracting Officer.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
6.3 All electronic equipment shall conform to the following minimum requirements:
6.3.1 UL 916 Underwriters Laboratories Standard for Energy Management Equipment or UL61010
Underwriters Laboratories Standard for Process Control Equipment, Electrical (Canada and United States) and be labeled for the specific use, application and environment to which they are applied.
6.3.1.1 Where there is no alternative to supply equipment that is not UL or ULC certified, submit such equipment to Inspection Authorities having jurisdiction, pay for special inspection and obtain approval before delivery of equipment to site.
6.3.2 International Building Code (IBC), including local amendments.
6.3.2.1 Section 719 Ducts and Air Transfer Openings
6.3.2.2 Chapter 28 Mechanical
6.3.3 International Mechanical Code (IMC)
6.3.4 National Electrical Code (NEC).
6.3.5 FCC Part 15, Subpart B, Class B.
6.3.6 2004/108/EC Electromagnetic compatibility directive (EMC).
6.3.7 2002/96/EC Restriction of hazardous substances in electrical and electronic equipment directive (ROHS).
6.3.8 2002/96/EC Waste electrical and electronic equipment directive (WEEE).
6.4 Arrange for inspection of all work by the authorities having jurisdiction over the Work. On completion of the Work, present to the Contracting Officer the final unconditional certificate of approval of the inspecting authorities.
6.5 Comply with the requirements of the latest edition of the applicable UL standards, the requirements of the Authorities, National, and Local Codes, and all other authorities having jurisdiction. These Codes and Regulations constitute an integral part of these Specifications.
6.6 In case of conflict, applicable Codes take precedence over the Contract Documents. In no instance reduce the standard or Scope of Work or intent established by the Drawings and Specifications by applying any of the Codes referred to herein.
6.7 Before starting any work, submit the required number of copies of documentation to the authorities for their approval and comments. Comply with any changes requested as part of the Contract, but notify the Contracting Officer immediately of such changes, for proper processing of these requirements. Prepare and furnish any additional drawings, details or information as may be required.
7.0 STANDARDS COMPLIANCE
7.1 Where materials or equipment are specified to conform to requirements of the standards of organizations, such as the Underwriter’s Laboratory (UL) that use a label or listing as method of indicating compliance, proof of such conformance shall be submitted and approved, indexed and cross-referenced with the specification. The label or listing of the specified organization will be acceptable evidence. In lieu of the label or listing, the contractor shall submit a certificate from a testing organization adequately equipped and competent to perform such services, and approved by the Contracting Officer, stating that the item has been tested in accordance with the specified organization's test methods and that the item conforms to the specified organization's standard or code. For materials whose compliance with organizational standards or specifications is not regulated by an organization using its own listing or label as proof of compliance, a certificate from the manufacturer shall be furnished to the Contracting Officer stating that the material complies with the applicable referenced standard or specification.
8.0 SYSTEM PERFORMANCE
8.1 The Energy Management Control System shall conform to the following minimum performance standards:
8.1.1 A Graphic screen shall be capable of displaying a minimum of 20 dynamic points with current data being available within 10 seconds.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
8.1.2 Binary objects shall react to a command within 10 seconds.
8.1.3 Analog object shall react to a command within 10 seconds.
8.1.4 Alarm Response Time. An object that goes into alarm shall be annunciated at the workstation within 15 seconds.
8.1.5 Custom or standard applications shall be capable of a Program Execution Frequency as often as once every 5 seconds. Controllers shall be able to completely execute direct digital control PID control loops at a frequency of once per second or faster.
8.1.6 Each workstation on the network shall be able to receive an alarm within 5 seconds of other workstations.
8.1.7 System shall be capable to report values with minimum end-to-end accuracy listed in Table 1 System Accuracy.
8.1.8 Control loops shall maintain stability and accuracy as measured by the variable at setpoint within tolerances listed in Table 2 Control Stability and Accuracy.
Table 1 Reporting Accuracy
Measured Variable Reported Accuracy Space Temperature ±0.5ºC (±1ºF) Ducted Air ±0.5ºC (±1ºF) Outside Air ±1.0ºC (±2ºF) Dew Point ±1.5ºC (±3ºF) Water Temperature ±0.5ºC (±1ºF) Delta-T ±0.15ºC (±0.25ºF) Relative Humidity ±5% RH Water Flow ±2% of full scale Airflow (terminal) ±10% of full scale (see Note 1) Airflow (measuring stations) ±5% of full scale Airflow (pressurized spaces) ±3% of full scale Air Pressure (ducts) ±25 Pa (±0.1 in. w.g.)
