AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
1 8
0001 Jun 19, 2017
W912PL
U.S. Army Corps of Engineers Los Angeles District 915 Wilshire Boulevard, Suite 930 Los Angeles, California 90017-3401 Attn:Contracting Division CESPL-CT-W
SEE ITEM 6
W912PL-17-B-0002
Jun 13, 2017
Sediment Removal, San Luis Rey River Flood Control Project, City of Oceanside, San Diego County,California
Amendment issued to revise the site visit start time from 9:00 AM to 9:30 AM, June 22, 2017 and provide the site map for participants convenience.
INSTRUCTIONS
Instructions for items other than those that are self-explanatory, are as follows:
Item 1 (Contract ID Code) . Insert the contract type identification code that appears in the title block of the contract being modified.
Item 3 (Effective date) .
(1)
(2)
(3)
(4)
(5)
For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.
For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.
For a modification issued as an initial or confirming notice of termination for the convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.
For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.
For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.
(a)
(b)
(c)
(d)
(e)
(f)
Item 6 (Issued By) . Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.
Item 8 (Name and Address of Contractor) . For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.
Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated ). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.
Item 12 (Accounting and Appropriation Data) .
When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following entries.
(2) Accounting classification Net decrease $
Include subject matter or short title of solicitation/contract where feasible.
Item 16B . The contracting officer's signature is not required on solicitation amendments. The contracting offier's signature is normally affixed last on supplemental agreements.
(i)
NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation sheet".
Item 13 . Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)
Item 14 (Description of Amendment/Modification) .
Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:
Total contract price increased by $
Total contract price decreased by $
Total contract price unchanged.
State reason for modification.
When removing, reinstating, or adding funds, identify the contract items and accounting classifications.
When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --
A reference to the letter determination; and
A statement of the net amount determined to be due in settlement of the contract.
(g)
(h)
(i)
(ii)
(1)
(2)
(3)
(4)
(5)
(6)
(i)
(ii)
(iii)
STANDARD FORM 30 (REV. 10-83) BACK
(1) Accounting classification Net increase $
San Luis Rey River Flood Control Project W912PL-17-B-0002 Sediment Removal and Beach Fill Placement - Oceanside, California
19 June 2017 SECTION 00 21 13 Page 1 Amendment 0001
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I (FEB 1995)
52.0000-4010 INQUIRIES
DIRECTIONS FOR DELIVERY OF OFFERS
SPECIAL INSTRUCTIONS PERTAINING TO HAND-CARRIED OFFERS:
CONTRACTOR RESPONSIBILITY, PRE-AWARD SURVEY INFORMATION TO BE SUBMITTED WITH
BID
OFFEROR'S CHECKLIST
19 June 2017 SECTION 00 21 13 Page 2 Amendment 0001
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)—ALTERNATE I
(FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) A pre bid meeting is scheduled for
22 June 2017 at 0930 AM. Meeting location will be the corner of Benet Rd and North Airport Road (North of the river), Oceanside, California, see attachment map.
(c) People interested in attending the pre bid meeting shall contact with an e-mail The e-mail is to be received by Corps of Engineers personnel no later than 12:00 p.m. the day preceding the pre bid meeting.
The e-mail shall include a day-time telephone number. If there are any changes to the pre bid meeting date or location, people who have registered to attend the pre bid meeting shall be informed.
Following are the USACE e-mail addresses:
Email: Gregory.J.Lugar@usace.army.mil Phone: 213-452-3989 Email: Rafiqul.I.Talukder@usace.army.mil Phone: 213-452-3745
(End of provision)
52.0000-4010 INQUIRIES
Any prospective offeror desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders/offerors before submission of their bids/offers. Oral explanations or instructions given before award of a contract are not binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if lack of it would be prejudicial to other prospective bidders/offerors.
1. All inquiries relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet/
19 June 2017 SECTION 00 21 13 Page 3 Amendment 0001
A. To submit and review bid inquiry items, offerors will need to be a current registered user, self register into the ProjNet system.
To access the Bid Inquiry system, go to the ProjNet web page and fill in:
- Managing Agency – USACE
- Email address
- Key Access (this is the Bidder Inquiry Key – see below for key)
- Click on “Sign In”
- You will be prompted for the answer to your secret question on the next screen
If this is your first time accessing ProjNet, you will be directed to a screen titled, “User account not found.
Please create one using the form below.” Fill in the requested information (name, company, city, phone #, etc.).
B. From this page, you may view all bidder inquiries or add an inquiry. Please note: Offerors shall only submit one question per inquiry. All inquiries containing multiple questions may be rejected.
C. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W912PL-17-B-0002
The Bidder Inquiry Key is: N3FE6H-867X6N
2. The Bidder Inquiry System will be unavailable for new inquires up to 5 business days prior to bid/proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Offerors are requested to review the specifications in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
4. The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the ProjNet Call Center is 800-428-HELP.
5. Responses on the Bidder Inquiry System do not revise, change, amend or supersede the provisions of the solicitation. Changes to the solicitation must be by written amendment thereto. Any Bidder Inquiry System response that can be interpreted to be in conflict with the solicitation or amendment, shall be subordinate to the conflicting provision, term, and/or note, wherever it appears in the solicitation, until revised or altered by a written amendment to the solicitation.
Additionally, offerors may not anticipate a change to the solicitation until the change, revision, correction, or alteration of the solicitation is actually made, in writing and published as an amendment to the solicitation.
DIRECTIONS FOR DELIVERY OF OFFERS
Envelopes/Packages Sealed and Marked as follows: Envelopes/packages containing offers must be sealed;
marked showing the time and date specified for receipt; the solicitation number; and the name and address of the Offeror.
19 June 2017 SECTION 00 21 13 Page 4 Amendment 0001
Solicitation No.: W912PL-17-B-0002 Bid Opening Date: Refer to SF 1442, “Solicitation, Offer & Award” Block No.13A Name of the firm submitting the Offer
Addressed to:
U.S. Army Corps of Engineers, Los Angeles District ATTN: Contracting Division C/O: Carlos Antonio/Patricia Bonilla 915 Wilshire Blvd, Ste 930 Los Angeles, CA 90017
SPECIAL INSTRUCTIONS PERTAINING TO HAND‐CARRIED OFFERS:
Due to security precautions, offerors are no longer permitted to hand-carry their offers directly to Contacting Division. All deliveries of offers are now required to arrive on the 11th floor at 915 Wilshire Blvd, Los Angeles, California 90017 and contact the Contracting Division personnel listed below to meet you at the 11th floor elevator lobby. A wall telephone is provided in the elevator lobby on the 11th floor for official use only.
Offers may not be left unattended anywhere in the building, including the 11th floor.
For those offers to be submitted prior to the scheduled day of receipt please must notify the Contracting Division to arrange for receipt of their Offer by Contracting Division personnel. Normally the contact will be the Contract Specialist(s) as designated above, but any of the telephone extensions for the Contracting Division can be dialed (see USACE Los Angeles District telephone listing next to wall telephone). In the event the Contract Specialist(s) cannot be reached, please call the following Contracting Division telephone numbers in the following order, 213-452-3308, 3309, 3247, 3311 or 3252, in order to request assistance.
At approximately 5 minutes prior to the scheduled Offer time/date deadline, Contracting Division personnel will be on the 11th floor elevator lobby to collect remaining offers and call the official closing time.
| CONTRACTOR | RESPONSIBILITY, | PRE‐AWARD | SURVEY | INFORMATION | TO | BE |
| SUBMITTED | WITH | BID |
In order to determine a contractor's responsibility for purposes of contract award in accordance with FAR Part 9, a statement regarding previous experience in performing comparable work and information related to their business organization, financial resources, and/or plant to be used in performing the work is required. In accordance with FAR 9 Determination of responsibility of the offeror by the Contracting Officer, please provide the following information in order to perform a pre-award survey on your firm:
1. List of projects completed for the past three years, including dollar value of each correct.
2. List of projects in progress, percentage of work completed, including dollar value of each contract.
3. The name and qualifications of the employee designated to act as the Project Superintendent/Manager for this contract.
19 June 2017 SECTION 00 21 13 Page 5 Amendment 0001
4. Copy of latest financial statement.
5. General description of your firm
Please include this information with your bid.
OFFEROR'S CHECKLIST
All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to, those listed below. This checklist is furnished only to assist you in submitting a complete Bid. Check as you read.
|_|Have you acknowledged all amendments?
|_| I s your SF-1442, Certificate of Corporate Principal and Pricing Schedule (Section 00 10 00), properly completed and signed?
[ ] Is a bid bond included with your bid? (A late bid bond is treated the same as a late bid.)
[ ] Is your bid bond in the proper amount? (20% of total bid price or $3,000,000 whichever is less)
[ ] Is the bond properly signed by both the Offeror and Surety and are all required seals affixed?
[ ] Is the name in which you submitted the bid the same on your bid as on your bid bond?
[ ] Are all erasures or corrections initialed by the person signing the bid?
[ ] Have you restricted your bid by altering the provisions of the solicitation?
[ ] Is the envelope containing your bid properly identified that it is a bid and does it contain the correct solicitation number and bid due date and time?
[ ] Is your preaward survey information(Section 00 21 13, Contractor Responsibility, Pre-Award Survey Information To Be Submitted With Bid) included with your bid?
[ ] Will your bid arrive on time? Late hand-carried bids will not be considered. Late bids or modifications will be handled in accordance with FAR 52.214-1 Submissions,Modifications, Revisions, and Withdrawals of bids.
| SF30_NonInteractive_B-0002- Am01 |
| Section 00 21 13 Instructions to Bidders |
| SLR Site Visit Location |
File details come from the government source that posted it. Updated .