Two Step Design-Build for a 20, 000 square foot space related site at Vandenberg AFB
Solicitation number
W912PL-16-R-0018
Issued by

About this file

Amendment 2 - Replace page 2 of Section 01 10 10 - Specific Technical Engineering and Design Criteria.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICIATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPIRATION DATA (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

1 2

0002 Mar 14, 2016

USACE-LOS ANGELES DISTRICT

CONTRACTING DIVISION, WEST REGION BRANCH

915 WILSHIRE BLVD, SUITE 1440

LOS ANGELES, CA 90017

W912PL-16-R-0018

Feb 17, 2016

Design-Build, construction of 20,000ft Technical Support Facility(TCF), B2510 Addition, to include a Sensitive Compartmented information Facility (SCIF), at Vandenberg Air Force Base, California.

The following section has been updated

1. Section 01 10 10 - Replace page 2. (Paragraph 1.2 revised)

The due date for receipt of proposals remains 23 March 2016, 2:00pm local time.

BUILDING 2510 2059

1. SCOPE

1.1 Design and construct a new addition to the National Reconnaissance Office (NRO) Building 2500 at Vandenberg AFB, CA, in accordance with the criteria contained herein and using industry standard materials and efficient practices.

The objective of this contract is to design and construct the required facility as described in this document and Section 01 10 11, Room-by-Room Requirements, and to meet the operational requirements of the NRO. The Contractor shall provide all labor, equipment and material to perform the design and construct the complete, operational facility. The Contractor is responsible for visiting the site during a prescheduled site visit of all bidders prior to submitting his proposal

1.2 The Contractor shall be responsible for the professional quality, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, structural, mechanical, electrical, civil, landscape and other engineering features of the work shall be accomplished, reviewed, approved and sealed by engineers, architects and landscape architects who are licensed professionals with a minimum of six years’ experience to practice in their respective professional field in a state or possession of the United States, with the exception of the design/review of architectural and structural who shall be licensed in the state of California. The structural interior design (SID) shall be designed/supervised by a registered or certified (as appropriate for the state) interior designer in the state of California who is NCIDQ certified.

1.3 The design and construction of this project shall conform to the Vandenberg AFB Facilities Excellence Standards and the requirements contained in this solicitation. Features differing from the Vandenberg AFB Facilities Excellence Standards and the requirements in this RFP may be allowed if said changes otherwise provide the same level of function, quality and performance established in Solicitation. The Government will be the sole authority in determining if changes are acceptable.

1.3.1 The Vandenberg AFB General Plan and the NRO Facility Standards shall be considered in the design. The Vandenberg AFB Facilities Excellence Standards shall take precedence, except as modified by this document. See Attachment 10 for copies of both of these documents.

1.4 The Contractor is responsible and liable for the complete design and shall not assume that the provided design criteria and drawings in this solicitation will alleviate him from performing any additional design as required to produce a complete set of construction documents. The following provisions shall be maintained in the Contractor’s design:

1.4.1 Provision 1: Gross Square Feet: The Contractor’s design shall provide at least the same square foot area overall, and on a room by room basis as shown in the Government’s conceptual design.

1.4.2 Provision 2: Equivalent Functional Arrangement: The Contractor’s design shall provide equivalent functional arrangement of rooms and spaces as shown in the Government’s conceptual design.

SECTION 01 10 10 Page 2 AM 000 2

L2PMMGWB

Line

SF-30 - Amendment 2
01 10 10 - page 2