Air Pressure (space) ±3 Pa (±0.01 in. w.g.)
Water Pressure ±2% of full scale (see Note 2) Electrical (A, V, W, Power Factor) ±1% of reading (see Note 3) Carbon Monoxide (CO) ±5% of reading Carbon Dioxide (CO2) ±50 ppm
Note 1: Accuracy applies to 10% - 100% of scale Note 2: For both absolute and differential pressure Note 3: Not including utility-supplied meters
Table 2 Control Stability and Accuracy
Controlled Variable Control Accuracy Range of Medium
Air Pressure
±50 Pa (±0.2 in. w.g.)
±3 Pa (±0.01 in. w.g.)
0-1.5 kPa (0-6 in. w.g.)
-25 to 25 Pa (-0.1 to 0.1 in.
w.g.)
Airflow ±10% of full scale Space Temperature ±1.0ºC (±2.0ºF) Duct Temperature ±1.5ºC (±3ºF) Humidity ±5% RH
Fluid Pressure
±10 kPa (±1.5 psi) ±250 Pa (±1.0 in.
w.g.)
MPa (1-150 psi) 0-12.5 kPa (0-50 in. w.g.)
differential
9.0 COORDINATION
9.1 All work shall be performed at times acceptable to the Contracting Officer and/or the Construction Manager.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
Provide work schedule at the start of the job for the approval of the Contracting Officer/Construction Manager. Schedule shall show when all staff and sub-contractors shall be on-site.
9.2 Organize all sub-contractors and ensure that they maintain the schedule.
9.3 Full cooperation shall be shown with other sub-contractors to facilitate installations and to avoid delays in carrying out the work.
9.4 Notify Contracting Officer and/or the Construction Manager of any changes to the schedule. Send any schedule changes and weekly progress reports via e-mail to Contracting Officer/Construction Manager.
9.5 Where, in the judgment of the Contracting Officer and/or the Construction Manager, the work could disrupt the normal operations in or around the building, contractor shall schedule work to eliminate or minimize interference.
9.6 When connecting to the existing systems advise the Contracting Officer and/or the Construction Manager and obtain permission to do so. Perform work at a time acceptable to the Contracting Officer and/or the Construction Manager and Owner.
9.7 Contact the Construction Manager to coordinate with the 56 CES/CEOIH (Foreman, HVAC Shop), to schedule with the EMCS Operators when the work will affect existing EMCS operations or communications with the installed EMCS equipment.
10.0 SUPERVISION OF PERSONNEL
10.1 Maintain qualified personnel and supporting staff at this project with proven experience in erecting, supervising, testing, and adjusting projects of comparable nature and complexity.
10.2 Supervisory personnel and their qualifications are subject to the approval of the Contracting Officer.
10.3 All personnel working on-site shall sign in as required by the Contracting Officer and shall wear company identification.
10.4 When requested and for whatever reason, remove personnel and/or support staff from project. Take immediate action.
11.0 SYSTEM DESIGN AND RESPONSIBILITY
11.1 The drawings do not show conduit size or wire type to link the various elements of the system. The EMCS contractor is responsible for designing these links in view of the present and future capabilities.
11.2 The Contractor is responsible for supplying sufficient Controllers of all types to meet the intent of the specification. The quantity and point content of the Controllers must be approved by the Contracting Officer prior to installation.
12.0 PRODUCTS
12.1 Materials and equipment shall be essentially the catalogued products of manufacturers regularly engaged in production of such materials or equipment and shall be manufacturer's latest standard design that complies with the specification requirements. Where two units of the same class of equipment are required, these units shall be products of a single manufacturer, and the component parts of the system shall be the products of a single manufacturer. Each major component of equipment shall have the manufacturer's name and address and the model and serial number on a nameplate securely attached in a conspicuous place.
13.0 ELECTRICAL WORK, WIRING AND SAFETY
13.1 Electrical work shall be in accordance ANSI/NFPA 70 and the local Electrical Code. Electrical wiring, SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
terminal blocks and other high voltage contacts shall be fully enclosed or properly guarded and marked to prevent accidental injury to personnel. All wiring shall conform to the most stringent requirements of the local electrical authority. Refer to Division 26 for electrical requirements.
