SHEET NO. TITLE FILE NO.
GENERAL
CIVIL
INDEX TO CONTRACT DRAWINGS
REVISION
CIVIL CON'T.
T-10
T-09
T-08
T-07
T-06
T-05
T-04
T-03
T-02
T-01
PROJECT ACCESS MAP AND STAGING AREAS
TEMPORARY CONSTRUCTION EASEMENT LIMITS (3)
TEMPORARY CONSTRUCTION EASEMENT LIMITS (2)
TEMPORARY CONSTRUCTION EASEMENT LIMITS (1)
POINTS AND CURVE DATA
PROJECT CONTROL LINE - HORIZONTAL CONTROL
SHEET LAYOUT AND SURVEY CONTROL POINTS
GENERAL NOTES, LEGENDS, AND ABBREVIATIONS
INDEX TO CONTRACT DRAWINGS SHEET 2
INDEX TO CONTRACT DRAWINGS SHEET 1
PROJECT LOCATION AND VICINITY MAP
SHEET NO. TITLE FILE NO. REVISION
CS-12
CS-11
CS-10
CS-09
CS-08
CS-07
CS-06
CS-05
CS-04
CS-03
CS-02
CS-01
239/3586
239/3585
239/3584
239/3583
239/3582
239/3581
239/3580
239/3579
239/3578
239/3577
239/3576
239/3575
SHEET NO. TITLE FILE NO. REVISION
SHEET NO. TITLE FILE NO. REVISION
STRUCTURAL
S-03
S-02
S-01
SHEET NO. TITLE FILE NO. REVISION
MISCELLANEOUS
M-07
M-06
M-05
M-04
M-03
M-02
M-01
SHEET NO. TITLE FILE NO. REVISION
SHEET NO. TITLE FILE NO. REVISION
SARI SEWER SIPHON PROTECTION
LANDSCAPE
AT BANK STA. 1330+99.57
36-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1324+43.00
96-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1317+61.24
30-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1309+66.02
30-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1298+82.75
66-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1290+91.06
36-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1282+71.01
42-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1276+34.12
30-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1393+57.40
42-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1390+56.93
48-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1384+13.54
42-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1378+53.53
84-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1372+47.25
48-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1367+33.80
48-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1356+70.73
30-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1348+36.64
72-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
AT BANK STA. 1338+99.34
36-INCH CULVERT EXTENSION PLAN, PROFILE AND DETAILS
SD-08
SD-07
SD-06
SD-05
SD-04
SD-03
SD-02
SD-01
SD-17
SD-16
SD-15
SD-14
SD-13
SD-12
SD-11
SD-10
SD-09
CROSS-SECTIONS STA 1399+60
CROSS-SECTIONS STA 1388+00 TO STA 1398+00
CROSS-SECTIONS STA 1376+00 TO STA 1386+00
CROSS-SECTIONS STA 1364+00 TO STA 1374+00
CROSS-SECTIONS STA 1352+00 TO STA 1362+00
CROSS-SECTIONS STA 1342+00 TO STA 1350+50
CROSS-SECTIONS STA 1330+00 TO STA 1340+00
CROSS-SECTIONS STA 1318+00 TO STA 1328+00
CROSS-SECTIONS STA 1306+00 TO STA 1316+00
CROSS-SECTIONS STA 1294+00 TO STA 1304+00
CROSS-SECTIONS STA 1282+00 TO STA 1292+00
CROSS-SECTIONS STA 1270+00 TO STA 1280+00
OUTLET STRUCTURAL PLAN, ELEVATION AND DETAILS
AND MISC OUTLET DETAILS
OUTLET STRUCTURE REINFORCEMENT SCHEDULE, CONCRETE COLLAR
GENERAL STRUCTURAL NOTES
C-29
C-28
C-27
C-26
C-25
C-24
C-23
C-22
C-21
C-20
C-19
C-18
C-17
C-16
C-15
C-14
C-13
C-12
C-11
C-10
C-09
C-08
C-07
C-06
C-05
C-04
C-03
C-02
C-01
REST STOP LANDSCAPE DETAILS
REST STOP LANDSCAPING
PLANTING LEGEND
PLANTING & IRRIGATION DETAILS AND NOTES
LANDSCAPE PLAN STA 1397+00 TO STA 1399+60
LANDSCAPE PLAN STA 1388+00 TO STA 1397+00
LANDSCAPE PLAN STA 1379+00 TO STA 1388+00
LANDSCAPE PLAN STA 1370+00 TO STA 1379+00
LANDSCAPE PLAN STA 1361+00 TO STA 1370+00
LANDSCAPE PLAN STA 1352+00 TO STA 1361+00
LANDSCAPE PLAN STA 1343+00 TO STA 1352+00
LANDSCAPE PLAN STA 1334+00 TO STA 1343+00
LANDSCAPE PLAN STA 1325+00 TO STA 1334+00
LANDSCAPE PLAN STA 1316+00 TO STA 1325+00
LANDSCAPE PLAN STA 1307+00 TO STA 1316+00
LANDSCAPE PLAN STA 1298+00 TO STA 1307+00
LANDSCAPE PLAN STA 1289+00 TO STA 1298+00
LANDSCAPE PLAN STA 1280+00 TO STA 1289+00
LANDSCAPE PLAN STA 1271+00 TO STA 1280+00
L-19
L-18
L-17
L-16
L-15
L-14
L-13
L-12
L-11
L-10
L-09
L-08
L-07
L-06
L-05
L-04
L-03
L-02
L-01
MISCELLANEOUS EXISTING FEATURES
SOUND BARRIER WALL ELEVATIONS, SECTIONS AND DETAILS
SOUND BARRIER WALL PLAN AND HORIZONTAL CONTROL DATA
SURVEY MONUMENT AND STATION MARKER AND MISCELLANEOUS DETAILS
CABLE FENCE ELEVATION AND DETAILS
DOUBLE GATE, TEMPORARY FENCING ELEVATION AND DETAILS
RAMP GATE ELEVATION, TRAIL REGULATIONS AND GUIDANCE POST DETAILS
CU-04
CU-03
CU-02
CU-01
SARI MANHOLE ACCESS ROAD TYPICAL SECTIONS
SARI MANHOLE ACCESS ROAD PLAN AND PROFILE
SARI MANHOLE PROTECTION TYPICAL SECTIONS
SARI MANHOLE PROTECTION PLAN AND PROFILE
FINAL GRADING AND TOE ROAD (5)
FINAL GRADING AND TOE ROAD (4)
FINAL GRADING AND TOE ROAD (3)
FINAL GRADING AND TOE ROAD (2)
FINAL GRADING AND TOE ROAD (1)
EXCAVATION AND FILL LIMITS
CONCRETE ACCESS RAMP DETAILS
PLAN DETAIL AT BRIDGE
REST STOP
BIKEWAY STRIPING DETAIL AND SUBDRAIN SYSTEM DETAILS
DETAIL AT GROUTED STONE V-DITCH
CURB AND PVC DRAIN DETAILS
TYPICAL SECTIONS AND CUT OFF WALL
TYPICAL SECTIONS - 1
PLAN AND PROFILE STA 1397+00 TO STA 1399+60
PLAN AND PROFILE STA 1388+00 TO STA 1397+00
PLAN AND PROFILE STA 1379+00 TO STA 1388+00
PLAN AND PROFILE STA 1370+00 TO STA 1379+00
PLAN AND PROFILE STA 1361+00 TO STA 1370+00
PLAN AND PROFILE STA 1352+00 TO STA 1361+00
PLAN AND PROFILE STA 1343+00 TO STA 1352+00
PLAN AND PROFILE STA 1334+00 TO STA 1343+00
PLAN AND PROFILE STA 1325+00 TO STA 1334+00
PLAN AND PROFILE STA 1316+00 TO STA 1325+00
PLAN AND PROFILE STA 1307+00 TO STA 1316+00
PLAN AND PROFILE STA 1298+00 TO STA 1307+00
PLAN AND PROFILE STA 1289+00 TO STA 1298+00
PLAN AND PROFILE STA 1280+00 TO STA 1289+00
PLAN AND PROFILE STA 1271+00 TO STA 1280+00
239/3603 REV.A
239/3602 REV.A
239/3601 REV.A
239/3600 REV.A
239/3599 REV.A
239/3598 REV.A
239/3597 REV.A
239/3596 REV.B
239/3595 REV.A
239/3594 REV.A
239/3593 REV.A
239/3592 REV.A
239/3591 REV.A
239/3590 REV.A
239/3589 REV.A
239/3588 REV.A
239/3587 REV.A
239/3613
239/3612
239/3611 REV.A
239/3545 REV.A
239/3544
239/3543
239/3542
239/3541
239/3540
239/3539 REV.B
239/3538
239/3537 REV.B
239/3536
239/3610 REV B
239/3609
239/3608
239/3607
239/3606
239/3605
239/3604
239/3632
239/3631 REV. A
239/3630
239/3629
239/3628
239/3627
239/3626
239/3625
239/3624
239/3623
239/3622
239/3621 REV.A
239/3620
239/3619
239/3618
239/3617
239/3616
239/3615 REV.A
239/3614
239/3636 REV. A
239/3635 REV.A
239/3634
239/3633
239/3574
239/3573
239/3572
239/3571
239/3570
239/3569
239/3568 REV. A
239/3567 REV. A
239/3566 REV. A
239/3565
239/3564
239/3563
239/3562 REV. A
239/3561
239/3560
239/3559
239/3558
239/3557