13.2 All wiring associated with and required by the EMCS shall be the responsibility of this contractor. The term "wiring" shall be construed to include furnishing of wire, conduit, and miscellaneous material and labor as required to install a total working system. If departures from the contract documents are deemed necessary by the contractor, details of such departures, including changes in related portions of the project and the reasons therefore, shall be submitted with the drawings to the Contracting Officer for approval.
14.0 MANUFACTURERS RECOMMENDATIONS
14.1 Where installation procedures, or any part thereof, are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the Contracting Officer with shop drawing submission.
Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations shall be cause for rejection of the material.
15.0 NAMEPLATES
15.1 Nameplates shall be provided for all control items listed or shown in the submittal and approved control diagrams. Each inscription shall identify its function, such as "mixed air controller", "cold deck sensor" in official languages etc. and when applicable, its position. Size of nameplates shall be 1 inch by 3 inches minimum. Lettering shall be minimum ¼ inch high normal black lettering. Submit duplicate samples of identification tags and lists of wording proposed for approval.
16.0 PRELIMINARY DESIGN REVIEW
16.1 The EMCS contractor shall submit a preliminary design document for review. This document shall contain the following information:
16.1.1 Provide a description of the proposed system along with a system architecture diagram with the intention of showing the contractors solution to meet this specification.
16.1.2 Provide product data sheets and a technical description of all direct digital controller hardware required to meet specifications listed herein.
16.1.3 Open Protocols - For all direct digital controller hardware proof of conformance to LonMark
Certification and interoperability guidelines including the provision of all controller XIF files.
Provide complete description and documentation of any proprietary services and/or objects where used in the system. Provide a description and samples of Operator Workstation graphics and reports.
16.1.4 Provide a URL address for the Contracting Officer to view the proposed web based EMCS through a standard web browser.
16.1.5 Provide an overview of the EMCS contractor’s local/branch organization, local staff, recent related project experience with references, and local service capabilities.
16.1.6 Provide information on the EMCS contractor’s project team including project organization, project manager, project engineer, programmers, project team resumes, and location of staff.
16.1.7 Project Schedule of work indicating:
16.1.7.1 Intended sequence of work items
16.1.7.2 Start date of each work item
16.1.7.3 Duration of each work item
16.1.7.4 Planned delivery dates for ordered material and equipment and expected lead times
16.1.7.5 Milestones indicating possible restraints on work by other trades or situations.
17.0 SUBMITTALS
17.1 Du r ing the des ign phase and m in imum 90 days before the start of construction, submit 8 hard copies and 1 soft copy of manufacturer’s information and shop drawings. If the project is awarded as
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
a Design Bid Build type contract, the controls contractor must submit their full EMCS system design prior to “Final Design” phase to ensure Luke EMCS personnel have sufficient review period of the submittal documents. Drawings to be in AutoCAD or VISIO and PDF on a minimum of 11” X 17” paper and Sequence of Operations and Points List (Input/output Summary) shall be in Word and Excel format (latest versions) structured using menu format for easy loading and retrieval on the OWS.
17.2 Provide in completely coordinated and indexed package to assure full compliance with the contract requirements. Piecemeal submittal of data is not acceptable and such submittals will be returned without review. Information shall be submitted for all material and equipment the contractor proposes to furnish under terms of this contract work. Arrange the submittals in the same sequence as these specifications and reference at the upper right-hand corner the particular specification provision for which each submittal is intended. Submittals for each manufactured item shall be manufacturer's descriptive literature (equipment specification), equipment drawings, diagrams, performance and characteristic curves, and catalog cuts, and shall include the manufacturer's name, trade name, catalog model or number, nameplate data, size layout dimension, capacity, specification reference, applicable specification references, and all other information necessary to establish contract compliance.
17.3 Control System Shop Drawings
17.3.1 Schematic diagram of each controlled system. Label control points with point names.
17.3.2 Detailed system architecture showing all points associated with each controller, controller locations, and describing the spare point’s capacity at each controller and EMCS LAN.
17.3.3 Bill of Material for each controlled system. List each control system element in a table. Show element name, type of device, manufacturer, model number, and product data sheet number.
17.3.4 Specification sheets for each item including manufacturers descriptive literature, drawings, diagrams, performance and characteristic curves, manufacturer and model number, size, layout, dimensions, capacity, etc.
17.3.5 Control schematics with narrative description and control descriptive logic fully showing and describing operation and/or manual procedures available to operating personnel to achieve proper operation of the building, including under complete failure of the EMCS.
17.3.6 Shop drawings for each input/output point showing all information associated with each particular point including sensing element type and location; details of associated field wiring schematics and schedules; point address; software and programming details associated with each point;
and manufacturer's recommended installation instructions and procedures for each type of sensor and/or transmitter.
17.4 Direct Digital Control System Hardware
17.4.1 LonMark Certification and XIF file for each submitted type of LonWorks controller (This includes Mechanical equipment with Factory Mounted Controls)
17.4.2 Bill of materials indicating quantity, manufacturer, model number, and relevant technical data of equipment to be used.
17.4.3 Manufacturer's description and technical data including product specifications and installation and maintenance instructions for items listed herein:
17.4.3.1 Direct digital controllers (LonWorks Only)
17.4.3.2 Sensors and Transmitters
17.4.3.3 Transducers
17.4.3.4 Actuators
17.4.3.5 Automatic Control Valves
17.4.3.6 Automatic Control Dampers
17.4.3.7 Air Flow Stations
17.4.3.8 Control panels
17.4.3.9 Operator interface equipment
17.4.3.10 Ancillary equipment such as relays, power supplies and wiring
17.4.4 Riser diagrams showing control network layout, communication protocol, and wire types.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
17.4.5 Network diagram of control, communication, and power wiring for EMCS Server and OWS installation.
18.0 AS-BUILT DOCUMENTATION (OPERATING and MAINTENANCE MANUALS)
18.1 As-built documentation shall consist of 4 hard copies and one soft copy for all information described below
18.2 The final documentation package shall include:
18.2.1 Hard and soft copies of all control drawings.
18.2.2 Flow charts.
18.2.3 Manufacturer’s technical data sheets for all hardware and software.
18.2.4 Factory operating and maintenance manuals with any customization required.
18.2.5 Soft copies of programming and front-end software and each controller’s database. Hard copy output of programming is not necessary.
18.2.6 Provide clear, concise, typewritten and soft copy descriptions of all control sequences in the working language.
18.2.7 Soft copy text files shall be in Microsoft Word format.
18.2.8 Copy of all graphics files
18.3 Each instruction and reference manual shall be bound in hardback, 3 ring, binders or an approved equivalent shall be provided to the Contracting Officer. Binders to be no more than 2/3 full. Each binder to contain index to full volume. One complete set of manuals shall be furnished prior to the time that the system or equipment tests are performed, and the remaining manuals shall be furnished at acceptance.
The identification of each manual's contents shall be inscribed on the cover and spine. The manuals shall include the names, addresses and telephone numbers of each subcontractor installing equipment systems and of the local representatives for each item of equipment and each system. The manuals shall have a table of contents and be assembled to conform to the table of contents with the tab sheets placed before instructions covering the subject. Additionally, each manual shall contain a comprehensive index of all manuals submitted in accordance with this paragraph. Manuals and specifications shall be furnished which provide full and complete coverage of the following subjects:
18.3.1 Operational Requirements: This document shall describe in concise terms, all the functional and operational requirements for the system and its functions that have been implemented. It shall be written using common terminology for building operation staff and shall not presume knowledge of digital computers, electronics or in-depth control theory.
18.3.2 System Operation: Complete step by step procedures for operation of the system, including required actions at each operator station; operation of computer peripherals; input and output formats; and emergency, alarm and failure recovery. Step-by-step instructions for system startup, back-up equipment operation, and execution of all system functions and operating modes shall be provided.
18.3.3 Maintenance: Documentation of all maintenance procedures for all system components including inspection, periodic preventive maintenance, fault diagnosis, and repair or replacement of defective module. This shall include calibration, maintenance, and repair or replacement of all system hardware.
18.3.4 Test Procedures and Reports: The test implementation shall be recorded with a description of the test exercise script of events and documented as test procedures. A provision for the measurement or observation of results, based on the previously published test specification, forms the test reports. The procedures record and the results of these exercises shall be conveniently bound and documented together.
18.3.5 Configuration Control: Documentation of the basic system design and configuration with provisions and procedures for planning, implementing, and recording any hardware or software modifications required during the installation, test, and operating lifetime of the system. This shall include all information required to ensure necessary coordination of hardware and software changes, data link or message format/content changes, and sensor or control changes in the event system modification are required, and to fully document such new system configurations.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
PART 2 – PRODUCTS (GENERAL)
1.0 SYSTEM DESCRIPTION / SCOPE OF WORK
1.1 Energy Management Control System (EMCS) This contractor shall be responsible for the hardware and software for the enterprise framework and system integration required for the complete Energy Management Control System. The EMCS shall be comprised of Network Control Units (NCU) connected to the Building Automation System local area network (EMCS LAN). Access to the EMCS, either through a Workstation on the EMCS LAN or within the building. Each NCU shall communicate to LonMark Certified LonWorks controllers provided under the Programmable Controllers section. The system includes Network Control Unit(s) (NCU), software and programming of the NCU, development of all graphical screens, setup of schedules, trends, logs and alarms, network management and connection of the NCU to the local area network.