239/3556
239/3555 REV. A
239/3554 REV. A
239/3553
239/3552
239/3551
239/3550
239/3549 REV. A
239/3548
239/3547
239/3546
(THIS SHEET) (THIS SHEET)
(THIS SHEET)
(THIS SHEET)
(THIS SHEET)
(THIS SHEET)
AS SHOWN
T-02
L .D o
L .D o
O .O ju ri
IN
D
E X T
O C
O N
T R
A C
T D
R A
W
IN
G S S
H E
E T
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
B
B
E .K
A
/1
/1
E .K
/1
/1
B
B
B
B
B
B
B
B
B
B
A
B
B
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B G
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
A M
IS
C
C H
A N
G E
S
A M
T
B R
E V
IS
E D I
N D
E X
A M
T
R E
V
B
A
REINFORCING
REINFORCED CONCRETE BOX
ROAD
RADIUS
REINFORCED CONCRETE PIPE
REINF
R
RD
RCB
RCP
RCC ROLLED COMPACTED CONCRETE
RIGHT
SQUARE FOOT
TANGENT
SIDE DRAIN
STD STANDARD
TEMPORARY
USACE
SOIL CEMENTSC
SARI SANTA ANA RIVER INTERCEPTOR
SAR SANTA ANA RIVER
RIGHT-OF-WAY
SYMMETRICAL
UPSTREAM
VERTICAL
VERTICAL POINT OF INTERSECTION
TYPICAL
U/S
R/W
SD
T
TYP
TCE
SPF STANDARD PROJECT FLOOD
TEMP
VERT
VPI
SYMM
SF
RT
CORPS OF ENGINEERS
UNITED STATES ARMY
SHT(S) SHEET(S)
W/O WITHOUT
STA STATION
S SLOPE
TWA TEMPORARY WORK AREA
EASEMENT, ALSO KNOWN AS
TEMPORARY CONSTRUCTION
POINT OF VERTICAL INTERSECTIONPVI
PVC POLYVINYLE CHLORIDE PIPE
PVT POINT VERTICAL TANGENT
MANHOLE
MAXIMUM
MINIMUM
MISCELLANEOUS
MUTCD
CONTROL LINE
TCE LIMIT
FENCE
SOUND WALL
TRAFFIC DIRECTION
NUMBER
CORRUGATED METAL PIPE
BENCHMARK
CUBIC YARDS
EXPANSION JOINT
ELEVATION
JOINT
ABC
POINT OF INTERSECTION
POINT OF TANGENCY
POINT OF ENDING
AGGREGATE BASE COURSE
CMP
PI
PROTECT IN PLACE
PERM PERMANENT
CONTROL LINE
FINISH SURFACE
FWY FREEWAY
FS
CONTROL DISTRICT
ORANGE COUNTY FLOOD
INV
INSIDE DIAMETER
ON CENTER
OUTSIDE DIAMETER
PLATE
BEGIN HORIZONTAL CURVE
BEGIN VERTICAL CURVE
CONSTRUCTION JOINT
DOUBLE
DIAMETER
DIAGONAL
DOWNSTREAM
EACH
END HORIZONTAL CURVE
END VERTICAL CURVE
HEIGHT
HORIZONTAL
INTERSECTION
LENGTH
POUNDS
LEFT
POINT OF CURVATURE
BW
MAX
MIN
RIGHT-OF-WAY
POWER POLE
MANHOLE
PP
MH
EXISTING SEWER LINE
EXISTING WATER LINE
EXISTING GAS LINE
RIGHT-OF-WAY
BM
DIA
DBL
CY
EXISTING
D/S
HORIZ
INT
L
LBS
GRADE LINE
DECOMPOSED GRANITE
FINISHED GRADE
POC
POE
INVERT
EL
TRAFFIC CONTROL DEVICES
MANUAL ON UNIFORM
HMA
MISC
LT
JT
GL
HT
FG
EXP JT
EVC
EA
DG
EC
DIAG
CL
CJ
BVC
BC
ID
MH
NO
PT
PL
PC
OCFCD
OD
OC
BIKEWAY
N.T.S. NOT TO SCALE
BARRICADE
PORTABLE STEEL
HAUL ROUTE
COR
CALTRANS
OF TRANSPORTATION
CALIFORNIA DEPARTMENT
REPRESENTATIVE
CONTRACTING OFFICER'S
EXISTING ASPHALT PAVING
EXISTING OVERHEAD ELECTRICAL LINE
OC PARKS
(OC PARKS)
COUNTY OF ORANGE
CONTROL LINE
P.I.P.
HOA HOMEOWNER ASSOCIATION
DELTA, ANGLE OF INTERSECTION
AC ASPHALTIC CONCRETE (HMA)
AVE AVENUE
APPROX APPROXIMATE
CONC CONCRETE
EX/EXIST
FT FEET
HOT-MIX ASPHALT (AC)
IN INCH
POINT OF BEGINNINGPOB
POINT OF CONTACT
MARKED ON THE AS- BUILT DRAWING AND SUBMITTED TO THE USACE.
USACE PRIOR TO CONSTRUCTION, AND ANY CHANGES MUST BE CLEARLY
ALL REVISIONS TO THESE CONTRACT DRAWINGS MUST BE APPROVED BY THE
GENERAL NOTES: ABBREVIATIONS:GENERAL LEGENDS:
INFORMATION.
RESTRICTIONS. SEE SPECIFICATION SECTION 01 57 19 FOR MORE
CLEARING SITE AND GRUBBING WINDOW IS SUBJECT TO ENVIRONMENTAL
AS SHOWN
T-04
G E
N E
R A
L N
O T
E S L E
G E
N D
S
A N
D A
B B
R E
V
IA
T
IO
N S
ARE ALLOWED WITHOUT WRITTEN APPROVAL OF THE CONTRACTING OFFICER.
INCLUDED AS PART OF THE WORK. NO CHANGES TO THE CONTRACT DRAWINGS
SITE DIMENSIONS OR CONDITIONS, AND SUCH ADJUSTMENTS MUST BE
RESULT OF DESIGN. MINOR MODIFICATIONS MAY BE REQUIRED TO SUIT JOB
DETAILS ON THE CONTRACT DRAWINGS ARE INTENDED TO SHOW THE FINAL
RIVER - REACH 9 - PHASE 5B CONTRACTOR UNLESS OTHERWISE NOTED.
THE DESIGNATION, 'CONTRACTOR' ON THE PLANS REFERS TO THE SANTA ANA
PROTECT IN PLACE.
CONTRACT BOUNDARY OF ALL UTILITIES PRIOR TO CONSTRUCTION, AND
POTHOLING AS NECESSARY TO CONFIRM EXISTENCE AND LOCATIONS WITHIN
OF THE CONTRACTOR TO UTILIZE A UTILITY LOCATING SERVICE AND
GROUND UTILITIES NOT SHOWN ON THIS PLAN SET. IT IS THE RESPONSIBILITY
MUST BE CONSIDERED APPROXIMATE. THERE MAY BE ADDITIONAL UNDER
EFFORT HAS BEEN MADE TO DEPICT THESE UTILITIES, BUT THESE LOCATIONS
ARE BASED ON AS-BUILT INFORMATION PROVIDED BY THE OWNER. THE BEST
ABOVE-GROUND SURVEY. THE EXISTING UNDER GROUND UTILITIES SHOWN
THESE CONTRACT DRAWINGS HAVE BEEN PREPARED BASED ON AN
CONTAINED IN THE CONTRACT DOCUMENTS.
USED OR THE CONCLUSIONS REACHED IN UTILIZING THE INFORMATION
NO RESPONSIBILITY FOR THE MANNER IN WHICH THIS INFORMATION MAY BE
BEYOND THE ACTUAL LOCATION OF THE TEST SPECIMEN(S) AND ASSUMES
SUBSURFACE INVESTIGATIONS AS BEING REPRESENTATIVE OF THE SITE
THE USACE DOES NOT GUARANTEE THE RESULTS OF ANY GEOTECHNICAL OR
L .D
L .D
F .O
AND DISPOSED OF BY THE CONTRACTOR, UNLESS OTHERWISE STATED.
TRAIL, AC CURB, AND CONCRETE DRAINAGE DITCH (25 EA) WILL BE REMOVED
THE FOLLOWING EXISTING FEATURES: WOODEN HEADER BOARD ALONG THE
SALVAGED.
THE "WOODEN FENCE AND POST"S (42 EA) WILL BE REMOVED AND
DOWNLOAD THE REPORT PRIOR TO BID OPENING FOR THEIR USE.
AVAILABLE FOR INFORMATION PURPOSES. ALL BIDDERS ARE RESPONSIBLE TO
THE PROJECT'S BID PACKAGE WEBSITE. THIS GEOTECHNICAL STUDY IS MADE
RIVER, ORANGE COUNTY, CALIFORNIA, DATED 06/2016, WILL BE POSTED ON
GEOTECHNICAL STUDY REPORT, REACH 9 - PHASE 5B, LOWER SANTA ANA
THE BORING LOGS ARE INCLUDED IN THE CONTRACT DRAWINGS AND THE
1.
2.
3.
4.
5.
6.
7.
8.
9.
TO BE REMOVED.
CONTRACTOR SHALL FIELD VERIFY THE QUANTITY OF ALL EXISTING FEATURES
10.
/1
/1
A
A D
D E
D N
O T
E
A M
T
E .K
A
AND REVISE EXCAVATION LIMITS FOR STONE AS NECESSARY.
JUNE 1981. CONTRACTOR SHALL FIELD VERIFY LOCATION OF EXISTING STONE
ROAD TO 3600 FEET DOWNSTREAM FROM COAL CANYON ROAD, APPROVED ON
LOMAS DE YORBA - SUR LEVEE FROM 3000 FEET UPSTREAM OF WEIR CANYON
DRAWINGS TITLED CITY OF YORBA LINDA, PLANS FOR CONSTRUCTION OF
BE SALVAGED IS APPROXIMATE AND BASED ON THE ORIGINAL DESIGN
THE LOCATION OF THE EXISTING STONE SHOWN ON THE CROSS-SECTIONS TO
R E
V
B
/1
/1
B
E .K
B
B
THE CITY OF YORBA LINDA PRIOR TO SUBMITTING TO THE COR FOR APPROVAL.
WITH THE TRAFFIC CONTROL PLAN. BOTH PLANS SHALL BE APPROVED BY
THE CONTRACTOR SHALL PROVIDE A BIKEWAY DETOUR PLAN IN CONJUNCTION
R E
V
IS
E D N
O T
E S
A M
T
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B G
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
FLOW FLOW LINE
PVC POINT VERTICAL CURVE
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B G
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
+0
+0
+0
0 1
0 1
1400+0
GROUTED STONE
BIKEWAY
DG TRAIL
RIPRAP
CONCRETE
MAINTENANCE ROAD
AS SHOWN
1.