2.0 SYSTEM DESIGN
2.1 The system shall consist of a network of Network Control Units (NCUs), interoperable Local Control
Units (LCUs) and Terminal Control Units (TCUs) (VAV Box Controllers, Fan Coil Unit Controllers, etc.).
All controllers for terminal units, air handling units (AHU) and controllers shall communicate and share data, utilizing LonWorks communications protocols only.
2.2 The proposed system must maintain strict adherence to Device Profile and/or Functional Profiles identified in LonMark Interoperability Guideline standards to assure interoperability between all system components. LonWorks system must be certified and listed on LonMark web site. Systems based on vendor specific proprietary hardware or software will not be considered for this project.
2.3 Systems utilizing gateways will not be considered for this project. A gateway is considered to be a device or controller where the sole function is mapping of data points from one protocol to another. A gateway device cannot perform higher-level energy management functions such as Outdoor Air Optimization, Electrical Demand Limiting and the like.
2.4 A hierarchical topology is required to assure reasonable system response times and to manage the flow and sharing of data without unduly burdening the customer’s internal Intranet network. Systems employing a flat single tiered architecture shall not be acceptable. Maximum acceptable response time from any alarm occurrence (at the point of origin) to the point of annunciation shall not exceed 10 seconds for network connected user interfaces.
2.5 User Access - The supplied system must incorporate the ability to access all data using standard Web browsers without requiring proprietary operator interface and configuration programs.
2.6 An Open Database Connectivity (ODBC) or Structured Query Language (SQL) compliant server database is required for all system database parameter storage. This data shall reside on the installed server for all database access. Systems requiring proprietary database and user interface programs shall not be acceptable.
2.7 Software Tools - All software tools needed for full functional use, including programming of controllers, network management and expansion, and graphical user interface use and development, of the EMCS described within these specifications shall be provided to the owner or his/her designated agent. Any licensing required by the manufacturer now and to the completion of the warranty period, including changes to the licensee of the software tools and the addition of hardware corresponding to the licenses, to allow for a complete and operational system for both normal day to day operation and servicing shall be provided. Any such changes to the designated license holders shall be made by the manufacturer upon written request by the owner or his/her agent. Any cost associated with the license changes shall be identified within the EMCS submittals.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
2.8 SOFTWARE LICENSE AGREEMENT - The Owner shall sign a copy of the manufacturer's standard software and firmware licensing agreement as a condition of this contract. Such license shall grant use of all programs and application software to Owner as defined by the manufacturer's license agreement, but shall protect manufacturer's rights to disclosure of trade secrets contained within such software. The Owner shall be the named license holder of all software associated with any and all incremental work on the project(s). In addition, the Owner shall receive ownership of all job specific configuration documentation, data files, and application-level software developed for the project. This shall include all custom, job specific software code, databases and documentation for all configuration and programming that is generated for a given project and/or configured for use with the NCU, Server, OWS and any related LAN/WAN/Intranet connected routers and devices. Any and all required User IDs and passwords for access to any component or software program shall be provided to the owner.
Network Control Units shall be Tridium based, Minimum version of 4.2:
a. brandid can equal anything but; brandid = “Distech” is preferred.
b. accept.station.in = “*”
c. accept.station.out =”*”
d. accept.wb.in = “*”
e. accept.wb.out = “*”
3.0 DYNAMIC DATA ACCESS
3.1 All operator devices shall have the ability to access all point status and application report data, or execute control functions for any and all other devices via the local area network. Access to data shall be based upon logical identification of building equipment.
4.0 NETWORKS
4.1 Design for the Network LAN (NCU LAN) shall include the following provisions
4.1.1 The Server and OWS shall communication to the NCUs utilizing standard Ethernet to IEEE 802.3 Standards. Products utilizing Manufacturer specific proprietary protocols, gateways, or protocol converters are not acceptable for this project.