2.
REFERENCE NOTES:
3.
ENVIRONMENTAL PROTECTION SECTION 01 57 19.
FOR WINDOW WHEN SOUND WALL SHALL BE IN PLACE, SEE
SCALE: 1 IN = 500 FT
N
0500 500 1000FT
SCALE: 1''= 500'
PLAN
FLOW
T-10
STAGING AREA
STAGING AREA
TCE
G Y
P S
U M C
A N
Y O
N R
D B
R
ID
G E
V
IA
L
O M
A S D
E Y
O R B A W
E S T
LA P
ALMA A
VE
STATE ROUTE 91
STATE
R
OUTE
P R
O J E
C T A
C C
E S
S M
A P A
N D S
T A
G
IN
G A
R E
A S
CONCRETE MEDIAN
EXISTING
CONCRETE MEDIAN
EXISTING
LA PALMA AVE
LA P
ALMA A
VE
FOR TCE WORK LIMITS, SEE SHEETS T-07 TO T-09.
L
D o
L
D o
O .O ju ri
EXISTING DRIVEWAY
PROJECT ACCESS AT
EXISTING DRIVEWAY
PROJECT ACCESS AT
EXISTING DRIVEWAY
PROJECT ACCESS AT
LEGEND:
CONTROL LINE
STAGING AREA
TEMPORARY CONSTRUCTION EASEMENT
CONTROL LINE
ENTER HERE
MEDIAN BEGINS
STAGING AREA
A R
E V
IS
E D N
O T
E
A M
T
E .K
A
CURVE DATA, SEE SHEET T-06.
FOR BANK PROTECTION HORIZONTAL CONTROL POINTS AND
/1
/1
R E
V
ASPH
S C
A T T E R E
D
B R
U S
H
D E
N
E
V
G E T
A T I
O N
M
N H
O L E
W A T E R
W
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
380380
380380
1298+00 1299+00 1300+00 1301+00 1302+00 1303+00 1304+00 1305+00 1306+00 1307+00
P V
C
.0
P V I .0
E L .8
P V
T
.0
L = 50.00'
E L .6
E L .9
S= 0.81%
S= 0.36%
GROUTED STONE
BIKEWAY
DG TRAIL
LEGEND:
RIPRAP
N
PROFILE
HORIZ. SCALE: 1 IN = 50 FT
VERT. SCALE: 1 IN = 10 FT
PLAN
SCALE 1 IN = 50 FT
EL 355.73
EL 326.38
EL 359.47
EL 331.32
S=0.42%
S=0.55%
STONE
TOE OF GROUTED
H :1
V
1.
4.
REFERENCE NOTES:
5.
6.
7.
3.
C-04
S T
A T
O S
T A
P L
A N A
N D P
R O
F
IL
E
S T
A .7
STONE
TOE OF GROUTED
EL 363.86
EL 368.59
TCE
CONSTRUCTION NOTES:
GENERAL NOTES:
STONE
TOP OF GROUTED
BOTTOM OF RIPRAP/
STAGING AREA
E
N
E
5 INSTALL CABLE FENCE.
FLOW
N
-I
N D
IA
R C
P S
T A
.7
TCE
L A P
A L
M A A
V E
WOLF CIFFART
EXTEND SIDE DRAIN STRUCTURE PER SHEET SD-04.
S T
A M
A T
C H L
IN
E S
E E S
H E
E T C -0
S T
A M
A T
C H L
IN
E S
E E S
H E
E T C -0
.5
H :1
V
2. CABLE FENCE AND CURBS NOT SHOWN ON PLAN FOR CLARITY.
ARE PROJECTED ONTO PROFILE.
1. TOP AND TOE OF GROUTED STONE, SIDE DRAIN, AND CABLE FENCE
FOR CABLE FENCE DETAILS, SEE SHEET M-01.
(TYP)
BIKEWAY
STONE
TOP OF GROUTED
BOTTOM OF RIPRAP/
CONSTRUCT GROUTED STONE PER PLANS.
CONSTRUCT RIPRAP.
3. FINAL GRADING AND TOE ROAD NOT SHOWN ON PLAN FOR CLARITY.
4. LANDSCAPING LIMITS NOT SHOWN ON PLAN FOR CLARITY.
9.
8.
PI(9)
2.6 -I
N D
IA
R
P
SEE SHEET C-18.
FOR BIKEWAY AND DECOMPOSED GRANITE TRAIL DETAILS,
FOR SIDE DRAIN, SEE SHEETS SD-01 THROUGH SD-17.
L = 50.00'
X
B
FOR CROSS-SECTIONS, SEE SHEETS CS-01 THROUGH CS-12.
LINE
CONTROL
LIMIT
EXCAVATION
EXCAVATION
BOTTOM OF
ALONG CONTROL LINE
EXIST. GRADE
AND TOP OF RIPRAP
ALONG CONTROL LINE
DESIGN GRADE
CONCRETE RAMP
REMOVE EXISTING
AND GATE
CHAINLINK FENCE
REMOVE EXISTING
CONSTRUCT BIKEWAY PER PLANS.
CONSTRUCT DG TRAIL PER PLAN.
D
STAGING AREA
R O
A D R
O
W SEE SHEETS T-05 AND T-06.
FOR SURVEY CONTROL POINTS, AND CURVE DATA,
FOR TYPICAL SECTIONS, SEE SHEETS C-16 AND C-17.
FOR LANDSCAPING FEATURES, SEE SHEETS L-01 THROUGH L-19.
FOR TCE COORDINATE POINTS, SEE SHEETS T-07, T-08, AND T-09.
C-29.
FOR FINAL GRADING AND TOE ROAD, SEE SHEETS C-25 THROUGH
J .U re n a
L .D o
J .U re n a
SEE SHEET M-07
EXISTING FEATURES,
(PIP)
GAS LINE
EXIST. 8 IN
ACCESS
DRIVEWAY
EXISTING
(TYP)
DG TRAIL
RIPRAP
TOP OF
0 10 10 20FT
SCALE: 1''= 10'
0 50 50 100FT
SCALE: 1''= 50'
A
A
/1
/1
E .K
R E
M O
V E
D E
X F
E A
T U
R E
A M
T
R E
V
SCATTERED BRUSH
PIPE
DENSE VEGETATION
DENSE VEGETATION
371.1
367.0
370.4
366.5
357.1 356.3
368.9
370.2
379.0
369.9
365.1
365.8
SANTA ANA RIVER TRAIL
MANHOLE_WATERW
380380
0 1
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
390390
390390
1343+00 1344+00 1345+00 1346+00 1347+00 1348+00 1349+00 1350+00 1351+00 1352+00
P V
C
.1
P V I .1
E L .8
P V
T
.1
E L .6
E L .9
S= 0.81% S= 0.14% P
V C
.9
E le v
.1
P V I .9
E L .2
P V
T
.9
E le v
.1
P V
C
.5
E le v
.0
P V I .0
E L .9
P V
T
.5
E le v
.6
S= -0.0020
P V
C
.5
E le v
.0
P V I .0
E L .3
P V
T
.5
E le v
.3
P V
C
.5
E le v
.3
P V I .0
E L .3
P V
T
.5
E le v
.4
L = 75.00' L = 75.00'
S= -10.00%
S= 0.00%
S= 8.
GROUTED STONE
BIKEWAY
DG TRAIL
LEGEND:
RIPRAP
CONCRETE
HORIZ. SCALE: 1 IN = 50 FT
VERT. SCALE: 1 IN = 10 FT
SCALE 1 IN = 50 FT
STONE
TOE OF GROUTED
1.
4.
REFERENCE NOTES:
5.
6.
7.
9.
3.
C-09
AS SHOWN
S T
A T
O S
T A
P L
A N A
N D P
R O
F
IL
E
INSTALL CABLE FENCE.
TCE
GENERAL NOTES:
CONSTRUCTION NOTES:
H :1
V
E
E
PLAN
S T
A
.6
S
T A
.6
-I
N D
IA
R
C P
EL 350.95
EL 377.37
FLOW
EL 378.63
N 624,000
PROFILE
EL 347.62
S T
A
.9
N
L A P
A L
M A A
V E
WOLF CIFFART
EXTEND SIDE DRAIN STRUCTURE PER SHEET SD-10.
FOR CROSS-SECTIONS, SEE SHEETS C-18 THROUGH C-29.
FOR ACCESS RAMP DETAILS, SEE SHEET C-23.
S T
A M
A T
C H L
IN
E S
E E S
H E
E T C -1
T
A M
A T
C H L
IN
E S
E E S
H E
E T C -0
.5
H :1
V
2. CABLE FENCE AND CURBS NOT SHOWN ON PLAN FOR CLARITY.
CABLE FENCE ARE PROJECTED ONTO PROFILE.
1. TOP AND TOE OF GROUTED STONE, ACCESS RAMP, SIDE DRAIN, AND
(TYP)
DG TRAIL
(TYP)
BIKEWAY
CONSTRUCT GROUTED STONE PER PLANS.
3. FINAL GRADING AND TOE ROAD NOT SHOWN ON PLAN FOR CLARITY.
4. LANDSCAPING LIMITS NOT SHOWN ON PLAN FOR CLARITY.
FOR LANDSCAPING FEATURES, SEE SHEET L-01 THROUGH L-19.
8.
S=
STONE
GROUTED
TOP OF
E L .1
PI(27)PI(26)
PI(25)
PI(23)
PI(22 )
1.
2.
10.
SEE SHEET C-18.
FOR BIKEWAY AND DECOMPOSED GRANITE TRAIL DETAILS,
FOR SIDE DRAINS, SEE SHEETS SD-01 THROUGH SD-17.
FOR UNDERCROSSING DETAILS, SEE SHEET C-22.
PI(24)
EL 373.27
TOP OF GROUTED STONE
BOTTOM OF RIPRAP/
H :1
V
-I
N D
IA
R
P
CONSTRUCT BIKEWAY PER PLANS.
CONSTRUCT DG TRAIL PER PLAN.
LIMITS
EXCAVATION
ALONG CONTROL LINE
EXIST. GRADE
GROUTED STONE
TOE OF
STONE
GROUTED
TOP OF
EXCAVATION
BOTTOM OF
S T
A .1
CONTROL LINE
ALONG
DESIGN GRADE
X
D
AREA
TURN AROUND
40-FT X 40-FT
S= 0.37%
8 CONSTRUCT CONCRETE RAMP.
EL 375.84
STA 1348+77.13
TCE
LINE
CONTROL
R A
M P
B E
G
IN
C
O N
C R
E T E
E N
D B
IK
E W
A Y
S T
A
.3
EL 373.27
STA. 1343+32.11
EL 347.74
STA. 1343+32.11
STAGING AREA
R O
A D R /W
SEE SHEETS T-05 AND T-06.
FOR SURVEY CONTROL POINTS, AND CURVE DATA,
FOR TCE COORDINATE POINTS, SEE SHEETS T-07, T-08, AND T-09.
FOR TYPICAL SECTIONS, SEE SHEETS CS-01 AND CS-12.
FOR CABLE FENCE DETAILS, SEE SHEET M-01.
J .U re n a
L .D o
J .U re n a
SEE SHEET M-07
EXISTING FEATURES,
ACCESS
PROJECT
BRIDGE (PIP)
GYPSON CANYON RD
TO EL. 380
RIPRAP
GAS LINE (PIP)
EXIST. 8 IN B
C-29.
FOR FINAL GRADING AND TOE ROAD, SEE SHEETS C-25 THROUGH
0 10 10 20FT
SCALE: 1''= 10'
0 50 50 100FT
SCALE: 1''= 50'
CONSTRUCT CONCRETE ACCESS RAMP PER PLAN.
ACCESS RAMP
CONCRETE
CONCRETE A
CCESS
RAMP
A /1
/1
E .K
R E
V
A
EL 374.00
14 CONSTRUCT CONCRETE CRADLE.
RIPRAP
TOP OF
R E
V P
R O
F
IL
E
A D
D C
O N
C R
E T
E
A
GROUTED STONE
TOP OF
EL 380.00
14 M A T C
H E
X
IS
T
IN
G A
C
E N
D B
IK
E W
A Y
S T
A
C R
A D
L E E
X T
E N
D A
C
A M
T
A
11.FOR CONCRETE CRADLE DETAILS, SEE SHEET C-22.
A
A
EX. AC
MATCHGROUTED STONE
TOP OF SEE NOTE 5
A
A
BIKEWAY. TIE INTO EX. AC. VERTICAL CURVE IS L=75 FT, GRADE 8% MAX.
5. PROJECTED EXISTING GROUND AND FINISHED SURFACE ALONG
ASPH
374.4
368.7 369.1
370.5
370.7
370.1
371.6
373.6
380380
0 1
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
400400
400400
1352+00 1353+00 1354+00 1355+00 1356+00 1357+00 1358+00 1359+00 1360+00 1361+00
P V
C
.0
P V I .0
E L .2
P V
T
.0
P V
C
.6
P V I .6
E L .4
P V
T
.6
L = 50.00'
L = 50.00'
E L .2
E L .5
E L .1
E L .5
S= 1.17% S= 0.20%
P V
C
.5
E le v
.1
P V I .0
E L .3
P V
T
.5
E le v
.9
P V
C
.9
E le v
.7
P V I .9
E L .4
P V
T
.9
E le v
.3
L = 125.00' L = 100.00'
S= 8.
S= -0.59%
S= -0.16%
GROUTED STONE
LEGEND:
RIPRAP
CONCRETE
MAINTENANCE ROAD
PROFILE
HORIZ. SCALE: 1 IN = 50 FT
VERT. SCALE: 1 IN = 10 FT
PLAN
SCALE 1 IN = 50 FT
S=0.36%
S=0.37%
STONE
TOE OF GROUTED
C-10
AS SHOWN
FLOW
1.
4.
REFERENCE NOTES:
5.
6.
3.
STONE
TOE OF GROUTED
CONTROL LINE
H :1
V
EXCAVATION
BOTTOM OF
S T
A T
O S
T A
P L
A N A
N D P
R O
F
IL
E
S T
A .7
EL 376.48
EL 350.95
EL 379.69
EL 354.27
EL 374.00
EL 384.06
INSTALL CABLE FENCE.
TCE
TCE
GENERAL NOTES:
CONSTRUCTION NOTES:
STAGING AREA
E
E
N
-I
N R
C P
S T
A .7
L A P
A L
M A A
V E
WOLF CIFFART
TOP OF RIPRAP
EXTEND SIDE DRAIN STRUCTURE PER SHEET SD-11.
S T
A M
A T
C H L
IN
E S
E E S
H E
E T C -1
A M
A T
C H L
IN
E S
E E S
H E
E T C -0
9 S
ID
E D
R
IN
-I
N D
IA
R
C P
BOUNDARY
ORANGE GROVE
EXISTING
TCE
.5
H :1
V
2. CABLE FENCE AND CURBS NOT SHOWN ON PLAN FOR CLARITY.
PROJECTED ONTO PROFILE.
1. TOP AND TOE OF GROUTED STONE, SIDE DRAIN, AND CABLE FENCE ARE
(TYP)
MAINTENANCE ROAD
CONSTRUCT GROUTED STONE PER PLANS.
CONSTRUCT RIPRAP.
3. FINAL GRADING AND TOE ROAD NOT SHOWN ON PLAN FOR CLARITY.
4. LANDSCAPING LIMITS NOT SHOWN ON PLAN FOR CLARITY.
7.
8.
PI(29 )
PI(28)
1.1.
2.
CONSTRUCT MAINTENANCE ROAD.
8 CONSTRUCT CONCRETE RAMP.
FOR SIDE DRAINS, SEE SHEETS SD-01 THROUGH SD-17.
C-29.
FOR FINAL GRADING AND TOE ROAD, SEE SHEETS C-25 THROUGH
J
X
FOR CROSS-SECTIONS, SEE SHEETS CS-01 THROUGH CS-12.
ALONG CONTROL LINE
DESIGN GRADE
ALONG CONTROL LINE
EXIST. GRADE
TOP OF GROUTED STONE
BOTTOM OF RIPRAP/
LIMIT
EXCAVATION
TOP OF GROUTED STONE
BOTTOM OF RIPRAP/
AC
EXISTING
ACCESS
PROJECT
SEE S
HEET C
-22
DETAIL
S,FOR U
NDERCROSS
ING
M A
T C
H E
X
IS
T
IN
G A
C
E N
D M
A
IN
T E
N A
N C
E R
O A
D
S T
A
.0
E X
IS
T
IN
G G
A T E
R E
M O
V E A
N D R
E P
L A
C E
B E
G
IN
M
A
IN
T E
N A
N C
E R
O A
D
E N
D C
O N
C R
E T E R
A M
P
S T
A
.8
STAGING AREA
R O
A D R /W
SEE SHEETS T-05 AND T-06.
FOR SURVEY CONTROL POINTS, AND CURVE DATA,
FOR TCE COORDINATE POINTS, SEE SHEETS T-07, T-08, AND T-09.
FOR TYPICAL SECTIONS, SEE SHEETS C-16 AND C-17.
FOR CABLE FENCE DETAILS, SEE SHEET M-01.
FOR LANDSCAPING FEATURES, SEE SHEETS L-01 THROUGH L-19.
ORANGE GROVE
J .U re n a
L .D o
J .U re n a
SEE SHEET M-07
EXISTING FEATURES,
GAS LINE (PIP)
EXIST. 8 IN
0 10 10 20FT
SCALE: 1''= 10'
0 50 50 100FT
SCALE: 1''= 50'
EL. 380
RIPRAP TO
E .K
/1
/1
R
E V P
R O
F
IL
E
A M
T
A
R E
V
A
FOR SURFACE FINISH
SEE SPEC 03 36 00
N.T.S.
SECTION A-A
CUT OFF WALL DETAIL
2(TYP.)
2%
6" ABC
4" AC
RIPRAP
LC
2(TYP.)
2%
6" ABC
C
ROAD
FOR CURB
SEE DETAIL A ON SHEET C-18
STA. 1353+01.27 TO STA. 1390+00
TYPICAL SECTION
MAINTENANCE ROAD
STA. 1390+00 TO STA. 1399+60
TYPICAL SECTION
CREST ROAD
RIPRAP
15' AC
15' ABC
(PROJECTED)
STONE
24" GROUTED
CUT OFF WALL
5' GROUTED STONE
A
A
TOP OF GROUTED STONE, SEE PROFILE FOR ELEVATION
N.T.S.
FOR ELEVATION
STONE, SEE PROFILE
TOE OF GROUTED
TOP OF RIPRAP
(PROJECTED)
STONE
24" GROUTED
MATERIAL
6" BEDDING
MATERIAL
6" BEDDING
N.T.S.
STAGE 1:
GROUTED STONE
CONSTRUCTION OF
AFTER STAGE 1
CONSTRUCTION OF RIPRAP
STAGE 2:
STONE AND RIPRAP INTERFACE
CONSTRUCTION OF GROUTED
MATERIAL
BEDDING
CUT OFF WALL
GROUTED STONE
PROFILE)
(OR RIPRAP PER
GROUTED STONE
(PROJECTED)
MATERIAL
6" BEDDING
2'
5'
AS SHOWN
C-17
TOP OF BANK
2%
GRADE
EXIST. EXCAVATION
S E
E P
R O
F
IL
E V
A R
IE
S
N.T.S.
TOP OF RIPRAP, SEE PROFILE FOR ELEVATION
C
TOP OF GROUTED STONE, SEE PROFILE FOR ELEVATION
SLOPE 5%
V A
R
IE
S S
E E P
R O
F
IL
E
2%
15'
TOE OF GROUTED STONE
1.5
TOP OF BANK
2%
GRADE
EXIST. EXCAVATION
S E
E P
R O
F
IL
E V
A R
IE
S
N.T.S.