4.1.2 The NCU LAN shall be a 100 Megabits/sec Ethernet network supporting Java, XML, HTTP, SOAP, OBIX, Fox, SNMP and SMTP for maximum flexibility for integration of building data with enterprise information systems and providing support for multiple Network Control Units (NCUs), user workstations and where specified, a local server. Local area network must be installed in accordance with Current AETC First 400 Feet. Minimum physical and media access requirements:
4.1.2.1 Ethernet; IEEE standard 802.3
4.1.2.2 Cable; 10G Base-T, UTP-8 wire, CAT 6
4.1.2.3 Minimum throughput; 10 Gbps
4.2 Design for the Building Automation System LAN (LCU and TCU LAN) shall include only LonWorks architecture provisions:
4.2.1 The EMCS must be based on Open Systems. The EMCS can employ LonTalk communications utilizing the Echelon Neuron chip and transceiver, which conforms to ISO/IEC 14908-1: Open Data Communication in Building Automation, Controls and Building Management – Control Network Protocol. The content of messages shall be the manufacturers standard. The Neuron chip and a transformer-isolated transceiver shall provide for 78.8 kbps communications over Echelon approved LonWorks cabling.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
PART 2A – OPERATOR WORKSTATION (OWS) HARDWARE
5.0 WORKSTATION HARDWARE REQUIREMENTS:
5.1 A workstation exists on the Luke Air Force Base local area network. The Workstation is a server class machine running Windows Server 2003 or newer and must be verified at the time of award.
It contains the Graphical User Interface Software, V3.7.106 (as of Aug 31, 2015) and provides the network management functionality for the EMCS. Contractor must coordinate with Luke EMCS personnel regarding current version upon award of the contract.
5.2 If the current workstation hardware is not compatible with Tridium Niagara N4, the current workstation must be upgraded or a new workstation provided. N4 Supervisor platform requirements are as follows:
5.2.1 Processor to be Intel Xeon E5-2640 x64 or better, compatible with dual and quad core processors
5.2.2 Operating System to be 64-bit Windows 8.1 Enterprise, Windows Server 2012 Standard, 2012 R2 Standard, or better
5.2.3 4 GB of RAM minimum
5.2.4 4 GB hard drive minimum
5.2.5 Video card and monitor capable of displaying 1024x768 pixel resolution or greater for display
5.2.6 Ethernet adapter (10/100MB with RJ-45 connector) included
6.0 GRAPHICAL USER INTERFACE WORKSTATION HARDWARE (LAPTOP COMPUTER):
6.1 Provided by Luke Air Force Base
6.1.1 Hardware requirements equal to the N4 Supervisor platform requirements listed in Paragraph 5.2 above.
PART 2B: OPERATOR WORKSTATION (OWS) SOFTWARE
7.0 OPERATOR WORKSTATION SOFTWARE
7.1 Operating System: The Operator Workstation software exists at various locations including laptop PC’s used by operating personnel. If required, the software shall run on Microsoft Windows 8.1 Enterprise or later.
7.2 The software shall employ browser-like functionality for ease of navigation. It shall include a tree view
(similar to Windows Explorer) for quick viewing of, and access to, the hierarchical structure of the database.
In addition, menu-pull downs, and toolbars shall employ buttons, commands and navigation to permit the operator to perform tasks with a minimum knowledge of the HVAC Control System and basic computing skills. These shall include, but are not limited to, forward/backward buttons, home button, and a context sensitive locator line (similar to a URL line), that displays the location and the selected object identification.
7.3 Real-Time Displays. The OWS, shall at a minimum, support the following graphical features and functions:
7.3.1 Graphic screens shall be developed using Luke Air Force Base approved Graphic
Standards Only. All new graphics shall be native HTML5 requiring no software plug-ins for visualization. If job specific graphics are developed to satisfy the project requirements, the contractor shall provide an electronic update of the library graphic pages at project completion. Graphic screens shall be developed using GIF, PNG, JPG or ICO file format. Use of proprietary graphic file formats shall not be acceptable. In addition to, or in lieu of a graphic background, the GUI shall support the use of scanned pictures.
SECTION 255100 - 15972
ENERGY MANAGEMENT CONTROL SYSTEM (EMCS)
7.3.2 Graphic screens shall have the capability to contain objects for text, real-time values, animation, color spectrum objects, logs, graphs, HTML or XML document links, schedule objects, hyperlinks to other URLs, and links to other graphic screens.
7.3.3 Graphics shall support layering and each graphic object shall be configurable for assignment to one a layer. A minimum of six layers shall be supported.
7.4 Modifying common application objects, such as schedules, calendars, and set points shall be accomplished in a graphical manner. Schedule times will be adjusted using a graphical slider, without requiring any keyboard entry from the operator.