TOP OF RIPRAP, SEE PROFILE FOR ELEVATION
C
TOP OF GROUTED STONE, SEE PROFILE FOR ELEVATION
SLOPE 5%
V A
R
IE
S S
E E P
R O
F
IL
E
2%
STA. 1390+07 TO STA. 1399+60
TYP. SECTION
15'
TOE OF GROUTED STONE
1.5
TOP OF BANK
2%
GRADE
EXIST. EXCAVATION
S E
E P
R O
F
IL
E V
A R
IE
S
N.T.S.
TOP OF RIPRAP, SEE PROFILE FOR ELEVATION
C
TOP OF GROUTED STONE, SEE PROFILE FOR ELEVATION
SLOPE 5%
V A
R
IE
S S
E E P
R O
F
IL
E
2%
STA. 1366+80 TO STA. 1390+07
TYP. SECTION
15'
TOE OF GROUTED STONE
1.5
BLOCKWALL
TOE ROAD
TOE ROAD
TOE ROAD
2.5'
2.5'
FENCE
EXIST.
LA PALMA AVE
EXCAVATION
LIMIT OF
T Y
P
IC
A L S
E C
T
IO
N S A
N D C
U T O
F F W
A L L
2%
EXCAVATION
LIMIT OF
2%
EXCAVATION
LIMIT OF
2%
N.T.S.
N.T.S.
STA. 1353+01.27 TO STA. 1366+80
TYP. SECTION
BACKFILL
COMPACTED
BACKFILL
COMPACTED
BACKFILL
COMPACTED
L .D
L .D
F .O
TCE
TCE
TCE
TCE
FILL
COMPACTED
(SALVAGE)
EXIST. RIPRAP
STONE (SALVAGE)
EXIST. DERRICK
STONE (SALVAGE)
EXIST. DERRICK
(SALVAGE)
EXIST. RIPRAP
FILL
COMPACTED
STONE (SALVAGE)
EXIST. DERRICK
(SALVAGE)
EXIST. RIPRAP
FILL
COMPACTED
SECTION)
(SEE TYPICAL
ROAD
MAINTENANCE
SECTION)
(SEE TYPICAL
ROAD
MAINTENANCE
SECTION)
(SEE TYPICAL
ROAD
CREST
2.5'
VARIES, SEE PLANS
VARIES, SEE PLANS
TCE
TCE
VARIES, SEE PLANS24" RIPRAP
MATERIAL
6" BEDDING
STONE
24" GROUTED
MATERIAL
6" BEDDING
STONE
24" GROUTED
24" RIPRAP
MATERIAL
6" BEDDING
STONE
24" GROUTED
24" RIPRAP
GROUTED STONE
TOP OF
MATERIAL
6" BEDDING
STONE
24" GROUTED
24"
BEDDING MATERIAL
TOP OF
24" RIPRAP
MATERIAL
6" BEDDING
TOP OF GROUTED STONE
BOTTOM OF RIPRAP
CONSTRUCTION
STAGE 1
NOTES:
1. CABLE FENCE NOT SHOWN FOR CLARITY
1. FOR TOE ROAD DETAILS, SEE SHEET C-16.
REFERENCE NOTES:
2. FOR GROUTED STONE AND RIPRAP INTERFACE, SEE DETAIL BELOW.
1' ABC
A R
E V
C A
L L O
U T
A M
T
/1
/1
E .K
R E
V
A
MAINTENANCE ROAD
REMOVE EXIST. 4" AC
MAINTENANCE ROAD
REMOVE EXIST. 4" AC
MAINTENANCE ROAD
EXIST. 6" ABC
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
DIRT
357.5
359.2
359.0 369.1
357.6
374.9
376.1
MANHOLE_SEWER
MANHOLE_WATER
MANHOLE_SEWER
S
S
W
380 380
GROUTED STONE
BIKEWAY
DG TRAIL
LEGEND:
RIPRAP
380380
380380
0+80 1+00 2+00 3+00 4+00 5+00 6+00 7+00
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
L L
L L
L L
L L
L L
L L
L L
L L
FLOW
LIMITS
EXCAVATION
APPROX.
.5
H :1
V
H :1
V
GROUTED STONE
TOE OF
N.T.S.
S
BIKEWAY
DG TRAIL
SIDE DRAIN
RIPRAP
DG TRAIL
GROUTED STONE
HORIZ. SCALE: 1 IN = 30 FT
BIKEWAY
EXISTING GRADE
PROJECTED DG TRAIL
CABLE FENCE
PROFILE ALONG BIKEWAY AT REST STOP
PLAN
VERT. SCALE: 1 IN = 10 FT N
X
CABLE FENCE
0 10 10 20FT
SCALE: 1''= 10'
0 30 30 60FT
SCALE: 1''= 30'
TOP SOIL (LANDSCAPE)
CONTROL LINE
LAYOUT LINE (LL )
PI(1)
PI(2 )
PI(3 )
POB
POE
B A
N K S
T A .1
L A
Y O
U T L
IN
E S
T A
B A
N K S
T A .2
L A
Y O
U T L
IN
E S
T A .2
AS SHOWN
R E
S T S
T O
P
C-21
LAYOUT LINE (LL) CURVE DATA
POB PI(1 ) PI(2 ) POEP.I. NO.
NORTHING
EASTING
B.C. STA.
E.C. STA.
R=
T=
L=
623,282.95
1,552,951.66
623,412.29
1,553,535.87
623,292.96
1,553,105.61
10°59'34.49"
1,520'
146.26'
291.63'
1+08.00
3+99.64
5+05.46
6+65.41
6+69.31
6+77.09
623,377.29
1,553,426.80
3°03'17.60"
3,000'
80.00'
159.95'
623,404.08
1,553,510.40
0°05'20.85"
5,000'
3.89'
7.78'
PI(3 )
K
L
N K S
T A .1
L A
Y O
U T L
IN
E S
T A
B A
N K S
T A .2
L
A Y
O U
T L
IN
E S
T A .2
2%
RIPRAP
DG TRAIL
STONE
GROUTED
S E
E P
R O
F
IL
E V
A R
IE
S
BIKEWAYDG
SCALE: 1 IN = 30 FT
M
INSTALL LANDSCAPING PER SHEET L-18
D
L D
J U
N.T.S.
2%
DG TRAIL
S E
E P
R O
F
IL
E V
A R
IE
S
BIKEWAYDG
GROUTED STONE
SEE SHEET M-07
EXISTING FEATURE
SEE NOTE 1
ALONG LAYOUT LINE
CABLE FENCE
REFERENCE NOTES:
NOTES:
1.FOR EXISTING FEATURES, SEE SHEET M-07.
1.
9' 8'
N.T.S.
CONCRETE MOWSTRIP CURB
6"
SEE PROFILE FOR ELEVATION
TOP OF SLOPE,
SEE PROFILE FOR ELEVATION
TOP OF SLOPE,
C C
PER SHEET L-18
INSTALL LANDSCAPING
LANDSCAPE
CURB
MOWSTRIP
CONCRETE
DG TRAIL
2.
STATIONS LL 2+05 AND LL 5+60.
INSTALL CABLE FENCE ALONG LAYOUT LINE BETWEEN
CENTER OF MOWSTRIP
#4 REBAR CONTINOUS,
3.
4.
EXPOSED EDGES
0.5" RADIUS ON
5.
FOR USE AS IRRIGATION POINT OF CONNECTION.
WATERLINE REACHES REST STOP LANDSCAPE SLOPE
LARGER THAN THE EXISTING WATERLINE. ENSURE
BURY MINIMUM 36”AND PROTECT IN SLEEVE 1"
PLACE. IF LOCATED UNDER THE BIKEWAY OR TRAIL,
CONTRACTOR TO LOCATE WATERLINE AND PROTECT IN
LOCATION OF EXISTING 3" WATERLINE IS UNCERTAIN.
LANDSCAPED SLOPE AREAS.
TOP OF MOWSTRIP CURB FLUSH TO DG AND 2" ABOVE
CURB AT 10' MAXIMUM SPACING AND AT ANGLE POINTS.
CONSTRUCT WEAKENED PLANE JOINTS ON MOWSTRIP
COMPACTED FILL OR COMPACTED NATIVE GRADE.
PLACE CONCRETE FOR MOWSTRIP CURB ON
STA. 1317+00 TO STA. 1318+75, AND STA. 1320+50 TO STA. 1322+00
TYP. SECTION AT REST STOP
REST STOP - STA. 1318+75 TO STA. 1320+50
TYP. SECTION
A M
IS
C
R E
V
IS
IO
N S
A M
T
/1
/1
E .K
R E
V
A
6.A
BLOCK RETAINING WALL
SEGMENTAL CONCRETE
A
(P.I.P.)
MANHOLE
EXISTING
(P.I.P.)
16-IN SEWER LINE
EXISTING
(PIP)
GAS LINE
EXIST. 8-IN
LINE
ALONG CONTROL
CABLE FENCE
SEE DETAIL
CURB,
MOWSTRIP
CONCRETE
SEE DETAIL
CURB,
MOWSTRIP
CONCRETE
WATERLINE, SEE NOTE 2
OF 3-IN PRESSURIZED
APPROX. LOCATION
A
CAPSTONE
FROM VERTICAL
WALL BATTER
RETAINED SOIL
DEPTH
EMBEDMENT
12" ß
GRADE
FINISHED
LESS THAN 10% FINES
WALL ROCK 0.25" TO 1.5"
WELL GRADED GRANULAR
WALL ROCK
TOPSOIL AND
BETWEEN
TO BE PLACED
FILTER FABRIC
BLOCK WALL PLAN VIEW
MIN.
12"4' 4'
MIN.
12"
2'
MIN.
12"
C
C
DIFFERENT WING WALL CONFIGURATIONS ARE ALLOWED.
WALL ALIGNMENT IS CONCEPTUAL. DESIGN SUBMITTALS SHOWING
N.T.S.
A
GRADE OF SLOPE.
MIN. 6" BETWEEN TOP OF CAPSTONE AND FINISHED
BLOCK AND EDGE OF REST STOP CONC. PAD. PROVIDE
FOR BLOCK WALL: PROVIDE MIN. 12" BETWEEN FACE OF
DIMENSION)
PAD, (FIELD VERIFY
EXIST. 4'X8' CONC.
*THE PURPOSE OF THIS SKETCH IS FOR PRELIMINARY DESIGN ONLY
SEGMENTAL CONCRETE BLOCK RETAINING WALL *
N.T.S.
VENTED TO DAYLIGHT
4" TOE DRAIN PIPE
BLOCK WALL
HEIGHT
WALL
EXPOSED
2'-8"
UNITS (LAU)
LONG ANCHORING
CONC. UNIT WITH
UNITS (SAU)
SHORT ANCHORING
CONC. UNIT WITH
MANHOLE_WATERW
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
GROUTED STONE
BIKEWAY
DG TRAIL
LEGEND:
RIPRAP
CONCRETE
MAINTENANCE ROADFLOW
N
AS SHOWN
C-22
SCALE 1 IN = 30 FT
PLAN
.5
H :1
V
SIDE DRAIN
JOIN TO EXISTING
SAW CUT AND
SIDE DRAIN
S T
A .9
TCE
REMOVE EXISTING FENCE
TCE
ACCESS
PROJECT
N.T.S.
A
A
P L
A N D
E T
A
IL
A
T B
R
ID
G E
TOE ROAD
AT EXISTING DRIVEWAY
PROJECT ACCESS
EXISTING CONCRETE MEDIAN
X
0 30 30 60FT
SCALE: 1''= 30'
N.T.S.
16'
CONCRETE
REINFORCED
DETAIL "C"
SEE DETAIL "C" HEREON
CONCRETE RAMP,
S T
A .3
STA. 1348+81.28 TO STA. 1352+39.40
SECTION A-A
S T
A .2
S T
A .5
G
J .U
L
D
L
D
EL. 372.56
EL. 368.56
E 1,556,250.55
N 624,121.26 E 1,556,287.72
N 624,136.06
EL. 375.75
EL. 371.74
DRIVABLE SURFACE
WITH SMOOTH
RIVER ACCESS
CONSTRUCT
CONSTRUCTION NOTES:
SEE SHEET M-07
EXISTING FEATURE
SUBGRADE
COMPACTED
(P.I.P.)
CHAIN LINK FENCE
EXISTING
FENCE
CHAIN LINK
INSTALL
DOUBLE GATE
INSTALL
CHAIN LINK FENCE
INSTALL
(P.I.P.)
CHAIN LINK FENCE
EXISTING
#6 @ 12" CENTERED
-I
N
-I
N
-I
N
ABC
B E
G
IN
C
H A
IN
L
IN
K F
E N
C E
E N
D C
A B
L E F
E N
C E
S T
A
FENCE
CABLE
INSTALL
F E
N C
E
E N
D C
H A
IN
L
IN
K
S T
A
C O
N C
R E T E R
A M
P
J O
IN
B
IK
E W
A Y
O
A .2
F E
N C
E
B E
G
IN
C
H A
IN
L
IN
K S
T A
B E
G
IN
C
A B
L E F
E N
C E
E N
D C
H A
IN
L
IN
K F
E N
C E
S T
A
SEE NOTE 2
SEE NOTE 2
BRIDGE
GYPSUM CANYON
#5 @ 12"
1.
2.
PRIOR TO INSTALLATION.
(714-961-7170) TO SCHEDULE A SITE INSPECTION
SHALL CONTACT THE CITY OF YORBA LINDA
CALTRANS STANDARD SPECIFICATIONS. CONTRACTOR
LATEST EDITION OF THE CALIFORNIA MUTCD AND
ACTUAL CLEARANCE. SIGNS SHALL CONFORM TO THE
CONTRACTOR TO THE NEAREST INCH NOT EXCEEDING THE
UNDERCROSSING CLEARANCES SHALL BE MEASURED BY THE
SIDES OF THE UNDERCROSSING. THE FINAL
CENTERED OVER THE TRAVELED WAY ON THE APPROACH
SUPERSTRUCTURE. THE W12-2A PLAQUE SHOULD BE
PLAQUE ON SIDES OF THE GYPSUM CANYON BRIDGE
CONTRACTOR SHALL MOUNT LOW CLEARANCE W12-2A
1352+39.40.
NO CONCRETE CURB FROM STA. 1348+81.28 TO STA.
IN
S
T A
L L D
O U
B L E G
A T E
B E
G
IN
M
A
IN
T E
N A
N C
E R
O A
D
E N
D C
O N
C R
E T E R
A M
P
S T
A
.8
A /1
/1
E .K
R E
V
A
14 CONSTRUCT CONCRETE CRADLE.
AC TRAIL
EXISTING
10" CONCRETE
6" ABC
#5 @ 12"
C L
R4
C L
R
.5
(TYP)
CLR
3"
(TYP)
CLR
3"
24"
TYP
14"
TYP
(TYP)
"2
13'-7
72" RCP
AC
EXISTING
MATCH
2.
A D
D E
D C
O N
C
C R
A D
L E
A M
T
B B
A
N.T.S.
CONCRETE CRADLE
SECTION B-B
H S
E E N
O T
E
L
H S
E E N
O T
E
TYP
C.J. TYPE "J"
H = 5'-6" AT ROADSIDE
H = 5'-4" AT RIVERSIDE
H = 5'-9" AT ROADSIDE
H = 5'-7" AT RIVERSIDE
HEIGHT OF CRADLE VARIES.
L
L
R
R
A
A
A
(TYP)
SUBGRADE
COMPACTED
#5@12"
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
U .d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
0+20
390390
390390
0+40 0+60 0+80 1+00 1+20 1+40 1+60 1+80 2+00
E L E
V A
T
IO
N
E L E
V A
T
IO
N d o n e b y
USA
CE.
b y Jo h n so n a n d fran k as wel l as in house surveys for a c c ura c y an d d o match up with surveys d o n e -Some perm anent fe a tures have be e n re-surveyed o u tcro p p in g etc.).
an d to p o g ra phy (i.e.
roads, bui l din g s, rock field verifica tio n of co n trol network for new dataset, Usin established proje c t co trol, per f orm .pad. Al l ma tched u p to wi t hin a 0.1 sFT.
-Verified m an h o les, to p o g rap h ic area, an d co n crete chan g es/co n v ersio s data must be field verified.
If dr a win g or surfa c e req u ires .-have be en fol l owed Verif y that CA
D Standards were fol owed.
.-it is.
Microstat i n.
Veri y that the drawin g is spat i ally cor r e c t in .-U.S.
Sur vey fe e t
Wha t Workin g Units are used?
.VI (4
US Fo o t -set cor r e c t l y: N A
D California State Planes, Zo e Ch e ck Geo g rap h ic Coordinate System .-listed i n n o tes an shown.
sure the co n v ersio n statement is l sted.
local his toric datums to N
A D an d N
A V
D make I there is a datum conversio f r om .3
.5
.8
.14
OCS 1L-
-89
3.6
73.5
.4
.0
.8
.3
OCS 1L
-8
.4
.5
.6
.5
.4
.7
6 VERIF
IED LOCAL CO
N
TROL:
.5
.7
.3
PBA-
.3
.5
PBA-
E
L E
V
ATIO
N
EASTIN
G N
O
RTHIN
G
IDPRIM
A
RY CO
N
TROL: N
A D
N
G V
D
-is p p ro p riate:
surv e y data an d if i t is ap p ro p riate.
Determine what co trol was used for the .-ye s req u irement.Ident i fy stated a c c ura c y, es i t match
9.-N/ A pro c ed u res.Che c k for Proje c t Rep rt.
Lo k for Q A
/QC
8.-N /A co m pletenes s .Che c k del i verable pa c kage for 7.-F ield to p o an d p h o to g ram m etry or t h o p h o to g rap h planimetric, int fi e, dtm, etc.
h oto g ram m etry, b u n ary, co trol, ty pe….
bath metry, field to
LiD
R, Ident fy data col l e c t i o n meth o d an
Compat i ble.
p o ints fi l e he der, etc.
li s ted an d labeled o n the drawin disc, in Che k to make sure that al l metadata is
N/A
O btain Data Management Plan (DMP).
N/A p ertain to the data or the proje c t.other pert i nent d cuments.
These d cuments may Obtain Sco e of Work (SOW), Plans, Spe s, or 3.for Re c h 9 Phase 5 b .-For Olufu n k e A.
Ojuri to cre te plans an d spe c s Ident i fy inten d ed use.2.Jan u ary to March 2
.USACE in h o u se RTK GP S No v ember 2
& Jo h n so n an d Fran k Ph o to g ram m etry 2
.1.Ident i fy data so u rc e
/originat i o n
L S A
R REACH 9 PH
A
SE 4&5 MERG
AS SHOWN
PLAN
1 IN. = 10 FT.
N
010 10 20
SCALE: 1" = 10'
CONSTRUCTION NOTES:
HEADWALL, WINGWALLS, AND APRON.
DEMOLISH AND DISPOSE OF EXIST. CONCRETE OUTLET STRUCTURE INCLUDING
AND ON SHEETS S-2 THRU. S-4.
WINGWALLS AND APRON PER PLAN, ELEVATION AND DETAILS ON THIS SHEET
CONSTRUCT NEW RCP CULVERT OUTLET STRUCTURE INCLUDING HEADWALL,
CULVERT EXTENDED SEGMENT AND THE OUTLET STRUCTURE.
STRUCTURAL EXCAVATION AND COMPACTION ARE REQUIRED FOR THE RCP
POINTS, SUCH THAT CONTROL LINE WILL BE ALIGNED WITH FLOWLINE OF THE RCP.
SHALL FIELD VERIFY TO LOCATE EXACT LOCATION FOR HORIZONTAL CONTROL
ARE NOT GUARANTEED EXACT LOCATIONS OF P.O.B AND P.O.E. THE CONTRACTOR
CONTROL POINTS PROVIDED ON THE PLAN ARE BEST APPROXIMATED AND
THE RCP FLOW LINE UTILIZING THE BEST INFO AVAILABLE. HORIZONTAL
THE RCP CULVERT CONTROL LINE WAS ALIGNED ALONG THE CENTERLINE OF
N.T.S.
DAYLIGHT
EXCAVATION
S T
A
.6
D E
T A
IL
S A
T B
A N
K S
T A .6
-I
N C
H C
U L
V E
R T E
X T
E N
S
IO
N P
L A
N
P R
O F
IL
E A
N D
COLLAR
CONCRETE
GATE
FLAP
CONTROL LINE
CULVERT
GROUND
EXISTING
SHEET S-02
ON THIS SHEET AND ON SHEETS S-02 THRU. S-03 AND CONCRETE COLLAR PER
CONSTRUCT RCP CULVERT EXTENDED SEGMENT PER PLAN, PROFILE AND DETAILS
(P.I.P.)
EXIST. RCP
BANK PROTECTION
EXCAVATION DAYLIGHT
BANK IMPROVEMENT
GROUTED STONE
TOE OF 24-IN.
(BANK PROTECTION)
CONTROL LINE
S T
A
.1
C
U T P
IP
E
S T
A
.6
I.
D
S=0.0065
GROUND SURFACE
APPROX. EXISTING
PROTECTION
RIPRAP SLOPE
TOP OF 24-IN.
S=0.02
S=0.02
A
B
TCE LIMITS
69.3' TO
S T
A
.2
S-1 FOR FLAP GATE
SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. SEE SHEET
EXISTING FLAP GATE SHALL BE REMOVED AND DISPOSED OF. NEW FLAP GATE
S T
A
.6
S=0.02
1 3
S T
A
.6
15'
SECTION A-A
N.T.S.
7.5' 7.5'
6'
T
H
IC
K A
T E
D G
E
OUTLET STRUCTURE
CONCRETE
R
K w a n
SD-10
OUTLET STRUCTURE DETAIL "A"
PLAN/PROFILE
SEE FINAL GRADING
GRADE TO DRAIN.
N
E. 1,556,000
E. 1,556,000
F L
O W
N ,1
HORIZONTAL SCALE: 1 IN. = 10 FT.
VERTICAL SCALE: 1 IN. = 10 FT.
CONTROL LINE PROFILE
CONCRETE SLAB CROSS SLOPE.
V-SHAPED CONCRTE OUTLET STRUCTURAL CROSS SLOPE SHALL MATCH V-SHAPED
20'
RCP EXTENSION
8.5'
D .P h a m
B
V-SHAPED SLAB
CONCRETE
1.5
2'
S 4°40'34.90"E
1.5H:1V
2H:1V
E 1,555,978.39 N 624,220.00
CULVERT P.O.B.
CONTROL LINE
RCP CULVERT
EL. 368.53
EL. 370.00
E 1,555,995.46 N 624,011.26
CULVERT P.O.B.
EL. 368.13
OVER 6 IN. BEDDING MATERIAL
24 IN. GROUTED STONE
RCP
72-IN.
S=.0065
EL. 370.06
15'
DRAIN
V-SHAPED SLAB AND VERTICAL
OUTLET STRUCTURE, CONCRETE
AND DETAIL "A" ON THIS SHEET FOR
SEE STRUCTURAL SHEETS S-01, S-02
TOE ROAD SURFACE
MATCH TOP OF FINISHED
ROAD SURFACE
TOP OF FINISHED TOE
V-SHAPED SLAB
CONCRETE
15' TOE ROAD
DRAIN
VERTICAL
10' WIDE
D P h a m
J In th ir a th
EXCAVATION
BACKFILL
COMPACTED
OVER 6 IN. BEDDING MATERIAL
24 IN. GROUTED STONE
.5
.5
A
10'
RIPRAP
SLURRY MIX
7' WIDE
8"
OF ABC
6" THICK LAYER
MATERIAL
COMPACTED SUBGRADE
18" THICK LAYER OF
STA. 1348+36.64
PROTECTION
BANK
STA. 0+46.13
WING WALL
CULVERT HEADWALL/
FENCING ON RCP
SEE SHEET M-03 FOR
CABLE FENCE
EXCAVATION
BANK PROTECTION
BOTTOM OF
(P.I.P.)
EXIST. 72" RCP
A
A E .K
R E
V
A
/1
/1
MIX
SLURRY
OF SLURRY MIX
PRIOR TO PLACEMENT
FORM THESE EDGES
BEDDING LAYER
PROTECTION OVER
RIPRAP SLOPE
1'
N.T.S.
SECTION B-B
MIN. TRENCH WIDTH
1.5 X PIPE O.D.
SAND BEDDING
A
M
IS
C
R E
V
IS
IO
N S
A M
T
120°
PIPE
BELOW
BEDDING
6" SAND
(SHEET C-22)
CONCRETE CRADLE
E .K
/1
/1
(A M
T
A D
D E
D C
O N
C R
E T
E C
R A
D
V
IS
E D R
O A
D P
R O
F
IL
E
B
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
L S
A R
R P
H
B C
M .d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
AS SHOWN
J .S
J .S
J .U
M-07
SIGNS MONITORING WELL IN RIVER
ROAD MARKER
PROTECT IN PLACE
PROTECT IN PLACEREMOVE AND REPLACE
CONCRETE WALKWAY AND FENCE
SARI MONITORING WELL
SIGN
REMOVE AND REPLACE
LANDSCAPE BOULDERS (8 TOTAL)
SALVAGE AND REINSTALL
IRRIGATION CONTROLLER, WIRING, & ENCLOSURE
WELL
DESTRUCTION AS SPECIFIED
DESTRUCTION AS SPECIFIED DESTRUCTION AS SPECIFIED
DESTRUCTION AS SPECIFIED
WELL
REPAINT AT STA 1309+37
A
A
R E
V
B
E .K
R E
V
N O
T E
A M
T
REMOVE
/1
/1
AND INTERFERING CONNECTING PIPE
UNDER BRIDGE DRAINAGE GRATE
E .K
R E
V
N O
T E
A M
T
/1
/1
B
B
PROTECT IN PLACE
REST STOP AND SITE FURNISHINGS
REMOVE. REPLACE PER SHEET C-21
SEGMENTAL CONCRETE BLOCK RETAINING WALL
M
IS
C E
L L
A N
E O
U S E
X
IS
T
IN
G F
E A
T U
R E
S
C J
E
F
H
D
M
KA
B L
G
AS SHOWN
10. PROVIDE PLANT ESTABLISHMENT AND MAINTENANCE PER SPECIFICATIONS.
9. INSTALL 4-INCH LAYER OF MULCH OVER THE ENTIRE REST STOP LANDSCAPING AREA.
8. INSTALL JUTE NETTING AND FIBER ROLL ON SLOPES GREATER THAN 4:1.
7. INSTALL PLANTS AND TREE STAKING PER DETAILS B AND C ON SHEET L-19.
THE TYPES OF PLANTS.
6. MARK LOCATIONS OF PLANT MATERIAL WITH COLORED FLAGS TO DIFFERENTIATE
5. OBTAIN APPROVAL OF PLANT LOCATIONS PRIOR TO INSTALLATION OF BUBBLERS.
REUSE OF EXISTING LEIT CONTROLLER.
AVAILABLE WATER PRESSURE OF EXISTING IRRIGATION MAINLINE, AND OF POSSIBLE
AND PER IRRIGATION DETAILS SHOWN ON SHT. L-19. VERIFY LOCATION AND
4. DESIGN AND INSTALL AN AUTOMATIC BUBBLER IRRIGATION SYSTEM WITH BURIED LINES
HEIGHT IS MEASURED FROM FINISHED GRADE TO TOP OF BOULDER AFTER INSTALLATION.
BOULDERS ARE AS FOLLOWS: SIZE A = 3'L x 2'W x 18"H, SIZE B = 4'L x 3'W x 2'H.
LANDSCAPE ARCHITECT AND PER DETAIL A, SHT L-20. MININUM SIZES FOR NEW
3. INSTALL 8 SALVAGED AND 8 NEW BOULDERS IN LOCATIONS DIRECTED BY THE CORPS
2. PLACE AND PREPARE TOPSOIL PER SPECIFICATIONS.
WHICH CROSSES UNDER THE AC BIKEWAY TO REACH THE REST STOP SLOPE.
1. LOCATE AND PROTECT IN PLACE EXISTING 3" IRRIGATION MAINLINE (P.O.C.) IN PVC SLEEVE, REST STOP LANDSCAPING AND IRRIGATION NOTES:
9. PROVIDE PLANT ESTABLISHMENT AND MAINTENANCE PER SPECIFICATIONS.
8. INSTALL 4-INCH LAYER OF LARGE MULCH OVER THE ENTIRE REST STOP LANDSCAPING AREA.
7. INSTALL JUTE NETTING ON SLOPES GREATER THAN 4:1.
TYPES OF PLANTS.
6. MARK LOCATIONS OF PLANT MATERIAL WITH COLORED FLAGS TO DIFFERENTIATE
5. PRIOR TO INSTALLATION OF BUBBLERS, PLANT LOCATIONS MUST BE APPROVED.
4. DESIGN AND INSTALL AN AUTOMATIC BUBBLER IRRIGATION SYSTEM.
WATER METER AND BACKFLOW PREVENTOR.
CONNECTION AND OF POSSIBLE REUSE OF EXISTING LEIT CONTROLLER. IF REQUIRED INSTALL
3. VERIFY LOCATION AND AVAILABLE WATER PRESSURE OF EXISTING IRRIGATION POINT OF
LANDSCAPE ARCHITECT AND PER DETAIL A, SHT L-19.
2. INSTALL 8 SALVAGED AND 8 NEW BOULDERS IN LOCATIONS DIRECTED BY THE CORPS
1. PREPARE AND PLACE TOPSOIL PER SPECIFICATIONS.
REST STOP LANDSCAPING AND IRRIGATION NOTES:
B
B
B
BB
B
N 622,000 done by USACE. by Johnson and frank as well as in house surveys for accuracy and do match up with surveys done -Some permanent features have been re-surveyed outcropping, etc.).and topography (i.e. roads, buildings, rock field verification of control network for new dataset, Using established project contro l, perform 17.pad. All matched up to within a 0.1 sFT.-Verified manholes, topographic area, and concrete changes/conversions data must be field verified. If drawing or surface requires 16.-have been followedVerify that CAD Standards w ere followed. 15.-it is. Microstation. Verify that the drawing is spatially correct in 14.-U.S. Survey feetWhat Working Units are used?13.VI (406), US Foot-set correctly: NAD27 Californ ia State Planes, Zone Check Geographic Coord inate System12.-listed in notes and shown. sure the conversion statement is listed.
local/historic datums to NAD83 and NAVD88, make If there is a datum c onv ersion from 11.354.57 1548529.84627337.14OCS 1L-90-89353.63 155067 3.50625982.482013
4.071555956.89624200.32OCS 1L-93-89355.49 1549291.52626823.6320132038
9.54 1559054.48624457.792013 16 VERIFIED LOCAL CON TROL:528.539 1584476.78630847.357PBA-014530.501 1581061.3646
29570.503PBA-012ELEVATION EASTINGNO
RTHINGIDPRIMARY CONTROL: NAD 27 NGVD 29 -is appropriate: survey data and if it is appropriate.. Determ ine what control was used for the 10.-yesrequirement.Identify stated accuracy, does it match 9.-N/Aprocedures.Check for Project Report. Look for QA/QC 8.-N/Acompleteness.Check deliverable package for7.-Field top o and pho togrammetryorthophotography, planimetric, point file, dtm, etc.pho togrammetry, bound ary, control, type…..bathymetry, field topo, LiDAR, Id entify data collection method and 6.-Compatible.points file header, etc.listed and labeled on the drawing, on disc, in Check to make sure that all metadata is 5.-N/AObtain Data Management Plan (DMP).4.-N/Apertain to the data or the project.other pertinent documents. These documents may Obtain Scope of Work (SOW), Plans, Specs, or 3.for Reach 9 Phase 5b.- For Olufunk e A. Ojuri to create plans and specs Identify intended use.2.January to March 2016 .USACE in hou se RTK GPS November 201 5 & John son and Frank Photogrammetry 2013.1.Identify data source/origination.LSAR REACH 9 PHASE 4&5 MERG
L L
L L
L L
L L
L L
L L
L L
PLAN
N
B A
N K S
T A .2
L
A Y
O U
T L
IN
E S
T A .2
UPLAND VEGETATION PLANTINGS:
4 15 GAL. ARBUTUS 'MARINA' MARINA STRAWBERRY TREE LOW-BRANCHING FORM
5 15 GAL. PLATANUS RACEMOSA CALIFORNIA SYCAMORE
QTY SIZE BOTANICAL NAME COMMON NAME NOTES
(P.I.P.)
SEWER LINE
EXISTING
B B
020 20 40FT
SCALE: 1"=20'
L A
N D
S C
A P
IN
G R
E S
T S
T O
P
S L
W
D O
W
S L
W
SHEET C-21.
CONNECTION, SEE
IRRIGATION POINT OF
APPROX. LOCATION OF
AND LANDSCAPING, SEE NOTES
INSTALL IRRIGATION SYSTEM
SITE FURNISHINGS
P.I.P. REST STOP AND
SAFETY PAYS
VALUE ENGINEERING PAYS
D E
S
IG
N E
D B
Y
D R
A W
N B
Y
A P
P R
O V
A L
D A
T E
S Y
M B
O L
D E
S C
R
IP
T
IO
N S
R E
V
IS
IO
N S
D
IS
T R
IC
T F
IL
E N
O
S U
B M
IT
T E
D B
Y
A C
T
IN
G C
H
IE
F
D E
S
IG
N B
R A
N C
H
12345678
A
B
C
D
12345678
A
B
C
D
8/19/2016
SHEET
Plot Date:
C O
R P
S O
F E
N G
IN
E E
R S
L O
S A
N G
E L E
S
U .S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
C H
E C
K E
D B
Y
SCALE:
S P
E C
N O
W P
L -1
-B -0
B n b p L -L
P L -1
.d g n
F
IL
E N
A M
E
O R
A N
G E C
O U
N T
Y
C A
L
IF
O R
N
IA
A P
P R
O X M
IL
E E
A S
T O
F G
Y P
S U
M C
A N
Y O
N R
O A
D B
R
ID
G E
(A P
P R
O X /4 M
IL
E E
A S
T O
F V
IA
L
O M
A S D
E Y
O R
B A W T
O
L O
W E
R S
A N
T A A
N A R
IV
E R C
H A
N N
E L R
E A
C H P
H A
S E
B
S A
N T
A A
N A R
IV
E R M
A
IN
S T
E M
C H
U C
K M
E S
A P .E
L-18
SCALE: 1 IN = 30 FT
LANDSCAPE BOULDERS (8) SALVAGED, (4) NEW SIZE A, (4) NEW SIZE B
'JOHN DOURLEY'
JOHN DOURLEY MANZANITAARCTOSTPHYLOS 5 GAL.12
'TWIN PEAKS #2'GAL
PROSTRATE COYOTE BUSHBACCHARIS PILULARIS 1 DEEP 31
'PIGEON POINT'
DWARF COYOTE BUSHBACCHARIS PILULARIS 3 GAL 9
LAUREL SUMACMALOSMA LAURINA 5 GAL 5
CALIFORNIA SYCAMORE PLATANUS RACEMOSA15 GAL 5
LOW BRANCHING FORMMARINA STRAWBERRY TREEARBUTUS 'MARINA'15 GAL 4
NOTESCOMMON NAME BOTANICAL NAME SIZE QTY
357.5
357.6
P.I.P.
DG TRAIL
359.2
DIRT 369.1
H :1
V
374.9
380 380
SEE NOTES.
CONTROLLER,
IRRIGATION
EXIST.
FLOW
E .K
A
R E
V
A
A
/1
/1
R
E V
IS
E D N
O T
E
A M
T .0
LSARR9PH5BCU103.dgn 8/18/2016 4:21:32 PM
LSARR9PH5BCU104.dgn 8/18/2016 4:22:17 PM
| LSARR9PH5BG002 |
| Saved Views |
| sheet |
| id |
| References |
| .. |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| LSARR9PH5BG004 |
| Saved Views |
| SHEET |
| References |
| sht1, .. |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| LSARR9PH5BC104 |
| Saved Views |
| DDR |
| Sheet |
| References |
| prof_4, .. |
| 00-Ref |
| Project.dgn |
| bord_4, BDRSHT3D-Eng.dgn |
| 1 G R B D, .. |
| 00-Ref |
| Legend.dgn |
| LSARR9PH5BC109 |
| Saved Views |
| DDR |
| Sheet |
| References |
| prof_9, .. |
| 00-Ref |
| Project.dgn |
| bord_9, BDRSHT3D-Eng.dgn |
| 2 G R B D C, Legend.dgn |
| LSARR9PH5BC110 |
| Saved Views |
| DDR |
| Sheet |
| References |
| prof_10, .. |
| 00-Ref |
| Project.dgn |
| bord_10, BDRSHT3D-Eng.dgn |
| 4 G R M C, .. |
| 00-Ref |
| Legend.dgn |
| LSARR9PH5BC502 |
| Saved Views |
| sheet |
| References |
| sht1, .. |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| typ sec, .. |
| 00-Ref |
| Cross-Sections.dgn |
| LSARR9PH5BC506 |
| Saved Views |
| DDR |
| Sheet |
| References |
| PLAN, .. |
| 00-Ref |
| Project.dgn |
| 1 G R B D, .. |
| 00-Ref |
| Legend.dgn |
| LAY OUT LINE, .. |
| 00-Ref |
| Turnout-Profile.dgn |
BORDER, BDRSHT3D-Eng.dgn
| LSARR9PH5BC507 |
| Saved Views |
| DDR |
| Sheet |
| References |
| BLOW UP 3 times, .. |
| 00-Ref |
| Project.dgn |
| bord_9, BDRSHT3D-Eng.dgn |
| Cradle (S-02).dgn, Default |
| # G R B D M C, .. |
| 00-Ref |
| Legend.dgn |
| LSARR9PH5BCU510 |
| References |
| Ref, .. |
| .. |
| .. |
| .. |
| .. |
| CADD |
| Sheets |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| Section A-A-1, .. |
| .. |
| .. |
| .. |
| .. |
| CADD |
| Models |
| 05_Civil |
| SD-10.dgn |
| LSARR9PH5BCU501.dgn |
| Ref-2, .. |
| .. |
| .. |
| .. |
| .. |
| CADD |
| Sheets |
| 00-Ref |
| 01 BankProtection - Plan.dgn |
| LSARR9PH5BCM507 |
| References |
| .. |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| 5BnbpL-LP_L-18 |
| References |
| 5BnbpL-LP_L-18.dgn, Default |
| LSARR9PH5BG010.pdf |
| LSARR9PH5BG010 |
| Saved Views |
| sheet |
| References |
| 7 G R B D M C, .. |
| 00-Ref |
| Legend.dgn |
| .. |
| 00-Ref |
| BDRSHT3D-Eng.dgn |
| 01 LSAR R9 Ph5B BankAlignment.dgn |
| 01 LSAR R9 Ph5B RE Easement Request.dgn |
| 01 Reach_9-ROW.dgn |
| 01 BankProtection - Plan.dgn |
| .. |
| .. |
| reference files |
| Reach_9-Phase 5B ALL PhotoIndex-1.dgn |
| BlowUpSta.1350+00, |
| spl-netapp1 |
| fileserver |
| CADD |
| California |
| SAR |
| Reach9 |
| Phase_5B |
| CADD |
| Sheets |
| 00-Ref |
| ProjectAccess.dgn |
File details come from the government source that posted it. Updated .